Ibr Forms
Ibr Forms
Form II-A
31
32
Form II-B
30
Form III
33-42
Form III-A
43-44
45-46
Form III-B
47-48
49-50
Form III-C
51
Form III-D
52
Form III-E
53
Form III-F
54
Form IV
55
Form IV-A
56
Form V
57
Form VI
58-59
Form VII
60
Form VIII
Form IX
61-62
63-72
Form X
73
Form XI
74-75
Form XII
76-78
Form XIII
79-81
Form XIV
82-95
Form XV-A
96
Form XB-B
97
Form XV-C
98
Form XV-D
99
Form XV-E
100
Form XV-F
101
Form XV-G
102
103
104
105
106
107
108
109
110
Form XVI-I
111
Form XVII
112-113
Form XVII
FORM I
(Regulation 386 and 487)
National emblem
___________________________________________________________
Memorandum of Inspection
OR
Registration Book
MISCELLANEOUS
District: .
Owner: ..
Address of Factory: ..
____________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________
Nearest Railway Station
Factory is miles by . from station
Work or Factory: ..
Working season: : ..
____________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________
BOILER registered at : on
REGISTER BOOK No PAGE .
REGISTRY NUMBER . verified on: .
APPROVED WORKING PRESSURE: ...
BOILER RATING: .. INSPECTION FEE:
REGISTRATION BOOK filed at . on
____________________________________________________________________________________________________________________
Remarks on transfers, etc.: ______________________________________________________________________________________________
____________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________
___________________________________________________________________________________________________________________
Date
payment
of Date
of Certificate No. Period
Inspection
and date
Certificate
of Working
pressure
Boiler Rating
Evaporation
Initials of
Inspector
{
{Process
received
Plates
{Plates . received
{Bars: . received
{Rivets: received .
TEST RESULTS
{Shell .T to ... tons E to % in ...in.
{Gusset Stays .T to ... tons E to % in ...in.
{Girders .T to ... tons E to % in ...in.
{End and side .T to ... tons E to % in ...in.
{Fire & Flanged .T to ... tons E to % in ...in.
{...T to ... tons E to % in ...in.
{...T to ... tons E to % in ...in.
{Bars ...T to ... tons E to % in ...in.
{
{Screw .T to ... tons E to % in ...in.
{Bars ...T to ... tons E to % in ...in.
Rivet {
{Manufactured ....T to ... tons E to % in ...in.
{Plates .T to ... tons E to % in ...in.
Bends {
{Bars ...T to ... tons E to % in ...in.
Branding
{Plates .T to ... tons E to % in ...in.
Analysis
Phosphorus
Sulphur
Names of parts
Number and material of each..
Length between end plates.
Length between end plates seam
Diameter inside largest belt
Thickness of Plates.
Number of belts of plating..
First or top belt, inside or outside
(a)
Shell or Fire-box
Casing Crown
__________________________
__________________________
__________________________
__________________________
__________________________
__________________________
__________________________
__________________________
(b)
Barrel or Mud Drum
_______________________
_______________________
_______________________
_______________________
_______________________
_______________________
_______________________
_______________________
(c)
Steam & Water Drum or
Dome
_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
____________________
Longitudinal seams
Position (oclock)...
Kind. L., S.B., D.B., W...
Riveting, S., D., T., C., Z., H., M
No. of rivets per pitch.
Pitch of rivets..
Diar. of holes, outer rows...
Diar. of holes, inner rows...
Distance between rows, outer.
Distance between rows, inner.
Distance rivet centre to edge
Outer butt strap, width x thickness..
Inner butt strap, width x thickness..
__________________________
__________________________
__________________________
__________________________
__________________________
__________________________
__________________________
__________________________
__________________________
__________________________
__________________________
_________________________
_______________________
_______________________
_______________________
_______________________
_______________________
_______________________
_______________________
_______________________
_______________________
_______________________
_______________________
_______________________
_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
Circumferential seams
No. of seams (end and inner)..
Kind L., S.B., D.B., W.F. & B..
Riveting S., D.T., C.Z., H., M
No. of rivets per pitch.
Pitch of rivets..
Diar. of holes..
__________________________
__________________________
__________________________
__________________________
__________________________
__________________________
_______________________
_______________________
_______________________
_______________________
_______________________
_______________________
_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
__________________________
_
_______________________
_________________
____
Plates
RECTANGULAR FIREBOX, COMBUSTION CHAMBER, GIRDERS SMOKE OR WATER TUBES AND SCREW STAYS
Parts and material hereunder, ____________________________________________________________________________________________
{Length inside, bottom .. top .Width inside, bottom, .. top
{Height, foundation., seam or chamber Bottom to roof .. Radius of curve, chamber bottom, roof side, .
{Roof, flat, curved, cambered, corrugated, stayed to shell or girders, type, .
Firebox
{Plate thickness, firehole or chamber back, sides, .. roof, ..
of
{Plate thickness, bottom .. tube plate, F .. B., . roof and sides in one, .
Combustion {Attachment to firebox casing at bottom,
Chamber
{Attachment to firebox casing at firehole,
{Foundation Ring section, . riveting, pitch holes, .
{Firehole, ring, section, . riveting, pitch holes,
{Firehole, opening . distance of centre above found. seam, ..
{Side seams, distance between riveting, pitch holes, ..
____________________________________________________________________________________________________________________
Girders
Tubes
Screw
Stays
{
{
{
{
{
{
{
{
{
{
{
{
{
R
Length
between
Centre
L
R
Inside
Diameter
L
R
Plate
Thickness
L
R
Position of
cross tubes
Crown
Headers
Mudboxes
Valves
etc.
Chests
{Safety
{Do
{M. Stop
{A. Do
{Feed
{Blow down
{Scum
{Injector
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
CALCULATIONS
SHELL, BARREL, S. & W. DRUM, F.C. CROWN, DOME, M. DRUM RIVETED JOINTS
Parts
(A) .
Longitudinal
P.D ....T.
N
C
S1
Circumferential
P. D...T
N.
C.
S1
Actual
Rule
Actual
Rule
(B) .
(C) .
Max. Pitch .
Outer Rows ...
Inner Rows
Edges .
Wide Strap .
Narrow Strap .
Plate %
Rivet %
Combined %
Working Pressure
100 (P D)
-------------- =
%
P
100 x A x N x C x S1
------------------------- =
%
PxTxS
100 (P 2D)
100 x A x C x S
--------------- + ------------------- %
P
PxTxS
t..S....J....C....D...W.P. =
100 (P D)
-------------- =
%
P
100 x A x N x C x S1
------------------------- =
PxTxS
(t 2) x S x J
---------------- =
CxD
lbs.
Least Pressure
lbs.
CALCULATIONS contd.
FLAT END PLATES AND GUSSET STAYS
Plate stiffness
Dimensions
Front
_____________________________________________________ _____________
{ t.
Thickness
{
_____________
{t1
{I
{
{I II ..
{
{II III
{
{III ..
{
{IV ..
{
{IV V
{
{Over Furnaces ...
{
{Below Do ..
{
{Manhole .
_____________
_____________
Back
________________
________________
________________
________________
_____________
________________
_____________
________________
_____________
________________
_____________
________________
_____________
________________
_____________
________________
_____________
________________
FRONT END
(t 1)2
W.P. = -------- = lbs.
D2
Around Manhole
[(t 1)2 + (t1 1)2]
W.P.= ---------------------- =
D2
BACK END
(T 1)2
W.P. = ----------------- =
D2
lbs.
lbs.
CALCULATIONS contd.
FLAT END PLATES AND GUSSET STAYS contd.
AREAS (A) SUPPORTED BY GUSSET STAYS
Dimensions
______________________________________
{Mid.
{I .
Length
{II
of Lines
{III ..
{IV ..
{V or Mid.
Distance
between
Lines
{I I
{I II ..
{II III
{III Apex. .
{IV Apex. .
{IV V or Mid.
Front
______________
______________
______________
______________
______________
______________
______________
______________
______________
______________
______________
______________
______________
______________
Back
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
FRONT END
Gussets
Areas
I.
=
Sq. in.
II.
=
"
III.
=
"
IV
=
"
V
=
"
I
II
III
IV
V
BACK END
=
"
=
"
=
"
=
"
=
"
PLATE MARGINS
W. P
3.7(t 1)
3.47 (t 1)
-------------------------- = ins.
-------------------------- = ins.
W. P.
W. P.
_______________________________________________________________________________________________
LEAST PRESSURE lbs.
_____________________________________________________________________________________________________
CALCULATIONS contd.
FLAT END PLATES AND GUSSET STAYS contd.
Number and
Diameter
of Rivets
and Section
& of Stays
{Gusset
N1
N2
N3
N4
D1
D2
D3
D4
G
G1
Toe Rivets
{
___________________________________________________________________________________
{
F
{
I.
_____________________________________________________________________________
{
B
{
___________________________________________________________________________________
{
F
{
II.
_____________________________________________________________________________
{
B
{
___________________________________________________________________________________
{
F
{
III.
_____________________________________________________________________________
{
B
{
___________________________________________________________________________________
{
F
{
IV.
_____________________________________________________________________________
{
B
{
___________________________________________________________________________________
{
F
{
V.
_____________________________________________________________________________
{
B
{
___________________________________________________________________________________
CALCULATIONS contd.
GUSSET STAY CALCULATIONS
I
II
III
IV
Coefficient
Working
Pressur
{
F
{N1 x A1.
_________________________________________________________________________________
{
B
{_______________________________________________________________________________________________
{
F
{N2 x A2 x 1.875 __________________________________________________________________________________
{
B
{_______________________________________________________________________________________________
{
F
{N3 x A3 x 1.875 __________________________________________________________________________________
{
B
{_______________________________________________________________________________________________
{
F
{N4 x A4___________________________________________________________________________________
{
B
{_______________________________________________________________________________________________
{
F
{(G-N2D2)(t-2) .037 ________________________________________________________________________________
{
B
{________________________________________________________________________________________________
{
F
{(G1-D2)(t-2) .037__________________________________________________________________________________
{
B
{________________________________________________________________________________________________
{
F
{8500 x C ____________________________________________________________________________________ Least Pressure
{
A
B
. lbs.
{_________________________________________________________________________________________________________
CALCULATIONS contd.
Least Pressure
CALCULATIONS contd.
SAFETY VALVES
(A)
(B)
(C)
__________________________
No. valves each chest __________________________
Type __________________________
{V________________
________________
{B to F________________
Distances {G to F________________
{V to F________________
Balanced Lever ( )
[W.P. (A - a) V] V to F
------------------------------- = ins.
B
Small Valve ( )
W.P. x a ( ) =
Unbalanced Lever ( )
[W.P. (A - a) V] V to F (G to F) L
---------------------------------------------- = ins.
B
Ordinary Type Unbalanced (Lever) ( )
[W.P. (A V)] V to F (G to F) L
----------------------------------------------- = ins.
B
lbs.
{ Plates _________________
{Casing _________________
{Valve __________________
CALCULATIONS contd.
SAFETY VALVES contd.
SPRING LOADED VALVE
;D=
;H=
Round Section
10000n x d2
;C
; W.P.
Square Section
33333 x d2
;K=
;A=
;
;
Rectangular Section
2
160000 B x H
d=
"
W.P. = -------------DACK
W.P. = ------------DACK
E
A = -------C.P.
E=
;C=
;
P=
; A=
AS =
T=
; A=
NOTES ON WORKING OF BOILER
Boiler is used for ...
Constant, intermittent or seasonal work ..
Is boiler relieved by square boiler? ..
How long worked between cleanings? .
Most suitable time for inspection .
Pump available for hydraulically testing boiler? ..
Feed water used, town well, surface or jet condenser ..
Nature of water .
Fuel used . Are printed instructions kept near boiler? ..
Period between cleanings approved by Inspector .
CALCULATIONS contd.
HEATING SURFACE
RIGHT HAND
Ring
Before Test
Furnace
Gaugings
During Test
After Test
Bulging
Permt. Set
Furnace Gaugings
Nos.
Before Test
V
H
ace Gaugings During Test
V
H
After Test... V
H
Bulging... V
H
Nos
V
H
V
H
V
H
V
H
V
H
10
11
12
13
14
12
13
14
15
10
11
15
Permt. Set
V
H
FRONT END
BACK END
5 mins.
10 mins.
14 mins.
Difference
Timing of test .
Height of water in glass .
Pressure by Inspectors gauge
Pressure by Boiler gauge
Accumulation of pressure, 100(-) = % ___________________________________________________________________________________
Do safety valves efficiently relieve boiler? _______________________________________________________________________________
Name
Date of Employment
FORM II
INSPECTING AUTHORITIES CERTIFICATE OF
INSPECTION DURING CONSTRUCTION
[REGULATION 4 (c)(1)]
DESIGNATION OF INSPECTING AUTHORITY
We hereby certify that the __________ type, boilers; length __________ feet ________
inches; diameter ______________ feet ______________ inches; working pressure _____________
lbs. built by Messrs ____________________________________________________________ at
___________________ under shop Number _______________ was constructed under our
supervision and inspected at various stages of construction by the Inspecting Officer and that the
construction and workmanship were satisfactory and in accordance with the Standard Conditions for
the design and construction of land boilers under the Indian Boilers Act, 1923.
The boiler is stamped on the front end plate with our stamp as shown hereunder:________________________________________________________________________________
Makers Name _______________________ Year of Make _____________
Works number _______________________
Tested to _____________ lbs. ___________ on ___________
W. P.________________ lbs.
Inspecting Officers or Inspecting Authoritys
Official Stamp.
*The boiler on completion was
------------------------------------ subjected to a water pressure test of ......................... lbs. per
The drum and headers were
square inch in the presence of the Inspecting Officer on ________ 19 _______ and satisfactorily
withstood the test.
*Samples of materials used in the constructions of the boiler were tested in the presence of
the Inspecting Officer and found to comply with the requirements.
All welded seams were subjected to physical tests and radiographic examination wherever
applicable and found satisfactory.
NOTE.- Strike off this paragraph where no such test has been carried out and the certificate
in Form IV by a Well-known Maker is intended to be furnished.
We have satisfied ourselves that the construction and dimensions of the boiler are as shown
in the Makers Drawing No.___________________ signed by us, and that the particulars entered in
the Makers certificate of manufacture in Form III countersigned by us are correct to the best of our
knowledge and belief.
____________________________________________
*Strike out what is not applicable.
FORM II-A
INSPECTING AUTHROTIES CERTIFICATE OF INSPECTION
DURING CONSTRUCTION IN RESPECT OF A BOILER MADE
TO FOREIGN CODE FOR EXPORT.
(Regulation 3 A.)
Designation of Inspecting Authority
We hereby certify that the ___________________ type, boilers; length,
_____________ diameter, _________ working pressure ___________ built by Messrs.
________________________________________ at _________________
under shop Number ________________ was constructed under our supervision and
inspected at various stages of construction by the Inspecting Officer and that the design,
construction and workmanship were satisfactory and in every respect in accordance with
_______________ Code/Specification.
The boiler is stamped as under:The boiler on completion was tested to ____________ in the presence of the
Inspecting Officer on _________________ and it satisfactorily withstood the test. Details
of tests and inspections are furnished with this certificate.
We have satisfied ourselves that the design, construction and dimensions of the
boiler are as shown in the Makers Drawing No.________________ approved and signed
by us, and that the particulars entered in the Makers certificate of manufacture are correct
to the best of our knowledge and belief. Makers certificate signed by them and
countersigned by us, as required by the _____________ Code/Specification, is enclosed.
FORM II-B
INSPECTING AUTHORITIES CERTIFICATE OF INSPECTION DURING
[REGULATION 4 (c)(III)]
1. Description ..
NOTE.- Similar information is to be furnished for each part manufactured outside the Constructors Works.
4. Construction:
(a) Riveted/composite construction shells/drums/Miniature Boilers: The construction is in accordance with
Chapter III/XIV of the Indian Boiler Regulations.
Number
of
longitudinal
seams
in
shell/drum
in
each
belt________________________________________
Number of longitudinal seams in furnace in each ring _________________________________________
Number of circumferential seams in shell/drum ______________________________________________
(including end seams) __________________________________________________________________
Number of circumferential seams in the furnace ______________________________________________
Details of repairs, if any, carried out in welded seams during construction _________________________
Details of heat treatment ________________________________________________________________
The longitudinal seams are welded/riveted and have ______________________ rows of rivets in
inside strap and ____________ rows of rivets in outside strap.
Rivet holes are _____________ diameter and number ________ per pitch of __________________ .
Butt straps cut from plates and bent to required curvature in ____________________.
The circumferential seams joining rings of shell are ________________________ jointed and single/double
riveted/welded.
Rivet holes are _____________ diameter and number _________ per pitch of _________________.
The shell end seams are _______________________________________ jointed and single/double
riveted/welded.
Rivet holes are _____________ diameter and number ___________ per pitch of ________________
Details of seams as in drawing No.___________________________.
All welded seams are subjected to Radiographic examination to the satisfaction of the Inspecting
Authority, where required.
(b) Shell type boilers of welded construction The construction is in accordance with Chapter XII of the
Indian Boiler Regulations.
Number of longitudinal seams in shell in each belt _______________________________.
Number of longitudinal seams in furnace _______________________________________.
Number of circumferential seams in shell _______________________________________.
Number of circumferential seams in furnace _____________________________________.
Details of repairs, if any, carried out to welded seams during construction _________________________.
Details of heat treatment __________________________________.
All welded seams were subjected to radiographic examination to the satisfaction of the Inspecting
Authority, where required.
(c) Fusion welded Electrode Boilers The construction is in accordance with Chapter X of the Indian Boiler
Regulations, 1950.
Number of longitudinal seams in shell _________________________________________________.
Number of circumferential seams (including end seams) ___________________________________.
Details of repairs, if any carried out to welded seams during construction _________________________.
Details of heat treatment _____________________________________.
All welded seams were subjected to radiographic examination to the satisfaction of the Inspecting
Authority, where required.
(d) Fusion welded and seamless forged drums of water tube boilers - The construction is in accordance with
Chapter V of the Indian Boiler Regulations, 1950.
Number
of
longitudinal
seams
in
each
ring
_________________________________________________.
Number of circumferential seams _________________________________________________________.
Details of repairs, if any, carried out to seams during construction _______________________________.
Details of heat treatment _____________________________________.
All welded seams were subjected to radiographic examination to the satisfaction of the Inspecting
Authority.
(e) Furnace seams The longitudinal seams are welded/riveted. The cross seams joining rings are of
__________________________________ type ________________ riveted/welded.
Boiler parts and fittings
5. Material
Manufacturer
Material
Smelter
Make
Inspecting
Officer
Remarks
Plates
Plates
Rivet bars.
Stay bars..
Angles..
Bolts.
Tubes
Tubes
Tubes
Girders.
Boxes
Headers.
Headers.
Manhole frames
Manhole doors.
Manhole
Sighthole doors..
Stand blocks
Stand pipes.
Stop valve chests
Safety valve chests.
Feed valve chests
Blow down valve
Blow down elbow pipe..
Water gauge mountings..
NOTE.- Under material enter against appropriate items: Steel Simens Martin
Open
Hearth
acid
(or
basic)
process,
Wrought
Iron,
Brand., Cast Steel Process .. etc. etc. and under
Remarks a brief explanation of process of manufacture where necessary e.g.,
Solid drawn Lap welded, Solid Pressed, tested by Makers lbs. per
sq. inch etc.
Part of Boiler
1
6.
Thickness
Thickness
of plates
in 32nd or
diameter
in inches
3
2
of
Plates
etc.,
and
Tensile
strength
limits to
tons
Elongation
limits to %
Gauge
length
inches
6
Brand &
No.
of
plate
7
1
2
Flanged and fire exposed
Plates
Furnace circular (Plain)...
Furnace circular..
Firnace circular
(Corrugated)
Fire box crown...
Fire box side...
Fire box front..
2
Cross tubes
Smoke tubes (Plain).
Smoke tubes (Stay)..
Water tubes (Bottom or
Front bank)
Water tubes (top or rear
Bank)
Balancer tubes (Steam).
Balancer tubes (Water).
Superheater tubes.
Superheater tubes.
Superheater tubes.
Water wall tubes...
Water wall tubes
Integral Economiser tubes.
Miscellaneous
Manhole bolts...
Sighthole bolts..
Firebox girders..
End plate stiffeners...
Shell angle
Furnace angle
Uptake angle.
Gusset angle..
Manhole Compensation
ring...
Manhole frame..
Manhole cover..
Sighthole compensation
ring...
Sighthole doors.
Stand blocks..
Stand pipes
7. Details of Drums
Shell Plate
No.
Nomenclature
Nominal
dia.
Length
Thickness in
32nds of
inch.
Inside
radius
inches
Tube Plate
Thickness in
32nds of
inch.
Inside
radius
in
inches
Head
Thickness in
32nds of
inch.
**
Type
Radius of
dish
in
inches
10
11
Manhole
No. and
size
12
No.
Water Wall
Headers
Integral
Economiser headers
Superheaters
Headers
Mud boxes
9. Tubes
Sl.
No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
ThickHead or end
ness in
Shape
Thickness
32nds
in 32nds in.
inch
Hydrostatic
test lbs./sq.
in.
1
2
3
4
5
6
1
2
1
2
3
4
5
6
1
2
3
4
Nomenclature
Cross tubes.
Smoke tubes (Plain)
Smoke tubes (Stay).
Water tubes (bottom or front bank)
Water tubes (rear or top bank)
Balancer tubes (Steam)...
Balancer tubes (Water)...
Superheater tubes
Superheater tubes
Water wall tubes.
Integral economiser tubes..
Outside Thickness
diameter in 100ths
in inches of inch.
10. Mountings
No.
Nomenclature
1.
Main stop valve
2.
Auxiliary stop valves...
3.
Safety valves (a)..
(b)..
(c)..
4.
Blow down valve(s)
5.
Feed check valves
Material
Type
No.
Size
11. Boilers:
Details of safety valves and test results:
Manufacturer
Identification marks of valves.
Makers No..
Type.
Lift (mm) Drawing Nos...
Valves details:Material
Valve Seat
Flat/Bevel.
Diameter of valve seating.
Valve Body:Material...
Opening at neck..
Opening at outlet.
Springs:Material
Process of manufacture
Chemical composition.
Dimensions:
Outside diameter of coil..
Section of wire
Number of coils..
Free length of coils.
Test results:Place of test.. date
Closing down pressure
Remarks:Does the valve chatter?
Does the valve seat leak?.
Blow off pressure.
Type of valve and extract of test results..
Type of valve
Place of test.. date
Constant C by test results..
Capacity of the valve for the intended blow
off pressure..
Inspecting Authority
witnessing tests.
12. Certified that the particulars entered herein in manuscript by us are correct and that parts
and fittings in sections 2 to 11, against the names of which entries are made, have been used
in the construction and fittings of the boiler.
The particulars shown against the various parts used are in accordance with the enclosed
certificates from the respective Makers.
The design of the boiler is that as shown in Drawing Nos..
The boiler has been designed and constructed to comply with the Regulations under the
Indian Boilers Act, 1923, for a working pressure of ______________lbs.
per square inch at our Works above-named and satisfactorily withstood a water test of
____________________ lbs. per square inch on the __________ day of _______________,
19___ in the presence of our responsible representative whose signature is appended
hereunder.
MAKER
(Signature of Maker)
or
Secretary of Firm.
Official Seal
Name and Signature of
Inspecting Authorities.
FORM III-A
Certificate of Manufacture and test
[REGULATION 4(e)]
Name of part
Makers name and address..
Design pressure
Design temperature..
Material
Process of manufacture
Fully killed/rimmed.
Chemical composition.
Pipes
Main dimensions..
Tolerances
Mode of manufacture..
Identification marks.
Drawing numbers
Bend test on pipe.
Bend test on weld
Flattening test..
Tensile strength
Mode of attachment of flanges
Flange particulars
Size of branches..
Mode of attachment of branches.
Heat treatment..
Final hydraulic test..
NOTE.- In addition, the following information in respect of the material shall be
furnished in a tabular form in conformity with the requirements of
regulation 4(c)(vi) or the note thereto, as the case may be. The information
may be given from the established test data or if the material is of standard
quality an extract from the standard may be furnished instead.
Metal
temperature
Et
Sc
Sr
250
275
300
325
350
375
400
425
450
475
500
525
550
575
600
**Sr = Average and lowest stress to produce rupture in 100,000 hours at the
various working metal temperatures.
Temperature range in the table may extend upto the limit of applicability of the
material.
The value of Sc and Sr need be furnished only in respect of Pipes/Tubes intended to
be used for working metal temperature above 454C (850F).
Certified that the particulars entered herein are correct.
The particulars of fabricated component are shown in drawing No. ..................
The part has been designed and constructed to comply with the Indian Boiler
Regulations for a working pressure of _______________________ and temperature
____________ and satisfactorily withstood a water test of _________
on the ___________ day of ____________ 19___, in the presence of our responsible
representative whose signature is appended hereunder.
Makers Representative
(Name and signature)
Maker ___________________
We have satisfied ourselves that the pipes have been constructed in accordance with
chapter VIII. The tests conducted on the samples taken from the finished pipes have been
witnessed by us and the particulars entered herein are correct.
Place _______________
Date ________________
Name and signature of
Inspecting Authority.
NOTE (1).- This form is intended for the use of both pipe manufacturers and pipe fabricators. Only
such of the columns or paragraphs that are applicable, or information that can be
obtained and furnished from other certificates, need be filled or entered in this form.
NOTE (2).- In the case of fabrications made from steel pipes obtained from elsewhere, particulars in
regard to the material and pipes shall be taken from similar forms of certificates
obtained in respect of pipes and noted in the appropriate columns or paragraphs.
In the case of pipes made from steel, made and tested by well known Steel Makers
in India or other countries, particulars regarding the material as certified by them (in any
form) shall be noted in the appropriate columns or paragraphs in this certificate.
FORM III-A(i)
(Certificate of manufacture and test of steampipes for which variation has been permitted).
Regulation 4 (h)
Name of part
Makers name and address..
.
Intended working pressure...
Recommended maximum temperature
Material
Process of manufacture
Fully killed/rimmed.
Chemical composition.
Pipes
Main dimensions.
Tolerances
Mode of manufacture..
Identification marks
Drawings numbers..
Bend test on pipe.
Bend test on weld
Flattening test..
Tensile strength
Mode of attachment of flanges
Flange particulars
Size of branches.
Mode of attachment of branches
Heat treatment
Final hydraulic test
Note.- In addition, the following information in respect of the materials shall be
furnished in a tabular form as indicated. The information may be given from the
establishment test data or if the material is of standard quality an extract from the
standards may be furnished instead.
Metal
temperature
Et
Sc
Sr
250
275
300
325
350
375
400
425
450
475
500
525
550
575
600
Makers Representative
(Name and signature)
Maker ___________________
We have satisfied ourselves that the pipes have been constructed in accordance with
the variations, from the standard conditions laid down in the Indian Boiler Regulations,
1950, for material, design and construction permitted by the Board. The tests conducted on
the sample taken from the finished pipes have been witnessed by us and the particulars
entered herein are correct.
Place____________
Date _____________
Note (1)
This form is intended for the use of both pipe manufacturers and pipe
fabricators. Only such of the columns or paragraphs that are applicable,
or information that can be obtained and furnished from other
certificates, need be filled or entered in this form.
Note (2)
In the case of pipes made from steel, made and tested by Well known steel Makers
in India or other countries particulars regarding the material as certified by them (in any
form) shall be noted in the appropriate columns or paragraphs in this certificate.
FORM III-B
(Certificate of Manufacture and Test)
[REGULATION 4(f)]
Makers name..
Design pressure
Design temperature..
Material
Process of manufacture
Fully killed/rimmed.
Chemical composition.
Tubes
Process of manufacture
Main dimensions..
Tolerances
Tensile strength
Elongation percentage.
Bend test..
Flattening test..
Crushing test
Flare test..
Flange test
Bend test on weld
Bulging test and drifting test (for copper and brass)..
Heat treatment
Hydraulic test.
NOTE.- In addition, the following information in respect of the material shall be
furnished in a tabular form in conformity with the requirements of
Regulation 4(c)(vi) or the note thereto, as the case may be. This
information may be given from the established test data or if the
material is of standard quality, an extract from the standard may be
furnished instead.
Metal
temperature
Et
Sc
Sr
250
275
300
325
350
375
400
425
450
475
500
525
550
575
600
=
=
**Sr
Temperature range in the table may extend upto the limit of applicability of the
material.
Makers Representative
(Name and signature)
Maker ___________________
We have satisfied ourselves that the tubes have been constructed in accordance with
Chapter II. The tests conducted on the samples taken from the finished tubes, have been
witnessed by us and the particulars entered herein are correct.
Place ______________
Date _______________
NOTE (1).-
This form is intended for the use of both tube manufacturers and tube
fabricators. Only such of the columns or paragraphs that are
applicable, or information that can be obtained and furnished from
other certificates, need be filled or entered in this form.
NOTE (2).-
In the case of tubes made from steel, made and tested by well-known Steel Makers
in India or other countries particulars regarding the material as certified by them (in any
form) shall be noted in the appropriate columns or paragraphs in this certificate.
250
275
300
325
350
375
400
425
450
475
500
525
550
575
600
Temperature range in the table may extend up to the limit of applicability of the
material.
Makers Representative
(Name and Signature)
Maker ___________________
We have satisfied ourselves that the tubes have been constructed in accordance with
the variations from the standard conditions laid down in the Indian Boiler Regulations,
1950, for material, design and construction permitted by the Board. The tests conducted on
the sample taken from the finished tubes have been witnessed by us and the particulars
entered herein are correct.
Place___________
Date ___________
Note (1)
Note (2)
This form is intended for the use of the both tube manufacturers and tube
fabricators. Only such of the columns or paragraphs that are applicable, or
information that can be obtained and furnished from other certificates, need
be filled or entered in this form.
In the case of fabrications made from steel tubes obtained from elsewhere,
particulars in regard to the material and Tubes shall be taken from
similar forms of certificates obtained in respect of tubes and noted in the
appropriate columns or paragraphs.
In the case of tubes made from steel, made and tested by Well Known steel makers
in India or other countries particulars regarding the material as certified by them (in any
form) shall be noted in the appropriate columns or paragraphs in this certificate.
FORM III-C
Certificate of Manufacture and test of Boiler Mountings and Fittings
(REGULATION 269)
Name of part
Makers name and address.
MAKERS________________
We have satisfied ourselves and the valve/fitting has been constructed and tested in
accordance with the requirements of the Indian Boiler Regulations, 1950. We further
certify that the particulars entered herein are correct.
Place_________
Date____________ 19___.
In the case of valve chest made and tested by well known Foundries or Forges recognised
by the Central Boilers Board in the manner as laid down in regulations 4A to 4H, particulars
regarding the material as certified by them, in any form, shall be noted in the appropriate
columns or paragraphs in the certificates and in case of certificates from Well Known
Foundries or Forges is produced, such certificate may be accepted in lieu of the certificate
from Inspecting Authority in so far as it relates to the testing of material specified in the
Form.
FORM III-D
Certificate of manufacture and test
[Regulation 4(c)]
Certificate No..
Date of Manufacture
Name of Part
Makers Name and address..
Code of Manufacture/Specifications...
Material
Heat No
Process of manufacture
Fully killed/rimmed/semi killed..
Chemical composition.
Pipes
Main dimensions..
Tolerances
Mode of manufacture...
Identification marks.
Bend Test.
Bend test on weld
Flare test..
Flattening test..
Drift test..
Tensile strength
Crushing test
Heat treatment..
Flange test
Final hydraulic test..
Non-destructive examination...
Certified that the particulars entered herein are correct.
The part has been manufactured to comply with the Indian Boiler Regulations at our
Works above named and satisfactorily withstood a water test of _____________________
on the __________ day of _________________19___ in the presence of our responsible
representative whose signature is appended hereunder:
Makers Representative
(Name and signature)
Maker...
Note: In the case of pipes made from steel, made and certified by well-known Steel
Makers in India or other countries, particulars regarding the material as certified
by them (in any form) shall be noted in the appropriate columns or paragraphs in
this certificate.
FORM III-E
(Certificate of manufacture and test)
[Regulation 4(f)]
Makers Name
Code of Manufacture/specifications..
Material
Heat No
Process of Manufacture...
Fully killed/rimmed/semi killed..
Chemical composition.
Tubes
Process of manufacture
Main dimensions..
Tolerances
Tensile strength
Elongation percentage.
Bend test..
Flattening test..
Crushing test
Flare test..
Flange test
Bend test of weld.
Bulging test and drifting test
(for copper and brass).
Heat treatment.
Hydraulic test..
Non-destructive examination..
Certified that the particulars entered herein are correct.
The Tubes have been manufactured to comply with the Indian Boiler Regulations at
our works above named and satisfactorily withstood a water test of _________________on
the _______day of _______________ 19___ in the presence of our responsible
representative whose signature is appended hereunder:
Makers Representative
(Name and signature)
Maker ___________________
Note:- In the case of tubes made from steel, made and certified by the Well-known
Steel Makers in India or other countries, particulars regarding the material
a certified by them (in any form) shall be noted in the appropriate columns or
paragraphs in this certificate.
FORM III-F
Certificate of Manufacture and test of castings and forgings
(Regulations 73 to 80 or 81 to 85 as applicable)
Certificate No. ..
Name of part..
Makers name and address.
...
Main dimensions
Drawing Nos. .....
Identification Marks
Chemical composition.
Physical test results.
(i)
Tensile strength
(ii)
Transverse bend test.
(iii)
Elongation
Certified that the particulars entered herein by us are correct. This satisfies the
requirements of Indian Boiler Regulations, 1950.
Maker's Representative
(Name and signature)
MONOGRAM/
SEAL
MAKERS__________
FORM IV
STEEL MAKERS CERTIFICATE OF MANUFACTURE AND RESULTS OF TESTS
[REGULATION 4(c) (iv)]
We hereby certify that the material described below has been made by M/s.
_________________ by the *__________________ process, as per specifications
_____________ and rolled by ________________ and has been satisfactorily tested in the
presence of our Test House Manager or his representative in accordance with the stipulated
tests and tolerances.
For gothic bars/scelps, billets and hot rolled strips which are to be processed further
by the same manufacturer for making tubes/pipes, the physical properties are not required to
be mentioned by the steel manufacturer.
Test certificate No.________________
Signature or initials of
Test House Manager
Dated______________
Deoxidation Plate No. of
practice
No.
pieces
Order
No.
Cast
No.
Specification/
and grade
Wt
Tonnes
Size
(mm)
Heat
Treatment
Y.S.
Kg/mm2
Mechanical Properties
U.T.S. Elongation Bend Temp. Homokg/mm2
%
Bend geniety
Chemical Analysis
(Ladles)_______
C Mn P S Si Other alloying
Elements
_____________________________________________________________________
Consignee _________
__________________
__________________
ii
Dated
Remarks
Wagon No.
FORM IV-A
CERTIFICATE OF MANUFACTURE AND RESULTS OF TESTS
IN LIEU OF FORM IV
[Regulation 4 (c) (iv)]
It is hereby certified that original steel Makers certificate in Form IV contain
following information in respect of the material used in the manufacture of boiler or parts
thereof bearing Makers Number: Sample and according to Drawing Number:
Part Quantity Cast/Heat No .Plate No. Steel making
Specifi- Deoxidation
of
Process
cation
Boiler
Name of
Test piece
Steel Maker/ No.
Part Maker
% Chemical Analysis
Cr
Mn
P
S
Certificate
No. & Date
Length/Breadth/
O. D. Thickness
Si
Mechanical Properties
Y.S. kg/mm2 UTS (kg/mm2)
Elongation
% GL
Official Seal
Heat Treatment
Bend Remarks
Test
INSPECTING AUTHORITY
Counterfoil
No.
FORM V
No.
--------------------------------------------------------------------------------------------------------------------------------____________________________________________________________
are hereby permitted to use the
No.
) Boiler Rating
Boiler (Registry
made by
and bearing Makers number
of
____________________________________________________________
are hereby permitted to use the
(Register No.
at a maximum pressure
lbs.
Boiler
) Boiler Rating
made by
and bearing Makers number
maximum pressure of
lbs.
per square inch pending the issue of refusals of a
certificate within six months from the date thereof.
at a
Dated
Inspector of Boilers.
Dated
Inspector of Boilers
FORM VI
BOILER INSPECTION DEPARTMENT
CERTIFICATE FOR USE OF A BOILER
(Regulation 389)
Type of Boiler
Boiler Rating
to
I hereby certify that the above described boiler is permitted by me/the Chief
Inspector under the provisions of Section 7/8 of the Indian Boilers Act, No. V of 1923, to be
worked at a maximum pressure of
lbs. to the square inch for the period from
to
.
The loading of the
.
Fee Rs.
Dated at
this
Paid on
day of
, 19___.
Inspector
Countersigned
Chief Inspector
See reverse for Conditions.
CONDITIONS
(2)
Under the provisions of Section 8 of the Act this certificate shall cease to be in
force:
(a) on the expiry of the period for which it was granted; or
(b) when any accident occurs to the boiler; or
(c) when the boiler is moved the boiler not being vertical boiler the heating surface
of which is less than two hundred square feet, or a portable or vehicular boiler;
or
(d) when any structural alteration, addition or renewal is made in or to the boiler; or
(e) if the Chief Inspector in any particular case so directs when any structural
alteration, addition or renewal is made in or to any steam-pipe attached to the
boiler; or
(f) on the communication to the owner of the boiler of an order of the Chief
Inspector or Inspector prohibiting its use on the ground that it or any steam-pipe
attached thereto is in a dangerous condition.
Under Section 10 of the Act, when the period of a certificate relating to a
boiler has expired, the owner shall, provided that he has applied before the expiry of
that period for a renewal of the Certificate, be entitled to use the boiler at the
maximum pressure entered in the former certificate, pending the issue of orders on
the application but this shall not be deemed to authorise the use of a boiler in any of
the cases referred to in clause (b), (c), (d), (e) and (f) of sub-section (1) of section 8
occurring after the expiry of the period of the certificate.
(3)
The boiler shall not be used at a pressure greater than the pressure entered in the
certificate as the maximum pressure nor with the safety valve set to a pressure
exceeding such maximum pressure.
(4)
The boiler shall not be used otherwise than in a condition which the owner
reasonably believes to be compatible with safe working.
NOTE.- The particulars and dimensions regarding this boiler may be obtained by the
owner on payment in the prescribed manner on application to the Chief
Inspector.
FORM VII
INSPECTING AUTHORITYS CERTIFICATE OF INSPECTION UNDER
this
day of
, 19___.
1. Description
Type of Economizer
No. of Sections
Intended working pressure
Year of manufacture
Description
2. Inspecting Authority
........
Economizer
No. of tubes
lbs.
Total heating surface of tubes
constructed
under
supervision
of
....................................................................................................
..
Sections hydraulically tested for . minutes and inspected
after test by ...
3. Construction and
Workmanship
Parts
Material
Maker
Headers
Tubes and/or
Pipes
Valve chests
Bolt
Thickness
in 32nds
Tensile
strength
Elongation
limits to %
Gauge
length
Brand and
No.
of inch.
limits to
tons
Headers..
Tubes.
Bolts...
Certified that the particulars entered herein are correct and that the parts and fittings
mentioned above have been used in the construction and fittings of the Economiser.
The particulars shown against the various parts used are in accordance with the
Makers certificates in our possession.
The design of the economiser in section and end view with principal parts fully
dimensioned is that shown in Drawing No.
. The Economiser has been designed and
constructed to comply with the Indian Boiler Regulations for a working pressure of
________ lbs. per sq. in. at our Works abovementioned and the sections satisfactorily
withstood a water test of ______ lbs. per sq. in. for ___________ minutes on _________
day of __________19___ in the presence of our ______________ responsible
representative whose signature is appended hereunder.
Designation of Maker
Signature of the Engineer who witnessed the test.
Dated at _______________ this ____________ day of ______________19___.
FORM IX
(Regulation 528)
(National Emblem)
Memorandum of Inspection
or
Registration Book
MISCELLANEOUS
District
Owners..
Address of Factory
_______________________________________________________________________
Nearest
Station
Railway
_______________________________________________________________________
Economiser Registered at. on ..
Register Book No. page ...
Registry Number.verified on
Approved Working Pressure lbs....
Economiser Rating Inspection fee
Registration Book filled at. on .
Remarks on transfer etc.
Date of Date of
Payment Inspection
Remarks
and
Inspectors
initial
Type of Economiser..
Maker
Intended Working Pressure...
Place and year of make.
Makers No
Description of Economiser
No. of tubes. Length.Dia...
Thickness...
Internal dimensions...
No. of Headers..
Thickness of Headers
Length of top Branch pipe Thickness .
Length of Bottom Branch Pipe.Thickness
Dimensions of cap openings.
Diameter of cap bolts
MOUNTINGS
No.
Diameter
Relief Valve.
Type
Position
Material
Stop Valve...
Blow Down..
Thermometers..
Pressure Gauge
Additional Fittings
MAKERS CERTIFICATE
Name of Maker
Makers Hydraulic Test Pressure..
Makers Drawing No.
Name of Inspecting Authority...
Name of Maker of Material..
[Tubes..
Process[Headers..
[Bolts
Test Results
Tubes..T
Headers...T
PipesT
BoltsT
% Sulphur
% Phosphorus
Makers Identification Marks
Position
CALCULATIONS
HEADERS
TUBES
BRANCH PIPES
BOLTS
HEATING SURFACE
Calculations made by
submitted on
Calculations checked by
on
lbs.
lbs.
INSPECTORS NOTES
Counterfoil
No.
Name of the person or firm
to which Provisional Order
is granted.
FORM X
Regulation 525 (e)
No.
PROVISIONAL ORDER UNDER THE INDIAN
BOILERS ACT, 1923
__________________________________________________
Description of Economiser
__________________________________________________
Maker's No.
and
Economiser Rating
made by
Rating
Pressure permitted
maximum temperature of
F pending the
Period
Date
Inspector
INSPECTOR
FORM XI
__________________________________________________ Boiler Inspection
Department
CERTIFICATE FOR THE USE OF AN ECONOMISER
(Regulation 530)
Registry Number of Economiser
Type
__________________________________________________________________________
_
No. of tubes
Number of Headers
__________________________________________________________________________
_
Economiser Rating
Place and year of manufacture
_______________________________________________________________________
Name of owner
_______________________________________________________________________
Situation of Economiser
_______________________________________________________________________
Repairs
________________________________________________________________________
*Remarks
Hydraulically tested on ___________________ to ________________kg. per sq. cm.____
lbs.
paid on
day of
INSPECTOR
COUNTER
SIGNED
CHIEF INSPECTOR
REVERSE OF FORM XI
CONDITIONS
(1)
(2)
(3)
The Economiser shall not be used at a pressure greater than the pressure/temperature
entered in the certificate as maximum pressure/temperature not with the relief valve
set to pressure/temperature exceeding such maximum pressure/temperature.
(4)
The Economiser shall not be used otherwise than in a condition which the owner
reasonably believes to be compatible with safe working.
FORM XII
(Regulation 613)
Record of Welders Qualification/Requalification Tests (Indian Boiler Regulations, 1950).
Place of test_________
Date___________
Name of Welder
Fathers name
Date of birth Address
Service of experience on Gas/Electric Arc..years
Signature of Welder..
Names and addresses of the firms where trained..
..
..
Tested on...
(Plate, pipe, tube)
Gas or electric A.C./D.C...
Kind of test. Position.
(Groove/Fillet/Branch)
Thickness of material used Diameter and thickness of pipe,
branch
or
used.
tubes
Results of Observations
Marks
__________________
Maximum Awarded
A. PROCEDURE
1. Preparation of specimen
2. Size & grade of electrode or filler rod
3. Number of runs and manipulation of control.
B. VISUAL INSPECTION
4. Root penetration.
5. Freedom from undercut..
6. Disposition of runs.
7. Uniformity of surface.
8. Shape of profile
9. Smoothness of joints
10. Freedom from cavities & slags..
11. Dimensions of weld deposit
12. Quality of weld metal (Overheating, surface cracks,
spongy surface etc.).
3
2
5
10
5
2
1
1
2
5
1
3
C. PHYSICAL TEST
13. Face bend test..
14. Root bend test..
10
20
D. ETCH TEST
15. Disposition of runs..
16. Degree of fusion..
17. Root penetration..
18. Slags inclusions and porosity..
2
5
11
5
E. FRACTURED SURFACE
19. Quality of weld metal (Excessive oxidation, carburisation,
overheating, roughness, porosity, appearance)
__________________
100
__________________
Marks awarded...................%
Results of Oral or Written examination
Marks awarded.......................... %.
GENERAL REMARKS OF COMPETENT AUTHORITY
..
..
...
...
...
...
...
TYPE AND CLASS OF WELDING QUALIFIED..
.in Gas or Electric Arc welding.
PERIOD OF VALIDITY OF CERTIFICATE
FROM. TO ..
PLACE.
DATE
COMPETENT AUTHORITY
FORM NO.XIII
Qualified Boiler Welders Certificate
ISSUED UNDER
Photo
Name of Welder
Passport Size
Fathers name
Date of birth..
Seal and
Signature of
Competent
Authority
Identification marks..
Left hand thumb impression .
Signature of Welder...................
Address of Welder.................
Period of Validity
_______________________________________________________________________
From
To
---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------This is to certify that Shri.......son
of
Shri has been examined and
tested in the prescribed manner in the presence of ..
(Representative of Competent Authority)
and is deemed to have satisfactorily proved his ability to make sound welds as per
particulars given below and is hereby authorised to undertake such welds. He is
authorised/not authorised to undertake welding where radiographic examination is
necessary under the Regulations.
Granted this day of . _____ under the seal and
authority of ...
Seal
(Representative of Competent
Authority)
Particulars:_______________________________________________________________________
*Particulars shall contain information on the following:Tested on
Date
Material
Process
Class of welding
Backing strip
Electrode
Filter rod
Test piece X-rayed or not.
Period of validity
From
To
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Employment particulars
From
To
Name of Employer
Work on which
engaged
Signature of
employer
(COVER PAGE)
FORM XIV
[Regulation 394 (c)]
National Emblem
FORM XIV
[Regulation 394 (c)]
National Emblem
MISCELLANEOUS
District..
Owner
Address of Factory
Work of Factory:
_______________________________________________________________________
Registration Number of Boilers to which the pipes and fittings, particulars of which
are given in this Memorandum are connected.
Remarks
DATE
........
...........................................................................
.......................................................................
.......................................................................
.......................................................................
....................................................
....................................................................................................................................................
Drawing No.
Total length of
Steam Pipes
No. of connected
vessels
Fee
Date of
payment
Temp.
allowed
C
Remarks &
initial of
Inspector
Situation
Ry. No. of connected Boilers.
Steam piping System include
......
...
Pipes Material.Diameter (outside).
Pipes Thickness Make...
Attachment of Flanges..
Elbows, Tees etc
......
..
Support.
Flexibility..
Drainage..
..
..
...
Feed Pipes
Outside Dia. Thickness
Make
Max. Pressure. Max. Temp..
Connected Vessel
No.
Type
...
Max. Design Press.. Max. Design Temp..
...
Date of Installation
First Inspection inside &..............
Outside
.....................................................
...
First Hydraulic Test to.kg/cm2By on...
Remarks
...
CALCULATIONS
Steam Pipes:
.......................
..........................................................
.............................................................................................
.............................................................................................
.............................................................................................
.............................................................................................
.............................................................................................
CALCULATIONS
Feed Pipes.............
.............................................
.............................
...............................................................................................
..............................
.....
CALCULATIONS
Steam Pipe Fittings and Vessels: ..
...........................................
..........................
.............
...........................................
..........................
.......................................
..............................
CALCULATIONS
.................................................................................
....
.....................................................................................
.....................................................................................
.....................................................................................
.....................................................................................
.....................................................................................
CALCULATIONS
.................................................................................
....
.....................................................................................
.....................................................................................
.....................................................................................
.....................................................................................
.....................................................................................
.............................................................................
.............................................................................
.............................................................................
.............................................................................
.............................................................................
...
FORM XV-A
(Regulation 4A (2)
QUESTIONNAIRE TO BE ANSWERED BY FIRMS SEEKING RECOGNITION BY THE CENTRAL BOILERS BOARD TO BECOME AN
INSPECTING AUTHORITY UNDER THE INDIAN BOILER REGULATIONS, 1950.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
12.
13.
14.
FORM XV-C
[Regulation 4A (2)]
FORM XV-D
[Regulation 4A (2)]
QUESTIONNAIRE TO BE ANSWERED BY FOUNDRY/FORGE SEEKING RECOGNITION BY CENTRAL BOILERS BOARD TO BE
NOTIFIED AS WELL KNOWN FOUNDRY/FORGE UNDER REGULATION 4A(2) OF THE INDIAN BOILER REGULATIONS, 1950.
1.
The Registered name and address of the firm:
2.
Works address
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
QUESTIONNAIRE TO BE ANSWERED BY TUBE/PIPE MAKER SEEKING RECOGNITION BY CENTRAL BOILERS BOARD AS WELL
KNOWN TUBE/PIPE MAKER UNDER IBR, 1950.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
Capacity of production of Tube/Pipe and the tonnage details per year from the beginning.
Reasons for seeking recognition under IBR.
Steel grades of Tube/Pipes under production:
Size range of Tubes/Pipes under production:
Process of manufacture of Tube/Pipes:
(a) Whether the firm is producing the raw material or purchasing the raw material.
(b) If the raw material is purchased, give the details of purchase so far.
(i)
from well known steel maker under IBR.
(ii)
from non-recognised firm.
If purchase is as per 9(b)(ii) state whether the raw material is tested at Tube
makers/Pipe makers
premises under IBR.
If the firm is producing raw material, state whether the firm is recognised as Well Known steel maker under IBR.
Major manufacturing facilities available with the firm:
Testing facilities available with the works:
Types of tests conducted on Tubes/Pipes (enclose complete quality control plan from raw material stage to finished stage along with the quality control & inspection
personnel of the firm).
The details of failures and rejection
(1) By NDT
(2) By Destructive Testing.
Whether the firm is in a position to manufacture Tubes/Pipes and also provide for their necessary testing facilities in accordance with the provision in IBR, 1950.
The name of the firms to whom the firm has supplied Tubes/Pipes:
Whether the firm is agreeable to show their manufacturing process and in-house facilities to a team consisting of three members appointed by the Board.
Whether the firm is aware of the fact that the recognition is for a period of three years only, which is renewable after every three years term on fresh assessment.
FORM XV-F
(See regulation 4A (2)
QUESTIONNAIRE TO BE ANSWERED BY A LABORATORY SEEKING RECOGNITION BY CENTRAL BOILERS BOARD AS A WELLKNOWN MATERIAL TESTING LABORATORY UNDER SUB-REGULATION (2) OF REGULATION 4A OF THE INDIAN BOILER
REGULATIONS, 1950.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
Note: The recognition is valid for a period of 3 years only, which is renewable for 3 years on fresh assessment.
FORM XV-G
[See regulation 4A (2)]
Questionnaire to be answered by firm seeking recognition by Central Boilers Board as Remnant Life
Assessment Organisation under regulation 391A of the Indian Boiler Regulations, 1950.
1.
2.
3.
4. (a)
:
:
8.
9.
(b)
5.
6.
7.
10.
11.
12.
Note:- The recognition is valid for a period of three years only which is renewable for three
years on fresh assessment.
FORM XVI-A
(Regulation 4C (2)
Serial No.
National Emblem
________________________________
________________________________
________________________________
has been evaluated by the Central Boilers Board and has been granted recognition under
regulation 4C(2) of the Indian Boiler Regulations, 1950, as an INSPECTING
AUTHORITY.
__________________________________________________________________
This Certificate is valid for three years, i.e. upto..
__________________________________________________________________
Validity is subject to the adherence to the quality Control prescribed under the provisions of
the Indian Boiler Regulations.
_________________
Date of Issue
Approval Certificate No.____________
________________
Secretary
FORM XVI-B
(Regulation 4C(2)
Serial No.
National Emblem
_______________________
_______________________
_______________________
has been evaluated by the Central Boilers Board and has been granted recognition under
regulation 4C(2) of the Indian Boiler Regulations, 1950, as a COMPETENT AUTHORITY.
__________________________________________________________________
This Certificate is valid for three years, i.e. upto..
__________________________________________________________________
Validity is subject to the adherence to the quality Control prescribed under the provisions of
the Indian Boiler Regulations.
_________________
Date of Issue
Approval Certificate No.___________
_________________
Secretary
FORM XVI-C
(Regulation 4C(2)
Serial No.
National Emblem
_________________________
_________________________
_________________________
has been evaluated by the Central Boilers Board and has been granted recognition under
regulation 4C(2) of the Indian Boiler Regulations, 1950, as WELL KNOWN STEEL
MAKER, for the manufacture of _________________________________
__________________________________________________________________
This Certificate is valid for three years, i.e. upto_______________________
__________________________________________________________________
Validity is subject to the adherence to the quality control prescribed under the provisions of
the Indian Boiler Regulations.
_________________
Date of Issue
Approval Certificate No.____________
__________________
Secretary
FORM XVI-D
(Regulation 4C(2)
Serial No.
National Emblem
_______________________
_______________________
_______________________
has been evaluated by the Central Boilers Board and has been granted recognition under
regulation 4C (2) of the Indian Boiler Regulations, 1950 as a WELL KNOWN FOUNDRY.
__________________________________________________________________
This Certificate is valid for three years, i.e. upto _____________________
__________________________________________________________________
Validity is subject to the adherence to the quality control prescribed under the provisions of
the Indian Boiler Regulations.
______________
Date of Issue
Approval Certificate No.__________
_______________
Secretary
FORM XVI-E
(Regulation 4C(2)
Serial No.
National Emblem
__________________________
__________________________
__________________________
has been evaluated by the Central Boilers Board and has been granted recognition under
regulation 4C (2) of the Indian Boiler Regulations, 1950 as a WELL KNOWN FORGE.
__________________________________________________________________
This Certificate is valid for three years, i.e. upto__________________
__________________________________________________________________
Validity is subject to the adherence to the quality control prescribed under the provisions of
the Indian Boiler Regulations.
__________________
Date of Issue
Approval Certificate No.___________
______________
Secretary
FORM XVI-F
(Regulation 4C(2)
Serial No.
National Emblem
__________________________
__________________________
__________________________
has been evaluated by the Central Boilers Board and has been granted recognition under
regulation 4C(2) of the Indian Boiler Regulations, 1950, as a WELL KNOWN TUBE
MAKER for the manufacture of Tubes of Sizes from _______________________________
to ________________________________
__________________________________________________________________
This certificate is valid for three years, i.e. upto _______________________
__________________________________________________________________
Validity is subject to the adherence to the quality control prescribed under the provisions of
the Indian Boiler Regulations.
_______________
Date of Issue
Approval Certificate No.__________
_______________
Secretary
FORM XVI-G
(Regulation 4C(2)
Serial No.
National Emblem
__________________________
__________________________
__________________________
has been evaluated by the Central Boilers Board and has been granted recognition under
regulation 4C(2) of the Indian Boiler Regulations, 1950, as a WELL KNOWN PIPE
MAKER
for
the
manufacture
of
pipe
of
sizes
from
_________________________________ to _______________________________
__________________________________________________________________
This Certificate is valid for three years, i.e. upto ______________________
__________________________________________________________________
Validity is subject to the adherence to the quality control prescribed under the provisions of
the Indian Boiler Regulations.
_______________
Date of Issue
Approval Certificate No.____________
_______________
Secretary
FORM XVI-H
(See Regulation 4C(2)
Serial No.
National Emblem
_________________________
_________________________
_________________________
__________________________________________________________________
This Certificate is valid for three years, i.e. upto____________________
__________________________________________________________________
Note:- The validity is subject to the quality controls prescribed under the provisions of the
Indian Boiler Regulations, 1950.
________________
Date of Issue
Approval Certificate No.____________
_______________
Secretary
FORM XVI-I
[See Regulation 4C(2)]
Serial No.
National
Emblem
REMNANT
LIFE
This is to certify that after evaluation of the inspection and material testing system of the
following firm, the Central Boilers Board has granted recognition to it under sub-regulation
(2) of regulation 4C of the Indian Boiler Regulations, 1950 as a Well Known Remnant Life
Assessment Organisation.
M/s._____________________
_________________________
_________________________
This certificate is valid for three years, i.e. upto____________
_______________
Date of Issue
Approval Certificate No.____________
_______________
Secretary
FORM XVII
CERTIFICATE OF MANUFACTURE AND TEST
FOR SMALL INDUSTRIAL BOILERS
(MANUFACTURED UNDER CHAPTER XIV)
1. Makers name_______________________________ Year of make_________
2. Manufactured for
3. Location of installation
4. Boiler identification
6. Size of Boiler
Length (metres)
Width (metres)
Height(metres)
Si
Mn
Diameter(metres)_
Mechanical properties
--------------------------------------
YS
UTS
% EL
Shell.........
Furnace........
Tube plates..........
Flange..........
Boiler tubes/pipes/pads details........................
Diameter Thickness Material specification
Chemical composition
Mechanical properties
------------------------------------------------
Si
Mn
--------------------------------------
YS
UTS
% EL
Tube ...
Pipes
Pads
8. Volumetric Capacity
9. Heating Surface (sq. metres)..............
10. Nozzle Connection
(a) Steam Outlet.
(No., Size and Type of Nozzles)
(b) Safety Value.
(No., Size and Type of Nozzles)
(c) Auxiliary (Air Vent).....
(Size and Type)
(d) Blow-off Valve
(No., Size and Type of Nozzles)
(e) Feed Valve
(No., Size and Type of connection)
11. Shop Hydro Test Pressure (kg/cm2)____________________ date __________
Signature of Manufacturer
We certify that the above boiler constructed under our supervision and inspected at
various stages of construction by the inspecting officer and that the construction,
workmanship were satisfactory as per Indian Boiler Regulations.
Inspecting Officer
FORM XVIII
{See regulation 392(4)}
2.
Year of establishment
3.
4.
:
:
5.
evidence
6.
7.
8.
9.
10.
11.
12.
13.
Date:
Place:
Note: 1. The recognition of the firm as a repairer shall be for a period of two years,
thereafter they shall apply for renewal of their recognition at least two months before the
expiry of the said period.