APQP Progress Report - Coversheet

This document is an APQP (Advanced Product Quality Planning) progress report checklist for a supplier. It summarizes progress on key APQP elements such as design FMEA, drawings, timeline, tooling, trial production runs, and training. Open issues are documented along with responsibilities and target completion dates. The checklist ensures all significant characteristics are controlled and that production preparation is on track to meet PPAP (Production Part Approval Process) deadlines.

Uploaded by

Aman Awachat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
366 views3 pages

APQP Progress Report - Coversheet

This document is an APQP (Advanced Product Quality Planning) progress report checklist for a supplier. It summarizes progress on key APQP elements such as design FMEA, drawings, timeline, tooling, trial production runs, and training. Open issues are documented along with responsibilities and target completion dates. The checklist ensures all significant characteristics are controlled and that production preparation is on track to meet PPAP (Production Part Approval Process) deadlines.

Uploaded by

Aman Awachat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

APQP Progress Report - Coversheet

Supplier: Using Plant:


Location: SDE:
Supplier Code:
Contact:

Part number: Program:


Part Name: Model Year:
Revision: PPAP Due:
Date of Rev: PPAP Run:

Team Members Company Phone

Open Issues Responsibility Completion Date

Cayman Business Systems


2/2000 -- 16949.com
APQP Progress Report - Checklist
Supplier:
Part Number: Rev:
Person Due
APQP Element % GY R Comment/Action Required Responsible Date
DESIGN FMEA
1 Header complete to AIAG standards
2 Cross functional team formed.
3 RPN value for corrective action established
4 Corrective action for high RPN.
5 Design verification plan complete.

DRAWING
1 Drawing is understood, all specs. in hand.
2 Tolerances are realistic and attainable.
3 Significant characteristics are agreed upon.
4 Team feasibility commitment complete.

TIME LINE - GANTT CHART


1 Time line is established.
2 Customer report dates included.
3 Required due dates are included.

RAW MATERIALS/COMPONENTS
1 Sub-contractors/Suppliers are determined.
2 APQP is on time. (components).
3 Raw materials are ordered.
4 Raw materials are in-house.
5 Raw materials have been tested/verified.

PROTOTYPE CONTROL PLAN


1 Header complete to AIAG standards.
2 All significant characteristics included.
3 Evaluation method included.

PROCESS FLOW CHART


1 Flow chart is complete.
2 characteristics.

PFMEA
1 Header complete to AIAG standards.
2 Cross functional team formed.
3 RPN value for corrective action established.
4 Corrective action for high RPN.

CONTROL PLAN
1 Header complete to AIAG standards.
2 All significant characteristics included.
3 Evaluation method included.
4 Sample sizes adequate.
5 Sample frequencies adequate.
6 Reaction plan for nonconforming matl.
7 Pre-launch control plan is completed.

MEASUREMENT SYSTEMS ANALYSIS


1 New gages have been dimensionally verified.
2 Gage R&R's are complete.
3 R&R's are acceptable.
TOOLING
1 Tooling on time
2 Tooling sampled at toolshop.
3 Tooling is properly identified
4 Tooling sampled on production equipment.

TRIAL PRODUCTION RUN


1 Capacity verified.
2 All dimensions are within tolerance.
3 SC's, CC's, DC's are capable (>1.67 Ppk).
4 Samples have been submitted for ES test.
5 ES testing is complete and satisfactory.

CAPITAL EQUIPMENT
1 Equipment is on time.
2 Run off at supplier complete.
3 Run off at installation to machine specs.
4 Capacity has been verified.
5 Equipment is properly identified.

Disk File Name: 606759003.xls The Cove! Page 2


Sheet Name: Checklist 16949.com Print Date: 08/22/2022
APQP Progress Report - Checklist
Supplier:
Part Number: Rev:
Person Due
APQP Element % GY R Comment/Action Required Responsible Date
TRAINING
Adequate staffing for new equipment/processes
1 is acquired and trained.
2 Maintenance personnel are trained.
3 Production personnel are trained.

OPERATOR INSTRUCTIONS
1 approved.
2 Includes instructions for nonconforming material.
3 Includes packaging requirements.

PROCESS SET-UP INSTRUCTIONS


1 Process parameters are determined.
Parameters are in a range to allow for variation in
2 materials and environment.
3 required.

INSPECTION INSTRUCTIONS
1 Incoming inspection instructions are complete.
2 In-process inspection instructions are complete.
3 Final inspection instructions are complete.
4 All are keyed to the Control Plan, Flow Chart.

PACKAGING INSTRUCTIONS
1 Packaging per customer specifications.
2 Ensures product integrity.

Disk File Name: 606759003.xls The Cove! Page 3


Sheet Name: Checklist 16949.com Print Date: 08/22/2022