Ooling Echnology Nstitute: Publications
Ooling Echnology Nstitute: Publications
PRICE LIST
Publications
ESG-138............... Recommended Procedures ........... $10.00 ESG-151 ................ Variable Frequency Drive ............. $15.00
Long Term Storage Application Guidelines for Cooling Towers
Procedures recommended for the long-term storage of industrial scale This standard covers the guidelines for operation of cooling towers at
cooling towers. In general, long-term storage is for an extended period variable speeds. Revised January 2020
of more than one year, but these recommendations can also be
modified for seasonal storage. The techniques are divided between
ESG-152 ... Structural Design of FRP Components.... $15.00
Mechanical Equipment and Wood Structure. These two groups of This guideline provides minimum design standards and cautionary
components require the most attention because they will deteriorate recommendations to designers of FRP structural cooling towers.
rapidly if preventive measures are not taken. Revised October 2009 Revised May 2013
WTB-139 ........... Suggested Ozone Reading List .......... $8.00 ESG-153 ... Recommended Guidelines for Portland ... $10.00
WTB-139.1 Cement Concrete for Mechanical Draft Cooling Towers
The CTI Water Treatment Committee has prepared the attached This guideline offers recommendations for the use of Portland cement
reading list on the use of ozone in cooling water systems. This concrete in the use of mechanical draft cooling towers. May 2019
suggested list of reading materials was developed to assist in the
dissemination of information on the use of ozone in cooling water STD-154 .......... Cooling Tower Filament Wound ......... $10.00
systems and in no way represents an endorsement by CTI on the use Fiberglass Piping Systems
of ozone. This list will periodically be updated as new contributions to The information within this standard is for the design, manufacturing,
the literature are made on this topic. April 1992 / July 1994 installation and testing of FRP piping to be used in Cooling Tower
applications. Revised July 2017
ATC-140 ... Isokinetic Drift Measurement Test Code ... $60.00
For Water Cooling Towers
WTG-155 ...... Internal Plant Cooling Water Reuse ....... $10.00
The purpose of this document is to provide general guidelines to plant
owners and operators for water conservation through internal plant
cooling water reuse. July 2008
Research Papers
RSP-1 ............................................................................. $20.00
CTI Multi-Agency Testing Committee – Wet Bulb Instrument Investigation. Summary White Paper. July 2019
(Prices do not include postage and handling.)
CTI Journal
The CTI Journal is the first technical journal devoted solely to the subject of cooling towers and their operations. The CTI Journal is of current interest to
Institute members and other professionals responsible for the construction specifications, testing, maintenance and operation of cooling towers.
The CTI Journal is published each year in January and June. Complimentary subscriptions are mailed to individuals in the United States. Library
subscriptions are $45/year. Subscriptions mailed to individuals outside the United States are $45/per year.
CTI Directory
Membership Directory .................................................. $50.00
Spiral bound with membership categorized by Honorary Members, Manufacturers, Suppliers, Users and Individual Members. Includes a copy of the CTI
Bylaws.
(Prices do not include postage and handling.)
CTI Manual
The purpose of the CTI Manual is to bring together into a common place, comprehensive information pertaining to cooling towers and other types of
equipment that reject heat to the atmosphere. The Manual has been developed in the form of individual chapters, each of which stands on its own merit,
and includes a list of references and a bibliography.
Chapters now available:
Chapter 1 - Cooling Tower Operations
(March 2010).............................................. $10.00
Chapter 2 - Introduction to CTI Thermal Design
(March 1998)................................................ $8.00
Chapter 3 - Performance Variables of Cooling Towers
(March 1998).............................................. $15.00
Chapter 4 - Recommendations for Winter
(September 2018) ...................................... $15.00
Chapter 6 - Water Chemistry and Treatments
(July 2005) ................................................. $25.00
Chapter 9 - Materials of Construction for Cooling Towers
(Revised May 2017) ................................... $15.00
Chapter 10 - Mechanical Components for Cooling Towers
(March 2011).............................................. $15.00
Chapter 11 - Electrical Components for Cooling Towers
(January 1984) ............................................. $8.00
Chapter 12 - Field-Erected Cooling Tower Fire Protection
(Reviewed April 2018)................................ $10.00
Chapter 13 - Inspection of Cooling Towers
(Revised January 2013) ............................. $20.00
Complete manual .......................................................... $138.00
3-Ring 2" binder with “CTI Manual” lettered on it is available for $20.00.
Historical Documents
The following documents have been removed from the CTI Publication Manual and/or the CTI Manual
either because they are considered no longer feasible, considered inaccurate per current technology,
or not permitted due to environmental concerns. However, the documents do contain valuable
information for the industry as historical documents. These documents are only available in .pdf
format.
Bid Form
PTG-118 ................................................... SF/FA (Factory Assembled) ........................................................ $5.00
PTG-118 ......................................................... SF/FE (Field Erected) ............................................................... $5.00
The inquiry and Bid Form is used to show minimum information that is necessary to include inquiries and to show all
pertinent data on the requested bids. Cooling tower purchasers use this form with their inquiries by filling out all the
information marked with an asterisk (*). Manufacturers then return their bids on this form. This assures the purchaser of
receiving adequate information on all bids. It also facilitates the comparison of bids by furnishing the same information in
the same place on all bids. Further, it establishes uniform units for the various data. July 1993
WTG-132 .......................... Supervisory Guide Handling Water Treatment Chemicals ................................ $8.00
A guide for first-line supervisors responsible for cooling tower treatment operations. October 1984