0% found this document useful (0 votes)
391 views

11.2 Project Folder Structure: AEC (UK) BIM Protocol

The document provides an example folder structure for organizing BIM project data with 6 main folders: BIM data repository, Shared data, Published Data, Archived Data, Incoming Data, and Project Resources Library. The structure is designed to encourage compliance with the standard and separate work-in-progress, shared, published, archived, incoming, and resource files into clearly labeled subfolders for each stage of the project.

Uploaded by

devansh kakkar
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
391 views

11.2 Project Folder Structure: AEC (UK) BIM Protocol

The document provides an example folder structure for organizing BIM project data with 6 main folders: BIM data repository, Shared data, Published Data, Archived Data, Incoming Data, and Project Resources Library. The structure is designed to encourage compliance with the standard and separate work-in-progress, shared, published, archived, incoming, and resource files into clearly labeled subfolders for each stage of the project.

Uploaded by

devansh kakkar
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

AEC (UK) BIM Protocol

11.2 Project Folder Structure


The following folder structure is provided as an example arrangement, designed to
encourage compliancy with the strategies contained within this standard.

This is provided as an example only and should not be used in preference to or


replace any internal company quality assured standard folder structures. Always
consider your company processes and procedures, especially if ISO accreditation is
involved before adopting change.

- [Project Folder]
- BIM [BIM data repository]
- 01-WIP [WIP data repository]
- CAD [CAD files (incl. ‘Modified’)]
- BIM [Design models (incl. ‘Modified’)]
- SheetFiles [Sheet/dwg files]
- Export [Export data e.g. gbXML or images]
- Families [Components created during this
project]
- WIP_TSA [WIP Temporary Shared Area (TSA)]
- 02-Shared [Verified Shared data]
- CAD [CAD data/output files]
- BIM [Design models]
- CoordModels [Compilation models]
- 03-Published [Published Data]
+ YYYYMMDD-Description [Sample submission folder]
+ YYYYMMDD-Description [Sample submission folder]
- 04-Archived [Archived Data repository]
+ YYMMDD-Description [Archive folder]
+ YYMMDD-Description [Archive folder]
- 05-Incoming [Incoming Data repository]
- Source [Data originator]
+ YYYYMMDD-Description [Incoming folder]
+ Source [Data originator]
- 06-Resource [Project BIM Resources Library]
+ Titleblocks [Drawing borders/titleblocks]
+ Logos [Project logos]
+ Standards [Project standards]

No spaces are to be used in the folder naming as this can potentially interfere with
certain file management tools and collaboration across the internet.

AEC(UK)BIMProtocol-v2.0.docx Page 46 of 46

You might also like