RISK ASSESSMENT
ACTIVITY: Installation of UPS System RA No. ASU/ HSE – RA 0128
LOCATION: Dubai. UAE PROJECT: VIDA HOTEL AND RESIDENCES – E105 DATE: 23/07/2022
AL SHAFAR UNITED LLC.
HEALTH, SAFETY AND ENVIRONMENT
RISK ASSESSMENT SHEET
Project: VIDA HOTEL AND RESIDENCES Risk Assessment No: ASU/ HSE – RA 128
Activity: Flushing of Chilled & Condenser Water Piping Date of assessment: 23/07/2022 Rev: 00
Date Reviewed:
R/A Activity Hazard Harm Personnel involved Risk Control Measure Residual Risk Responsible
Ref. P S R P S R Person
☒ WORK AT HEIGHT ☒ ELECTRICITY ☒ HAND TOOLS ☒ TASK LIGHTING ☐ CONFINED SPACE ☐ EXCAVATION / ☒ EMPLOYEES ☐ PUBLIC
BACK FILLING
1|Page
AL SHAFAR UNITED LLC.
HEALTH, SAFETY AND ENVIRONMENT
RISK ASSESSMENT SHEET
Project: VIDA HOTEL AND RESIDENCES Risk Assessment No: ASU/ HSE – RA 128
Activity: Flushing of Chilled & Condenser Water Piping Date of assessment: 23/07/2022 Rev: 00
Date Reviewed:
R/A Activity Hazard Harm Personnel involved Risk Control Measure Residual Risk Responsible
Ref. P S R P S R Person
☒ SAFETY
☒ ADEQUATE VENTILATION ☒ WORK PERMIT ☒ PROPER TOOLS / EQUIPMENTS ☒ PROPER SUPERVISION
INDUCTION
☒ COVID 19 PRECAUTIONS ☒ PROPER PPE ☒ SAFE WORKPLACE ☒ PROPER BARRICADE AND WARNING SIGN IN THE AFFECTED AREA
☒ TOOL BOX TALK
☒ SAFETY HELMET ☒ GOGGLES / SAFETY GLASSES ☒ RESPIRATORY PROTECTION / BREATHING APPARATUS ☒ GLOVES ☒ OVERALLS
☒ SAFETY BOOTS ☒ EAR PLUGS / DEFENDERS ☒ FULL BODY SAFETY HARNESS ☒ HIGH VIZ SAFETY JACKET ☐ WELDING/METAL CUTTING PPE
RISK LEVEL
H (HIGH-Potential to cause death, M (MEDIUM – Potential to cause loss time injury L (LOW – An injury treatable with First Aid or Short Term Environmental
permanent injury or Severe or Long Term Environmental Impact) Impact)
Permanent Environmental Harm)
SEVERITY (S)
LIKELIHOOD (L) CLASS OF RISK (L X S) RISK MATRIX
Health & Safety Environmental Impact
2|Page
AL SHAFAR UNITED LLC.
HEALTH, SAFETY AND ENVIRONMENT
RISK ASSESSMENT SHEET
Project: VIDA HOTEL AND RESIDENCES Risk Assessment No: ASU/ HSE – RA 128
Activity: Flushing of Chilled & Condenser Water Piping Date of assessment: 23/07/2022 Rev: 00
Date Reviewed:
R/A Activity Hazard Harm Personnel involved Risk Control Measure Residual Risk Responsible
Ref. P S R P S R Person
0 = No injury 5 5 10 15 20 25
0 = Impossible Short Term < less than 1 month
LIKELIHOOD
4 4 8 12 16 20
1 = Minor – (FAC)
1 = Improbable 0 = No harm HIGH = 15 – 25 3 3 6 9 12 15
2 = Major - (MTC)
2 = Remote 3 = Minor 2 2 4 6 8 10
3 = LTI (Lost Time
(L)
3 = Probable Long Term > Greater than 1 Month MEDIUM = 07 – 14 1 1 2 3 4 5
Incident) 1 2 3 4 5
4 = Occasional 4 = Major
LOW = 01 - 06
5 = Frequent
4 = Disabling Injuries
5 = Fatality
5 = Catastrophic X SEVERITY (S)
NOTE: 1. Risk assessment must be addressed to workers by work in charge before starting job.
2. Risk assessment is a continuous process hence to be reviewed depending on activity and risk involved
1 Access to Access/ Egress Fatality Site personnel 5 5 25 Site safety induction for all must be 1 5 5 SE /
worksite/ Hit by vehicle Fracture Operatives done prior to enter the workplace. Supervisor /
Work Area Slip, Trip & Fall Personal Follow site emergency procedures. FM /WF/ HSE
Injury Ensure separate way for vehicles
Property /equipment’s and pedestrians.
Damage Proper coordination and necessary
permission shall be obtained with
3|Page
AL SHAFAR UNITED LLC.
HEALTH, SAFETY AND ENVIRONMENT
RISK ASSESSMENT SHEET
Project: VIDA HOTEL AND RESIDENCES Risk Assessment No: ASU/ HSE – RA 128
Activity: Flushing of Chilled & Condenser Water Piping Date of assessment: 23/07/2022 Rev: 00
Date Reviewed:
R/A Activity Hazard Harm Personnel involved Risk Control Measure Residual Risk Responsible
Ref. P S R P S R Person
4|Page
AL SHAFAR UNITED LLC.
HEALTH, SAFETY AND ENVIRONMENT
RISK ASSESSMENT SHEET
Project: VIDA HOTEL AND RESIDENCES Risk Assessment No: ASU/ HSE – RA 128
Activity: Flushing of Chilled & Condenser Water Piping Date of assessment: 23/07/2022 Rev: 00
Date Reviewed:
R/A Activity Hazard Harm Personnel involved Risk Control Measure Residual Risk Responsible
Ref. P S R P S R Person
5|Page
AL SHAFAR UNITED LLC.
HEALTH, SAFETY AND ENVIRONMENT
RISK ASSESSMENT SHEET
Project: VIDA HOTEL AND RESIDENCES Risk Assessment No: ASU/ HSE – RA 128
Activity: Flushing of Chilled & Condenser Water Piping Date of assessment: 23/07/2022 Rev: 00
Date Reviewed:
R/A Activity Hazard Harm Personnel involved Risk Control Measure Residual Risk Responsible
Ref. P S R P S R Person
compact access
Alternative measures adopted if
need to move the heavy materials
through stairs
Ensuring adequate illumination in
workplace by providing light.
Try to reduce manual handling and
use alternate methods such as
mechanical lifting
Appropriate PPEs should be worn
all the time of activities in addition
to mandatory PPEs i.e. Heavy-duty
hand gloves, eye protectors etc.
Small items should be put into
cages or palletized for ease of
movements and reduce hazards dur
to physical nature of the load.
3 Use of Power Electrocution. Fatality Operatives 5 5 25 Only 110V rated power tools must 1 5 5 SE/
tools/Hand Fire. Disability Site personnel be used at site. Supervisor /
tools. Sharp Edges. Hand Injury Only competent person should be FM / HSE
Slip and fall of Burn. allowed to operate the power tools.
tools. Overheating. Ensure all tools are inspected and
Electrocutio color coded prior to use.
n. Adequate sign Boards.
6|Page
AL SHAFAR UNITED LLC.
HEALTH, SAFETY AND ENVIRONMENT
RISK ASSESSMENT SHEET
Project: VIDA HOTEL AND RESIDENCES Risk Assessment No: ASU/ HSE – RA 128
Activity: Flushing of Chilled & Condenser Water Piping Date of assessment: 23/07/2022 Rev: 00
Date Reviewed:
R/A Activity Hazard Harm Personnel involved Risk Control Measure Residual Risk Responsible
Ref. P S R P S R Person
7|Page
AL SHAFAR UNITED LLC.
HEALTH, SAFETY AND ENVIRONMENT
RISK ASSESSMENT SHEET
Project: VIDA HOTEL AND RESIDENCES Risk Assessment No: ASU/ HSE – RA 128
Activity: Flushing of Chilled & Condenser Water Piping Date of assessment: 23/07/2022 Rev: 00
Date Reviewed:
R/A Activity Hazard Harm Personnel involved Risk Control Measure Residual Risk Responsible
Ref. P S R P S R Person
8|Page
AL SHAFAR UNITED LLC.
HEALTH, SAFETY AND ENVIRONMENT
RISK ASSESSMENT SHEET
Project: VIDA HOTEL AND RESIDENCES Risk Assessment No: ASU/ HSE – RA 128
Activity: Flushing of Chilled & Condenser Water Piping Date of assessment: 23/07/2022 Rev: 00
Date Reviewed:
R/A Activity Hazard Harm Personnel involved Risk Control Measure Residual Risk Responsible
Ref. P S R P S R Person
place.
Only cup-lock scaffolds allowed to
work beside/ nearby shafts, or
unprotected edges.
Only inspected and green tagged
scaffolds allowed to proceed work.
Only competent and certified
scaffold inspectors/ supervisor
allowed to inspect and put tag on
scaffolds.
Prior to use scaffold, must check and
confirm scaffold components (top
rails/ mid rail/ toe-board/ out
riggers/ base plate/ platform planks
etc.) properly installed and secure to
use.
5 Use of trolleys Damaged/ Physical Workers 4 4 16 Load the trolley within its limit of 1 4 SE/
for shifting defected trolleys injury Storekeeper capacity • Defected trolley must Supervisor /
materials Overloaded or Property not be used FM / HSE
unsecured damage Persons should be aware about safe
trolleys use of trolley.
Monthly color-coding shall be
available for trolley in good
condition.
9|Page
AL SHAFAR UNITED LLC.
HEALTH, SAFETY AND ENVIRONMENT
RISK ASSESSMENT SHEET
Project: VIDA HOTEL AND RESIDENCES Risk Assessment No: ASU/ HSE – RA 128
Activity: Flushing of Chilled & Condenser Water Piping Date of assessment: 23/07/2022 Rev: 00
Date Reviewed:
R/A Activity Hazard Harm Personnel involved Risk Control Measure Residual Risk Responsible
Ref. P S R P S R Person
10 | P a g e
AL SHAFAR UNITED LLC.
HEALTH, SAFETY AND ENVIRONMENT
RISK ASSESSMENT SHEET
Project: VIDA HOTEL AND RESIDENCES Risk Assessment No: ASU/ HSE – RA 128
Activity: Flushing of Chilled & Condenser Water Piping Date of assessment: 23/07/2022 Rev: 00
Date Reviewed:
R/A Activity Hazard Harm Personnel involved Risk Control Measure Residual Risk Responsible
Ref. P S R P S R Person
11 | P a g e
AL SHAFAR UNITED LLC.
HEALTH, SAFETY AND ENVIRONMENT
RISK ASSESSMENT SHEET
Project: VIDA HOTEL AND RESIDENCES Risk Assessment No: ASU/ HSE – RA 128
Activity: Flushing of Chilled & Condenser Water Piping Date of assessment: 23/07/2022 Rev: 00
Date Reviewed:
R/A Activity Hazard Harm Personnel involved Risk Control Measure Residual Risk Responsible
Ref. P S R P S R Person
12 | P a g e
AL SHAFAR UNITED LLC.
HEALTH, SAFETY AND ENVIRONMENT
RISK ASSESSMENT SHEET
Project: VIDA HOTEL AND RESIDENCES Risk Assessment No: ASU/ HSE – RA 128
Activity: Flushing of Chilled & Condenser Water Piping Date of assessment: 23/07/2022 Rev: 00
Date Reviewed:
R/A Activity Hazard Harm Personnel involved Risk Control Measure Residual Risk Responsible
Ref. P S R P S R Person
13 | P a g e
AL SHAFAR UNITED LLC.
HEALTH, SAFETY AND ENVIRONMENT
RISK ASSESSMENT SHEET
Project: VIDA HOTEL AND RESIDENCES Risk Assessment No: ASU/ HSE – RA 128
Activity: Flushing of Chilled & Condenser Water Piping Date of assessment: 23/07/2022 Rev: 00
Date Reviewed:
R/A Activity Hazard Harm Personnel involved Risk Control Measure Residual Risk Responsible
Ref. P S R P S R Person
11 Emergency Incompetent Fatality All personnel at 4 5 20 All activities to stop and area to be 1 5 5 SE/
Response Plan person Physical site evacuated in case of emergency Supervisor /
Lack of injury event. FM / HSE
14 | P a g e
AL SHAFAR UNITED LLC.
HEALTH, SAFETY AND ENVIRONMENT
RISK ASSESSMENT SHEET
Project: VIDA HOTEL AND RESIDENCES Risk Assessment No: ASU/ HSE – RA 128
Activity: Flushing of Chilled & Condenser Water Piping Date of assessment: 23/07/2022 Rev: 00
Date Reviewed:
R/A Activity Hazard Harm Personnel involved Risk Control Measure Residual Risk Responsible
Ref. P S R P S R Person
15 | P a g e
AL SHAFAR UNITED LLC.
HEALTH, SAFETY AND ENVIRONMENT
RISK ASSESSMENT SHEET
Project: VIDA HOTEL AND RESIDENCES Risk Assessment No: ASU/ HSE – RA 128
Activity: Flushing of Chilled & Condenser Water Piping Date of assessment: 23/07/2022 Rev: 00
Date Reviewed:
R/A Activity Hazard Harm Personnel involved Risk Control Measure Residual Risk Responsible
Ref. P S R P S R Person
16 | P a g e