0% found this document useful (0 votes)
290 views

CT Calculation MFAC14

This document provides specifications for a current transformer (CT) for use with an MFAC14 restricted earth fault relay. It includes the CT designation, system data, CT data, cable data, relay data, and three requirements for the CT: 1) to prevent relay maloperation during saturation, 2) for appropriate relay application, and 3) that the CT knee point voltage must be greater than twice the relay voltage setting. The CT specifications are for a National Grid substation in Saudi Arabia.

Uploaded by

Jay Win
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
290 views

CT Calculation MFAC14

This document provides specifications for a current transformer (CT) for use with an MFAC14 restricted earth fault relay. It includes the CT designation, system data, CT data, cable data, relay data, and three requirements for the CT: 1) to prevent relay maloperation during saturation, 2) for appropriate relay application, and 3) that the CT knee point voltage must be greater than twice the relay voltage setting. The CT specifications are for a National Grid substation in Saudi Arabia.

Uploaded by

Jay Win
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

CERT'D

APPR'D
CHK'D National Grid Saudi Arabia

MFAC14

CT1 CORE-3
CT DATA FOR MFAC14- 87REF
DESCRIPTION

3000-2500-2000-1500-1250-1000-750/1A
CLASS:TPS, Rct<=6.7Ω, VK>=5500V, Im<=50mA
BY
DATE
NO.

REVISIONS
DRAWN

BY:-

DATE:-

CHECKED

BY:-

DATE:-

OPRG. DEPT

BY

DATE:-

ENG'G. DEPT.

BY:-

DATE:-

CERTIFIED.

BY:-

DATE:-

AS BUILT BY DATE 12/30/99

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT TO BE
USED FOR CONSTRUCTION CT & PT CALCULATIONS
OF FOR ORDERING
MATERIALS UNTIL CERTIFIED 132/13.8kV S/S P 01 OF 00
AND DATED
THIS DRAWING IS NOT TO BE
USED FOR CONSTRUCTION
OF FOR ORDERING
MATERIALS UNTIL CERTIFIED P 01 OF 00
AND DATED

RIYADH SAUDI ARABIA JOB ORDER NO. DWG. CONT. SHT.


CERT'D
APPR'D National Grid Saudi Arabia

1 SYSTEM PARAMETERS
CHK'D

Nominal Voltage : 110 kV


Max. SC current capacity : 40 kA
System frequency : 60 Hz

Resistivity of the Copper

ρ75 = ρ20 [(1 + α (θ - 20)]


DESCRIPTION

where:
ρ20 Resistivity of the copper at 20 deg c = 0.01786 Ωmm2/m

α Cofficient of resistance = 0.00393

ρ75 Resistivity of the copper at 75 deg c = 0.021720439 Ωmm2/m


BY
DATE
NO.

REVISIONS
DRAWN

BY:-

DATE:-

CHECKED

BY:-

DATE:-

OPRG. DEPT

BY

DATE:-

ENG'G. DEPT.

BY:-

DATE:-

CERTIFIED.

BY:-

DATE:-

AS BUILT BY DATE 12/30/99

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT TO BE
USED FOR CONSTRUCTION CT & PT CALCULATIONS
OF FOR ORDERING
MATERIALS UNTIL CERTIFIED 132/13.8kV S/S P 01 OF 00
AND DATED
THIS DRAWING IS NOT TO BE
USED FOR CONSTRUCTION
OF FOR ORDERING
MATERIALS UNTIL CERTIFIED P 01 OF 00
AND DATED

RIYADH SAUDI ARABIA JOB ORDER NO. DWG. CONT. SHT.


CERT'D
APPR'D National Grid Saudi Arabia

1.1 CT Designation : 87REF


CHK'D

Application : Restricted Earth Fault


Relays : MFAC14

System Data
System Voltage 110 kV
System Frequency 60 Hz
System fault level 40 kA
Time constant 80 ms

CT Data
DESCRIPTION

CT Ratio 3000-2500-2000-1500-1250-1000-750/1 A
CT used tap 3000 A
Class TPS
CT resistance (Rct) 6.7 Ω
CT secondary 1 A
CT knee voltage 5550 V
CT mag current 50 mA

Cable data
Cable Length (lwire1) 240 m
Cross Section (awire1) 4 mm2
Resistivity at 75 deg C (ρ75) 0.021720439 Ωmm2/m
Eff. Wire length p.u. (k) 2
BY

RLEAD1 = (k*lwire1*pcu)/awire1
DATE

= 2.607 Ω

Relay Data
NO.

Relay Description Relay Type Relay Burden Make


REVISIONS
Restricted Earth Fault (REF) MFAC14 0.00 VA Alstom
DRAWN

BY:-

DATE:- Other Burden 0.00 VA


CHECKED

BY:-

DATE:-

OPRG. DEPT Power Transformer Data:


BY SMVA = 502 MVA
DATE:- %IMPED = 19.50%
ENG'G. DEPT. IFL = 2634.82 A
BY:-

DATE:-

CERTIFIED.

BY:-

DATE:-

AS BUILT BY DATE 12/30/99

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT TO BE
USED FOR CONSTRUCTION CT & PT CALCULATIONS
OF FOR ORDERING
MATERIALS UNTIL CERTIFIED 132/13.8kV S/S P 01 OF 00
AND DATED
THIS DRAWING IS NOT TO BE
USED FOR CONSTRUCTION
OF FOR ORDERING
MATERIALS UNTIL CERTIFIED P 01 OF 00
AND DATED

RIYADH SAUDI ARABIA JOB ORDER NO. DWG. CONT. SHT.


CERT'D
APPR'D National Grid Saudi Arabia

CT requirement for MFAC14

Requirement No.-1
CHK'D

To prevent maloperation of the relay during saturation of the CT on external fault, the relay setting Vs
must be greater than the voltage produced by the maximum secondary flowing through the cable resistance.

Vs > Ithrough * ( 1∕ T ) * ( RLEAD + Ri )


Requirement No.-2
For appropriate application of the relay, the min. primary fault current required to operate
through fault current the relay should be greaer than 10% of the nominal primary full load current.

Iop ≥ 0.1 * IFL

Requirement No.-3
The Knee point voltage must be greater than twice the voltage setting of the relay.
DESCRIPTION

Vkp ≥ 2 * VS
Where,
Iop = Minimum relay primary operating current
Vkp = Knee point voltage of the CT
IFL = Nominal primary full load current
Vs = Relay voltage setting
Ithrough = Maximum through fault current
T = Turns ratio of CT
RLEAD = Connecting cable resistance
Ri = Internal resistance of the CT
IMAG. = CT mag. Current at Vs.

CT Adequacy Check
BY

Requirement No.-1
DATE

Vs > Ithrough * ( 1∕ T ) * ( RLEAD + Ri )


> 40000 * ( 1∕ 3000 ) * ( 2.607 + 6.7 )
> 124.09333 V
NO.

Thus,
REVISIONS Vs = 124 V
DRAWN Requirement No.-2
BY:- Iop ≥ 0.1 * IFL
DATE:- ≥ 263.482 A
CHECKED

BY:- Requirement No.-3


DATE:-

OPRG. DEPT Vkp ≥ 2 * VS


BY

DATE:- Vkp ≥ 248 V


ENG'G. DEPT.

BY:-

DATE:-

CERTIFIED.

BY:-

DATE:-

AS BUILT BY DATE 12/30/99

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT TO BE
USED FOR CONSTRUCTION CT & PT CALCULATIONS
OF FOR ORDERING
MATERIALS UNTIL CERTIFIED 132/13.8kV S/S P 01 OF 00
AND DATED
THIS DRAWING IS NOT TO BE
USED FOR CONSTRUCTION
OF FOR ORDERING
MATERIALS UNTIL CERTIFIED P 01 OF 00
AND DATED

RIYADH SAUDI ARABIA JOB ORDER NO. DWG. CONT. SHT.


CERT'D
APPR'D National Grid Saudi Arabia

Now , actual operating current of the relay shall be:


IOP1 = T * ( IR + n * IMAG1 )
Where IR = The relay operating current = 0.02 A
CHK'D

(At setting voltage as relay catalouge)

n = No. of current transformer in parallel with relay = 10


Since the magnetizing curve shall be linear in the region upto knee-point voltage , therefore the magnetizing current
at setting voltage can be calculated as under:

IMAG at Vkp is = 0.05 A


IMAG at setting volts is = ( Vs * IMAG ) ∕ Vkp

IMAG1 at setting volts is = 0.00111711712 A

IOP1 = 93.52 A < 263.482 A


DESCRIPTION

SHUNT RESISTOR CALCULATIONS:

As the relay will operate at a current much less than the actual fault current , therefore ,
it may be increased by the addition of a resistor RST to give a current IST to achieve the necessary primary current.

IST1 = (IOP/Tp)-(IR+n*IMAG1)

IST1 = 0.05665616216 A

The value of resistor is:

RST1 = Vs/IST1
RST1 = 2188.641
BY

= 3282.962 Ohms (50% more than the calculated value)

METROSIL CALCULATIONS:
DATE

VP1 = 2√(2*Vkp(Vf1-Vkp)
If:
NO.

VP1 > 2 kV
REVISIONS Then metrosil are required
DRAWN VP1 = Peak voltage across relay under maximum internal fault condition
BY:- Vkp = Knee point voltage of C.T
DATE:- Vf1 = (ISCC/Tp)*(RLEAD+Ri+RRELAY)
CHECKED

BY:- RRELAY = VSETTING ∕ IRELAY


DATE:- = 124 ∕ 0.02
OPRG. DEPT RRELAY = 6200 Ohm
BY For a fault of 40kA on primary side, we will check the requirement of metrosils
DATE:- Vf1 = (ISCC/Tp)*(RLEAD+Ri+RRELAY)
ENG'G. DEPT. Vf1 = 82790.76 V
BY:-

DATE:- Therefore
CERTIFIED. VP1 = 58561.8454627 Vp-p
BY:- METROSIL IS REQUIRED
DATE:-

AS BUILT BY DATE 12/30/99

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT TO BE
USED FOR CONSTRUCTION CT & PT CALCULATIONS
OF FOR ORDERING
MATERIALS UNTIL CERTIFIED 132/13.8kV S/S P 01 OF 00
AND DATED
THIS DRAWING IS NOT TO BE
USED FOR CONSTRUCTION
OF FOR ORDERING
MATERIALS UNTIL CERTIFIED P 01 OF 00
AND DATED

RIYADH SAUDI ARABIA JOB ORDER NO. DWG. CONT. SHT.