Inspection & Testing Plan For Installation of GRP Pipes

This document outlines the inspection and testing plan for installing GRP pipes at an ADCOOP distribution center project. It details 5 items to be inspected prior to installation, including verifying method statements, drawings, material quality, storage, and dimensions. It also details 1 item during installation: visually checking that pipes are the proper size and location according to approved drawings. The plan notes the acceptance criteria, specifications, frequency of inspection, and responsibilities of the job contractor, engineer, and third parties for each test.

Uploaded by

sandeep reshma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
678 views

Inspection & Testing Plan For Installation of GRP Pipes

This document outlines the inspection and testing plan for installing GRP pipes at an ADCOOP distribution center project. It details 5 items to be inspected prior to installation, including verifying method statements, drawings, material quality, storage, and dimensions. It also details 1 item during installation: visually checking that pipes are the proper size and location according to approved drawings. The plan notes the acceptance criteria, specifications, frequency of inspection, and responsibilities of the job contractor, engineer, and third parties for each test.

Uploaded by

sandeep reshma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Inspection & Testing Plan for Installation of GRP pipes

Ref. P1122-0000-GEN-ME-ITP-0150-03 Rev. (03) Form Issue Date: 13/06/2022

Client : ADCOOP Prepared & signed by: Eng.SANDEEP


Project : ADCOOP DISTRIBUTION CENTRE
The Employer : ADCOOP Discipline : MEP Reviewed & signed by: ENG.NAVEEN
Engineer : WINNER ITP Serial No. : P1122-0000-GEN-HV-ITP-0150-03 Approved & signed by: ENG.YOUSUF
Contractor : JAZAL ENGINEERING AND CONTRACTING L.L.C Date : Page :
Item No.

Frequency of Applicable
Inspection THIRD
Inspection / Test to be carried out Test / Acceptance Criteria Specification / Control Data / Forms
Method JEC WINNER PARTY/SITE
Inspection Standard
LAB

1 PREPARATION PHASE (Before Installation)


Specifications/appr Approved Method Statement
oved material Ref. Ref.MS-JECL-MEP-001
Prior to start of
1.1 Method Statement Visula check satisfactory, MS-JECL-MEP-001
proper sizes pipes and accessories free of damage N/A H H N/A
work

Specifications/appr
Prior to start of oved material Ref. Approved Shop Drawings
1.2 Drawings Engineers Approval N/A H H N/A
work JEC-C1040-SD-ME- IFC Drawings
DR-SP-00
Specifications/appr Approved Method Statement
Prior to start of oved material Ref.
1.3 Delivery of GRP pipes Quantity verification Visual R S N/A
work JEC-C1040-SD-ME-
DR-SP-00
Dust and Dirt protection Approved Method Statement
Prior to start of Manufacturer's
1.4 Proper storage and proper cover.Not over Visual W S N/A
work stacking
recommendation
No Damage material, Specifications/appr
Dimensions / Sizes, oved material
Prior to start of
1.5 Material Inspection Marking on material, Material submittal Visual W W N/A
work
As per material
approval

1 BICC-P1122-FM-000 8rev.00
Inspection & Testing Plan for Installation of GRP pipes
Ref. P1122-0000-GEN-ME-ITP-0150-03 Rev. (03) Form Issue Date: 13/06/2022

Client : ADCOOP Prepared & signed by: Eng.SANDEEP


Project : ADCOOP DISTRIBUTION CENTRE
The Employer : ADCOOP Discipline : MEP Reviewed & signed by: ENG.NAVEEN
Engineer : WINNER ITP Serial No. : P1122-0000-GEN-HV-ITP-0150-03 Approved & signed by: ENG.YOUSUF
Contractor : JAZAL ENGINEERING AND CONTRACTING L.L.C Date : Page :
Item No.

Frequency of Applicable
Inspection THIRD
Inspection / Test to be carried out Test / Acceptance Criteria Specification / Control Data / Forms
Method JEC WINNER PARTY/SITE
Inspection Standard
LAB
2 INSTALLATION PHASE
Approved shop
Visual check
drawings/material submittal
satisfactory, proper
GRP pipes are installed in correct location as per As per approved and manufacturer
2.1 For each location size pipes and Visual R S N/A
approved drawings and equipment schedule shop drawings recommendations and check
accessories free of
list Ref. P1122-0000-GEN-
damage
HV-CK-0002
Specifications/appr
Visual check Approved shop
oved material
satisfactory, as per drawings/material submittal
2.2 Below Ground Drainage Gravity test For each location Visual R/W W N/A
approved material and manufacturer
submittal recommendations

Visual check Approved shop


As per approved
satisfactory, as per drawings/material submittal
2.3 2.3a Installation of underground pipes For each location shop drawings/ Visual/Dimension R W N/A
approved SD and and manufacturer
Details drawings
details drawings recommendations

No Damage to manufacturer's
Final inspection of complete installation including pipes/accessories and recomm.,Proj.
2.3 For each location Approved Drawings Visual R H N/A
identification prior to cover up works installed as per Spec., Approved
approved SD SD
Visula check
Approved shop
satisfactory, proper As per approved
drawings/material submittal
2.3 Clearance for civil work For each location sizes pipes and shop drawings/ N/A H H N/A
and manufacturer
accessories free of Details drawings
recommendations
damage
As per approved
complying all the IFC Drawings and
2.3 Review & endorse Red Line drawings For each location shop drawings/ N/A H H N/A
comments specifications
Details drawings

Visual check
Functional testing of complete drainage piping satisfactory, as per Spec. & Local Approved Drawings/Specs/
2.3 Final Hand over Visual H W N/A
system approved SD and Authority Material submittal
details drawings

1 BICC-P1122-FM-000 8rev.00
Inspection & Testing Plan for Installation of GRP pipes
Ref. P1122-0000-GEN-ME-ITP-0150-03 Rev. (03) Form Issue Date: 13/06/2022

Client : ADCOOP Prepared & signed by: Eng.SANDEEP


Project : ADCOOP DISTRIBUTION CENTRE
The Employer : ADCOOP Discipline : MEP Reviewed & signed by: ENG.NAVEEN
Engineer : WINNER ITP Serial No. : P1122-0000-GEN-HV-ITP-0150-03 Approved & signed by: ENG.YOUSUF
Contractor : JAZAL ENGINEERING AND CONTRACTING L.L.C Date : Page :
Item No.

Frequency of Applicable
Inspection THIRD
Inspection / Test to be carried out Test / Acceptance Criteria Specification / Control Data / Forms
Method JEC WINNER PARTY/SITE
Inspection Standard
LAB
Visual check
satisfactory, as per Spec. & Local Approved Drawings/Specs/
2.3 Final connection with Manhole/Infrastructure Final Hand over Visual H R/A A
approved SD and Authority Material submittal
details drawings

Visual check
satisfactory, as per Spec. & Local Approved Drawings/Specs/
2.3 Testing & Comissioning for gravity system For each location Visual H R/W A
approved SD and Authority Material submittal
details drawings

Spec. & Local


Engineers Approval/ Authority & Approved Drawings/Specs/
3 Review as built drawings For each location N/A H R/A N/A
As per site installation approved shop Material submittal
drawings
Note: AAAA: Contractor's Abbreviation, B: Discipline (CIV for Civil, STR for Structural, ELC for Electrical & MEC for Mechanical), ITP: Inspection & Testing Plan, NNN: Form Serial Number, XX: Revision Number,
dd/mm/yyyy: day/month/year , Responsibility: H-Hold, W-Witness, S-Surveillance, R-Review/Record