0% found this document useful (0 votes)
623 views1 page

2 Storey Residential

This document is a bill of materials for a proposed 2-storey house owned by Apolinario B. Peralta to be built on Lot 8 Blk 38 Sub-Blk C 155 KKK St. in Brgy 150 Bagong Barrio, Caloocan City. It includes costs for general requirements, site preparation, earth works including excavation and backfilling, reinforcement bars, and concrete works. The total cost of materials is estimated to be over PHP 100,000.

Uploaded by

Mark
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
623 views1 page

2 Storey Residential

This document is a bill of materials for a proposed 2-storey house owned by Apolinario B. Peralta to be built on Lot 8 Blk 38 Sub-Blk C 155 KKK St. in Brgy 150 Bagong Barrio, Caloocan City. It includes costs for general requirements, site preparation, earth works including excavation and backfilling, reinforcement bars, and concrete works. The total cost of materials is estimated to be over PHP 100,000.

Uploaded by

Mark
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PROJECT: Proposed 2-Storey House (Peralta Residence)

OWNER: Apolinario B. Peralta


LOCATION: Lot 8 Blk 38 Sub-Blk C 155 KKK St. Brgy 150 Bagong Barrio Caloocan City
Date: December 12, 2016

BILL OF MATERIALS
Item No. Description Unit Qty Rate Amount
1.0 GENERAL REQUIREMENTS lot 1 10,000.00 15,000.00
Signed and sealed plans and other documents

necessary for building and construction permit

2.0 SITE PREPARATION


Mobilization, site clearing and layout lot 1 5,000.00 5,000.00

3.0 EARTH WORKS


2.1 Excavation
Foundation cu.m 34 75.00 2,550.00
Wall footing cu.m 11 75.00 825.00
Septic Tank cu.m 9 75.00 675.00
2.2 Backfill/Compaction cu.m 33 100.00 3,300.00
2.3 Gravel Base cu.m 3.5 500.00 1,750.00
2.4 Soil debris disposal cu.m 13 75.00 975.00
Sub-total (Earth works) 10,075.00

STRUCTURAL WORKS

3.0 REINFORCEMENT BARS


3.1 Foundation/Footing
20mmø x 6.0m Gr.60 Rebars kg 770 22.50 17,325.00
16mmø x 6.0m Gr.60 Rebars kg 247 22.50 5,557.50
10mmø x 6.0m Gr.60 Rebars kg 93 22.70 2,111.10
3.2 Column
16mmø x 6.0m Gr.60 Rebars kg 512 22.50 11,520.00
10mmø x 6.0m Gr.60 Rebars kg 49 22.70 1,112.30
3.3 Beam/girders
16mmø x 6.0m Gr.60 Rebars kg 511 22.50 11,497.50
10mmø x 6.0m Gr.60 Rebars kg 33 22.70 749.10
3.4 Slab
10mmø x 6.0m Gr.40 Rebars kg 809 22.0 17,798.00
3.6 GI Tie wires #16 kg 50 35.0 1,750.00
Sub-total (Reinforcement bars) 69,420.50

4.0 CONCRETE WORKS


Class A mixture 1:2:4 @ 50 Kg cement bag