100% found this document useful (3 votes)
929 views

Job Safety Analysis (JSA) - CONCRETE WORKS - Date

This document summarizes the job safety analysis for concrete works. It identifies potential hazards at each step, including unauthorized work without permits, lack of barricades creating risks to others, physical injuries from equipment, and slip hazards from wet or reinforced concrete. Control measures are provided to mitigate each hazard, such as obtaining valid work permits, conducting toolbox talks, using appropriate personal protective equipment, controlling concrete discharge hoses, and maintaining good housekeeping.

Uploaded by

nabeel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
929 views

Job Safety Analysis (JSA) - CONCRETE WORKS - Date

This document summarizes the job safety analysis for concrete works. It identifies potential hazards at each step, including unauthorized work without permits, lack of barricades creating risks to others, physical injuries from equipment, and slip hazards from wet or reinforced concrete. Control measures are provided to mitigate each hazard, such as obtaining valid work permits, conducting toolbox talks, using appropriate personal protective equipment, controlling concrete discharge hoses, and maintaining good housekeeping.

Uploaded by

nabeel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

King Faisal Air Academy Project

Job Safety Analysis (JSA) ___CONCRETE WORKS__________________________


Date:_____________________________
Steps of Work Identified Hazard Control Measures

 Authorized PTW holder shall ensure obtaining


1.Work permits to be obtained.  Unauthorized commencement of works may and maintaining valid work permit.
result in exposing workers and or potential to  Inform all workers regarding permit condition
2.Pre-task briefing toolbox talks harm or danger before work starts. Supervisor shall conduct TBT
before work starts.
 Wear appropriate PPE
3.Set out boundary markers/barricades for the work site  No barricading shall Creating a risk of others  Ensure that all barricades and signage are of a
area. coming into the area. suitable height to be clearly seen and sufficient
lighting is placed to identify the area at night
 Ensure that a driver is having knowledge to
4.Mobilization and demobilization the hazard while transporting the
 Physical injury from heavy equipment, heavy materials.
lifting, pinch point, slip, trips and fall hazards  Driver is driving only in the minimum
speed limit.

 Machine works too close to persons within  Ensure that all equipment is having valid 3rd
5.Unloading the ready-mix concrete from truck and from the same working area. party certificates to work in the vicinity.
concrete pumps  Violent ejection of concrete from hose at  Give warning prior to starting or re- commencing
first moment of delivery the pour
 Check hoses for air sources.
 Walking on the concrete foundation during  Ensure delivery hose is not damaged prior to pour
the pour that causing slipping on wet ply or
 Control T-bar at end of hose
reinforcement
 Be aware of potential for blow back in the line
 Fumes from fuel used for vibrator possible to  In case of chemical contact, Remove chemical
from skin with waterless hand cleaner
explosion and/or fire, burns, rashes or
allergies

6. Disposal of waste concrete to designated areas.  Poor access to working area causing of  Housekeeping regimes to help keep site clear
7.House keeping slips, trips, falls and or other injuries  Ensure sufficient space around work areas

Prepared by: Review by:


Foreman / Leadman Name & Signature Safety Officer Name

Page 1 of 1 KFAA-1422-FOR-HS-0028-R0
King Faisal Air Academy Project
Job Safety Analysis (JSA) ___CONCRETE WORKS__________________________
Date:_____________________________
Steps of Work Identified Hazard Control Measures

Page 2 of 1 KFAA-1422-FOR-HS-0028-R0

You might also like