Job Safety Analysis (JSA) - CONCRETE WORKS - Date
Job Safety Analysis (JSA) - CONCRETE WORKS - Date
Machine works too close to persons within Ensure that all equipment is having valid 3rd
5.Unloading the ready-mix concrete from truck and from the same working area. party certificates to work in the vicinity.
concrete pumps Violent ejection of concrete from hose at Give warning prior to starting or re- commencing
first moment of delivery the pour
Check hoses for air sources.
Walking on the concrete foundation during Ensure delivery hose is not damaged prior to pour
the pour that causing slipping on wet ply or
Control T-bar at end of hose
reinforcement
Be aware of potential for blow back in the line
Fumes from fuel used for vibrator possible to In case of chemical contact, Remove chemical
from skin with waterless hand cleaner
explosion and/or fire, burns, rashes or
allergies
6. Disposal of waste concrete to designated areas. Poor access to working area causing of Housekeeping regimes to help keep site clear
7.House keeping slips, trips, falls and or other injuries Ensure sufficient space around work areas
Page 1 of 1 KFAA-1422-FOR-HS-0028-R0
King Faisal Air Academy Project
Job Safety Analysis (JSA) ___CONCRETE WORKS__________________________
Date:_____________________________
Steps of Work Identified Hazard Control Measures
Page 2 of 1 KFAA-1422-FOR-HS-0028-R0