IFRC Logframe Template Definitions Examples 3 2011
IFRC Logframe Template Definitions Examples 3 2011
Click the links for definition of terms, example logframe 1 and example 2 and project/programme planning guidance manual on Fednet
Outcome 3
Output 3.1
Output 3.2
Output 3.3
Inputs/resources Costs & sources
Activities
Continue to add additional rows for outcomes, outputs and activities as necessary
IFRC Logical Framework (logframe) – Definition of Terms
OBJECTIVES INDICATORS ASSUMPTIONS
MEANS OF VERIFICATION
(What we want to achieve) (How to measure change) (What else to be aware of)
(Where / how to get information)
Impact Indicators
Goal
Quantitative and/or qualitative How the information on the
The long-term results that an External conditions necessary if the
criteria that provide a simple and indicator will be collected (can
intervention seeks to achieve, which Goal is to contribute to the next level
reliable means to measure include who will collect it and how
may be contributed to by factors of intervention.
achievement or reflect changes often).
outside the intervention.
connected to the goal.
Outcomes1
External conditions not under the
The primary result(s) that an
Outcome Indicators direct control of the intervention
intervention seeks to achieve, most
As above, connected to the stated As above necessary if the outcome is to
commonly in terms of the knowledge,
outcome. contribute to reaching intervention
attitudes or practices of the target
goal.
group.
Outputs
External factors not under the direct
The tangible products, goods and Output Indicators
control of the intervention which
services and other immediate results As above, connected to the stated As above
could restrict the outputs leading to
that lead to the achievement of outputs.
the outcome.
outcomes.
Output 2.1 School Disaster 1.1: # of participating schools that have a new
Management plans are developed DM Plan tested (20 [out of 25] within 2 years) 1.1a: Copy of school DM plan (checked
Students are not taken out
and tested at participating schools. by project manager, every 6 months)
of school by their parents.
Output 2.2: School Disaster 1.2: % of DMGs that have at least 2
Management Groups (DMGs) are teachers/staff, 2 parents, 2 students, and 1.2a: DMU meeting minutes (checked by
The majority of teachers
formed in participating schools. conduct regular monthly meetings (80% within 2 project manager, every 6 months)
remain in their jobs for at
years)
Output 2.3: Disaster risk reduction least 1 year.
1.3a: School classroom reports (project
lessons are included in the 1.3: % of students [of which 25% are female] in
manager & volunteer, every 6 months)
curriculum. the targeted schools who have received disaster
preparedness and disaster risk education
Activities (for output 2.1) Input/ Resources
2.1.1Organize 10 school planning 2.1.1: Space to hold meetings, trainers/peer Costs & sources
People in the community
meetings. facilitators, training materials CHF 10,000 (appeal), CHF 3,000 (locally
have no new demands on
2.1.2Train school teachers in 2.1.2: Classroom, training materials raised funds), volunteer time, donated
their time preventing them
facilitating DM planning. 2.1.3: Computers, printers, awareness raising space for meeting/training
from participating
2.1.3Develop/translate school-based materials, translator
DM awareness materials.
Activities for other outputs Inputs & resources for other outputs Costs & sources for other outputs