Distribution : Controlled X Uncontrolled Available on computer X
Document status : CUSTOMER :
F.I ( Information )
F.C ( Comments )
F.E ( Execution )
F.A X ( Application ) PT. PLN (PERSERO)
Title : DISTANCE PROTECTION RELAY
Micom P446 - F2179
GI 150 kV Galang
OHL Negeri Dolok 1
Type : FIELD TEST REPORT
Contract :
PEMBANGUNAN GARDU INDUK 150 kV NEGERI DOLOK
DAN 150 kV GALANG EXT
GLN/150/ITS/0151/ED GI 150 kV Galang
Contract draw specific number Name
by
on
by
on
B by
on
A by CIPTO LUHUR DIAN Original Issue EN
on 3/13/2013 3/13/2013 3/13/2013
Ind Rev Prepared Checked Approved Modification Sheets
PT. GRID SOLUTIONS INDONESIA
This document is the property of PT. AG and cannot be used, reproduced or transmitted to thirds without prior written permission.
PT. GRID SOLUTIONS INDONESIA DISTANCE PROTECTION Ref.
FA SECTION RELAY Chapt.
OHL NEGERI DOLOK 1 Sheet : 2
F211 Rev. A
SUMMARY SHEET REVISION
1 LIST OF EQUIPMENT USED 2 B
2 CHARACTERISTICS 3 B
3 PRELIMINARY CHECKS 3 B
4 RELAY TEST 6 B
1 - LIST OF TEST EQUIPMENT USED
Identification Test corresponding to paragr.
Designation
Number 3 4 5
UNIVERSAL TESTING SET, CMC 356 X X
DIGITAL MULTIMETER FLUKE 179 X X
This document is the property of PT. AG and cannot be used, reproduced or transmitted to thirds without prior written permission.
PT. GRID SOLUTIONS INDONESIA DISTANCE PROTECTION Ref.
FA SECTION RELAY Chapt.
OHL NEGERI DOLOK 1 Sheet : 3
F211 Rev. A
Testing and Commissioning will be performed using the following manufacturer publication :
- P44x/EN CM/E33 - Commissioning
- P44x/EN RS/E33 - Commissioning Test & Record Sheet
2 CHARACTERISTICS
- Circuit : OHL NEGERI DOLOK
- Relay Type : P 4 4 3 9 1 6 D 0 7 6 0 M
- Serial No : 34233986/10/17
- Rated current In : 1/5 A
- Rated Voltage Vn : 48 -110 V
- Auxiliary Voltage Vx : 110 V
3 PRELIMINARY CHECKS
Visual Inspection
Device condition GOOD
Rating information CORRECT
Case earth CONNECTED
CT shorting contact check GOOD
External wiring conformity
Wiring conformity to drawing DES/275/ITS/0132/ED
Test block connection CONFORM
Watchdog contact check (aux. supply off)
Terminal 11 & 12 contact CLOSED
Contact resistance 0.1 Ω
Terminal 13 & 14 contact OPEN
Measured Auxiliary Supply
Watchdog contact check (aux. supply on)
Terminal 11 & 12 contact OPEN
Terminal 13 & 14 contact CLOSED
Contact resistance 0.1 Ω
Date and Time
Clock set to local time ? YES
Time maintained when aux. supply removed? YES
LED (Light Emitting Diodes)
Relay healthy (green ) LED status WORKING
Alarm (yellow) LED status WORKING
Out of service (yellow) LED status WORKING
Trip (red) LED status WORKING
All (8) programmable LED's status WORKING
Field Supply Voltage
Measured voltage at terminal 7 & 9
Measured voltage at terminal 8 & 10
This document is the property of PT. AG and cannot be used, reproduced or transmitted to thirds without prior written permission.
PT. GRID SOLUTIONS INDONESIA DISTANCE PROTECTION Ref.
FA SECTION RELAY Chapt.
OHL NEGERI DOLOK 1 Sheet : 4
F211 Rev. B
Rear Communication Port
Comm. Standard
Comm. Status
Protocol converter
Current Inputs Check
Setting : Displayed current : X Primary Secondary
Phase CT ratio : 2000/1 A Mutual CT ratio :
Earth Fault CT ratio : 2000/1 A
Injected Displayed Expected
Phase
Current (A) Current Display
0.1 198.5 A 200 A
IA 0.5 1001 A 1000 A
1.0 2007 A 2000 A
0.1 1991. A 200 A
IB 0.5 1001 A 1000 A
1.0 2007 A 2000 A
0.1 198.5 A 200 A
IC 0.5 1000 A 1000 A
1.0 2006 A 2000 A
---
IM ---
---
Voltage Inputs Check
Setting : Displayed current : X Primary Secondary
Main VT ratio : 275/100 V
Injected Displayed Expected
Phase
Voltage (V) Voltage (kV) Display (kV)
14.38 39.4 39.54
Va 28.75 78.97 79.06
57.73 158.7 158.75
14.38 39.44 39.54
Vb 28.75 78.96 79.06
57.73 158.7 158.75
14.38 39.48 39.54
Vc 28.75 79.00 79.06
57.73 158.7 158.75
This document is the property of PT. AG and cannot be used, reproduced or transmitted to thirds without prior written permission.
PT. GRID SOLUTIONS INDONESIA DISTANCE PROTECTION Ref.
FA SECTION RELAY Chapt.
OHL NEGERI DOLOK 1 Sheet : 5
F211 Rev. B
4.2 Distance Protection Zone Reach
Phase-Ground
Fault Impedance Z (Ohm) V Operating
Zone Phase Phi ° Indication Remarks
type Z R X Test(V) time
5 1,462 4,782 16.7 ms DISTANCE TRIP
A 73 10 PHASA A OK
23.5 6,817 22.47 19.70 ms GRND ZONE I
5 1,462 4,782 16.7 ms DISTANCE TRIP
1 B 70 40 PHASA B OK
23.5 6,817 22.47 19.70 ms GRND ZONE I
5 1,462 4,782 16.7 ms DISTANCE TRIP
C 70 40 PHASA C OK
23.5 6,817 22.47 19.70 ms GRND ZONE I
24 7,017 22.95 621.2 ms DISTANCE TRIP
A 70 40 PHASA A OK
34 9,941 32.51 626.1 ms GRND ZONE II
24 7,017 22.95 621.2 ms DISTANCE TRIP
Ph-Grd 2 B 70 40 PHASA B OK
34 9,941 32.51 626.1 ms GRND ZONE II
24 7,017 22.95 621.2 ms DISTANCE TRIP
C 70 40 PHASA C OK
34 9,941 32.51 626.1 ms GRND ZONE II
35 10.23 33.47 1421 ms DISTANCE TRIP
A 70 40 PHASA A OK
50 14.62 47.82 1.428 ms GRND ZONE III
35 10.23 33.47 1422 ms DISTANCE TRIP
3 B 70 40 PHASA B OK
50 14.62 47.82 1.428 ms GRND ZONE III
35 10.23 33.47 1423 ms DISTANCE TRIP
C 70 40 PHASA C OK
50 14.62 47.82 1.428 ms GRND ZONE III
This document is the property of PT. AG and cannot be used, reproduced or transmitted to thirds without prior written permission.
PT. GRID SOLUTIONS INDONESIA DISTANCE PROTECTION Ref.
FA SECTION RELAY Chapt.
OHL NEGERI DOLOK 1 Sheet : 6
F211 Rev. B
Phase-Phase
Fault Impedance Z (Ohm) V Operating
Zone Phase Phi ° Indication Remarks
type Z R X Test(V) time (msec)
0.5761 0.1684 0.5509 15.80 ms DISTANCE TRIP
A-B 73 10 PHASA A,B,C OK
24 7,017 22.95 22.60 ms PHASA ZONE I
5 0.522 4.973 15.80 ms DISTANCE TRIP
1 B -C 73 10 PHASA A,B,C OK
28 2.927 27.85 22.60 ms PHASA ZONE I
5 0.522 4.973 15.80 ms DISTANCE TRIP
C-A 73 10 PHASA A,B,C OK
28 2.927 27.85 22.60 ms PHASA ZONE I
24.5 7,163 23.43 420.1 ms DISTANCE TRIP
A-B 73 10 PHASA A,B,C OK
42.5 12.43 40.64 437.2 ms PHASA ZONE II
29 3.031 29 420.1 ms DISTANCE TRIP
Ph-Ph 2 B -C 73 10 PHASA A,B,C OK
38 3.972 37.79 437.2 ms PHASA ZONE II
29 3.031 29 420.1 ms DISTANCE TRIP
C-A 73 10 PHASA A,B,C OK
38 3.972 37.79 437.2 ms PHASA ZONE II
43.5 12.72 41.60 1.223 ms DISTANCE TRIP
A-B 73 10 PHASA A,B,C OK
62 18.13 59.29 1.247 ms PHASA ZONE III
39 4.077 39.79 1.223 ms DISTANCE TRIP
3 B -C 73 10 PHASA A,B,C OK
50 5.226 49.73 1.247 ms PHASA ZONE III
39 4.077 39.79 1.223 ms DISTANCE TRIP
C-A 73 10 PHASA A,B,C OK
50 5.226 49.73 1.247 ms PHASA ZONE III
TESTED BY WITNESS BY APPROVAL
KOS PT MEGA ELTRA PT. GRID SOLUTIONS PT. PLN(PERSERO) PT. PLN(PERSERO) PT. PLN
PT ENAM ENAM GROUP INDONESIA UPP MEDAN UIP JARSUM 1 PUSERTIF
This document is the property of PT. AG and cannot be used, reproduced or transmitted to thirds without prior written permission.