Ducted System Handing Over Report: Form SH-1
Ducted System Handing Over Report: Form SH-1
1. We have handed over the AC system described below today for beneficial use by you:
Equipment installed Achieved conditions
Description of space
Model Qty Temp RH
Outside conditions
P.T.O.
2. We have trained your .............................................................................................................................................
.............................................................................................................................. on how to start/stop the AC units.
3. We have handed over one User Manual for each Packaged / Ducted Split Airconditioner. The manual contains a lot
of useful information. We request you to read the same.
4. Warranty dates have been established earlier in this document. Warranty conditions are explained in the User
Manual.
5. You are requested to complete the following works, so that the AC plant delivers full capacity:
6. Please contact us at the following numbers, for after-sales service. And please check with us for our good
value-for-money Annual Maintenance Contracts when the warranty is coming to a close.
............................................................................
(Signature of BSL representative)
Signature: ....................................................
distributed on .....................................................................
Customer
Customer.............................................................................
No: ££££££
BSL Code
Model
Sr. No.
Location
(e.g.: Office, Reception
Area & Conference Hall etc.,)
–– Circuit 1
–– Circuit 2
–– Circuit 3
Operating Voltage
Operating Current
Supply Air
(canvas temp) Temperature ..................................... oC/oF Temperature ..................................... oC/oF
Return Air (at grille) Temperature ..................................... oC/oF Temperature ..................................... oC/oF
Model
Sr. No.
Location
(e.g.: Office, Reception
Area & Conference Hall etc.,)
–– Circuit 1
–– Circuit 2
–– Circuit 3
Operating Voltage
Operating Current
Supply Air
(canvas temp) Temperature ..................................... oC/oF Temperature ..................................... oC/oF
Return Air (at grille) Temperature ..................................... oC/oF Temperature ..................................... oC/oF