0% found this document useful (0 votes)
207 views

Objective Assignment 2: (Https://swayam - Gov.in)

This document is from an online course on Quality Control and Improvement with MINITAB. It covers Unit 4, Week 2, including lectures on Pareto charts, cause and effect diagrams, design failure mode and effect analysis, introduction to statistical process control, and X-bar and R charts. It also includes an objective assignment with 11 multiple choice questions related to these quality control topics.

Uploaded by

smg26thmay
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
207 views

Objective Assignment 2: (Https://swayam - Gov.in)

This document is from an online course on Quality Control and Improvement with MINITAB. It covers Unit 4, Week 2, including lectures on Pareto charts, cause and effect diagrams, design failure mode and effect analysis, introduction to statistical process control, and X-bar and R charts. It also includes an objective assignment with 11 multiple choice questions related to these quality control topics.

Uploaded by

smg26thmay
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

22/06/2021 Quality Control and Improvement with MINITAB - - Unit 4 - Week 2

(https://swayam.gov.in)       (https://swayam.gov.in/nc_details/NPTEL)

[email protected]

NPTEL (https://swayam.gov.in/explorer?ncCode=NPTEL) » Quality Control and Improvement with

MINITAB (course)

Course
outline Objective Assignment 2
The due date for submitting this assignment has passed.
How does an Due on 2021-03-03, 23:59 IST.
NPTEL online As per our records you have not submitted this assignment.
course work?
1) What is RPN? 1 point
Week 0
Risk Potential Number

Week 1 Risk Priority Number


Risk Preference number
Week 2 Risk Preventive Number

Lecture 06:
No, the answer is incorrect.
Score: 0
Importance of
Accepted Answers:
Pareto Chart
Risk Priority Number
and Cause
and Effect 2) A particular product has been given the following rankings for calculating RPN while 1 point
Diagram (unit?
preparing FMEA chart, S=10, O=2, D=2. What is the value of RPN?
unit=30&lesson=33)

Lecture 07: 20
Design Failure 10
Mode and
40
Effect Analysis
(unit? 2
unit=30&lesson=34)
No, the answer is incorrect.
Score: 0
Lecture 08:
Introduction to Accepted Answers:
Statistical 40
Process
3) According to common industry scale, what does occurrence ranking (O) 1 indicate? 1 point
Control (unit?
unit=30&lesson=35)
Not likely
Highly likely

https://onlinecourses.nptel.ac.in/noc21_mg47/unit?unit=30&assessment=31 1/4
22/06/2021 Quality Control and Improvement with MINITAB - - Unit 4 - Week 2

Lecture 09: X- Certain to happen


bar and R
The value doesn’t exist
Chart (unit?
unit=30&lesson=36) No, the answer is incorrect.
Score: 0
Lecture 10: X- Accepted Answers:
bar and S Not likely
Chart (unit?
unit=30&lesson=37) 4) Inspection of 20 samples (taken at specific interval of time) for bearing and seal 1 point
assemblies with subgroup size of 100 is considered and sample data sheet is given below:
Quiz :
Objective
Assignment 2
(assessment?
name=31)

Subjective
Assignment 2
(/noc21_mg47/subjective?
name=32)

Assignment
solutions-2
(unit?
unit=30&lesson=64)

Weekly
Feedback
(unit?
unit=30&lesson=38)

Download
Videos (unit?
unit=30&lesson=39)

Week 3 Which specific type of control chart will you recommend for monitoring the assembly process?

Week 4 X-bar & S chart


c chart
Week 5 np chart
X-bar & R chart
Week 6
No, the answer is incorrect.
Score: 0
Week 7
Accepted Answers:
np chart
Week 8
5) Which one is correct? 1 point
 
In a stable process gap between UCL & LCL is always higher than tolerance
In a stable process gap between UCL & LCL is always lower than tolerance
There is no relationship between UCL, LCL & tolerance.
None of the above is correct
No, the answer is incorrect.
Score: 0
Accepted Answers:
There is no relationship between UCL, LCL & tolerance.

6) The output of a process is stable and normally distributed. If the process mean 1 point
equals 23.5, what percent of output will be smaller than the mean?

https://onlinecourses.nptel.ac.in/noc21_mg47/unit?unit=30&assessment=31 2/4
22/06/2021 Quality Control and Improvement with MINITAB - - Unit 4 - Week 2

10%
30%
50%
Cannot be determined without the standard deviation
No, the answer is incorrect.
Score: 0
Accepted Answers:
50%

7) Within subgroup variation and between subgroup variation are reflected in 1 point

X-bar chart and R chart respectively


R chart and X chart respectively
Only R chart reflects both cases
Only X-bar chart reflects both cases.
No, the answer is incorrect.
Score: 0
Accepted Answers:
R chart and X chart respectively

8) Minimum number of defects to define a defective item is 1 point

One
Two
Defect has no relation with Defective
More than two.
No, the answer is incorrect.
Score: 0
Accepted Answers:
One

9) Quality Improvement projects should be selected from: 1 point

Projects where the root cause is known


Projects that are management “pet projects”
Voice of Customer (VOC)
Projects where there is a lack of data
No, the answer is incorrect.
Score: 0
Accepted Answers:
Voice of Customer (VOC)

10) To form rational-subgroups for an -chart, the goal is to have the samples be as 1 point
____________ as possible.

heterogeneous
homogeneous
large
equally spaced
No, the answer is incorrect.
Score: 0
Accepted Answers:
homogeneous

https://onlinecourses.nptel.ac.in/noc21_mg47/unit?unit=30&assessment=31 3/4
22/06/2021 Quality Control and Improvement with MINITAB - - Unit 4 - Week 2

11) Cause and effect diagram is also known as _______ 1 point

Fishbone diagram
Ishikawa diagram
Effect diagram
Ishikawa diagram or Fishbone diagram
No, the answer is incorrect.
Score: 0
Accepted Answers:
Ishikawa diagram or Fishbone diagram

https://onlinecourses.nptel.ac.in/noc21_mg47/unit?unit=30&assessment=31 4/4