Objective Assignment 2: (Https://swayam - Gov.in)
Objective Assignment 2: (Https://swayam - Gov.in)
(https://swayam.gov.in) (https://swayam.gov.in/nc_details/NPTEL)
MINITAB (course)
Course
outline Objective Assignment 2
The due date for submitting this assignment has passed.
How does an Due on 2021-03-03, 23:59 IST.
NPTEL online As per our records you have not submitted this assignment.
course work?
1) What is RPN? 1 point
Week 0
Risk Potential Number
Lecture 06:
No, the answer is incorrect.
Score: 0
Importance of
Accepted Answers:
Pareto Chart
Risk Priority Number
and Cause
and Effect 2) A particular product has been given the following rankings for calculating RPN while 1 point
Diagram (unit?
preparing FMEA chart, S=10, O=2, D=2. What is the value of RPN?
unit=30&lesson=33)
Lecture 07: 20
Design Failure 10
Mode and
40
Effect Analysis
(unit? 2
unit=30&lesson=34)
No, the answer is incorrect.
Score: 0
Lecture 08:
Introduction to Accepted Answers:
Statistical 40
Process
3) According to common industry scale, what does occurrence ranking (O) 1 indicate? 1 point
Control (unit?
unit=30&lesson=35)
Not likely
Highly likely
https://onlinecourses.nptel.ac.in/noc21_mg47/unit?unit=30&assessment=31 1/4
22/06/2021 Quality Control and Improvement with MINITAB - - Unit 4 - Week 2
Subjective
Assignment 2
(/noc21_mg47/subjective?
name=32)
Assignment
solutions-2
(unit?
unit=30&lesson=64)
Weekly
Feedback
(unit?
unit=30&lesson=38)
Download
Videos (unit?
unit=30&lesson=39)
Week 3 Which specific type of control chart will you recommend for monitoring the assembly process?
6) The output of a process is stable and normally distributed. If the process mean 1 point
equals 23.5, what percent of output will be smaller than the mean?
https://onlinecourses.nptel.ac.in/noc21_mg47/unit?unit=30&assessment=31 2/4
22/06/2021 Quality Control and Improvement with MINITAB - - Unit 4 - Week 2
10%
30%
50%
Cannot be determined without the standard deviation
No, the answer is incorrect.
Score: 0
Accepted Answers:
50%
7) Within subgroup variation and between subgroup variation are reflected in 1 point
One
Two
Defect has no relation with Defective
More than two.
No, the answer is incorrect.
Score: 0
Accepted Answers:
One
10) To form rational-subgroups for an -chart, the goal is to have the samples be as 1 point
____________ as possible.
heterogeneous
homogeneous
large
equally spaced
No, the answer is incorrect.
Score: 0
Accepted Answers:
homogeneous
https://onlinecourses.nptel.ac.in/noc21_mg47/unit?unit=30&assessment=31 3/4
22/06/2021 Quality Control and Improvement with MINITAB - - Unit 4 - Week 2
Fishbone diagram
Ishikawa diagram
Effect diagram
Ishikawa diagram or Fishbone diagram
No, the answer is incorrect.
Score: 0
Accepted Answers:
Ishikawa diagram or Fishbone diagram
https://onlinecourses.nptel.ac.in/noc21_mg47/unit?unit=30&assessment=31 4/4