Mock Associate Certification
Mock Associate Certification
a Business Rules
b Community
c Accelerator
d Data dictionary
a Guidewire Community
b Guidewire Marketplace
c Guidewire website
d Client site
3 Which are the tools provided by GW to understand the product features ? (Any 3)
a Testable
b Feature
c Traceable
d Necessary
a Document the requirements as discussed in the meeting because the solution is already provided
b Check for gaps between the requirement and the solution
c Consider the impact of the solution
d Do not challenge the solution or design
7 In which guidewire website you will find training material where it will show how can we prepare a quote?
a markeplace.guidewire.com
b guidewire.com
c education.guidewire.com
d Client site
a Use cases
b Assumptions
c Business Rules
d Acceptance criteria
s are conflict
we prepare a quote? H
L
M
1 Select the responsibilities of a Business Analyst in Guidewire Project (Any 2)
a Unit testing
b Act as a liasion with all stakeholders
c Works closely with the Developers and Testers
d Demo to Developers and Testers
a Inception
b Before each sprint
c Pre-Inception
d During Sprint 0
1 Week
2 Weeks
3 to 4 Weeks
<6 weeks
7 A single story card feature can be built through several user stories across several iterations ? Is it True or False ?
1
0
8 What is the naming convention of a story card ?
a UI Mock up - screenshot of a proposed user story. UI - Final - Final screenshot to be placed by a BA after
b UI Mock up - screenshot of a proposed user story, placeholder to document UI requirements. UI - Final -
c UI Mock up - screenshot of a proposed user story. UI - Final - Final screenshot to be placed by a BA after
d UI Mock up - screenshot of a proposed user story, not a placeholder to document UI requirements. UI
10 If there are changes to the user story document on an approved version, what is the best practice while updating th
12 What are the best practices to follow while conducting elaboration workshop ? (Any 3)
14 Which group will work on communicating the functions of the new product to the end users ?
a Product Owners
b Business SMEs
c Change Management
d BA's, Developers, QA
a Role
b Actor
c Reason
d Action
17 If there are different values for Marital status - Divorced, Widowed, Single, Married and if 'Single' has to be listed fir
a Conditions
b Priority
c Code
d Type code name
a Focus on Value
b Delivery
c Knowledge Transfer
d Increased scope delivery
a User story
b PCF
c Data Dictionary
d Accelerator
22 What are the best practices during planning a delivery sprint (Select 2)
a Definition of Done
b Restatements of requirements
c Descriptions of Solutions
d conditions of satisfaction
a At the same time as the business requirement and before the functional requirements are written
b At the end of the delivery sprint
c Duirng the inception phase
d Beginning of the sprint
L
L
ations ? Is it True or False ?
L
ment sprint
H
L
nd if 'Single' has to be listed first in the dropdown, how can it be indicated in the Typelist tab ? H
M
M
a Pre inception
b Inception
c Development
d Stabilization
a Program-->Project -->Release-->Iteration-->Dailyscrum
b Program-->Release -->Project-->Iteration-->Dailyscrum
c Release-->Program -->Project-->Iteration-->Dailyscrum
d Project-->Program -->Release-->Iteration-->Dailyscrum
a Project Manager
b Product Owner
c PMO
d Scrum Master
a Independent
b Verifiable
c Non-Negotiable
d Valuable
9 A Project manager is preparing a plan for a GW CC implementation. What best practice he/she has to follow as part
a Finalize estimates
b Finalize scope
c Develop conceptual sprint plan
d Determine Development and Migration Strategy
a Priority
b Cost
c Size
d User action
15 Project manager feels team has completed most of the work but it is not reflecting in the reports accurately. What
16 Program manager is interested in monitoring the overall progress of the project. Which one from the below helps h
a Executive Role up
b Release Burn up
c Compare actual velocity vs planned velocity
d Release tracking
17 A Business analyst can revise or rewrite requirement until the sprint starts.
a 1
b 0
19 Accessing the product alignment for each user story is done as part of
a Pre inception
b Inception
c During Sprint 0
d Before each sprint
a Deployment
b Delivery
c Stabilization
d Support and Success
23 Which phases in guidewire project life cyle are divided into sprints ? (Any 3)
a Inception
b Development
c Post deployment
d Stabilization
24 During deployment phase, what happens during the pilot step ? (Any 2)
a Gather feedback
b End to End Testing
c Allow all the users to use the system
d Implement changes as needed
a Pre inception
b Inception
c Development
d Stabilization
a Points
b Hours
c Days
d Week
H
M
M
H
would be your recommendation to them ? (Any 3) M
M
L
M
L
1 Entity and Typelist are defined by
a Data dictionary
b Gosu Rules
c PCF
d Entity Relationship
a Data dictionary
b Gosu Rules
c PCF
d LV or DV
a ALT+SHIFTT+ T
b ALT+SHIFT+L
c ALT+SHIFT+W
d ALT+SHIFT+I
a Type Key
b Foreign Key
c Array Key
d None of the above
5 A claim can have multiple claimants. How it is set at the entity level ?
a Type Key
b Foreign Key
c Array Key
d None of the above
a Acceptable values
b Can be used as a drop down
c Fixed set
d It can used only by one field
a All insurance suite product share 5 common UI Areas - Screen Area,sidebar,tab bar,info bar, workspace
b All insurance suite product share 5 common UI Areas - Screen Area,sidebar,tab bar,info bar, workarea
c Familiar look and feel
d Increase training time
8 Why it is important for the non-developers to understand the basics of UI architecture and components ? (Any 2)
a UI functionality
b Rules conditions and actions
c To define data mapping requirements
d Application processing flow
L
L
L
1. Which characteristic is not a part of Good requirement : Ans - feature
2. Which factor make requirements believed to be true, but not confirmed : Ans - Assumption
3.Question on Guiding Principle
4. Component used to build screen is : Ans - PCF
5. What are the mechanisms used in Integration framework : Ans - Webservices, Predefined plugin
6. What is true for Typelist : Ans - Typelist are values given in drop-down list, Fixed set of values
7. What is true for Gosu Rules : Ans- Created and maintained by Developers, can hold complex logic
8.Question on Goal of Inception phase
9.Question on Deliverables of Inception phase
10. Success of Cross Function Teams depends on : Ans - Empowered decision making, Active Business Involvemen
11. Which activity is not performed by ProductOwner : Ans - Does not write requirements
12. Which statement is true on Acceptance Criteria in USerSTory Lifecycle: Ans- Developers use them to configure
13. Arrange layers of planning in the order : Ans - Program-->Project -->Release-->Iteration-->Dailyscrum
14.Best Practice from Inception
15.Best Practice from Planning
16.Question on Accelerators (2-3 question)
17. Website for browsing and downloading accelerators, software and products add-ons : Ans- marketplace
18.UserStory cards has a role during which phases of Project Lifecycle : Options were - Pre-inception, Inception, Pre
19.Not a good practice for User Story cards
20.Question on Customizing the User story card
21.Not a good practice for Elaborating requirement.
In general , the major area to focus from Examination questions point of view are :
1. Best practices/Details about : before Elaboration session, During Elaboration and Post Elaboration session
2.Acceptance Criteria
3.Best Practices of Planning, Inception & Pre-inception
Questions
One of the primary role of a BA
One who test the requirement
best practices for elaborative session
sequence of elaborative session
sequence of planning (from first to last)
full form of INVEST
Why non developer should have basic knowledge on application logic
Why non developer should have basic knowledge on integration
Why non developer should have basic knowledge on ui architecture
1 - All insurance suite product share 5 common UI Areas - Screen Area,sidebar,tab bar,info bar,
workspace
2 - Common UI architecture provide familiar look and feel for all products
ALT+Shift+I
full form
marketplace.guidewire.com
education.guidewire.com
pre-inception
Conceptual PLan
User Story
Program,Project,Release,Iteration,Daily Scrum
Accelerators
Guidewire Market Place
Preinception,Inception other oprion not given like sprint 0 , development
phases of Guidewire project lifecycle
Key deliverable of Inception phase
in which steps user strory are referenced - other than deployment
most common team members
who are key participents in inception phase
Accelerator reduces the timeline by providing the good starting point
Feature is is not a characteristic of good requirement
In education.guidewire.com, you will find training material where it will show how can we prepare a quote
Which one is the correct statement about Acceptance Criteria - Develelopers use Acceptance criteria to Configure and code
Components of User Story - Role, Action and Reason
Customizations to be done on User Story
Correct order - Program-->Project -->Release-->Iteration-->Dailyscrum
Full Form of Invest
Short cut for Location Information in PCF
Gosu rules consists of Business Rule or Business Object/A condition that evaluates true or false
Sequence of Eloboration meeting
Sequence of User Story Estimation
teria to Configure and code