Standard Vertical Calculation For Staging
Standard Vertical Calculation For Staging
PROJECT TITLE:
Construction and Development of 4/6 Lane Divided Carriageway For THDCIL Bypass for
Re-Routing of Ghaziabad – Aligarh (NH-91) Road Project in THDCIL area from Km
98+400/0+000 (Existing/Design Chainage ) Near Dushehra Village to Km 105+500/09+285
(Existing/Design Chainage ) Near Arnia Khurd Village Total Length of Bypass=09.285Kms on
EPC Mode Under NHDP Phase –IV in the State of U.P.
Client – NHAI
Authority Engineer- SA INFRASTRUCTURE CONSULTANTS PVT. LTD.
WORK:
Staging Load Calculation for Proposed LVUP for (12 and 15 Mtr. Span)
Name:
Date: 27-July-21
Project ID
Project Name
Primary 1 DL
Primary 2 LL
Combination 3 DL+LL
Combination 4 1.2(DL+LL)
Combination 5 1.5(DL+LL)
CONTRIVE DESIGNS
CIVIL & STRUCTURAL ENGINEERS
MEERUT
Y
X
Z Load 1
Whole Structure
CONTRIVE DESIGNS
CIVIL & STRUCTURAL ENGINEERS
MEERUT
CALCULATION:
A=453 mm2
Allowable l/r = 64
A=453 mm2
Allowable l/r = 64