TRANSMISSION ENGINEERING STANDARD TES-P-104.01, Rev. 01
TABLE OF CONTENTS
1.0 PURPOSE
2.0 SCOPE
5.1 Frequency
5.2 System Voltage
5.3 Short Circuit Rating
5.4 Insulation Levels
6.0 DEVIATIONS
7.0 BIBLIOGRAPHY
TRANSMISSION ENGINEERING STANDARD TES-P-104.01, Rev. 01
1.0 PURPOSE
This chapter of the underground Power Cable Transmission Engineering Standards (TES-
P-104 01) is an introductory chapter to TES-P-104. It provides general information
.
applicable to power cables and their applications to the Transmission System of Saudi
Electricity Company (SEC), Kingdom of Saudi Arabia.
Chapters of TES-P-104 and the references therein serve as a guide to the Design
Engineer.
2.0 SCOPE
2.2 Reflects the use of the following types of cables and their applications:
2.3 Intended to help the Design Engineer in selection of the appropriate type and size
of the power cable.
2.4 Contains the type of installation and the installation requirements in details. These
are developed to govern the practices and procedures which shall be adopted by
the Design Engineer for the design of power cable systems.
2.5 Covers the drawings and ampacity tables in different installations cases and
their requirements in details, which shall enable the engineers to design and
install the power cables within the specified parameters.
2.6 Shows the various types and requirements of splicing and terminations of XLPE
and LPOF power cables. However, it shall not cover the requirements for LPOF or
XLPE cable termination at GIS cable boxes or at oil boxes at power transformers.
2.7 Serves as a guideline in selection of the single core power cable sheath bonding
and grounding method of insulated metallic sheath of power cables.
2.8 The technical data provided in this standard (TES-P-104) for 0.6/1kV to 380kV
are intended for general information.
TRANSMISSION ENGINEERING STANDARD TES-P-104.01, Rev. 01
3.1 Items not specifically covered in this standard shall be in accordance with the
latest revisions of the referenced Industry Codes and Standards.
3.2 It shall be the responsibility of the Design Engineer preparing the base design
or detailed design to be or become knowledgeable of the requirements of the
latest Industry Codes and Standards referred in TES-P-104. He shall bring to the
attention of National GridSA of SEC, any latest revisions of these Codes and
Standards which may have an impact on the technical requirements of TES-P-104.
3.3 Whenever different Codes and Standards are used, National GridSA of SEC
approval to the same shall be obtained before proceeding with design. These Codes
and Standards shall be equal to or better than those specified in TES-P-104.
In case of any conflict between various documents and standards or specifications for
underground power cable projects, the order of precedence shall be as follows:
4.1 The Scope of Work and Technical Specifications (SOW/TS) for the project.
Unless otherwise specified in the associated data schedule of relevant TMSS, the power
cables shall be suitable to operate under the typical system parameters as shown in Table 01-
1 and shall meet the minimum requirements given in clause 5.2.
TRANSMISSION ENGINEERING STANDARD TES-P-104.01, Rev. 01
5.1 Frequency
(kVrms) (kVrms)
11 10.5-11.6
13.8 13.1-14.5
33 31.4-34.7
34.5 32.8-36.2
69 65.6-72.5
110 104.5-115.5
115 109.3-121
132 125.4-139
230 219-242
380 361-399
The 3φ symmetrical short circuit current ratings and duration of the various
power cables shall be as specified in Table 01-2 as per clause 4.0 & Table-1 of
TRANSMISSION ENGINEERING STANDARD TES-P-104.01, Rev. 01
The insulation levels for all und erground cables shall not be less than the values
specified in Table 01-3. For installations at an altitude higher than 1000m, the
external air insulation level shall be calculated as per clause 4.6.6.3 of SEC
specification # 01-TMSS-01 Rev.01.
In table 01-3 basic lightning impulse insulation levels (BIL) are specified with
respect to a standard 1.2/50µs wave shape and the basic switching impulse
insulation level (BSL) is specified for a 250/2500µs impulse as per clause 4.6 of
SEC specification # 01-TMSS-01 Rev.01.
TRANSMISSION ENGINEERING STANDARD TES-P-104.01, Rev. 01
33 200 95/80 -
69 350 160/140 -
6.0 DEVIATIONS
6.1 The Design Engineer who prepares the SOW/TS for the U/G power cable project
is responsible to obtain an appropriate waiver from S&SD for any specific
deviation from this Standard (TES-P-104.01). This waiver shall be taken for over-
specification as well as under-specification.
6.2 In case of any deviations from this Standard (TES-P-104.01) during the base design
and detailed design of any U/G power cable project, it is the responsibility of the
engineer preparing the base design or detailed design to obtain appropriate waiver
from S&SD, through concerned SEC departments, before finalizing the design.
TRANSMISSION ENGINEERING STANDARD TES-P-104.01, Rev. 01
7.0 BIBLIOGRAPHY
1. Underground Systems Reference Book, Edison Electric Institute, New York, 1957,
no ISBN
2. R. M. Black The History of Electric Wires and Cables, Peter Pergrinus, London
1983 ISBN 0 86341 001 4