0% found this document useful (0 votes)
108 views7 pages

User Manual Ebb N Fid5717

This document provides instructions for installing an EBB centrifugal extractor. It describes how to assemble the extractor for surface or built-in installation. It includes safety recommendations and explains how to make electrical connections. The instructions cover different EBB models, including ones with a timer or electronic humidistat control. Proper installation is important for the extractor to operate efficiently and safely.

Uploaded by

Andrey Gaps
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
108 views7 pages

User Manual Ebb N Fid5717

This document provides instructions for installing an EBB centrifugal extractor. It describes how to assemble the extractor for surface or built-in installation. It includes safety recommendations and explains how to make electrical connections. The instructions cover different EBB models, including ones with a timer or electronic humidistat control. Proper installation is important for the extractor to operate efficiently and safely.

Uploaded by

Andrey Gaps
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

EBB

Instrucciones de montaje
Instruction leaflet
Notice de montage
Montageanweisungen
Montage-en gebruiksaanwijzing
Instruções de montagem
Istruzioni per l'installazione
Användar instruktion
Brugervejledning
Instrukcja obslugi
Návod
Инструкции по сборке
1 5 2 3 6 7 4 9

3 6 7
Fig.1

Fig.1B Fig.2A Fig.2B


N LA LB

Fig.3 Fig.4

EBB- S

N LA LB

Fig.5A L

N LA LB

L
Fig.5B

N LA LB

Fig.6A L

N LA LB

N
Fig.6B L

REB
EBB- T

N L LS

Fig.7A L

N L LS

Fig.7B L

EBB- HT

N L LS

Fig.8A L

N L LS

Fig.8B L

30 A 30 1 90 60

15 2 20 10 80 70

T(min.) T(min.) HR(%)

N L LS N L LS

Fig.9A Fig.9B
ENGLISH 100-mm diameter conduit
EBB CENTRIFUGAL EXTRACTOR - Before assembling the device, check that the
turbine rotates freely.
EBB series extractors have been manufactured
according to strict production and quality control For your extractor to work more efficiently:
standards such as ISO 9001. All the components - Do not use conduits whose diameter is less than
have been verified and all the devices have been 100 mm
tested following assembly. - If a flexible conduit is used, stretch it out fully
We recommend you to check the following points - Do not place elbows right at the extractor
when you receive this extractor: discharge
1- Make sure you have received the right model - Elbows should have as large a radius as
2- Make sure that the data on the nameplate are possible
appropriate to your needs: voltage, frequency,
speed, etc. Surface Assembly (fig. 2A):
1. Make a 105-mm diameter hole in the wall or
SAFETY RECOMMENDATIONS ceiling, making sure that the device fits in the area
The installation must be carried out in you have planned for it.
accordance with current regulations in each 2. Remove the front cover (1) of the fan body (2)
country. pressing the clips (3) carefully with a small
- The installation must be carried out by a screwdriver (fig.1B).
qualified professional. 3. The fan body (2) is secured to the base frame
- The electrical installation must incorporate an (4) by means of 4 screws and 3 flanges. To
omnipolar switch with an opening between dismantle it, remove the 4 screws from the
contacts of at least 3 mm, appropriate for the load corners and open the 3 flanges (7) by introducing
and complying with current standards. a small screw driver through the slots (6).
- In bathrooms, the device must be installed 4. Using 4 screws and plugs that are appropriate
outside the reach of any person taking a shower for the kind of wall, fix the base frame (4) on to the
or a bath and the switch must be installed outside surface, ensuring that the circular profile of the
the bathroom. frame coincides with the opening made, so that
- Do not use these fans in explosive or corrosive the discharge nozzle can be introduced easily
atmospheres. If the EBB is working in a kitchen subsequently.
where there is a boiler or any other kind of 5. Open the connections cover (5) of the fan
combustion device that needs air to work, check body and pass the cable through the hole
that the air inlets to the kitchen are sufficient. provided for this purpose on the bottom of the
- The extractor discharge cannot be connected to terminal box.
a conduit for the evacuation of smoke from 6. Reassemble the fan body (2) on to the base
devices worked by gas or any other fuel frame (4) by introducing it into the flanges and
- In the event of considerable humidity, you are securing it with the 4 screws.
advised to install the discharge conduit 7. Connect to the terminals passing the cable
horizontally, with a slight outwards slant. through as indicated in figure. 3.
8. Follow the electrical diagram applying to the
INSTALLATION EBB version that is being installed (fig. 5 to 8).
IMPORTANT: Before proceeding with the 9. Close the connections cover (5) with the
installation and connection of the device, screw.
make sure to disconnect the electricity 10.Assemble the front cover (1) again, pressing
supply. the upper and lower clips and pressing each
corner down to ensure that it fits properly in place.
Figure 1A: 11.Turn the extractor on to check that it works
1- Front cover properly.
2- Fan body
3- Front cover clip Built-in assembly (fig. 2B):
4- Base frame 1. Use the template to mark and cut the panel
5- Connections cover into which the device will be installed. Read the
6- Slots instructions given on the template carefully.
7- Retainers 2. Follow steps 1, 2 and 3 of the Surface
8- Deflector Assembly Instructions.
9- Discharge flange 3. With built-in assembly, the discharge can be
directed towards the side (fig. 4). To do this,
- EBB series fans must be installed in an area that remove the discharge flange (3). Cut the
is sheltered from meteorological conditions; they deflector (8) completely and put the discharge
can be assembled either in vertical or horizontal flange back in the desired direction.
position. 4. Open the connections cover (5) and pass the
- The extractor is designed to be connected to a cable through the hole provided for this purpose
on the bottom of the terminal box.
5. Connect a 100-mm diameter tube to the - If the device is used for more than 50 seconds
discharge flange (9). the timing is controlled automatically by the
6. Secure the fan body (2) using 4 screws and device. It is proportional to the time of use (time of
plugs that are appropriate for the kind of surface. use / x 2, with a maximum of 30 minutes).
7. Connect to the terminals, passing the cable Position 2': Timing set to 2 minutes
through as indicated in figure 3. Position 15': Timing set to 15 minutes
8. Follow the electrical diagram applying to the Position 30': Timing set to 30 minutes
EEB version that is being installed (fig. 5 to 8)
9. Close the connections cover (5) with the EBB version “HT”
screw. Models equipped with an electronic humidistat
10.Assemble the front cover (1) again by that can be regulated between 60 and the 90%
tightening the upper and lower clips and pressing RH (Relative Humidity %) and with timing that can
each corner to ensure that it fits properly in place. be set between 1 and 30 minutes.
11.Switch the extractor on to check that it is When in the timer mode the EBB works at slow
working properly. speed.

ELECTRICAL CONNECTION (fig. 5 to 8) Recommendations:


- Before working on the fan, make sure that it is - In order to modify the factory settings, the
fully disconnected from the electricity supply, potentiometers situated beside the connections
even if it is switched off. cover (fig. 9B) will have to be operated. These
- Make sure that the voltage and frequency potentiometers are fragile and must be handled
values of the electricity supply are the same as with care.
those indicated on the name plate of the device - For correct humidity detection, the device must
(maximum voltage and frequency variation: 5%). be installed in an area in which there is good air
- EBBs are class II (double insulation) devices circulation.
and do not require earth connection - Do not change the humidity setting outside the
- Follow the connections diagram applying to the area in which the device is installed.
version installed
Settings:
EBB version “S” The extractors are preset to 60% RH for humidity
Basic version with two-speed motor, which can and 1 minute for timing.
also be voltage regulated. For this model proceed - If the humidity level in the area is below 60% RH,
according to one of the following diagrams: the extractor will not start up.
Fig. 5A- Single-speed operation with an - If the humidity level in the area is above 60% RH,
independent switch. the extractor will start up automatically.
Fig. 5B- F Single-speed operation using the same - If the humidity level is always above 90% RH the
switch as the light extractor will operate constantly.
Fig. 6A- 2-speed operation with a switch - If you wish to modify the settings; that is,
Fig. 6B- Operation with an REB-type voltage maintain a humidity level of over 60% RH in the
regulator area, turn the “%Hr” potentiometer clockwise.
- If you wish to increase the timer setting; that is,
EBB version “T” increase the time during which the extractor
Models equipped with adjustable timing. The operates once the humidity level is under the set
timing enables the device to operate for the time level, turn the potentiometer “T min.“ clockwise.
set, when the switch has been turned off (fig. 7A).
In timer mode, the EBB operates at slow speed. ATTENTION: You should not attempt to adjust
the extractor settings when the extractor is in
ATTENTION: The device is timed to start up 50 timer mode. You must wait until the set time
seconds after being switched on, which has elapsed before adjusting the settings.
means that for the first 50 seconds it does not
work. Operation
Case 1: In automatic working mode (fig. 8A) the
Fig. 7B Timer-based operation so that the device device switches on automatically at fast speed
starts up by means of the same switch as the when the humidity level in the area is above the
light. selected value. It stops when the humidity level
To set this timer function (fig. 9A), turn the drops below this value and when the time set by
potentiometer situated beside the connections the timer has elapsed. When the device is in timer
cover (5). mode, it works at slow speed.
The device can be set to 4 different timer Case 2: Automatic operation with possibility of
positions: turning on the device by means of the light switch
(fig. 8B). Automatic operation similar to case 1 but
Auto Position: with the device will start up even if the humidity
- If the device is used for less than 50 seconds, level in the area is below the set value. In this
the timing will not come into operation case, when the switch is turned off (the light is
switched off), the device continues to operate at
slow speed for the length of time set by the timer.

ATTENTION: When the relative humidity level


in the area is above the set value, automatic
operation prevails over manual operation;
that is, the device cannot be turned off by
means of the switch.

MAINTENANCE
IMPORTANT: Before carrying out any
maintenance operations, make sure to
disconnect the electricity supply.
You are advised to remove any dirt that has
accumulated in the 4 filters of the front cover (1) at
regular intervals. To do so, remove the front
cover as indicated in the “INSTALLATION”
section and hand wash with warm soapy water.
Make sure that the front cover is absolutely dry
before putting it back in place.
Clean the other parts with a cloth soaked in mild
detergent.

TECHNICAL ASSISTANCE
Should you observe any anomaly in the operation
of the device, contact an official authorised
service or the seller of the product.
If the device is handled by persons who are not
authorised by S&P, the guarantee will be
cancelled.

(S&P reserves the right to make changes


without prior notice.)

You might also like