User Manual Ebb N Fid5717
User Manual Ebb N Fid5717
Instrucciones de montaje
Instruction leaflet
Notice de montage
Montageanweisungen
Montage-en gebruiksaanwijzing
Instruções de montagem
Istruzioni per l'installazione
Användar instruktion
Brugervejledning
Instrukcja obslugi
Návod
Инструкции по сборке
1 5 2 3 6 7 4 9
3 6 7
Fig.1
Fig.3 Fig.4
EBB- S
N LA LB
Fig.5A L
N LA LB
L
Fig.5B
N LA LB
Fig.6A L
N LA LB
N
Fig.6B L
REB
EBB- T
N L LS
Fig.7A L
N L LS
Fig.7B L
EBB- HT
N L LS
Fig.8A L
N L LS
Fig.8B L
30 A 30 1 90 60
15 2 20 10 80 70
N L LS N L LS
Fig.9A Fig.9B
ENGLISH 100-mm diameter conduit
EBB CENTRIFUGAL EXTRACTOR - Before assembling the device, check that the
turbine rotates freely.
EBB series extractors have been manufactured
according to strict production and quality control For your extractor to work more efficiently:
standards such as ISO 9001. All the components - Do not use conduits whose diameter is less than
have been verified and all the devices have been 100 mm
tested following assembly. - If a flexible conduit is used, stretch it out fully
We recommend you to check the following points - Do not place elbows right at the extractor
when you receive this extractor: discharge
1- Make sure you have received the right model - Elbows should have as large a radius as
2- Make sure that the data on the nameplate are possible
appropriate to your needs: voltage, frequency,
speed, etc. Surface Assembly (fig. 2A):
1. Make a 105-mm diameter hole in the wall or
SAFETY RECOMMENDATIONS ceiling, making sure that the device fits in the area
The installation must be carried out in you have planned for it.
accordance with current regulations in each 2. Remove the front cover (1) of the fan body (2)
country. pressing the clips (3) carefully with a small
- The installation must be carried out by a screwdriver (fig.1B).
qualified professional. 3. The fan body (2) is secured to the base frame
- The electrical installation must incorporate an (4) by means of 4 screws and 3 flanges. To
omnipolar switch with an opening between dismantle it, remove the 4 screws from the
contacts of at least 3 mm, appropriate for the load corners and open the 3 flanges (7) by introducing
and complying with current standards. a small screw driver through the slots (6).
- In bathrooms, the device must be installed 4. Using 4 screws and plugs that are appropriate
outside the reach of any person taking a shower for the kind of wall, fix the base frame (4) on to the
or a bath and the switch must be installed outside surface, ensuring that the circular profile of the
the bathroom. frame coincides with the opening made, so that
- Do not use these fans in explosive or corrosive the discharge nozzle can be introduced easily
atmospheres. If the EBB is working in a kitchen subsequently.
where there is a boiler or any other kind of 5. Open the connections cover (5) of the fan
combustion device that needs air to work, check body and pass the cable through the hole
that the air inlets to the kitchen are sufficient. provided for this purpose on the bottom of the
- The extractor discharge cannot be connected to terminal box.
a conduit for the evacuation of smoke from 6. Reassemble the fan body (2) on to the base
devices worked by gas or any other fuel frame (4) by introducing it into the flanges and
- In the event of considerable humidity, you are securing it with the 4 screws.
advised to install the discharge conduit 7. Connect to the terminals passing the cable
horizontally, with a slight outwards slant. through as indicated in figure. 3.
8. Follow the electrical diagram applying to the
INSTALLATION EBB version that is being installed (fig. 5 to 8).
IMPORTANT: Before proceeding with the 9. Close the connections cover (5) with the
installation and connection of the device, screw.
make sure to disconnect the electricity 10.Assemble the front cover (1) again, pressing
supply. the upper and lower clips and pressing each
corner down to ensure that it fits properly in place.
Figure 1A: 11.Turn the extractor on to check that it works
1- Front cover properly.
2- Fan body
3- Front cover clip Built-in assembly (fig. 2B):
4- Base frame 1. Use the template to mark and cut the panel
5- Connections cover into which the device will be installed. Read the
6- Slots instructions given on the template carefully.
7- Retainers 2. Follow steps 1, 2 and 3 of the Surface
8- Deflector Assembly Instructions.
9- Discharge flange 3. With built-in assembly, the discharge can be
directed towards the side (fig. 4). To do this,
- EBB series fans must be installed in an area that remove the discharge flange (3). Cut the
is sheltered from meteorological conditions; they deflector (8) completely and put the discharge
can be assembled either in vertical or horizontal flange back in the desired direction.
position. 4. Open the connections cover (5) and pass the
- The extractor is designed to be connected to a cable through the hole provided for this purpose
on the bottom of the terminal box.
5. Connect a 100-mm diameter tube to the - If the device is used for more than 50 seconds
discharge flange (9). the timing is controlled automatically by the
6. Secure the fan body (2) using 4 screws and device. It is proportional to the time of use (time of
plugs that are appropriate for the kind of surface. use / x 2, with a maximum of 30 minutes).
7. Connect to the terminals, passing the cable Position 2': Timing set to 2 minutes
through as indicated in figure 3. Position 15': Timing set to 15 minutes
8. Follow the electrical diagram applying to the Position 30': Timing set to 30 minutes
EEB version that is being installed (fig. 5 to 8)
9. Close the connections cover (5) with the EBB version “HT”
screw. Models equipped with an electronic humidistat
10.Assemble the front cover (1) again by that can be regulated between 60 and the 90%
tightening the upper and lower clips and pressing RH (Relative Humidity %) and with timing that can
each corner to ensure that it fits properly in place. be set between 1 and 30 minutes.
11.Switch the extractor on to check that it is When in the timer mode the EBB works at slow
working properly. speed.
MAINTENANCE
IMPORTANT: Before carrying out any
maintenance operations, make sure to
disconnect the electricity supply.
You are advised to remove any dirt that has
accumulated in the 4 filters of the front cover (1) at
regular intervals. To do so, remove the front
cover as indicated in the “INSTALLATION”
section and hand wash with warm soapy water.
Make sure that the front cover is absolutely dry
before putting it back in place.
Clean the other parts with a cloth soaked in mild
detergent.
TECHNICAL ASSISTANCE
Should you observe any anomaly in the operation
of the device, contact an official authorised
service or the seller of the product.
If the device is handled by persons who are not
authorised by S&P, the guarantee will be
cancelled.