Handout - Sample Repair Parameter For BLSB Type I
Handout - Sample Repair Parameter For BLSB Type I
Ordinary Corrugated G.I. 80% to 100% Total Replacement Replace all using MPSS or OMS Prepainted Longspan
Materials are locally
Roofing and Sheet and Bended Dismantled, severe corrosion, Replace affected portions using OMS or match Corrugated Roofing
10% to 79% Major Repair available. No hauling cost
Accessories Accessories (see BLSB I - severe dents and deformation existing Sheet and Bended
needed
OMS) 1% to 9% Minor Repair School-based repair Accessories (see BLSB I -
90% to 100% Total Replacement Replace all using MPSS or OMS
Collapsed, evidence of termite When wood trusses are to
Wood Purlins (see BLSB I - Steel C-Purlins (see
Purlins incursion, severe deflection, 10% to 89% Major Repair Repair affected lengths using OMS or match existing be replaced with steel
OMS) BLSB I - MPSS)
evidence of decay trusses
1% to 9% Minor Repair School-based repair
90% to 100% Total Replacement Replace all using MPSS or OMS When anchorage details
Collapsed, evidence of termite
Wood Trusses (see BLSB I - Repair affected members and or connections using Steel Truss (see BLSB I - can be applied. When there
Trusses incursion, severe deflection, signs 10% to 89% Major Repair
OMS) OMS or match existing MPSS) is no additional hauling cost
of separation between members
1% to 9% Minor Repair School-based repair needed. For schools with
Plywood Ceiling Boards on Collapsed, evidence of termite 80% to 100% Total Replacement Replace all using MPSS or OMS Fiber Cement Boards on Materials are locally
Exterior Ceiling Wood Ceiling Joists (see incursion, severe sagging, decay, 10% to 79% Major Repair Repair affected areas using OMS or match existing Metal Furring (see BLSB I available. No hauling cost
BLSB I - OMS) dismantled boards 1% to 9% Minor Repair School-based repair - MPSS) needed
Plywood Ceiling Boards on Collapsed, evidence of termite 80% to 100% Total Replacement Replace all using MPSS or OMS Fiber Cement Boards on Materials are locally
Interior Ceiling Wood Ceiling Joists (see incursion, severe sagging, decay, 10% to 79% Major Repair Repair affected areas using OMS or match existing Metal Furring (see BLSB I available. No hauling cost
BLSB I - OMS) dismantled boards 1% to 9% Minor Repair School-based repair - MPSS) needed
Replace all using MPSS. Reconstruct from wall
90% to 100% Total Replacement
footing if necessary
CHB with Plain Cement Collapsed, severe cracks (2mm or CHB Wall (see BLSB I -
Exterior Wall Remove and replace affected areas using MPSS. None
Plaster (see BLSB I - OMS) larger), displacement MPSS)
1% to 89% Major Repair Consider column to column area. Reconstruct from
wall footing if necessary
90% to 100% Total Replacement Replace all using MPSS
Plywood Partition (see BLSB Collapsed, evidence of termite Plywood Partition (see
Partition 10% to 89% Major Repair Repair affected areas using MPSS or match existing None
I - OMS) incursion, sagging, decay BLSB I - MPSS)
1% to 9% Minor Repair School-based repair
90% to 100% Total Replacement Replace all using MPSS. Repair affected wall opening
Panel Door on Wood Jambs Solid Panel Door on
Doors with Transom (see BLSB I - Severely damaged door and jamb Refurbish affected portions using OMS or match Wooden Jamb (see BLSB None
10% to 89% Major Repair
OMS) existing. Repair affected wall opening I - MPSS)
1% to 9% Minor Repair School-based repair
90% to 100% Total Replacement Replace all using MPSS. Repair affected wall opening
Glass Jalousie Window
Wood Jalousie on Wood Severely damaged jalousie and
Windows Refurbish affected portions using OMS or match on Wooden Jamb (see None
Jambs (see BLSB I - OMS) jamb 10% to 89% Major Repair
existing. Repair affected wall opening BLSB I - MPSS)
1% to 9% Minor Repair School-based repair
REPAIR PARAMETERS BAGONG LIPUNAN TYPE I
DAMAGE
RANK
Rank 0 No damage
Rank 1 Negligible Damage
Rank 2 Moderate
Rank 3 Severe
Rank 4 Totally Damaged