Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
23K views
6 pages
81 Travel Time Estimates
How the community grid will affect travel times in Syracuse.
Uploaded by
Tim Knauss
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download
Save
Save 81 Travel Time Estimates For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
0 ratings
0% found this document useful (0 votes)
23K views
6 pages
81 Travel Time Estimates
How the community grid will affect travel times in Syracuse.
Uploaded by
Tim Knauss
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Carousel Previous
Carousel Next
Download
Save
Save 81 Travel Time Estimates For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
Download
Save 81 Travel Time Estimates For Later
You are on page 1
/ 6
Search
Fullscreen
1-81 VIADUCT PROJECT traffic conditions could be characterized as low-speed routes because their travel speeds are less than 20 mph during one or more peak hours. ‘Table 5-46 2026 No Build and Community Grid Alternative Travel Time, Delay and Speeds & [_TravelTime (min) | Travel Delay (min) | Travel Speed (mph) | Speed Limit > Route 3 No £ | NoBuild| CG | NoBuild| CG | NoBuild | CG | Build |_cG S Tam [em [am [em | am [pm [am [em | am | pm | am [pm | (mph) | (mph) | BLattomerrei foment [NB] 13 [14] 18/19] 2 [2] 7 |e | | s3| a1 | ae | 4565 | coss 1710 Exit23N seji|i| ali) 6] 2) a6) | s3| 26 | at | 4505 | 2005 2 | Newtatromerraet om [NB [13 [1 [ [rs] 0 lo] + | olesfes|ealea| os | 6s Exit 2 to Ext 8 sei [ 3) mli)olo)o|o)esles|es|es| os | 65 ee }e,e)e,o]o) 0] 0) s2| sa | s7| 66 | 4555 | 4555 3 | 1.690 from Exit 8 to Exit 17 we) e |i) e{i)o{1) 0] 1) | s1 | 66 | 60 | 4555 | «555 | wing Avenue tomaayer [Nelo [el[«felsla]1 [1] [wl ala] a | 2 AvenuetoFayetie Set [sp | 7 | 7) 3/3) 4|5)1|o) | 1| 2] 20] 30 | 20 ‘Aimond Sireet rom Van we) e|9)4|4)s]6)1]2)"]w|a|a| a | 0 5 | Buren Sveet to Bumet avenue sejel|s /s|/e sis alaju[u|wlis| 30 | 20 State Street fom Adams 8 | sweettoautematsiet | NB) 5/8) 5/7) 3/5) 3/5) wz) 9/3} 9) 30 | 30 Cinton Street from Websters 7 | ginton Sreetromwebstes |sep a fs |}a)s|2|a|2)aj1]i|is|a] a0 | 30 g | Westsrectromacms [NBL 2{2]afal+[s[+[+laolalwlal a | a Streetto Genesee Steet [sa | 3 | 2] 3] 2|2|1|14|1|19|20| 16| 2) a | 35 9 | Fayette Stecttromwainut [68 | 4 | 4 [6 [6 | 2 7 [1 [a3 [3 [6 [30 [30 Avenue to West Srect we[«t7[elel2 elal7telel so | 30 Harrison Street from 10 | Comstock AvenuetoWest |we|/s|s5|/ele)s}sj6|6)2]/1|7] 8] 3 | 20 Street Adams Seat Tom West 11 | sweattocomstoccaverue [| {8 )e{[e)4 [sisi sjwiwi7/s | so | Notes: ‘Via Almond Street under Community Grid; CG = Community Grid April 2022 PIN 3501.601-81 VIADUCT PROJECT ‘Table 5-47 2056 No Build and Community Grid Alternative Travel Time, Delay and Speeds % |_Travel Time (min) | Travel Delay (min) | Travel Speed (mph) | Speed Limit D Route 3 No % | Nosuis| co | Nosuis| co | NoBuils| co | Build | co © Tam [em [am [em [am [pm | am [pw | am [pm | am | pw | (meh) | (meh) | Bl atfomertsitome [NB] [13] [19] 3 [2 | s [7 | 52 | 54 20 [20 [4505 | c08s 1710 Ext 29N sels) fil s[2[ole | | sa | 6 | a7 | 4505 | 2005 Now Stormer iaat tom [NS] 12 [| 13]t]o]1]o]o)e|e|e|e| 5) a 2 Exit 2 to Ext 8 se) 13) ) 1) 19)0[2)]0)]0) 6] s/o [ oa] os | 65 ee wlio) efe|+ [+ [oo | a9 | 55 | s7 | 4555 | 4555 | +690 from Exit @ to Exit 17 t t we} ef) 9 {elol1| oo s5| s1| s5| 62 | 4555 4555 4 | WwingAvenuetomRayor [Nel 4 [el «ts[2fal+[2)w[m[alw| a | 2 AvenuetoFayetie Stet [sp] a [| s|a|2}alal1 || || 30 | 30 ‘mond Sireat rom Van we) 4]9)4{s[1[e[1[2)2[e)]a| 19] 9 | 30 5 | Buren Street to Surnet ‘Avenue se)el|e|/s[e{s[slala [um] mlm] 3 | 30 State Street from Adams 6 | State SteetiiomAdams | yep) g |e) 7] a) a] 4) 5]6 w2))o]s| a | 20 Clinton Street rom Websters 7 | Clinton Sueetfrom Websters | se |g |4|alal2)2) 2) 2 15]1| 15] 12} 30 | 20 g | Weststectiomadams | NB[2lel4¢l2[+[olal+ alal[wlw| x | Streetto Genesee Strest_ [sa] 2] 2] 2]2|1)o|1)1) 1) 28/20) 25| 3 | 35 9g | Fayette Steettromwanat | £6 | 7 [6] 6 [7[s[als[s]elole [7] a | 3 Avenue to West Street wel7{[7/elele{s|7|4 7|7|e|e| » | 3% Harrison Street from 10| Comstock Averuetowest |we|7]a|7|o|s|e|s|7)e]7|e]7] «| 2» Street ‘Adama Seat Fom West 1" | sweettocomstoceavewe | | 7/2) 7]e}s}e|sie s}e}e{s| | % Notes: “Via Almond Street under Community Grd; CG = Community Grid April 2022 PIN 3501.601-81 VIADUCT PROJECT ‘Travel times for key origin-destination pairs in Onondaga County were estimated using output from | __ VISSIM traffic simulations, as wellas the I-81 Project Travel Demand Model. Table 5-48 summarizes the average travel times for trips traveling between these origin-destination pairs during the AM and PM peak periods. Table 5-48 No Build Alternative and Community Grid Altetnative Origin-Destination Travel Times (Minutes) Year 2 7056, Peak i Pa i Pat No Wo We Wo Origin Destination suid | co | sua | co | suis | co | suta | co Cicero 2 [2] al] ala | 23 | 2) 2 Destiny USA 2 [2 | «| a | 23 | | 2 | 2 Downtown a fa | ao | a | 2] a] a | a Fairmount 1s | | | | te | 8 | 18 | 18 Baldwinsville Fayettevile/Manius af a | a | 2 | we | 3 | 8 | LaFayette a [a | 1 | 3 [| «| a | 2 | 36 Liverpool 6 [6 | 6 | ts | 6 | 5 | 6 | 16 Stosephis Hospital | 22 | 21 | 21 | 21 | 23 | 22 | 21 | 22 University Hil 2 | 2 | 2 | a | a | | 2 | 2 Baldwinsville a fa | 3 | a fa [a | 2] 2 Destiny USA ef[nf[ui[sal[ul~anluy a Downtown wo fel] «fe fs | 2] ew) 8 Fairmount za [a | 2 | 2 [a | 2 | 2) 2 Cicero Fayettevile/Manius wo [ | 2 | 2 | | 8 | a) 19 LaFayette a | | | | | | | Liverpool a fe] «fw fs fe | a | 3 Stosephis Hospital | 16 | 13 | 12 | 12 | 18 | 12 | 2 | 12 University Hil 2 | 6 | | is | 20 | 7 | 6 | 15 Baldwinsville a2 [2 | | | 2 | 2 | 2 | 2 Cicero afele le fol] a) 2 Downtown e{[7,e[e*/[7[7/s]e Fairmount wfel se | | 22] 6) 6 Destiny USA Fayettevile/Manlus wv [| «| 0 | 7 | | 2 | 2 LaFayette vo [| 2 | 0 | «|i | | | 2 Liverpool a fs |o]|ol]e|eifeln StdosepisHospial | 7 | 7 | 8 | 7 | 7 | 7 | 7) 8 University Hil 2folsfofeftnftui[n April 2022 PIN 3501.601-81 VIADUCT PROJECT Table 5-48 (cont'd) No Build and Community Grid Origin-Destination Travel Times (Minutes) Year 7026 7086 Peak | Aw Pat i Pa We, We Ne No origin Destination suis | co | suis | cc | suis | co | aula) co Baldwinsville we fa] a | 2] we la | a | 2 Cicero 6 [se] 6 | 6 | 3 | «| | Destiny USA sfe|[sf[s[s[sjsle Fairmount wife] «| 6 | 2 || Downtown _[FayettevileManius | 15 | 18 | 18 | 12 | 18 | t7 | a | 19 LaFayette wfl7l[ 7 [wf 6 |e || Liverpool »f[w| es |o|sfe)|e| Stdosepr'sHospial | 3 | «| 3 | 3 | 3 | « | a | 3 University Hil 77,2 [e[se|lel7|7 Baldwinsville av f[7l] we || | | | Cicero 2 fails |s|2l| miei Destiny USA sa f[s/s [sl] sf] s |e] s Downtown offs] 2f[se|“ ls |] a Fairmount | Fayettevilotantus | 22 | 23 | 23 | 28 | 24 | 22 | 30 | 24 LaFayette wm [a | a | a | | wm | w| 2 Uverpool wf[7l7 lew) e le |e] SiJosepisHospial | 14 | 13] 13 | 13 | 1 | 1 | 13 | 14 University Hil wv [| | 3 | | 6 || Baldwinsville 2 [a] a | 2 | oo | | 3 | 30 Cicero we fel/o |e] el rill a Destiny USA w~ [3] 6 | «| 6 | 3 || it Downtown we fe] 6 |e] vl] 6 | el] Fayettevilel | Faimount azflalm« |a2ileola|az| 2 LaFayette we [we] | | | | | i Uverpool 2 [7] || | | wl i StJoseph'sHospital | 16 | 14 | 16 | 14 | 15 | t4 | v4 | 15 University Hil we fLs[~« |s |» [= [wf Apsil 2022 PIN 3501.60 51441-81 VIADUCT PROJECT Table 5-48 (cont'd) No Build and Community Grid Origin-Destination Travel Times (Minutes) Year 2028, 2058 Peak i Pu i PM No No. No No Origin Destination suis | co | sulla | co | puta | co | euta| oo Baldwinsville 3o | a4 | at | a5 | a2 | 35 | 32 | 36 Cicero 2 | 2 | 25 | a | 2 | a7 | 24 | 2 Destiny USA 1 [| 2] 1 | 2 | 7 | 2 | 6 [ 2 Downtown v7 [we] 6 | 7) 2) 7 | 6 | te LaFayette Fairmount z | a7 | 24 | 2 | 2 | a | 2 | 2 Fayettevile/Maniius 3% 19) 2 | is te | 8 | 25 | 19 Liverpool 224 | ts | meat | 24 | 20 | 2m St JosephisHospital | 18 | 7 | 18 | t@ | 20 | 18 | t6 | 17 University Hil 1% | 4) te | 4 | iw | 4 | | 1 Baldwinsville 13) 3) 1 | | 1 | | te | 14 Cicero “4 [4] 6 | 6 | tw | 1 | 1 | 14 Destiny USA e[7 [6 7 6 7 [s|7 Downtown to | 8 8 e | |) 8 |el|e Liverpool Fairmount ws | | we | we | te | te | | te Fayettevile/Maniius zo | 19 | 20 | 2 | 2 | 1 | 2 | 2 LaFayette wz [2 | 2 | 2 | 2 | wm | 2 [ 2 St Joseph's Hospital | 10 | 8 8 7 | 0] 8s |s|[7 University Hil 3% |) 3 | wo) 6 | 2 | 2] im Baldwinsville a | 2 | 2 | 2 | 20 | a | al Cicero 3 [3] 3 | «| 2) 2 | 2| Destiny USA 3 [3 3 3 3 3 [4] 4 Downtown 4 [3 3 3 3 3 [33 St. Joseph's Hospital | Fairmount wa [fom [is | | wm [a | te Fayettevile/Manlius “4 [| 7 | wi) | tw | 2 | 1 LaFayette 1s | | 18 | 2 | 18 | 19 | 18 | 2 Liverpool 7 [7 7 a 7 7 | 8 University Hill 7 [7 8 7 7 @f[7|7 April 2022 PIN 3501.60 5-1451-81 VIADUCT PROJECT Table 5-48 (cont'd) No Build and Community Grid Origin-Destination Travel Times (Minutes) Year. 2028. 2056 Peak Aw Pa aM Pa No No Wo No Origin Destination suid | co | ula | co | euta | co | suia| co Baldwinsville 2 [2 | 2 | 2 | a | 21 | 2 | 23 Cicero 1s | te | | 7 | 6 | 6 | | Destiny USA 6 [sé 3 7 7 7 [7{[7 Downtown 6 | 6 6 7 [| 8 e[s|s University Hit [Fairmount ma [| 7 | | 4 | | te | 6 Fayettevile/Manius i [ts [ we | we [is | 5 [a | 7 LaFayette we [4 [| w [| is [ te | 15 Liverpool wo fol 3 | un [wo | n [al 2 St Joseph’sHospital | 6 | 6 7 7 [8 efs|7 Note: OG = Community Grd ‘Traffic Volumes Future Build Year Trafic Volumes A future Build year condition represents a future-year growth scenario, including all planned/committed transportation projects that are included in the No Build, as well as the I-81 Viaduct Project alternatives. Two future Build years were analyzed - the ETC year 2026 and design year 2056. The primary tool used for estimating future Build year traffic volumes is the I-81 Project ravel Demand Model. This model is based on the SMTC regional travel demand model developed by the Syracuse Metropolitan Transportation Council (SMTC), with additional refinements to improve model accuracy within the Project area. ‘The I-81 Project ‘Travel Demand Model predicts traffic volumes as a result of the anticipated changes in land use, population, economic activity, and transportation system. AM and PM peak hour traffic volumes were forecasted separately for the 2026 and 2056 Build years. Demand reductions to account for changes in telecommuting behavior were not applied to the analysis of the completed Community Grid Alternative under ETC and BTC+30 conditions Projected future Build traffic volumes under the Community Grid Alternative for the 2026 and 2056 analysis years and for the AM and PM peak hours are located in Appendix C-3 for all interstate segments, ramp connections, and intersection turning movements. Table 5-49 shows the weekday AM and PM peak hour traffic volumes for key segments on freeways and several local roadways in the project area, April 2022 PIN 3501.60
You might also like
AASHTO 2018 Greenbook
PDF
100% (7)
AASHTO 2018 Greenbook
1,048 pages
LEO #19 (Signed) (37003)
PDF
No ratings yet
LEO #19 (Signed) (37003)
1 page
Onondaga Zones Only
PDF
0% (1)
Onondaga Zones Only
1 page
Sample Outcomes of Minnesota Planning Process
PDF
No ratings yet
Sample Outcomes of Minnesota Planning Process
8 pages
Assembly Senate Response.2.10.21. Final PDF
PDF
No ratings yet
Assembly Senate Response.2.10.21. Final PDF
16 pages
PROJECT FORMULATION AND APPRAISAl
PDF
No ratings yet
PROJECT FORMULATION AND APPRAISAl
4 pages
National Grid Energy Vision NY
PDF
No ratings yet
National Grid Energy Vision NY
32 pages
Letter To President Biden On Ukraine Refugees
PDF
No ratings yet
Letter To President Biden On Ukraine Refugees
1 page
Belmont Ridge RD - Phase 2 Public Outreach Presentation - FINAL 040723
PDF
No ratings yet
Belmont Ridge RD - Phase 2 Public Outreach Presentation - FINAL 040723
18 pages
Transcript
PDF
100% (1)
Transcript
3 pages
12 Worst Deals
PDF
No ratings yet
12 Worst Deals
17 pages
B&L Sanitation Study 2.23.22
PDF
No ratings yet
B&L Sanitation Study 2.23.22
12 pages
Attorney General James Releases Report On Nursing Homes' Response To COVID-19
PDF
No ratings yet
Attorney General James Releases Report On Nursing Homes' Response To COVID-19
76 pages
Alternatives Analysis Report, Vol 2.traffic
PDF
No ratings yet
Alternatives Analysis Report, Vol 2.traffic
33 pages
Onondaga County Police Reform Plan
PDF
No ratings yet
Onondaga County Police Reform Plan
59 pages
NYCLU Letter To OCSO Re COVID Restrictions at Justice Center - 12-24-2020
PDF
No ratings yet
NYCLU Letter To OCSO Re COVID Restrictions at Justice Center - 12-24-2020
3 pages
2020 Poll Watcher Certificate General
PDF
No ratings yet
2020 Poll Watcher Certificate General
1 page
Summary Report
PDF
No ratings yet
Summary Report
352 pages
Syracuse Council Districts Map
PDF
No ratings yet
Syracuse Council Districts Map
1 page
Resolution To Roll Back Bail Reform
PDF
No ratings yet
Resolution To Roll Back Bail Reform
4 pages
138 Brownfield Properties
PDF
No ratings yet
138 Brownfield Properties
4 pages
DeWitt Warehouse EAF
PDF
No ratings yet
DeWitt Warehouse EAF
48 pages
Thoroughfare Plan 99 Laurin
PDF
No ratings yet
Thoroughfare Plan 99 Laurin
138 pages
Joanie Mahoney Recommendation
PDF
100% (1)
Joanie Mahoney Recommendation
2 pages
OEDAudit 2019
PDF
No ratings yet
OEDAudit 2019
16 pages
OEDAudit 2019
PDF
No ratings yet
OEDAudit 2019
16 pages
National
PDF
No ratings yet
National
4 pages
AEI Round 2 Allocation Recommendations ESD
PDF
100% (2)
AEI Round 2 Allocation Recommendations ESD
3 pages
Settlement Document
PDF
No ratings yet
Settlement Document
15 pages
11 - TrafficStudy - 8777washin Culver City
PDF
No ratings yet
11 - TrafficStudy - 8777washin Culver City
252 pages
11 - IvyStationTrafficReport Culvert
PDF
No ratings yet
11 - IvyStationTrafficReport Culvert
179 pages
CE431 TOPIC 5.1 - Forecasting Travel
PDF
No ratings yet
CE431 TOPIC 5.1 - Forecasting Travel
20 pages
Medical Examiner Audit
PDF
No ratings yet
Medical Examiner Audit
21 pages
Designated Funds - Expression of Interest Form
PDF
No ratings yet
Designated Funds - Expression of Interest Form
6 pages
432 Report
PDF
No ratings yet
432 Report
21 pages
CENG95 Lecture 03 Urban Transportation Planning
PDF
No ratings yet
CENG95 Lecture 03 Urban Transportation Planning
7 pages
I-20 East Texas Corridor Study Report
PDF
No ratings yet
I-20 East Texas Corridor Study Report
123 pages
Preliminary List of Highway Priority Program Projects For LaDOTD District 4 in Fiscal Year 2022-23
PDF
No ratings yet
Preliminary List of Highway Priority Program Projects For LaDOTD District 4 in Fiscal Year 2022-23
48 pages
Stadium Proposal
PDF
No ratings yet
Stadium Proposal
21 pages
Silver Line Extension Alternatives Analysis Public Meeting #1 - April 27 MassDOT Slides
PDF
No ratings yet
Silver Line Extension Alternatives Analysis Public Meeting #1 - April 27 MassDOT Slides
54 pages
Actividad A5. Study Case
PDF
No ratings yet
Actividad A5. Study Case
3 pages
TECHNICAL REPORT No, 55-5. Oregon State Highway Department 1955
PDF
No ratings yet
TECHNICAL REPORT No, 55-5. Oregon State Highway Department 1955
167 pages
City of Everett Transit Workshop - December 2019
PDF
No ratings yet
City of Everett Transit Workshop - December 2019
20 pages
The FEIS Summary of Alternatives of The I-81 Viaduct Project
PDF
No ratings yet
The FEIS Summary of Alternatives of The I-81 Viaduct Project
17 pages
2016 Brookland Edgewood Livability Study Full Report
PDF
100% (1)
2016 Brookland Edgewood Livability Study Full Report
148 pages
Traffic and Highway Engineering Solutions Manualpdf PDF Free
PDF
No ratings yet
Traffic and Highway Engineering Solutions Manualpdf PDF Free
304 pages
Bicycle Master Plan - May 2021
PDF
No ratings yet
Bicycle Master Plan - May 2021
138 pages
Module 1 Inro To Transpo
PDF
No ratings yet
Module 1 Inro To Transpo
20 pages
Some Network Flow Problems in Urban Road Networks
PDF
No ratings yet
Some Network Flow Problems in Urban Road Networks
39 pages
11 Roads
PDF
No ratings yet
11 Roads
26 pages
Appendix G - Regional Capacity Project List
PDF
No ratings yet
Appendix G - Regional Capacity Project List
203 pages
Flagler Trail - SAC #3 Presentation 12-20-18 - Lo Res
PDF
No ratings yet
Flagler Trail - SAC #3 Presentation 12-20-18 - Lo Res
42 pages
Transportation Planning Process
PDF
100% (3)
Transportation Planning Process
29 pages
Vta 2035
PDF
No ratings yet
Vta 2035
282 pages
Evaluation Form
PDF
No ratings yet
Evaluation Form
2 pages
In Motion: Development of The 2019-2024 Transportation Improvement Program For The Capital District Is Underway!
PDF
No ratings yet
In Motion: Development of The 2019-2024 Transportation Improvement Program For The Capital District Is Underway!
8 pages
Transportation Town Hall Presentation
PDF
No ratings yet
Transportation Town Hall Presentation
46 pages
Progress Report
PDF
No ratings yet
Progress Report
16 pages
Brigham City General Plan Steering Committee Meeting Transportation
PDF
No ratings yet
Brigham City General Plan Steering Committee Meeting Transportation
19 pages
Syracuse Legal-Regulatory Retraint
PDF
No ratings yet
Syracuse Legal-Regulatory Retraint
6 pages
I5 CorridorPartnership Report 040919
PDF
No ratings yet
I5 CorridorPartnership Report 040919
20 pages
Bridge Aesthetics: Context Sensitive Design
PDF
No ratings yet
Bridge Aesthetics: Context Sensitive Design
53 pages
Assignment: Malaviya National Institute of Technology Rajasthan, Jaipur
PDF
No ratings yet
Assignment: Malaviya National Institute of Technology Rajasthan, Jaipur
7 pages
Middlesex Diversion Routes Map Book
PDF
No ratings yet
Middlesex Diversion Routes Map Book
789 pages
MoveDC Action Plan
PDF
No ratings yet
MoveDC Action Plan
12 pages
D263958 Drawings PDF
PDF
No ratings yet
D263958 Drawings PDF
113 pages
Cha1 Garber 4th PDF
PDF
No ratings yet
Cha1 Garber 4th PDF
10 pages
Fairfax County Project List
PDF
No ratings yet
Fairfax County Project List
17 pages
Oct 2011 Final Draft Palo Alto Bike-Ped Plan
PDF
No ratings yet
Oct 2011 Final Draft Palo Alto Bike-Ped Plan
280 pages
Dr. ML King/ Mich RD.: Indygo Customer Service Center Fare Options Full Price Half Fare
PDF
No ratings yet
Dr. ML King/ Mich RD.: Indygo Customer Service Center Fare Options Full Price Half Fare
2 pages
BP SDEIS App C-1 GPI Transportation Plan 11-30-2010 Cape Vincent
PDF
No ratings yet
BP SDEIS App C-1 GPI Transportation Plan 11-30-2010 Cape Vincent
37 pages
NDMAP.2018 v5
PDF
No ratings yet
NDMAP.2018 v5
98 pages
Mtip Map
PDF
No ratings yet
Mtip Map
1 page
Attachment A - Ordinance
PDF
No ratings yet
Attachment A - Ordinance
36 pages
Reston Dulles Special Study 2009E4 Parks
PDF
No ratings yet
Reston Dulles Special Study 2009E4 Parks
1 page
North Jersey Coast Schedule
PDF
No ratings yet
North Jersey Coast Schedule
4 pages
2009.12.CAC.C Bike Plan
PDF
No ratings yet
2009.12.CAC.C Bike Plan
164 pages
Bus Map & Guide: University Mall / Airport
PDF
No ratings yet
Bus Map & Guide: University Mall / Airport
36 pages
2000 MeasureB Expenditure Plan v14
PDF
No ratings yet
2000 MeasureB Expenditure Plan v14
43 pages
Crystal City Multi Modal Transportation Study
PDF
No ratings yet
Crystal City Multi Modal Transportation Study
83 pages
Read The Final Draft of Alhambra's Bike Master Plan
PDF
No ratings yet
Read The Final Draft of Alhambra's Bike Master Plan
66 pages
Boulder Transit Village Area Plan
PDF
No ratings yet
Boulder Transit Village Area Plan
95 pages