COVER SLAB
3850
3850 NOTES:
225 1975 225 1200 225 700
1975 1200 225 THE ORIENTATION OF SEPTIC TANK AND SOAK WAY PIT
225 +0.050 225 225 +0.050 225 FGL
1500
±0.000 225 1500 225
SHOULD REFER TO SITE LAYOUT
T.O,S T.O,S
-0.100 -0.100
225
200
200
225
TWL
50 min TWL
INLET 150Ø T20Ø
150Ø
(TOP & BOTTOM 50
BOTH LAYERS) x
di
T20Ø a
(TOP & BOTTOM
BOTH LAYERS)
2350
1900
1500
75mm(TYP)
VARIES
150Ø
50mm
(TYP)
1500
WATER STOP
100 L
WATER STOP
225
B
OPENING
225
250
250
600x600 MANHOLE
OPENING WITH HEAVY
25mm PROTECTION SCREED 600 600 DUTY COVER (TYP.)
4mm MEMBRANE 300THK ,20 GRADE BLACK B
TYP.BELOW
GRADE SLAB
TORCH APPLIED
50mm BLINDING
SECTION - A AGGREGATE
WF1 LONG T20Ø 50 x dia
SCALE -1:25 (TOP & BOTTOM
SUBGRADE COMPACTED TO
95% M.D.D
NOTE:- ALL INTERNAL AND EXTERNAL WALL OPENING SHOULD BE STRUCTURAL G.A. PLAN AT COVER SLAB ( SEPTIC BOTH LAYERS)
INLINE WITH MEP AND SITE CONDITIONS, SHOP DRAWINGS
SHALL BE PROVIDED FOR ENGINEER'S REVIEW. TANK )
SCALE -1:25
TYPICAL REINFORCEMENT DETAILS
3850 200mm THICK REINFORCED AROUND OPENING IN FLOOR
100 225 1975 225 1200 225 100 CONCRETE COVER SLAB
2350 SLAB/WALL HAVING LARGER
200 225 1500 225 200 DIMENSIONS OF MORE THAN
225 1900 225
600 600 500mm.
NOTE : FOR OPENINGS HAVING LARGER DIMENSIONS LESS
225 100
200
600
C1 C1
WF1 TWL
45
225
Ø
(M
IN
200THK INFILLED BLOCKWALLS
)
LAID ON HORIZONTAL MORTAR
SOAKPIT 2T16 BARS (EF)
BED WITH 20mm WIDE OPEN VERTICAL 45Ø(MIN)
PAINTING NITOCOAT JOINTS BACKED CLEAN
225
EPW-100
BITUPAINT 1000MICRON
2550
1900
WF1
WF1
MAIN BARS : 4T16
A LINKS : T8-200
VARIES
BITUMEN PAINT C1
PROTECTIVE COATING
1500
GEOTEXTILE 1000GUAGE +POLYTHENE SHEET+
PLYWOOD PROTECTION
WF1
C1 C1 100
100
100 225
20 GRADE BLACK
AGGREGATE
250
B VOIDS IN CONCRETE BLOCKS TO BE
FILLED WITH CONCRETE AND AROUND CIRCULAR OPENINGS
REINFORCED WITH 1 NO. T16 VERTICAL
BAR POSITIONED ON CENTER AND
STRUCTURAL G.A. PLAN AT BASE SLAB PASSING THROUGH ALL BLOCKWORK
( SEPTIC TANK )
COURSES. SECTION - B
SCALE -1:25 SCALE -1:25
KINGDOM OF BAHRAIN
ELECTRICITY AND WATER AUTHORITY
T12-200(V)EF PLANNING & STUDIES
1500
SEPTIC TANK REINFORCEMENT DETAILS FOR SECTION - A SEPTIC TANK REINFORCEMENT DETAILS FOR SECTION - B
SUBSTATION CIVIL WORK
Rev
HM TMS 1154 ST-NERF-30
c