Joint Inspection Sheet: Second Integrated Road Investment Program (Eastern Province)
Joint Inspection Sheet: Second Integrated Road Investment Program (Eastern Province)
Decisions Taken-
1) Cross drain to be constrcted at Ch: 0+190 water flowing from RHS to LHS.
2) Construct new LHS U drain from Ch: 0+190 to 0+000 & to Ch: -0+025 connecting to the Lagoon.
3) Construct new RHS U drain from 0+000 to -0+025 to stop water stagnation at 0+000 junction.
5) Follwing locations boundary walls & shop accesses to be damaged. Residents agreed to the demolishing to allow drain path.
7) Road existing chamfer is LHS (+) & RHS (-), & it will not be changed.