Joint Inspection Sheet: Second Integrated Road Investment Program (Eastern Province)

The document discusses providing additional drainage to avoid storm water issues on road EAM 034. It was proposed to construct a cross drain and U drains between chainages 0+000 to 0+190 connecting to a lagoon. Decisions were taken regarding the drainage works and required shifting of utility poles and demolition of structures.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views1 page

Joint Inspection Sheet: Second Integrated Road Investment Program (Eastern Province)

The document discusses providing additional drainage to avoid storm water issues on road EAM 034. It was proposed to construct a cross drain and U drains between chainages 0+000 to 0+190 connecting to a lagoon. Decisions were taken regarding the drainage works and required shifting of utility poles and demolition of structures.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SECOND INTEGRATED ROAD INVESTMENT PROGRAM (EASTERN PROVINCE)

REHABILITATION / IMPROVEMENT AND MAINTENANCE OF 71.97 KM RURAL ROADS IN AMPARA DISTRICT


IN THE EASTERN PROVINCE - PACKAGE 5
CONTRACT PACKAGE : RDA/ADB/IROAD-2(EP)/NCB/AM-05

EMPLOYER ENGINEER CONTRACTOR

ROAD DEVELOPMENT AUTHORITY EGIS / GREENTECH JV NAWALOKA CONSTRUCTION COMPANY

Road ID : EAM 034


Chainage : 0+000 to 0+470
Subject : Providing additional drainage to avoiding storm water issue

Document no. : NCC/AM05/QA/JIS/004 Date: 13/01/2022


Joint Inspection Sheet
Description of Work & Sketch - EAM 034 Residents requested new drainage to stop the rain water issue. Contractor and Engineer
proposed a cross drain at Ch: 0+190 and RHS Udrain from Ch. 0+190 to 0+000 & Ch; -0+025 connecting to the lagoon. Please refer the
attached drawing of the proposal.

Attendees- RDA PE, ARE,CE,PM,DPM,SE,ESO, Residents of EAM 034.

Decisions Taken-

1) Cross drain to be constrcted at Ch: 0+190 water flowing from RHS to LHS.

2) Construct new LHS U drain from Ch: 0+190 to 0+000 & to Ch: -0+025 connecting to the Lagoon.

3) Construct new RHS U drain from 0+000 to -0+025 to stop water stagnation at 0+000 junction.

4) Following CEB poles & SLT poles need to be shifted.

a) CEB - Ch: 0+098 LHS, 0+082 LHS,0+060 LHS, 0+121 LHS


b) SLT - Ch: 0+192 RHS

5) Follwing locations boundary walls & shop accesses to be damaged. Residents agreed to the demolishing to allow drain path.

a) 0+137 LHS Boundary wall , 0+152 to 0+137 LHS shop access

6) Road width will be maintained as proposed 4m, without any change.

7) Road existing chamfer is LHS (+) & RHS (-), & it will not be changed.

Contractor Engineer Employer


Name : Name : Name :
Designation : Designation : Designation :
Signature : Signature : Signature :