Process Data Sheet Vessels: Plant: TAG Project: Unit: Doc. Type: Progr: Rev. Sheet OF Date

This document provides design specifications for vessels including: 1. Operating conditions such as temperature and pressure. 2. Design data for zones, wind load, seismic requirements, and minimum metal temperatures. 3. Materials used for shells, floors, roofs, nozzles, supports, bolting, and internals. 4. Nozzle specifications including quantity, rating, type, and service.

Uploaded by

Desiree Molina
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views

Process Data Sheet Vessels: Plant: TAG Project: Unit: Doc. Type: Progr: Rev. Sheet OF Date

This document provides design specifications for vessels including: 1. Operating conditions such as temperature and pressure. 2. Design data for zones, wind load, seismic requirements, and minimum metal temperatures. 3. Materials used for shells, floors, roofs, nozzles, supports, bolting, and internals. 4. Nozzle specifications including quantity, rating, type, and service.

Uploaded by

Desiree Molina
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

PROCESS DATA SHEET VESSELS

PLANT: TAG
PROJECT: UNIT: DOC. TYPE: PROGR: REV. 0 SHEET 1 OF 1 DATE:
1 SERVICE Item
2 CONDITIONS Temperature [ °F ] Pressure [ PSIG ] MR
3 Operating SKETCH
4 Design
5
6 Specific gravity @ 60 F:
7 Operating
Feedrate:
8 Design
9 Postweld Heat treatment (for process) Yes No X
10 DESIGN DATA
11 ZONE DESIGN OPERATING
12 TOP
13 BOTTOM
14 EXTERNAL
15
16 WIND: SEISMIC:
17 MIN. DESIGN METAL TEMP
18 SPECIAL SERVICE
19 PRESSURE TEST
20 CORROSION SHELL, FLOOR & ROOF NOZZLES
21 ALLOWACE FIXED INTERNALS REMOVABLE INTERNAL
22 RADIOGRAPHING
23 JOINT EFICIENCY
24 CODE:
25 INSPECTION BY
26 PAINTING
27 INSULATION
28 MATERIALS
29 SHELL:
30 FLOOR AND ROOF:
32 SUPPORTS
33 NOZZLES FLANGE NECK
34 GASKETS NOZZLE MANHOLE:
35 BOLTING INT: EXT:
36 NUTS INT: EXT:
37 PIPE: PLATE
INTERNAL
38 STRUCT
39 TRAYS
40 TRAY SUPPORT RINGS
41 REINFORCING PADS
42 NOZZLES & MANWAYS
43 NOM
MK QTY RATING TYPE SERVICE
44 SIZE
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
62
63
64 GENERAL NOTES:
65
66
67
68
69
70
71
72
73
74
75 0 MECHANICAL REVIEWED
76 0 METALLURGICAL REVIEWED
77 0 PROCESS REVIEWED
78 Rev Description Date Prd. Ckd. App. Rev Description Date Prd. Ckd. App.