HEC Ltd. Ranchi SAIL Bhilai Steel Plant MECON Limited: Number of Pages
HEC Ltd. Ranchi SAIL Bhilai Steel Plant MECON Limited: Number of Pages
Kalwa Works,
P.B. No. 85,
Thane-Belapur Road,
Industry Sector Thane-400601
Drive Technologies Maharashtra,India
Engineering & Commissioning Phone: +91 22-27600001-5
This document is Electronically generated & hence does not require any signature.
The reproduction, transmission or use of this document or its contents is not permitted without express written authority. Offenders
will be liable for damages. All rights, including rights created by patent or registration of a utility model or design, are reserved.
&RD1/1
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Title page / cover sheet Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TS1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&TS1/1
Design Document No. - G71053- J5663 (EF-1) Page 1
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 1
1 2 3 4 5 6 7 8 9 10
Record of Drawings
Document
Higher-level Function(=) Mounting Location(+) Page No. Page Description Document no. Date Prep. by
Type(&)
A000 : Overview
TS1 1 Title page / cover sheet =A000&TS1/1 07.05.19 IN226041
RD1 1 Record of Drawings =A000&RD1/1 07.05.19 Z003U8PM
RD1 2 Record of Drawings =A000&RD1/2 07.05.19 Z003U8PM
RD1 3 Record of Drawings =A000&RD1/3 07.05.19 Z003U8PM
RD1 4 Record of Drawings =A000&RD1/4 07.05.19 Z003U8PM
RD1 5 Record of Drawings =A000&RD1/5 07.05.19 Z003U8PM
RD1 6 Record of Drawings =A000&RD1/6 07.05.19 Z003U8PM
RD1 7 Record of Drawings =A000&RD1/7 07.05.19 Z003U8PM
RD1 8 Record of Drawings =A000&RD1/8 07.05.19 Z003U8PM
RD1 9 Record of Drawings =A000&RD1/9 07.05.19 Z003U8PM
RD1 10 Record of Drawings =A000&RD1/10 07.05.19 Z003U8PM
RD1 11 Record of Drawings =A000&RD1/11 07.05.19 Z003U8PM
RD1 12 Record of Drawings =A000&RD1/12 07.05.19 Z003U8PM
RD1 13 Record of Drawings =A000&RD1/13 07.05.19 Z003U8PM
RO1 1 Revision overview =A000&RO1/1 07.05.19 Z003U8PM
RO1 2 Revision overview =A000&RO1/2 07.05.19 Z003U8PM
RO1 3 Revision overview =A000&RO1/3 07.05.19 Z003U8PM
RO1 4 Revision overview =A000&RO1/4 07.05.19 Z003U8PM
RO1 5 Revision overview =A000&RO1/5 07.05.19 Z003U8PM
RO1 6 Revision overview =A000&RO1/6 07.05.19 Z003U8PM
RO1 7 Revision overview =A000&RO1/7 07.05.19 Z003U8PM
RO1 8 Revision overview =A000&RO1/8 07.05.19 Z003U8PM
RO1 9 Revision overview =A000&RO1/9 07.05.19 Z003U8PM
RO1 10 Revision overview =A000&RO1/10 07.05.19 Z003U8PM
RO1 11 Revision overview =A000&RO1/11 07.05.19 Z003U8PM
RO1 12 Revision overview =A000&RO1/12 07.05.19 Z003U8PM
RO1 13 Revision overview =A000&RO1/13 07.05.19 Z003U8PM
RO1 14 Revision overview =A000&RO1/14 07.05.19 Z003U8PM
RO1 15 Revision overview =A000&RO1/15 07.05.19 Z003U8PM
RO1 16 Revision overview =A000&RO1/16 07.05.19 Z003U8PM
RO1 17 Revision overview =A000&RO1/17 07.05.19 Z003U8PM
RO1 18 Revision overview =A000&RO1/18 07.05.19 Z003U8PM
RO1 19 Revision overview =A000&RO1/19 07.05.19 Z003U8PM
RO1 20 Revision overview =A000&RO1/20 07.05.19 Z003U8PM
RO1 21 Revision overview =A000&RO1/21 07.05.19 Z003U8PM
RO1 22 Revision overview =A000&RO1/22 07.05.19 Z003U8PM
RO1 23 Revision overview =A000&RO1/23 07.05.19 Z003U8PM
RO1 24 Revision overview =A000&RO1/24 07.05.19 Z003U8PM
&TS1/1 RO1 25 Revision overview =A000&RO1/25 07.05.19 Z003U8PM 2
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Record of Drawings Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RD1/1
Design Document No. - G71053- J5663 (EF-1) Page 1
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 13
1 2 3 4 5 6 7 8 9 10
Record of Drawings
Document
Higher-level Function(=) Mounting Location(+) Page No. Page Description Document no. Date Prep. by
Type(&)
A000 : Overview
RO1 26 Revision overview =A000&RO1/26 07.05.19 Z003U8PM
RO1 27 Revision overview =A000&RO1/27 07.05.19 Z003U8PM
RO1 28 Revision overview =A000&RO1/28 07.05.19 Z003U8PM
RO1 29 Revision overview =A000&RO1/29 07.05.19 Z003U8PM
RO1 30 Revision overview =A000&RO1/30 07.05.19 Z003U8PM
RO1 31 Revision overview =A000&RO1/31 07.05.19 Z003U8PM
RO1 32 Revision overview =A000&RO1/32 07.05.19 Z003U8PM
RO1 33 Revision overview =A000&RO1/33 07.05.19 Z003U8PM
RO1 34 Revision overview =A000&RO1/34 07.05.19 Z003U8PM
DMI1 1 Design/Manufacturing Instructions =A000&DMI1/1 07.05.19 in211311
DMI1 2 Design/Manufacturing Instructions =A000&DMI1/2 07.05.19 in211311
NP1 1 Name Plate Details =A000&NP1/1 07.05.19 IN226041
NP1 2 Name Plate Details =A000&NP1/2 07.05.19 IN226041
NP1 3 Name Plate Details =A000&NP1/3 07.05.19 IN226041
NP1 4 Name Plate Details =A000&NP1/4 07.05.19 Z003U8PM
SP1 1 Specification Sheet-Control Transformer(690 V to 230 V) =A000&SP1/1 07.05.19 IN216289
SP1 2 Specification Sheet-Potential Transformer(690 V) =A000&SP1/2 07.05.19 IN216289
SP1 3 Specification Sheet-Current Transformer =A000&SP1/3 07.05.19 IN216289
SP1 4 Specification Sheet-Control Transformer(690 V to 230 V) =A000&SP1/4 07.05.19 IN216289
SP1 5 Specification Sheet-Control Transformer(690 V to 230 V) =A000&SP1/5 07.05.19 IN213825
CMD1 1 Panel Overview =A000&CMD1/1 07.05.19 IN211311
CMD1 2 Panel Overview =A000&CMD1/2 07.05.19 IN216289
CMD1 3 GA_H2200_W800_DOOR2_P1 =A000&CMD1/3 07.05.19 IN160207
CMD1 4 GA_H2200_W800_DOOR2_P2 =A000&CMD1/4 07.05.19 IN160207
CMD1 5 GA_H2200_W1200_DOOR2_P3 =A000&CMD1/5 07.05.19 IN160207
CMD1 6 GA_Legend Details_P3 =A000&CMD1/6 07.05.19 IN160207
CMD1 7 GA_H2200_W800_DOOR2_P4 =A000&CMD1/7 07.05.19 IN160207
CMD1 8 GA_H2200_W800_DOOR2_P5 =A000&CMD1/8 07.05.19 IN160207
CMD1 9 GA_H2200_W600_DOOR1_P6 =A000&CMD1/9 07.05.19 IN160207
CMD1 10 GA_H2200_W800_DOOR2_P7 =A000&CMD1/10 07.05.19 IN160207
CMD1 11 GA_H2200_W800_DOOR2_P8 =A000&CMD1/11 07.05.19 IN160207
CMD1 12 GA_H2200_W1200_DOOR2_P9 =A000&CMD1/12 07.05.19 IN160207
CMD1 13 GA_Legend Details_P9 =A000&CMD1/13 07.05.19 IN160207
CMD1 14 GA_H2200_W800_DOOR2_P10 =A000&CMD1/14 07.05.19 IN160207
CMD1 15 GA_H2200_W800_DOOR2_P11 =A000&CMD1/15 07.05.19 IN160207
CMD1 16 GA_H2200_W800_DOOR2_P12 =A000&CMD1/16 07.05.19 IN160207
CMD1 17 GA_H2200_W1200_DOOR2_P13 =A000&CMD1/17 07.05.19 IN160207
CMD1 18 GA_H2200_W800_DOOR2_P14 =A000&CMD1/18 07.05.19 IN160207
1 CMD1 19 GA_H2200_W1200_DOOR2_P15 =A000&CMD1/19 07.05.19 IN160207 3
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Record of Drawings Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RD1/2
Design Document No. - G71053- J5663 (EF-1) Page 2
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 13
1 2 3 4 5 6 7 8 9 10
Record of Drawings
Document
Higher-level Function(=) Mounting Location(+) Page No. Page Description Document no. Date Prep. by
Type(&)
A000 : Overview
CMD1 20 GA_H2200_W800_DOOR2_P16 =A000&CMD1/20 07.05.19 IN160207
CMD1 21 GA_H2200_W1200_DOOR2_P17 =A000&CMD1/21 07.05.19 IN160207
CMD1 22 GA_H2200_W1200_DOOR2_P18 =A000&CMD1/22 07.05.19 IN160207
CMD1 23 GA_H2200_W600_DOOR1_P19 =A000&CMD1/23 07.05.19 in160207
CMD1 24 GA_H2200_W600_DOOR1_P20 =A000&CMD1/24 07.05.19 in160207
CMD1 25 GA_H2200_W600_DOOR1_P21 =A000&CMD1/25 07.05.19 IN160207
CMD1 26 GA_H2200_W800_DOOR2_P22 =A000&CMD1/26 07.05.19 IN160207
CMD1 27 GA_H2200_W600_DOOR1_P23 =A000&CMD1/27 07.05.19 IN160207
CMD1 28 GA_H2200_W800_DOOR2_P24 =A000&CMD1/28 07.05.19 IN160207
CMD1 29 GA_H2200_W600_DOOR1_P25 =A000&CMD1/29 07.05.19 IN160207
CMD1 30 GA_H2200_W600_DOOR1_P26 =A000&CMD1/30 07.05.19 IN160207
CMD1 31 GA_H2200_W1000_DOOR2_P27 =A000&CMD1/31 07.05.19 IN160207
CMD1 32 GA_H2200_W1200_DOOR2_P28 =A000&CMD1/32 07.05.19 IN160207
CMD1 33 GA_Legend Details_P28 =A000&CMD1/33 07.05.19 in160207
CMD1 34 GA_H2200_W800_DOOR2_P29 =A000&CMD1/34 07.05.19 IN213825
CMD1 35 GA_H2200_W800_DOOR2_P31 =A000&CMD1/35 07.05.19 IN160207
CMD1 36 GA_H2200_W1000_DOOR2_P32 =A000&CMD1/36 07.05.19 IN160207
CMD1 37 GA_H2200_W800_DOOR2_P33 =A000&CMD1/37 07.05.19 IN213825
CMD1 38 GA_Remote Post_Wall Mounted =A000&CMD1/38 07.05.19 in160207
CMD1 39 GA_Remote Post_Wall Mounted =A000&CMD1/39 07.05.19 in160207
A001 : Protective Panel
EQ1 1 Equipment List =A001&EQ1/1 07.05.19 Z003U8PM
EQ1 2 Equipment List =A001&EQ1/2 07.05.19 Z003U8PM
EQ1 3 Equipment List =A001&EQ1/3 07.05.19 incads2791
EQ1 4 Equipment List =A001&EQ1/4 07.05.19 Z003U8PM
EQ1 5 Equipment List =A001&EQ1/5 07.05.19 Z003U8PM
P027 WD1 1 Isolator Panel =A001+P027&WD1/1 07.05.19 IN216289
P027 WD1 2 Incomer (Air Circuit Breaker) =A001+P027&WD1/2 07.05.19 IN216289
P031 WD1 3 Feeder =A001+P031&WD1/3 07.05.19 IN216289
P028 WD1 4 Control Transformer =A001+P028&WD1/4 07.05.19 IN216289
P028 WD1 5 Power Distribution =A001+P028&WD1/5 07.05.19 IN216289
P028 WD1 6 Power Distribution =A001+P028&WD1/6 07.05.19 IN216289
P028 WD1 7 Panel Auxiliary Circuits =A001+P028&WD1/7 07.05.19 IN216289
P028 WD1 8 Feeders =A001+P028&WD1/8 07.05.19 IN216289
P028 WD1 9 Feeders =A001+P028&WD1/9 07.05.19 IN216289
P028 WD1 10 Power Supply =A001+P028&WD1/10 07.05.19 IN216289
P028 WD1 11 Feeders =A001+P028&WD1/11 07.05.19 IN216289
P028 WD1 12 Feeders =A001+P028&WD1/12 07.05.19 IN216289
2 P028 WD1 13 Feeders =A001+P028&WD1/13 07.05.19 IN216289 4
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Record of Drawings Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RD1/3
Design Document No. - G71053- J5663 (EF-1) Page 3
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 13
1 2 3 4 5 6 7 8 9 10
Record of Drawings
Document
Higher-level Function(=) Mounting Location(+) Page No. Page Description Document no. Date Prep. by
Type(&)
A001 : Protective Panel
P028 WD1 14 Feeders =A001+P028&WD1/14 07.05.19 IN216289
P028 WD1 15 Feeders =A001+P028&WD1/15 07.05.19 IN216289
P028 WD1 16 Feeders =A001+P028&WD1/16 07.05.19 IN216289
P028 WD1 17 Feeders =A001+P028&WD1/17 07.05.19 IN216289
P028 WD1 18 Multi-Function Meter =A001+P028&WD1/18 07.05.19 IN216289
P029 WD1 19 Control Logic =A001+P029&WD1/19 07.05.19 IN216289
P029 WD1 20 Control Logic =A001+P029&WD1/20 07.05.19 IN216289
P028 WD1 21 Control Logic =A001+P028&WD1/21 07.05.19 IN216289
P028 WD1 22 Annunciator =A001+P028&WD1/22 07.05.19 IN216289
P028 WD1 23 To PLC =A001+P028&WD1/23 07.05.19 IN216289
P028 WD1 24 To PLC =A001+P028&WD1/24 07.05.19 IN216289
P028 WD1 25 To PLC =A001+P028&WD1/25 07.05.19 IN216289
P028 WD1 26 To PLC =A001+P028&WD1/26 07.05.19 IN216289
P028 WD1 27 To PLC =A001+P028&WD1/27 07.05.19 IN216289
TD1 1 Terminal diagram =A001&TD1/1 07.05.19 Z003U8PM
TD1 2 Terminal diagram =A001&TD1/2 07.05.19 Z003U8PM
TD1 3 Terminal diagram =A001&TD1/3 07.05.19 Z003U8PM
TD1 4 Terminal diagram =A001&TD1/4 07.05.19 Z003U8PM
TD1 5 Terminal diagram =A001&TD1/5 07.05.19 Z003U8PM
TD1 6 Terminal diagram =A001&TD1/6 07.05.19 Z003U8PM
S001 : Incomer + AIM1 +ALM1 + AIM2 +ALM2
EQ1 1 Equipment List =S001&EQ1/1 07.05.19 incads2791
EQ1 2 Equipment List =S001&EQ1/2 07.05.19 incads2791
EQ1 3 Equipment List =S001&EQ1/3 07.05.19 incads2791
EQ1 4 Equipment List =S001&EQ1/4 07.05.19 incads2791
EQ1 5 Equipment List =S001&EQ1/5 07.05.19 IN226041
P001 WD1 1 Incomer (Air Circuit Breaker) =S001+P001&WD1/1 07.05.19 in211311
P003 WD1 2 Power Distribution =S001+P003&WD1/2 07.05.19 IN216289
P003 WD1 3 Power Distribution =S001+P003&WD1/3 07.05.19 IN216289
P003 WD1 4 Panel Auxiliary Circuits =S001+P003&WD1/4 07.05.19 IN216289
P001 WD1 5 Pre-Charging =S001+P001&WD1/5 07.05.19 IN216289
P001 WD1 6 AIM1 =S001+P001&WD1/6 07.05.19 IN216289
P002 WD1 7 ALM1 =S001+P002&WD1/7 07.05.19 IN216289
P004 WD1 8 AIM2 =S001+P004&WD1/8 07.05.19 IN216289
P005 WD1 9 ALM2 + DC Bus =S001+P005&WD1/9 07.05.19 IN216289
P003 WD1 10 CU320 =S001+P003&WD1/10 07.05.19 IN216289
P003 WD1 11 Relay Boards =S001+P003&WD1/11 07.05.19 IN216289
P003 WD1 12 Control Logic =S001+P003&WD1/12 07.05.19 IN216289
3 P003 WD1 13 Control Logic =S001+P003&WD1/13 07.05.19 IN216289 5
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Record of Drawings Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RD1/4
Design Document No. - G71053- J5663 (EF-1) Page 4
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 13
1 2 3 4 5 6 7 8 9 10
Record of Drawings
Document
Higher-level Function(=) Mounting Location(+) Page No. Page Description Document no. Date Prep. by
Type(&)
S001 : Incomer + AIM1 +ALM1 + AIM2 +ALM2
P003 WD1 14 Control Logic =S001+P003&WD1/14 07.05.19 IN216289
P003 WD1 15 Control Logic =S001+P003&WD1/15 07.05.19 IN216289
P003 WD1 16 Annunciation =S001+P003&WD1/16 07.05.19 IN216289
P003 WD1 17 To PLC =S001+P003&WD1/17 07.05.19 IN216289
TD1 1 Terminal diagram =S001&TD1/1 07.05.19 Z003U8PM
TD1 2 Terminal diagram =S001&TD1/2 07.05.19 Z003U8PM
TD1 3 Terminal diagram =S001&TD1/3 07.05.19 Z003U8PM
TD1 4 Terminal diagram =S001&TD1/4 07.05.19 Z003U8PM
TD1 5 Terminal diagram =S001&TD1/5 07.05.19 Z003U8PM
TD1 6 Terminal diagram =S001&TD1/6 07.05.19 Z003U8PM
S002 : AIM3 + ALM3 + AIM4 + ALM4
EQ1 1 Equipment List =S002&EQ1/1 07.05.19 incads2791
EQ1 2 Equipment List =S002&EQ1/2 07.05.19 incads2791
EQ1 3 Equipment List =S002&EQ1/3 07.05.19 incads2791
EQ1 4 Equipment List =S002&EQ1/4 07.05.19 incads2791
P009 WD1 1 Incomer (Air Circuit Breaker) =S002+P009&WD1/1 07.05.19 IN216289
P009 WD1 2 Power Distribution =S002+P009&WD1/2 07.05.19 IN216289
P009 WD1 3 Power Distribution =S002+P009&WD1/3 07.05.19 IN216289
P003 WD1 4 Panel Auxiliary Circuits =S002+P003&WD1/4 07.05.19 IN216289
P009 WD1 5 Pre Charging =S002+P009&WD1/5 07.05.19 IN216289
P007 WD1 6 AIM3 =S002+P007&WD1/6 07.05.19 IN216289
P008 WD1 7 ALM3 =S002+P008&WD1/7 07.05.19 IN216289
P010 WD1 8 AIM4 =S002+P010&WD1/8 07.05.19 IN216289
P011 WD1 9 ALM4 =S002+P011&WD1/9 07.05.19 IN216289
P006 WD1 10 DC Bus =S002+P006&WD1/10 07.05.19 IN216289
P008 WD1 11 CU 320 =S002+P008&WD1/11 07.05.19 IN216289
P009 WD1 12 Relay Boards =S002+P009&WD1/12 07.05.19 IN216289
P009 WD1 13 Control Logic =S002+P009&WD1/13 07.05.19 IN216289
P001 WD1 14 Annunciation =S002+P001&WD1/14 07.05.19 IN216289
P001 WD1 15 To PLC =S002+P001&WD1/15 07.05.19 IN216289
TD1 1 Terminal diagram =S002&TD1/1 07.05.19 IN226041
TD1 2 Terminal diagram =S002&TD1/2 07.05.19 Z003U8PM
TD1 3 Terminal diagram =S002&TD1/3 07.05.19 Z003U8PM
TD1 4 Terminal diagram =S002&TD1/4 07.05.19 Z003U8PM
TD1 5 Terminal diagram =S002&TD1/5 07.05.19 Z003U8PM
S003 : Main Hoist-1
EQ1 1 Equipment List =S003&EQ1/1 07.05.19 Z003U8PM
EQ1 2 Equipment List =S003&EQ1/2 07.05.19 incads2791
4 EQ1 3 Equipment List =S003&EQ1/3 07.05.19 incads2791 6
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Record of Drawings Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RD1/5
Design Document No. - G71053- J5663 (EF-1) Page 5
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 13
1 2 3 4 5 6 7 8 9 10
Record of Drawings
Document
Higher-level Function(=) Mounting Location(+) Page No. Page Description Document no. Date Prep. by
Type(&)
S003 : Main Hoist-1
EQ1 4 Equipment List =S003&EQ1/4 07.05.19 IN226041
P015 WD1 1 Power Distribution =S003+P015&WD1/1 07.05.19 IN216289
P015 WD1 2 Power Distribution =S003+P015&WD1/2 07.05.19 IN216289
P017 WD1 3 Panel Auxiliary Circuits =S003+P017&WD1/3 07.05.19 IN216289
P015 WD1 4 Field Auxillaries =S003+P015&WD1/4 07.05.19 IN216289
P016 WD1 5 MH-1 =S003+P016&WD1/5 07.05.19 IN216289
P016 WD1 6 SMC30 =S003+P016&WD1/6 07.05.19 IN216289
P016 WD1 7 CU320 =S003+P016&WD1/7 07.05.19 IN216289
P016 WD1 8 TM15 =S003+P016&WD1/8 07.05.19 IN216289
P017 WD1 9 Relay Board =S003+P017&WD1/9 07.05.19 IN216289
P017 WD1 10 Relay Board =S003+P017&WD1/10 07.05.19 IN216289
P017 WD1 11 Relay Board =S003+P017&WD1/11 07.05.19 IN216289
P017 WD1 12 Control Logic =S003+P017&WD1/12 07.05.19 IN216289
P016 WD1 13 Annunciation =S003+P016&WD1/13 07.05.19 IN216289
P016 WD1 14 Annunciation =S003+P016&WD1/14 07.05.19 IN216289
P016 WD1 15 To PLC =S003+P016&WD1/15 07.05.19 IN216289
P016 WD1 16 Master Controller =S003+P016&WD1/16 07.05.19 IN216289
TD1 1 Terminal diagram =S003&TD1/1 07.05.19 Z003U8PM
TD1 2 Terminal diagram =S003&TD1/2 07.05.19 Z003U8PM
TD1 3 Terminal diagram =S003&TD1/3 07.05.19 Z003U8PM
TD1 4 Terminal diagram =S003&TD1/4 07.05.19 Z003U8PM
TD1 5 Terminal diagram =S003&TD1/5 07.05.19 Z003U8PM
TD1 6 Terminal diagram =S003&TD1/6 07.05.19 Z003U8PM
TD1 7 Terminal diagram =S003&TD1/7 07.05.19 Z003U8PM
S004 : Main Hoist-2
EQ1 1 Equipment List =S004&EQ1/1 07.05.19 incads2791
EQ1 2 Equipment List =S004&EQ1/2 07.05.19 incads2791
P013 WD1 1 Power Distribution =S004+P013&WD1/1 07.05.19 IN216289
P013 WD1 2 Panel Auxiliary Circuits =S004+P013&WD1/2 07.05.19 IN216289
P013 WD1 3 Field Auxillaries =S004+P013&WD1/3 07.05.19 IN216289
P015 WD1 4 MH-2 =S004+P015&WD1/4 07.05.19 IN216289
P013 WD1 5 SMC30 =S004+P013&WD1/5 07.05.19 IN216289
P013 WD1 6 Drive: S120 PM340(90kW, 178A) =S004+P013&WD1/6 07.05.19 IN216289
P013 WD1 7 TM15 =S004+P013&WD1/7 07.05.19 IN216289
P013 WD1 8 Relay Board =S004+P013&WD1/8 07.05.19 IN216289
P013 WD1 9 Relay Board =S004+P013&WD1/9 07.05.19 IN216289
P013 WD1 10 Control Logic =S004+P013&WD1/10 07.05.19 IN216289
P013 WD1 11 To PLC =S004+P013&WD1/11 07.05.19 IN216289
5 TD1 1 Terminal diagram =S004&TD1/1 07.05.19 IN226041 7
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Record of Drawings Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RD1/6
Design Document No. - G71053- J5663 (EF-1) Page 6
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 13
1 2 3 4 5 6 7 8 9 10
Record of Drawings
Document
Higher-level Function(=) Mounting Location(+) Page No. Page Description Document no. Date Prep. by
Type(&)
S004 : Main Hoist-2
TD1 2 Terminal diagram =S004&TD1/2 07.05.19 IN226041
TD1 3 Terminal diagram =S004&TD1/3 07.05.19 Z003U8PM
TD1 4 Terminal diagram =S004&TD1/4 07.05.19 Z003U8PM
TD1 5 Terminal diagram =S004&TD1/5 07.05.19 IN226041
S005 : Main Hoist (Standby)
EQ1 1 Equipment List =S005&EQ1/1 07.05.19 incads2791
EQ1 2 Equipment List =S005&EQ1/2 07.05.19 incads2791
EQ1 3 Equipment List =S005&EQ1/3 07.05.19 IN226041
P013 WD1 1 Power Distribution =S005+P013&WD1/1 07.05.19 IN216289
P013 WD1 2 Power Distribution =S005+P013&WD1/2 07.05.19 IN216289
P013 WD1 3 Field Auxillaries =S005+P013&WD1/3 07.05.19 IN216289
P013 WD1 4 MH-STDBY =S005+P013&WD1/4 07.05.19 IN216289
P013 WD1 5 SMC30 =S005+P013&WD1/5 07.05.19 IN216289
P013 WD1 6 SMC30 =S005+P013&WD1/6 07.05.19 IN216289
P013 WD1 7 SMC30 =S005+P013&WD1/7 07.05.19 IN216289
P012 WD1 8 CU 320 =S005+P012&WD1/8 07.05.19 IN216289
P012 WD1 9 TM15 =S005+P012&WD1/9 07.05.19 IN216289
P012 WD1 10 TM15 =S005+P012&WD1/10 07.05.19 IN216289
P013 WD1 11 Relay Board =S005+P013&WD1/11 07.05.19 IN216289
P013 WD1 12 Relay Board =S005+P013&WD1/12 07.05.19 IN216289
P013 WD1 13 Control Logic =S005+P013&WD1/13 07.05.19 IN216289
P013 WD1 14 Control Logic =S005+P013&WD1/14 07.05.19 IN216289
P013 WD1 15 To PLC =S005+P013&WD1/15 07.05.19 IN216289
TD1 1 Terminal diagram =S005&TD1/1 07.05.19 Z003U8PM
TD1 2 Terminal diagram =S005&TD1/2 07.05.19 IN226041
TD1 3 Terminal diagram =S005&TD1/3 07.05.19 Z003U8PM
TD1 4 Terminal diagram =S005&TD1/4 07.05.19 Z003U8PM
TD1 5 Terminal diagram =S005&TD1/5 07.05.19 Z003U8PM
TD1 6 Terminal diagram =S005&TD1/6 07.05.19 Z003U8PM
TD1 7 Terminal diagram =S005&TD1/7 07.05.19 IN226041
S006 : Auxillary Hoist-1
EQ1 1 Equipment List =S006&EQ1/1 07.05.19 incads2791
EQ1 2 Equipment List =S006&EQ1/2 07.05.19 incads2791
EQ1 3 Equipment List =S006&EQ1/3 07.05.19 incads2791
P018 WD1 1 Power Distribution =S006+P018&WD1/1 07.05.19 IN216289
P018 WD1 2 Panel Auxiliary Circuits =S006+P018&WD1/2 07.05.19 IN216289
P018 WD1 3 Field Auxillaries =S006+P018&WD1/3 07.05.19 IN216289
P019 WD1 4 AH-1 =S006+P019&WD1/4 07.05.19 IN216289
6 P019 WD1 5 SMC30 =S006+P019&WD1/5 07.05.19 IN216289 8
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Record of Drawings Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RD1/7
Design Document No. - G71053- J5663 (EF-1) Page 7
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 13
1 2 3 4 5 6 7 8 9 10
Record of Drawings
Document
Higher-level Function(=) Mounting Location(+) Page No. Page Description Document no. Date Prep. by
Type(&)
S006 : Auxillary Hoist-1
P018 WD1 6 CU 320 =S006+P018&WD1/6 07.05.19 IN216289
P018 WD1 7 TM15 Module =S006+P018&WD1/7 07.05.19 IN216289
P018 WD1 8 Relay Board =S006+P018&WD1/8 07.05.19 IN216289
P018 WD1 9 Relay Board =S006+P018&WD1/9 07.05.19 IN216289
P018 WD1 10 Control Logic =S006+P018&WD1/10 07.05.19 IN216289
P018 WD1 11 Master Controller =S006+P018&WD1/11 07.05.19 IN216289
P018 WD1 12 Annunciation =S006+P018&WD1/12 07.05.19 IN216289
P018 WD1 13 To PLC =S006+P018&WD1/13 07.05.19 IN216289
TD1 1 Terminal diagram =S006&TD1/1 07.05.19 Z003U8PM
TD1 2 Terminal diagram =S006&TD1/2 07.05.19 Z003U8PM
TD1 3 Terminal diagram =S006&TD1/3 07.05.19 Z003U8PM
TD1 4 Terminal diagram =S006&TD1/4 07.05.19 Z003U8PM
TD1 5 Terminal diagram =S006&TD1/5 07.05.19 Z003U8PM
S007 : Main Cross Travel
EQ1 1 Equipment List =S007&EQ1/1 07.05.19 incads2791
EQ1 2 Equipment List =S007&EQ1/2 07.05.19 incads2791
EQ1 3 Equipment List =S007&EQ1/3 07.05.19 incads2791
EQ1 4 Equipment List =S007&EQ1/4 07.05.19 IN226041
P024 WD1 1 Power Distribution =S007+P024&WD1/1 07.05.19 IN216289
P024 WD1 2 Power Distribution =S007+P024&WD1/2 07.05.19 IN216289
P024 WD1 3 Panel Auxiliary Circuits =S007+P024&WD1/3 07.05.19 IN216289
P024 WD1 4 Field Auxillaries =S007+P024&WD1/4 07.05.19 IN216289
P026 WD1 5 MCT =S007+P026&WD1/5 07.05.19 IN216289
P024 WD1 6 SMC30 =S007+P024&WD1/6 07.05.19 IN216289
P024 WD1 7 SMC30 =S007+P024&WD1/7 07.05.19 IN216289
P024 WD1 8 CU320 =S007+P024&WD1/8 07.05.19 IN216289
P024 WD1 9 TM15 Module =S007+P024&WD1/9 07.05.19 IN216289
P024 WD1 10 TM15 Module =S007+P024&WD1/10 07.05.19 IN216289
P024 WD1 11 Relay Board =S007+P024&WD1/11 07.05.19 IN216289
P024 WD1 12 Relay Board =S007+P024&WD1/12 07.05.19 IN216289
P024 WD1 13 Control Logic =S007+P024&WD1/13 07.05.19 IN216289
P024 WD1 14 Master Controller =S007+P024&WD1/14 07.05.19 IN216289
P024 WD1 15 Annunciation =S007+P024&WD1/15 07.05.19 IN216289
P024 WD1 16 PLC =S007+P024&WD1/16 07.05.19 IN216289
TD1 1 Terminal diagram =S007&TD1/1 07.05.19 Z003U8PM
TD1 2 Terminal diagram =S007&TD1/2 07.05.19 Z003U8PM
TD1 3 Terminal diagram =S007&TD1/3 07.05.19 incads2791
TD1 4 Terminal diagram =S007&TD1/4 07.05.19 Z003U8PM
7 TD1 5 Terminal diagram =S007&TD1/5 07.05.19 Z003U8PM 9
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Record of Drawings Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RD1/8
Design Document No. - G71053- J5663 (EF-1) Page 8
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 13
1 2 3 4 5 6 7 8 9 10
Record of Drawings
Document
Higher-level Function(=) Mounting Location(+) Page No. Page Description Document no. Date Prep. by
Type(&)
S007 : Main Cross Travel
TD1 6 Terminal diagram =S007&TD1/6 07.05.19 incads2791
TD1 7 Terminal diagram =S007&TD1/7 07.05.19 incads2791
S008 : Auxillary Hoist-2
EQ1 1 Equipment List =S008&EQ1/1 07.05.19 incads2791
EQ1 2 Equipment List =S008&EQ1/2 07.05.19 incads2791
EQ1 3 Equipment List =S008&EQ1/3 07.05.19 incads2791
EQ1 4 Equipment List =S008&EQ1/4 07.05.19 IN226041
P022 WD1 1 Power Distribution =S008+P022&WD1/1 07.05.19 IN216289
P022 WD1 2 Panel Auxiliary Circuits =S008+P022&WD1/2 07.05.19 IN216289
P022 WD1 3 Field Auxillaries =S008+P022&WD1/3 07.05.19 IN216289
P024 WD1 4 AH-2 =S008+P024&WD1/4 07.05.19 IN216289
P022 WD1 5 SMC30 =S008+P022&WD1/5 07.05.19 IN216289
P022 WD1 6 SMC30 =S008+P022&WD1/6 07.05.19 IN216289
P022 WD1 7 CU 320 =S008+P022&WD1/7 07.05.19 IN216289
P022 WD1 8 TM 15 Module =S008+P022&WD1/8 07.05.19 IN216289
P022 WD1 9 Relay Board =S008+P022&WD1/9 07.05.19 IN216289
P022 WD1 10 Relay Board =S008+P022&WD1/10 07.05.19 IN216289
P022 WD1 11 Control Logic =S008+P022&WD1/11 07.05.19 IN216289
P022 WD1 12 Master Controller =S008+P022&WD1/12 07.05.19 IN216289
P022 WD1 13 Annunciation =S008+P022&WD1/13 07.05.19 IN216289
P022 WD1 14 PLC =S008+P022&WD1/14 07.05.19 IN216289
TD1 1 Terminal diagram =S008&TD1/1 07.05.19 Z003U8PM
TD1 2 Terminal diagram =S008&TD1/2 07.05.19 IN226041
TD1 3 Terminal diagram =S008&TD1/3 07.05.19 Z003U8PM
TD1 4 Terminal diagram =S008&TD1/4 07.05.19 Z003U8PM
S009 : Auxillary Cross Travel
EQ1 1 Equipment List =S009&EQ1/1 07.05.19 incads2791
EQ1 2 Equipment List =S009&EQ1/2 07.05.19 incads2791
EQ1 3 Equipment List =S009&EQ1/3 07.05.19 IN226041
P026 WD1 1 Power Distribution =S009+P026&WD1/1 07.05.19 IN216289
P026 WD1 2 Panel Auxiliary Circuits =S009+P026&WD1/2 07.05.19 IN216289
P026 WD1 3 Field Auxillaries =S009+P026&WD1/3 07.05.19 IN216289
P026 WD1 4 ACT =S009+P026&WD1/4 07.05.19 IN216289
P026 WD1 5 SMC30 =S009+P026&WD1/5 07.05.19 IN216289
P026 WD1 6 CU 320 =S009+P026&WD1/6 07.05.19 IN216289
P026 WD1 7 TM 15 Module =S009+P026&WD1/7 07.05.19 IN216289
P026 WD1 8 Relay Board =S009+P026&WD1/8 07.05.19 IN216289
P026 WD1 9 Relay Board =S009+P026&WD1/9 07.05.19 IN216289
8 P026 WD1 10 Control Logic =S009+P026&WD1/10 07.05.19 IN216289 10
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Record of Drawings Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RD1/9
Design Document No. - G71053- J5663 (EF-1) Page 9
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 13
1 2 3 4 5 6 7 8 9 10
Record of Drawings
Document
Higher-level Function(=) Mounting Location(+) Page No. Page Description Document no. Date Prep. by
Type(&)
S009 : Auxillary Cross Travel
P026 WD1 11 Master Controller =S009+P026&WD1/11 07.05.19 IN216289
P026 WD1 12 Annunciation =S009+P026&WD1/12 07.05.19 IN216289
P026 WD1 13 PLC =S009+P026&WD1/13 07.05.19 IN216289
TD1 1 Terminal diagram =S009&TD1/1 07.05.19 IN226041
TD1 2 Terminal diagram =S009&TD1/2 07.05.19 Z003U8PM
TD1 3 Terminal diagram =S009&TD1/3 07.05.19 Z003U8PM
TD1 4 Terminal diagram =S009&TD1/4 07.05.19 IN226041
S010 : Long Travel-1
EQ1 1 Equipment List =S010&EQ1/1 07.05.19 incads2791
EQ1 2 Equipment List =S010&EQ1/2 07.05.19 incads2791
EQ1 3 Equipment List =S010&EQ1/3 07.05.19 IN226041
P020 WD1 1 Power Distribution =S010+P020&WD1/1 07.05.19 IN216289
P020 WD1 2 Panel Auxiliary Circuits =S010+P020&WD1/2 07.05.19 IN216289
P020 WD1 3 Field Auxillaries =S010+P020&WD1/3 07.05.19 IN216289
P020 WD1 4 LT-1 =S010+P020&WD1/4 07.05.19 IN216289
P020 WD1 5 SMC30 =S010+P020&WD1/5 07.05.19 IN216289
P020 WD1 6 CU 320 =S010+P020&WD1/6 07.05.19 IN216289
P020 WD1 7 TM 15 Module =S010+P020&WD1/7 07.05.19 IN216289
P020 WD1 8 Relay Board =S010+P020&WD1/8 07.05.19 IN216289
P020 WD1 9 Relay Board =S010+P020&WD1/9 07.05.19 IN216289
P020 WD1 10 Control Logic =S010+P020&WD1/10 07.05.19 IN216289
P003 WD1 11 Control Logic =S010+P003&WD1/11 07.05.19 IN216289
P020 WD1 12 Master Controller =S010+P020&WD1/12 07.05.19 IN216289
P020 WD1 13 Annunciation =S010+P020&WD1/13 07.05.19 IN216289
P020 WD1 14 PLC =S010+P020&WD1/14 07.05.19 IN216289
TD1 1 Terminal diagram =S010&TD1/1 07.05.19 Z003U8PM
TD1 2 Terminal diagram =S010&TD1/2 07.05.19 Z003U8PM
TD1 3 Terminal diagram =S010&TD1/3 07.05.19 Z003U8PM
TD1 4 Terminal diagram =S010&TD1/4 07.05.19 Z003U8PM
S011 : Long Travel-2
EQ1 1 Equipment List =S011&EQ1/1 07.05.19 incads2791
P019 WD1 1 Power Distribution =S011+P019&WD1/1 07.05.19 IN216289
P019 WD1 2 Panel Auxiliary Circuits =S011+P019&WD1/2 07.05.19 IN216289
P019 WD1 3 Field Auxillaries =S011+P019&WD1/3 07.05.19 IN216289
P019 WD1 4 LT-2 =S011+P019&WD1/4 07.05.19 IN216289
P019 WD1 5 SMC30 =S011+P019&WD1/5 07.05.19 IN216289
P019 WD1 6 CU 320 =S011+P019&WD1/6 07.05.19 IN216289
P019 WD1 7 TM 15 Module =S011+P019&WD1/7 07.05.19 IN216289
9 P019 WD1 8 Relay Board =S011+P019&WD1/8 07.05.19 IN216289 11
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Record of Drawings Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RD1/10
Design Document No. - G71053- J5663 (EF-1) Page 10
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 13
1 2 3 4 5 6 7 8 9 10
Record of Drawings
Document
Higher-level Function(=) Mounting Location(+) Page No. Page Description Document no. Date Prep. by
Type(&)
S011 : Long Travel-2
P019 WD1 9 Relay Board =S011+P019&WD1/9 07.05.19 IN216289
P019 WD1 10 Annunciation =S011+P019&WD1/10 07.05.19 IN216289
TD1 1 Terminal diagram =S011&TD1/1 07.05.19 IN226041
TD1 2 Terminal diagram =S011&TD1/2 07.05.19 Z003U8PM
TD1 3 Terminal diagram =S011&TD1/3 07.05.19 Z003U8PM
L001 : ACU
EQ1 1 Equipment List =L001&EQ1/1 07.05.19 incads2791
EQ1 2 Equipment List =L001&EQ1/2 07.05.19 incads2791
RS001 WD1 1 Power Distribution =L001+RS001&WD1/1 07.05.19 IN216289
RS001 WD1 2 Push Buttons =L001+RS001&WD1/2 07.05.19 IN216289
RS001 WD1 3 Push Buttons =L001+RS001&WD1/3 07.05.19 IN216289
RS001 WD1 4 Selector Switches =L001+RS001&WD1/4 07.05.19 IN216289
RS001 WD1 5 Selector Switches =L001+RS001&WD1/5 07.05.19 IN216289
RS001 WD1 6 Master Controller =L001+RS001&WD1/6 07.05.19 IN216289
RS001 WD1 7 Master Controller =L001+RS001&WD1/7 07.05.19 IN216289
RS001 WD1 8 Master Controller =L001+RS001&WD1/8 07.05.19 IN216289
RS001 WD1 9 Annunciation =L001+RS001&WD1/9 07.05.19 IN216289
RS001 WD1 10 Annunciation =L001+RS001&WD1/10 07.05.19 IN216289
TD1 1 Terminal diagram =L001&TD1/1 07.05.19 Z003U8PM
TD1 2 Terminal diagram =L001&TD1/2 07.05.19 IN226041
TD1 3 Terminal diagram =L001&TD1/3 07.05.19 IN226041
C001 : PLC
EQ1 1 Equipment List =C001&EQ1/1 07.05.19 IN226041
P015 WD1 1 Rack Overview =C001+P015&WD1/1 07.05.19 IN216289
P015 WD1 2 Rack Overview =C001+P015&WD1/2 07.05.19 IN216289
P015 WD1 3 CPU =C001+P015&WD1/3 07.05.19 IN216289
P015 WD1 4 Power Supply =C001+P015&WD1/4 07.05.19 IN216289
P015 WD1 5 Counter =C001+P015&WD1/5 07.05.19 IN216289
P015 WD1 6 DI1 =C001+P015&WD1/6 07.05.19 IN216289
P015 WD1 7 DI2 =C001+P015&WD1/7 07.05.19 IN216289
P015 WD1 8 DI3 =C001+P015&WD1/8 07.05.19 IN216289
P015 WD1 9 DI4 =C001+P015&WD1/9 07.05.19 IN216289
P015 WD1 10 DI5 =C001+P015&WD1/10 07.05.19 IN216289
P015 WD1 11 DO1 =C001+P015&WD1/11 07.05.19 IN216289
P015 WD1 12 DO2 =C001+P015&WD1/12 07.05.19 IN216289
P015 WD1 13 AI/AO =C001+P015&WD1/13 07.05.19 IN216289
P015 WD1 15 Power Dsitribution =C001+P015&WD1/15 07.05.19 IN216289
P015 WD1 16 CPU =C001+P015&WD1/16 07.05.19 IN216289
10 P015 WD1 17 Power Supply =C001+P015&WD1/17 07.05.19 IN216289 12
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Record of Drawings Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RD1/11
Design Document No. - G71053- J5663 (EF-1) Page 11
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 13
1 2 3 4 5 6 7 8 9 10
Record of Drawings
Document
Higher-level Function(=) Mounting Location(+) Page No. Page Description Document no. Date Prep. by
Type(&)
C001 : PLC
P015 WD1 18 Counter =C001+P015&WD1/18 07.05.19 IN216289
P015 WD1 19 Counter =C001+P015&WD1/19 07.05.19 IN216289
P015 WD1 20 Counter =C001+P015&WD1/20 07.05.19 IN216289
P015 WD1 21 Counter =C001+P015&WD1/21 07.05.19 IN216289
P015 WD1 22 Counter =C001+P015&WD1/22 07.05.19 IN216289
P015 WD1 23 Counter =C001+P015&WD1/23 07.05.19 IN216289
P015 WD1 24 DI1 =C001+P015&WD1/24 07.05.19 IN216289
P015 WD1 25 DI1 =C001+P015&WD1/25 07.05.19 IN216289
P015 WD1 26 DI1 =C001+P015&WD1/26 07.05.19 IN216289
P015 WD1 27 DI1 =C001+P015&WD1/27 07.05.19 IN216289
P015 WD1 28 DI2 =C001+P015&WD1/28 07.05.19 IN216289
P015 WD1 29 DI2 =C001+P015&WD1/29 07.05.19 IN216289
P015 WD1 30 DI2 =C001+P015&WD1/30 07.05.19 IN216289
P015 WD1 31 DI2 =C001+P015&WD1/31 07.05.19 IN216289
P015 WD1 32 DI3 =C001+P015&WD1/32 07.05.19 IN216289
P015 WD1 33 DI3 =C001+P015&WD1/33 07.05.19 IN216289
P015 WD1 34 DI3 =C001+P015&WD1/34 07.05.19 IN216289
P015 WD1 35 DI3 =C001+P015&WD1/35 07.05.19 IN216289
P015 WD1 36 DI4 =C001+P015&WD1/36 07.05.19 IN216289
P015 WD1 37 DI4 =C001+P015&WD1/37 07.05.19 IN216289
P015 WD1 38 DI4 =C001+P015&WD1/38 07.05.19 IN216289
P015 WD1 39 DI4 =C001+P015&WD1/39 07.05.19 IN216289
P015 WD1 40 DI5 =C001+P015&WD1/40 07.05.19 IN216289
P015 WD1 41 DI5 =C001+P015&WD1/41 07.05.19 IN216289
P015 WD1 42 DI5 =C001+P015&WD1/42 07.05.19 IN216289
P015 WD1 43 DI5 =C001+P015&WD1/43 07.05.19 IN216289
P015 WD1 44 DO1 =C001+P015&WD1/44 07.05.19 IN216289
P015 WD1 45 DO1 =C001+P015&WD1/45 07.05.19 IN216289
P015 WD1 46 DO1 =C001+P015&WD1/46 07.05.19 IN216289
P015 WD1 47 DO1 =C001+P015&WD1/47 07.05.19 IN216289
P015 WD1 48 DO2 =C001+P015&WD1/48 07.05.19 IN216289
P015 WD1 49 DO2 =C001+P015&WD1/49 07.05.19 IN216289
P015 WD1 50 DO2 =C001+P015&WD1/50 07.05.19 IN216289
P015 WD1 51 DO2 =C001+P015&WD1/51 07.05.19 IN216289
P015 WD1 52 AI/AO =C001+P015&WD1/52 07.05.19 IN216289
P015 WD1 53 AI/AO =C001+P015&WD1/53 07.05.19 IN216289
P015 WD1 54 AI/AO =C001+P015&WD1/54 07.05.19 IN216289
P015 WD1 55 HMI =C001+P015&WD1/55 07.05.19 IN216289
11 PCD1 1 PLC diagram =C001&PCD1/1 07.05.19 IN226041 13
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Record of Drawings Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RD1/12
Design Document No. - G71053- J5663 (EF-1) Page 12
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 13
1 2 3 4 5 6 7 8 9 10
Record of Drawings
Document
Higher-level Function(=) Mounting Location(+) Page No. Page Description Document no. Date Prep. by
Type(&)
C001 : PLC
PCD1 2 PLC diagram =C001&PCD1/2 07.05.19 Z003U8PM
PCD1 3 PLC diagram =C001&PCD1/3 07.05.19 Z003U8PM
PCD1 4 PLC diagram =C001&PCD1/4 07.05.19 Z003U8PM
PCD1 5 PLC diagram =C001&PCD1/5 07.05.19 Z003U8PM
PCD1 6 PLC diagram =C001&PCD1/6 07.05.19 Z003U8PM
PCD1 7 PLC diagram =C001&PCD1/7 07.05.19 Z003U8PM
PCD1 8 PLC diagram =C001&PCD1/8 07.05.19 IN226041
PCD1 9 PLC diagram =C001&PCD1/9 07.05.19 IN226041
PCD1 10 PLC diagram =C001&PCD1/10 07.05.19 IN226041
PCD1 11 PLC diagram =C001&PCD1/11 07.05.19 IN226041
PCD1 12 PLC diagram =C001&PCD1/12 07.05.19 IN226041
TD1 1 Terminal diagram =C001&TD1/1 07.05.19 Z003U8PM
TD1 2 Terminal diagram =C001&TD1/2 07.05.19 Z003U8PM
TD1 3 Terminal diagram =C001&TD1/3 07.05.19 Z003U8PM
TD1 4 Terminal diagram =C001&TD1/4 07.05.19 Z003U8PM
J001 : LDB at cabin
EQ1 1 Equipment List =J001&EQ1/1 07.05.19 IN226041
RS002 WD1 1 Wiring Diagram =J001+RS002&WD1/1 07.05.19 IN216289
RS002 WD1 2 Wiring Diagram =J001+RS002&WD1/2 07.05.19 IN216289
TD1 1 Terminal diagram =J001&TD1/1 07.05.19 IN226041
J002 : Annunciation Box
EQ1 1 Equipment List =J002&EQ1/1 07.05.19 Z003U8PM
RS003 WD1 1 Annunciation =J002+RS003&WD1/1 07.05.19 IN216289
RS003 WD1 2 Annunciation =J002+RS003&WD1/2 07.05.19 IN216289
TD1 1 Terminal diagram =J002&TD1/1 07.05.19 Z003U8PM
Z001 : Commisioning Spares
EQ1 1 Equipment List =Z001&EQ1/1 07.05.19 incads2791
WD1 1 Commisioning Spares =Z001&WD1/1 07.05.19 IN216289
12 &RO1/1
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Record of Drawings Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RD1/13
Design Document No. - G71053- J5663 (EF-1) Page 13
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 13
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
D11 =A000&RD1/1 25.05.18 Z003U8PM As Commissioned D11 =A000&CMD1/17 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/19 25.05.18 Z003U8PM As Commissioned D11 =A000&CMD1/25 25.05.18 Z003U8PM As Commissioned
D11 =A000&RD1/4 25.05.18 Z003U8PM As Commissioned D11 =A000&CMD1/5 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/26 25.05.18 Z003U8PM As Commissioned D11 =A000&CMD1/26 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/8 25.05.18 Z003U8PM As Commissioned D11 =A000&RD1/6 25.05.18 Z003U8PM As Commissioned
D11 =A000&CMD1/30 25.05.18 Z003U8PM As Commissioned D11 =S005&TD1/2 25.05.18 Z003U8PM As Commissioned
D11 =A000&RD1/3 25.05.18 Z003U8PM As Commissioned D11 =A000&CMD1/4 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/25 25.05.18 Z003U8PM As Commissioned D11 =A000&CMD1/12 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/3 25.05.18 Z003U8PM As Commissioned D11 =S005&TD1/1 25.05.18 Z003U8PM As Commissioned
D11 =A000&RD1/11 25.05.18 Z003U8PM As Commissioned D11 =A000&CMD1/28 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/14 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/34 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/24 25.05.18 Z003U8PM As Commissioned D11 =A000&RD1/7 25.05.18 Z003U8PM As Commissioned
D11 =A000&CMD1/11 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/7 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/18 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/31 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/23 25.05.18 Z003U8PM As Commissioned D11 =A000&RD1/13 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/9 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/33 25.05.18 Z003U8PM As Commissioned
D11 =A000&RD1/10 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/32 25.05.18 Z003U8PM As Commissioned
D11 =S001&TD1/1 25.05.18 Z003U8PM As Commissioned D11 =S006+P018&WD1/7 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/2 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/4 25.05.18 Z003U8PM As Commissioned
D11 =A000&CMD1/21 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/12 25.05.18 Z003U8PM As Commissioned
D11 =A000&RD1/2 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/6 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/17 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/27 25.05.18 Z003U8PM As Commissioned
D11 =A000&RD1/5 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/30 25.05.18 Z003U8PM As Commissioned
D11 =A000&CMD1/20 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/11 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/22 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/29 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/16 25.05.18 Z003U8PM As Commissioned D11 =A000&CMD1/27 25.05.18 Z003U8PM As Commissioned
D11 =A000&RD1/12 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/10 25.05.18 Z003U8PM As Commissioned
D11 =S010&TD1/2 25.05.18 Z003U8PM As Commissioned D11 =A000&RD1/9 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/21 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/28 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/1 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/34 25.05.18 Z003U8PM As Commissioned
D11 =A000&CMD1/19 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/33 25.05.18 Z003U8PM As Commissioned
D11 =J002&TD1/1 25.05.18 Z003U8PM As Commissioned D11 =A000&CMD1/11 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/15 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/14 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/20 25.05.18 Z003U8PM As Commissioned D11 =S003+P016&WD1/15 25.05.18 Z003U8PM As Commissioned
D11 =A000&RD1/8 25.05.18 Z003U8PM As Commissioned D11 =A000&RD1/4 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/5 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/13 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/13 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/2 25.05.18 Z003U8PM As Commissioned
D11 =A000&CMD1/24 25.05.18 Z003U8PM As Commissioned D11 =A000&RD1/12 25.05.18 Z003U8PM As Commissioned
&RD1/13 2
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/1
Design Document No. - G71053- J5663 (EF-1) Page 1
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
D11 =S001&TD1/5 25.05.18 Z003U8PM As Commissioned D11 =S007&TD1/4 25.05.18 Z003U8PM As Commissioned
D11 =C001+P015&WD1/33 25.05.18 Z003U8PM As Commissioned D11 =A000&RD1/2 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/7 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/34 25.05.18 Z003U8PM As Commissioned
D11 =J002&TD1/1 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/22 25.05.18 Z003U8PM As Commissioned
D11 =S001&TD1/6 25.05.18 Z003U8PM As Commissioned D11 =S006+P018&WD1/10 25.05.18 Z003U8PM As Commissioned
D11 =A000&RD1/5 25.05.18 Z003U8PM As Commissioned D11 =A000&RD1/7 25.05.18 Z003U8PM As Commissioned
D11 =A000&CMD1/22 25.05.18 Z003U8PM As Commissioned D11 =S001+P003&WD1/10 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/3 25.05.18 Z003U8PM As Commissioned D11 =S006&TD1/2 25.05.18 Z003U8PM As Commissioned
D11 =S009+P026&WD1/8 25.05.18 Z003U8PM As Commissioned D11 =S007+P024&WD1/11 25.05.18 Z003U8PM As Commissioned
D11 =A000&RD1/1 25.05.18 Z003U8PM As Commissioned D11 =S002+P008&WD1/11 25.05.18 Z003U8PM As Commissioned
D11 =A000&CMD1/24 25.05.18 Z003U8PM As Commissioned D11 =S006+P018&WD1/12 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/26 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/21 25.05.18 Z003U8PM As Commissioned
D11 =S009&TD1/2 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/20 25.05.18 Z003U8PM As Commissioned
D11 =S003&TD1/5 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/32 25.05.18 Z003U8PM As Commissioned
D11 =A000&CMD1/17 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/1 25.05.18 Z003U8PM As Commissioned
D11 =A000&CMD1/21 25.05.18 Z003U8PM As Commissioned D11 =S008+P022&WD1/9 25.05.18 Z003U8PM As Commissioned
D11 =A000&CMD1/25 25.05.18 Z003U8PM As Commissioned D11 =A000&CMD1/19 25.05.18 Z003U8PM As Commissioned
D11 =A000&CMD1/5 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/19 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/25 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/4 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/9 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/31 25.05.18 Z003U8PM As Commissioned
D11 =A000&CMD1/26 25.05.18 Z003U8PM As Commissioned D11 =S008+P022&WD1/10 25.05.18 Z003U8PM As Commissioned
D11 =S005&TD1/2 25.05.18 Z003U8PM As Commissioned D11 =L001+RS001&WD1/4 25.05.18 Z003U8PM As Commissioned
D11 =A000&CMD1/30 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/18 25.05.18 Z003U8PM As Commissioned
D11 =A000&RD1/6 25.05.18 Z003U8PM As Commissioned D11 =A000&RD1/8 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/5 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/6 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/24 25.05.18 Z003U8PM As Commissioned D11 =A000&RD1/3 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/12 25.05.18 Z003U8PM As Commissioned D11 =S008&TD1/3 25.05.18 Z003U8PM As Commissioned
D11 =A000&CMD1/12 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/30 25.05.18 Z003U8PM As Commissioned
D11 =A000&CMD1/4 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/33 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/23 25.05.18 Z003U8PM As Commissioned D11 =A000&RD1/13 25.05.18 Z003U8PM As Commissioned
D11 =A000&CMD1/27 25.05.18 Z003U8PM As Commissioned D11 =S002&TD1/5 25.05.18 Z003U8PM As Commissioned
D11 =C001&PCD1/5 25.05.18 Z003U8PM As Commissioned D11 =S006&TD1/1 25.05.18 Z003U8PM As Commissioned
D11 =S005&TD1/1 25.05.18 Z003U8PM As Commissioned D11 =A000&RD1/11 25.05.18 Z003U8PM As Commissioned
D11 =A000&RD1/10 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/29 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/8 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/11 25.05.18 Z003U8PM As Commissioned
D11 =A000&CMD1/28 25.05.18 Z003U8PM As Commissioned D11 =A000&CMD1/20 25.05.18 Z003U8PM As Commissioned
D11 =S006&TD1/5 25.05.18 Z003U8PM As Commissioned D11 =S001&TD1/1 25.05.18 Z003U8PM As Commissioned
D11 =S010+P020&WD1/8 25.05.18 Z003U8PM As Commissioned D11 =S010&TD1/2 25.05.18 Z003U8PM As Commissioned
1 3
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/2
Design Document No. - G71053- J5663 (EF-1) Page 2
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
D11 =A000&RO1/10 25.05.18 Z003U8PM As Commissioned D11 =C001&PCD1/3 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/16 25.05.18 Z003U8PM As Commissioned D11 =A000&CMD1/27 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/15 25.05.18 Z003U8PM As Commissioned D11 =S010+P020&WD1/2 25.05.18 Z003U8PM As Commissioned
D11 =A000&RD1/9 25.05.18 Z003U8PM As Commissioned D11 =C001&PCD1/2 25.05.18 Z003U8PM As Commissioned
D11 =S008+P022&WD1/8 25.05.18 Z003U8PM As Commissioned D11 =J002&TD1/1 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/28 25.05.18 Z003U8PM As Commissioned D11 =A001&TD1/1 25.05.18 Z003U8PM As Commissioned
D11 =S003+P016&WD1/13 25.05.18 Z003U8PM As Commissioned D11 =S001+P003&WD1/13 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/27 25.05.18 Z003U8PM As Commissioned D11 =A000&CMD1/4 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/17 25.05.18 Z003U8PM As Commissioned D11 =A000&RD1/3 25.05.18 Z003U8PM As Commissioned
D11 =S006&TD1/4 25.05.18 Z003U8PM As Commissioned D11 =A000&CMD1/12 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/32 25.05.18 Z003U8PM As Commissioned D11 =S005&TD1/2 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/31 25.05.18 Z003U8PM As Commissioned D11 =A000&CMD1/26 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/29 25.05.18 Z003U8PM As Commissioned D11 =S001&TD1/1 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/30 25.05.18 Z003U8PM As Commissioned D11 =S007+P024&WD1/12 25.05.18 Z003U8PM As Commissioned
D11 =A000&RD1/1 25.05.18 Z003U8PM As Commissioned D11 =S009&TD1/3 25.05.18 Z003U8PM As Commissioned
D11 =S006&TD1/4 25.05.18 Z003U8PM As Commissioned D11 =A000&CMD1/5 25.05.18 Z003U8PM As Commissioned
D11 =J002+RS003&WD1/1 25.05.18 Z003U8PM As Commissioned D11 =A000&CMD1/17 25.05.18 Z003U8PM As Commissioned
D11 =J002&EQ1/1 25.05.18 Z003U8PM As Commissioned D11 =S001&TD1/2 25.05.18 Z003U8PM As Commissioned
D11 =C001&TD1/4 25.05.18 Z003U8PM As Commissioned D11 =S005&TD1/3 25.05.18 Z003U8PM As Commissioned
D11 =C001&TD1/3 25.05.18 Z003U8PM As Commissioned D11 =A000&CMD1/25 25.05.18 Z003U8PM As Commissioned
D11 =C001&TD1/2 25.05.18 Z003U8PM As Commissioned D11 =S005&TD1/4 25.05.18 Z003U8PM As Commissioned
D11 =C001&TD1/1 25.05.18 Z003U8PM As Commissioned D11 =S005&TD1/5 25.05.18 Z003U8PM As Commissioned
D11 =C001&PCD1/7 25.05.18 Z003U8PM As Commissioned D11 =A001&TD1/5 25.05.18 Z003U8PM As Commissioned
D11 =C001&PCD1/5 25.05.18 Z003U8PM As Commissioned D11 =A000&RD1/4 25.05.18 Z003U8PM As Commissioned
D11 =C001&PCD1/6 25.05.18 Z003U8PM As Commissioned D11 =S009&TD1/2 25.05.18 Z003U8PM As Commissioned
D11 =S005+P012&WD1/8 25.05.18 Z003U8PM As Commissioned D11 =S006+P018&WD1/6 25.05.18 Z003U8PM As Commissioned
D11 =S005+P012&WD1/9 25.05.18 Z003U8PM As Commissioned D11 =S001&TD1/3 25.05.18 Z003U8PM As Commissioned
D11 =C001&PCD1/4 25.05.18 Z003U8PM As Commissioned D11 =S005&TD1/6 25.05.18 Z003U8PM As Commissioned
D11 =A001&TD1/3 25.05.18 Z003U8PM As Commissioned D11 =A000&CMD1/24 25.05.18 Z003U8PM As Commissioned
D11 =A000&RD1/2 25.05.18 Z003U8PM As Commissioned D11 =S001&TD1/4 25.05.18 Z003U8PM As Commissioned
D11 =A000&NP1/4 25.05.18 Z003U8PM As Commissioned D11 =S009+P026&WD1/9 25.05.18 Z003U8PM As Commissioned
D11 =S006&TD1/5 25.05.18 Z003U8PM As Commissioned D11 =S007&TD1/2 25.05.18 Z003U8PM As Commissioned
D11 =S001+P003&WD1/10 25.05.18 Z003U8PM As Commissioned D11 =A001&TD1/6 25.05.18 Z003U8PM As Commissioned
D11 =S010+P020&WD1/6 25.05.18 Z003U8PM As Commissioned D11 =S009+P026&WD1/7 25.05.18 Z003U8PM As Commissioned
D11 =A000&CMD1/28 25.05.18 Z003U8PM As Commissioned D11 =A000&CMD1/21 25.05.18 Z003U8PM As Commissioned
D11 =A001&TD1/2 25.05.18 Z003U8PM As Commissioned D11 =A000&RD1/5 25.05.18 Z003U8PM As Commissioned
D11 =S005+P013&WD1/14 25.05.18 Z003U8PM As Commissioned D11 =S001&TD1/6 25.05.18 Z003U8PM As Commissioned
D11 =S005&TD1/1 25.05.18 Z003U8PM As Commissioned D11 =A001&TD1/4 25.05.18 Z003U8PM As Commissioned
2 4
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/3
Design Document No. - G71053- J5663 (EF-1) Page 3
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
D11 =A000&RD1/6 25.05.18 Z003U8PM As Commissioned D11 =S007&TD1/1 25.05.18 Z003U8PM As Commissioned
D11 =S007+P024&WD1/9 25.05.18 Z003U8PM As Commissioned D11 =S010&TD1/4 25.05.18 Z003U8PM As Commissioned
D11 =A000&RD1/7 25.05.18 Z003U8PM As Commissioned D11 =S010&TD1/3 25.05.18 Z003U8PM As Commissioned
D11 =S002+P008&WD1/11 25.05.18 Z003U8PM As Commissioned D11 =S008&TD1/1 25.05.18 Z003U8PM As Commissioned
D11 =S008&TD1/4 25.05.18 Z003U8PM As Commissioned D11 =S010&TD1/2 25.05.18 Z003U8PM As Commissioned
D11 =S002&TD1/2 25.05.18 Z003U8PM As Commissioned D11 =A000&RD1/13 25.05.18 Z003U8PM As Commissioned
D11 =S007&TD1/5 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/1 25.05.18 Z003U8PM As Commissioned
D11 =S008&TD1/3 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/2 25.05.18 Z003U8PM As Commissioned
D11 =S001&TD1/5 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/3 25.05.18 Z003U8PM As Commissioned
D11 =A000&RD1/8 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/4 25.05.18 Z003U8PM As Commissioned
D11 =S002&TD1/3 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/5 25.05.18 Z003U8PM As Commissioned
D11 =S002&TD1/4 25.05.18 Z003U8PM As Commissioned D11 =S006&TD1/1 25.05.18 Z003U8PM As Commissioned
D11 =S003&EQ1/1 25.05.18 Z003U8PM As Commissioned D11 =S010&TD1/1 25.05.18 Z003U8PM As Commissioned
D11 =S007&TD1/4 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/6 25.05.18 Z003U8PM As Commissioned
D11 =A001&EQ1/5 25.05.18 Z003U8PM As Commissioned D11 =S004+P013&WD1/7 25.05.18 Z003U8PM As Commissioned
D11 =S011&TD1/3 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/7 25.05.18 Z003U8PM As Commissioned
D11 =A001&EQ1/4 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/8 25.05.18 Z003U8PM As Commissioned
D11 =A000&RD1/9 25.05.18 Z003U8PM As Commissioned D11 =S008+P022&WD1/8 25.05.18 Z003U8PM As Commissioned
D11 =S011&TD1/2 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/9 25.05.18 Z003U8PM As Commissioned
D11 =A000&CMD1/39 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/10 25.05.18 Z003U8PM As Commissioned
D11 =A000&RD1/10 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/11 25.05.18 Z003U8PM As Commissioned
D11 =S003+P016&WD1/8 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/12 25.05.18 Z003U8PM As Commissioned
D11 =S011+P019&WD1/7 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/13 25.05.18 Z003U8PM As Commissioned
D11 =S011+P019&WD1/6 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/14 25.05.18 Z003U8PM As Commissioned
D11 =S003+P017&WD1/9 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/15 25.05.18 Z003U8PM As Commissioned
D11 =A000&RD1/11 25.05.18 Z003U8PM As Commissioned D11 =A000&CMD1/11 25.05.18 Z003U8PM As Commissioned
D11 =S003+P017&WD1/11 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/16 25.05.18 Z003U8PM As Commissioned
D11 =S003+P016&WD1/15 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/17 25.05.18 Z003U8PM As Commissioned
D11 =S003+P016&WD1/16 25.05.18 Z003U8PM As Commissioned D11 =S004+P013&WD1/10 25.05.18 Z003U8PM As Commissioned
D11 =A000&RD1/12 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/18 25.05.18 Z003U8PM As Commissioned
D11 =A000&CMD1/20 25.05.18 Z003U8PM As Commissioned D11 =A000&CMD1/19 25.05.18 Z003U8PM As Commissioned
D11 =S003&TD1/1 25.05.18 Z003U8PM As Commissioned D11 =S004+P013&WD1/11 25.05.18 Z003U8PM As Commissioned
D11 =S003&TD1/2 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/19 25.05.18 Z003U8PM As Commissioned
D11 =S003&TD1/3 25.05.18 Z003U8PM As Commissioned D11 =S004&TD1/3 25.05.18 Z003U8PM As Commissioned
D11 =S003&TD1/4 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/20 25.05.18 Z003U8PM As Commissioned
D11 =S003&TD1/5 25.05.18 Z003U8PM As Commissioned D11 =S004&TD1/4 25.05.18 Z003U8PM As Commissioned
D11 =S003&TD1/6 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/21 25.05.18 Z003U8PM As Commissioned
D11 =S003&TD1/7 25.05.18 Z003U8PM As Commissioned D11 =A000&RO1/22 25.05.18 Z003U8PM As Commissioned
3 5
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/4
Design Document No. - G71053- J5663 (EF-1) Page 4
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
D11 =S006&TD1/2 25.05.18 Z003U8PM As Commissioned D11 =A001+P028&WD1/23 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/23 25.05.18 Z003U8PM As Commissioned D11 =S004+P013&WD1/7 25.05.18 Z003U8PM As Commissioned
D11 =A000&CMD1/30 25.05.18 Z003U8PM As Commissioned D11 =S006+P018&WD1/8 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/24 25.05.18 Z003U8PM As Commissioned D11 =S002+P008&WD1/11 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/25 25.05.18 Z003U8PM As Commissioned D11 =A001+P028&WD1/21 25.05.18 Z003U8PM As Commissioned
D11 =S006&TD1/3 25.05.18 Z003U8PM As Commissioned D11 =S011+P019&WD1/9 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/26 25.05.18 Z003U8PM As Commissioned D11 =S003+P016&WD1/8 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/27 25.05.18 Z003U8PM As Commissioned D11 =S004+P013&WD1/5 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/28 25.05.18 Z003U8PM As Commissioned D11 =A001+P029&WD1/20 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/29 25.05.18 Z003U8PM As Commissioned D11 =S006+P018&WD1/7 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/30 25.05.18 Z003U8PM As Commissioned D11 =A001+P029&WD1/19 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/31 25.05.18 Z003U8PM As Commissioned D11 =S011+P019&WD1/5 25.05.18 Z003U8PM As Commissioned
D11 =A000&RO1/32 25.05.18 Z003U8PM As Commissioned D11 =S008+P022&WD1/3 25.05.18 Z003U8PM As Commissioned
D11 =S002+P009&WD1/13 25.05.18 Z003U8PM As Commissioned D11 =S003+P016&WD1/6 25.05.18 Z003U8PM As Commissioned
D11 =S001+P001&WD1/1 25.05.18 Z003U8PM As Commissioned D11 =S005+P012&WD1/10 25.05.18 Z003U8PM As Commissioned
D11 =S010+P020&WD1/9 25.05.18 Z003U8PM As Commissioned D11 =S010+P020&WD1/6 25.05.18 Z003U8PM As Commissioned
D11 =S010+P003&WD1/11 25.05.18 Z003U8PM As Commissioned D11 =S010+P020&WD1/10 25.05.18 Z003U8PM As Commissioned
D11 =S007+P024&WD1/3 25.05.18 Z003U8PM As Commissioned D11 =S004+P013&WD1/6 25.05.18 Z003U8PM As Commissioned
D11 =S001+P003&WD1/10 25.05.18 Z003U8PM As Commissioned D11 =S003+P015&WD1/4 25.05.18 Z003U8PM As Commissioned
D11 =A001+P029&WD1/19 25.05.18 Z003U8PM As Commissioned D11 =S001+P001&WD1/1 25.05.18 Z003U8PM As Commissioned
D11 =S011+P019&WD1/6 25.05.18 Z003U8PM As Commissioned D11 =S010+P020&WD1/5 25.05.18 Z003U8PM As Commissioned
D11 =S006+P018&WD1/8 25.05.18 Z003U8PM As Commissioned D11 =S008+P022&WD1/5 25.05.18 Z003U8PM As Commissioned
D11 =J002+RS003&WD1/2 25.05.18 Z003U8PM As Commissioned D11 =S002+P009&WD1/12 25.05.18 Z003U8PM As Commissioned
D11 =S007+P024&WD1/11 25.05.18 Z003U8PM As Commissioned D11 =A001+P028&WD1/8 25.05.18 Z003U8PM As Commissioned
D11 =S010+P020&WD1/8 25.05.18 Z003U8PM As Commissioned D11 =S011+P019&WD1/3 25.05.18 Z003U8PM As Commissioned
D11 =S011+P019&WD1/9 25.05.18 Z003U8PM As Commissioned D11 =S010+P020&WD1/3 25.05.18 Z003U8PM As Commissioned
D11 =S003+P015&WD1/1 25.05.18 Z003U8PM As Commissioned D11 =S001+P003&WD1/10 25.05.18 Z003U8PM As Commissioned
D11 =S006+P018&WD1/7 25.05.18 Z003U8PM As Commissioned D11 =S002+P009&WD1/1 25.05.18 Z003U8PM As Commissioned
D11 =S001+P003&WD1/14 25.05.18 Z003U8PM As Commissioned D11 =S001+P003&WD1/11 25.05.18 Z003U8PM As Commissioned
D11 =S010+P020&WD1/6 25.05.18 Z003U8PM As Commissioned D11 =A001+P028&WD1/11 25.05.18 Z003U8PM As Commissioned
D11 =A000&CMD1/28 25.05.18 Z003U8PM As Commissioned D11 =S011+P019&WD1/6 25.05.18 Z003U8PM As Commissioned
D11 =S006+P018&WD1/6 25.05.18 Z003U8PM As Commissioned D11 =S010+P020&WD1/9 25.05.18 Z003U8PM As Commissioned
D11 =S010+P020&WD1/10 25.05.18 Z003U8PM As Commissioned D11 =S003+P016&WD1/13 25.05.18 Z003U8PM As Commissioned
D11 =S002+P009&WD1/1 25.05.18 Z003U8PM As Commissioned D11 =S007+P024&WD1/6 25.05.18 Z003U8PM As Commissioned
D11 =A000&CMD1/24 25.05.18 Z003U8PM As Commissioned D11 =A001+P028&WD1/13 25.05.18 Z003U8PM As Commissioned
D11 =S003+P017&WD1/12 25.05.18 Z003U8PM As Commissioned D11 =S003+P017&WD1/11 25.05.18 Z003U8PM As Commissioned
D11 =S003+P016&WD1/13 25.05.18 Z003U8PM As Commissioned D11 =A001+P028&WD1/14 25.05.18 Z003U8PM As Commissioned
D11 =J002+RS003&WD1/1 25.05.18 Z003U8PM As Commissioned D11 =S003+P016&WD1/7 25.05.18 Z003U8PM As Commissioned
4 6
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/5
Design Document No. - G71053- J5663 (EF-1) Page 5
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
D11 =A001+P028&WD1/15 25.05.18 Z003U8PM As Commissioned D11 =S010+P020&WD1/10 25.05.18 Z003U8PM As Commissioned
D11 =A001+P027&WD1/2 25.05.18 Z003U8PM As Commissioned D11 =A001+P029&WD1/20 25.05.18 Z003U8PM As Commissioned
D11 =S006+P018&WD1/3 25.05.18 Z003U8PM As Commissioned D11 =A001+P029&WD1/19 25.05.18 Z003U8PM As Commissioned
D11 =S009+P026&WD1/5 25.05.18 Z003U8PM As Commissioned D11 =S010+P020&WD1/3 25.05.18 Z003U8PM As Commissioned
D11 =S006+P019&WD1/5 25.05.18 Z003U8PM As Commissioned D11 =C001+P015&WD1/33 25.05.18 Z003U8PM As Commissioned
D11 =S009+P026&WD1/3 25.05.18 Z003U8PM As Commissioned D11 =C001+P015&WD1/32 25.05.18 Z003U8PM As Commissioned
D11 =S007+P024&WD1/4 25.05.18 Z003U8PM As Commissioned D11 =S010+P020&WD1/2 25.05.18 Z003U8PM As Commissioned
D11 =S004+P013&WD1/3 25.05.18 Z003U8PM As Commissioned D11 =S011+P019&WD1/3 25.05.18 Z003U8PM As Commissioned
D11 =A001+P028&WD1/12 25.05.18 Z003U8PM As Commissioned D11 =S002+P009&WD1/1 25.05.18 Z003U8PM As Commissioned
D11 =S010+P020&WD1/5 25.05.18 Z003U8PM As Commissioned D11 =C001+P015&WD1/24 25.05.18 Z003U8PM As Commissioned
D11 =S008+P022&WD1/5 25.05.18 Z003U8PM As Commissioned D11 =S011+P019&WD1/4 25.05.18 Z003U8PM As Commissioned
D11 =S008+P022&WD1/5 25.05.18 Z003U8PM As Commissioned D11 =C001+P015&WD1/9 25.05.18 Z003U8PM As Commissioned
D11 =S010+P020&WD1/14 25.05.18 Z003U8PM As Commissioned D11 =S002+P003&WD1/4 25.05.18 Z003U8PM As Commissioned
D11 =S010+P020&WD1/9 25.05.18 Z003U8PM As Commissioned D11 =A001+P028&WD1/11 25.05.18 Z003U8PM As Commissioned
D11 =S003+P015&WD1/4 25.05.18 Z003U8PM As Commissioned D11 =A001+P027&WD1/2 25.05.18 Z003U8PM As Commissioned
D11 =C001+P015&WD1/6 25.05.18 Z003U8PM As Commissioned D11 =S003+P016&WD1/13 25.05.18 Z003U8PM As Commissioned
D11 =S001+P003&WD1/4 25.05.18 Z003U8PM As Commissioned D11 =C001+P015&WD1/37 25.05.18 Z003U8PM As Commissioned
D11 =S007+P024&WD1/13 25.05.18 Z003U8PM As Commissioned D11 =S010+P020&WD1/9 25.05.18 Z003U8PM As Commissioned
D11 =S003+P017&WD1/3 25.05.18 Z003U8PM As Commissioned D11 =S011+P019&WD1/5 25.05.18 Z003U8PM As Commissioned
D11 =A001+P028&WD1/6 25.05.18 Z003U8PM As Commissioned D11 =C001+P015&WD1/27 25.05.18 Z003U8PM As Commissioned
D11 =S009+P026&WD1/2 25.05.18 Z003U8PM As Commissioned D11 =S004+P013&WD1/5 25.05.18 Z003U8PM As Commissioned
D11 =C001+P015&WD1/25 25.05.18 Z003U8PM As Commissioned D11 =A001+P028&WD1/12 25.05.18 Z003U8PM As Commissioned
D11 =S001+P003&WD1/10 25.05.18 Z003U8PM As Commissioned D11 =C001+P015&WD1/28 25.05.18 Z003U8PM As Commissioned
D11 =S010+P020&WD1/6 25.05.18 Z003U8PM As Commissioned D11 =S002+P008&WD1/11 25.05.18 Z003U8PM As Commissioned
D11 =S001+P003&WD1/11 25.05.18 Z003U8PM As Commissioned D11 =S011+P019&WD1/6 25.05.18 Z003U8PM As Commissioned
D11 =S006+P019&WD1/5 25.05.18 Z003U8PM As Commissioned D11 =C001+P015&WD1/29 25.05.18 Z003U8PM As Commissioned
D11 =C001+P015&WD1/38 25.05.18 Z003U8PM As Commissioned D11 =S003+P016&WD1/8 25.05.18 Z003U8PM As Commissioned
D11 =S005+P012&WD1/10 25.05.18 Z003U8PM As Commissioned D11 =S003+P017&WD1/11 25.05.18 Z003U8PM As Commissioned
D11 =A001+P028&WD1/23 25.05.18 Z003U8PM As Commissioned D11 =S008+P022&WD1/2 25.05.18 Z003U8PM As Commissioned
D11 =S011+P019&WD1/2 25.05.18 Z003U8PM As Commissioned D11 =S004+P013&WD1/6 25.05.18 Z003U8PM As Commissioned
D11 =S010+P020&WD1/5 25.05.18 Z003U8PM As Commissioned D11 =C001+P015&WD1/30 25.05.18 Z003U8PM As Commissioned
D11 =C001+P015&WD1/36 25.05.18 Z003U8PM As Commissioned D11 =A001+P028&WD1/13 25.05.18 Z003U8PM As Commissioned
D11 =C001+P015&WD1/26 25.05.18 Z003U8PM As Commissioned D11 =S003+P016&WD1/7 25.05.18 Z003U8PM As Commissioned
D11 =S004+P013&WD1/7 25.05.18 Z003U8PM As Commissioned D11 =A000&CMD1/24 25.05.18 Z003U8PM As Commissioned
D11 =A001+P028&WD1/21 25.05.18 Z003U8PM As Commissioned D11 =C001+P015&WD1/8 25.05.18 Z003U8PM As Commissioned
D11 =C001+P015&WD1/35 25.05.18 Z003U8PM As Commissioned D11 =S009+P026&WD1/12 25.05.18 Z003U8PM As Commissioned
D11 =C001+P015&WD1/34 25.05.18 Z003U8PM As Commissioned D11 =S007+P024&WD1/4 25.05.18 Z003U8PM As Commissioned
D11 =S005+P013&WD1/15 25.05.18 Z003U8PM As Commissioned D11 =A001+P028&WD1/14 25.05.18 Z003U8PM As Commissioned
5 7
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/6
Design Document No. - G71053- J5663 (EF-1) Page 6
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
D11 =S003+P016&WD1/6 25.05.18 Z003U8PM As Commissioned C10 =S001&TD1/1 15.05.12 incad391 TFC Changes 01
D11 =S004+P013&WD1/2 25.05.18 Z003U8PM As Commissioned C10 =A000&RD1/4 15.05.12 incad391 TFC Changes 01
D11 =A001+P028&WD1/15 25.05.18 Z003U8PM As Commissioned C10 =S002&EQ1/3 15.05.12 incad391 TFC Changes 01
D11 =S007+P024&WD1/6 25.05.18 Z003U8PM As Commissioned C10 =A000&RO1/8 15.05.12 incad391 TFC Changes 01
D11 =S006+P018&WD1/2 25.05.18 Z003U8PM As Commissioned C10 =A000&CMD1/5 15.05.12 incad391 TFC Changes 01
D11 =S004+P013&WD1/3 25.05.18 Z003U8PM As Commissioned C10 =A000&RO1/15 15.05.12 incad391 TFC Changes 01
D11 =S006+P018&WD1/3 25.05.18 Z003U8PM As Commissioned C10 =A000&RO1/1 15.05.12 incad391 TFC Changes 01
D11 =S009+P026&WD1/5 25.05.18 Z003U8PM As Commissioned C10 =A000&CMD1/25 15.05.12 incad391 TFC Changes 01
D11 =S002+P009&WD1/12 25.05.18 Z003U8PM As Commissioned C10 =A000&RD1/11 15.05.12 incad391 TFC Changes 01
D11 =C001+P015&WD1/7 25.05.18 Z003U8PM As Commissioned C10 =A000&RO1/18 15.05.12 incad391 TFC Changes 01
D11 =S009+P026&WD1/4 25.05.18 Z003U8PM As Commissioned C10 =A000&RO1/19 15.05.12 incad391 TFC Changes 01
D11 =S009+P026&WD1/3 25.05.18 Z003U8PM As Commissioned C10 =A000&RO1/4 15.05.12 incad391 TFC Changes 01
D11 =S008+P022&WD1/3 25.05.18 Z003U8PM As Commissioned C10 =A000&CMD1/28 15.05.12 incad391 TFC Changes 01
D11 =S001+P001&WD1/1 25.05.18 Z003U8PM As Commissioned C10 =A000&RD1/12 15.05.12 incad391 TFC Changes 01
D11 =S011+P019&WD1/9 25.05.18 Z003U8PM As Commissioned C10 =A000&RO1/9 15.05.12 incad391 TFC Changes 01
D11 =S008+P022&WD1/5 25.05.18 Z003U8PM As Commissioned C10 =A000&RO1/16 15.05.12 incad391 TFC Changes 01
D11 =C001+P015&WD1/31 25.05.18 Z003U8PM As Commissioned C10 =A000&RO1/20 15.05.12 incad391 TFC Changes 01
C10 =S002+P007&WD1/6 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/11 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/9 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/21 15.05.12 incad391 TFC Changes 01
C10 =A000&RO1/11 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/24 15.05.12 incad391 TFC Changes 01
C10 =A000&RO1/28 15.05.12 incad391 TFC Changes 01 C10 =A000&RD1/1 15.05.12 incad391 TFC Changes 01
C10 =A001&EQ1/4 15.05.12 incad391 TFC Changes 01 C10 =S005&TD1/2 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/19 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/7 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/4 15.05.12 incad391 TFC Changes 01 C10 =A000&RD1/10 15.05.12 incad391 TFC Changes 01
C10 =A001&EQ1/5 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/20 15.05.12 incad391 TFC Changes 01
C10 =S005&TD1/1 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/22 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/6 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/30 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/8 15.05.12 incad391 TFC Changes 01 C10 =A000&RD1/7 15.05.12 incad391 TFC Changes 01
C10 =A000&RO1/14 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/3 15.05.12 incad391 TFC Changes 01
C10 =A001+P027&WD1/2 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/23 15.05.12 incad391 TFC Changes 01
C10 =A001&EQ1/3 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/6 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/26 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/17 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/12 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/3 15.05.12 incad391 TFC Changes 01
C10 =A000&RO1/5 15.05.12 incad391 TFC Changes 01 C10 =S007&EQ1/2 15.05.12 incad391 TFC Changes 01
C10 =A000&RO1/12 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/10 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/2 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/24 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/17 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/25 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/3 15.05.12 incad391 TFC Changes 01 C10 =S007+P024&WD1/3 15.05.12 incad391 TFC Changes 01
6 8
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/7
Design Document No. - G71053- J5663 (EF-1) Page 7
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
C10 =A001&EQ1/1 15.05.12 incad391 TFC Changes 01 C10 =S011&TD1/2 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/27 15.05.12 incad391 TFC Changes 01 C10 =S011&TD1/1 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/21 15.05.12 incad391 TFC Changes 01 C10 =A000&RD1/10 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/13 15.05.12 incad391 TFC Changes 01 C10 =A000&RD1/11 15.05.12 incad391 TFC Changes 01
C10 =A000&RO1/26 15.05.12 incad391 TFC Changes 01 C10 =A000&RD1/12 15.05.12 incad391 TFC Changes 01
C10 =A001&EQ1/2 15.05.12 incad391 TFC Changes 01 C10 =S011&EQ1/1 15.05.12 incad391 TFC Changes 01
C10 =A000&RO1/2 15.05.12 incad391 TFC Changes 01 C10 =S010&TD1/2 15.05.12 incad391 TFC Changes 01
C10 =A000&RO1/27 15.05.12 incad391 TFC Changes 01 C10 =A000&RD1/13 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/5 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/1 15.05.12 incad391 TFC Changes 01
C10 =A000&RO1/13 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/2 15.05.12 incad391 TFC Changes 01
C10 =A000&RO1/28 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/3 15.05.12 incad391 TFC Changes 01
C10 =A000&RO1/27 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/4 15.05.12 incad391 TFC Changes 01
C10 =S005&TD1/7 15.05.12 incad391 TFC Changes 01 C10 =S010&TD1/1 15.05.12 incad391 TFC Changes 01
C10 =S004&TD1/5 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/5 15.05.12 incad391 TFC Changes 01
C10 =S009&EQ1/3 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/6 15.05.12 incad391 TFC Changes 01
C10 =S007&EQ1/4 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/7 15.05.12 incad391 TFC Changes 01
C10 =S008&EQ1/4 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/8 15.05.12 incad391 TFC Changes 01
C10 =S005&EQ1/3 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/9 15.05.12 incad391 TFC Changes 01
C10 =S010&EQ1/3 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/10 15.05.12 incad391 TFC Changes 01
C10 =S003&EQ1/4 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/11 15.05.12 incad391 TFC Changes 01
C10 =S001&EQ1/5 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/12 15.05.12 incad391 TFC Changes 01
C10 =A000&RO1/26 15.05.12 incad391 TFC Changes 01 C10 =A000&RD1/9 15.05.12 incad391 TFC Changes 01
C10 =C001&PCD1/1 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/13 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/3 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/14 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/4 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/15 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/5 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/16 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/6 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/17 15.05.12 incad391 TFC Changes 01
C10 =A001&TD1/4 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/18 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/7 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/19 15.05.12 incad391 TFC Changes 01
C10 =C001&EQ1/1 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/20 15.05.12 incad391 TFC Changes 01
C10 =L001&TD1/3 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/21 15.05.12 incad391 TFC Changes 01
C10 =L001&TD1/2 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/22 15.05.12 incad391 TFC Changes 01
C10 =L001&TD1/1 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/23 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/8 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/24 15.05.12 incad391 TFC Changes 01
C10 =L001+RS001&WD1/2 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/25 15.05.12 incad391 TFC Changes 01
C10 =L001&EQ1/2 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/26 15.05.12 incad391 TFC Changes 01
C10 =L001&EQ1/1 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/27 15.05.12 incad391 TFC Changes 01
C10 =S011&TD1/3 15.05.12 incad391 TFC Changes 01 C10 =A000&RO1/28 15.05.12 incad391 TFC Changes 01
7 9
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/8
Design Document No. - G71053- J5663 (EF-1) Page 8
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
C10 =A000&NP1/1 15.05.12 incad391 TFC Changes 01 C10 =S007&TD1/4 15.05.12 incad391 TFC Changes 01
C10 =A000&NP1/2 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/13 15.05.12 incad391 TFC Changes 01
C10 =A000&NP1/3 15.05.12 incad391 TFC Changes 01 C10 =S007&TD1/3 15.05.12 incad391 TFC Changes 01
C10 =A000&NP1/4 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/14 15.05.12 incad391 TFC Changes 01
C10 =A000&SP1/3 15.05.12 incad391 TFC Changes 01 C10 =S007&TD1/1 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/3 15.05.12 incad391 TFC Changes 01 C10 =S006&EQ1/1 15.05.12 incad391 TFC Changes 01
C10 =S010&EQ1/3 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/15 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/4 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/16 15.05.12 incad391 TFC Changes 01
C10 =S010&EQ1/2 15.05.12 incad391 TFC Changes 01 C10 =S007&EQ1/4 15.05.12 incad391 TFC Changes 01
C10 =S010&EQ1/1 15.05.12 incad391 TFC Changes 01 C10 =S007&EQ1/3 15.05.12 incad391 TFC Changes 01
C10 =S009&TD1/4 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/17 15.05.12 incad391 TFC Changes 01
C10 =S009&TD1/3 15.05.12 incad391 TFC Changes 01 C10 =S007&EQ1/2 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/5 15.05.12 incad391 TFC Changes 01 C10 =S007&EQ1/1 15.05.12 incad391 TFC Changes 01
C10 =S009&TD1/2 15.05.12 incad391 TFC Changes 01 C10 =S006&TD1/5 15.05.12 incad391 TFC Changes 01
C10 =S009&TD1/1 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/18 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/6 15.05.12 incad391 TFC Changes 01 C10 =S006&TD1/4 15.05.12 incad391 TFC Changes 01
C10 =A001&TD1/5 15.05.12 incad391 TFC Changes 01 C10 =S006&TD1/3 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/7 15.05.12 incad391 TFC Changes 01 C10 =S006&TD1/2 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/8 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/19 15.05.12 incad391 TFC Changes 01
C10 =S009&EQ1/3 15.05.12 incad391 TFC Changes 01 C10 =S006&TD1/1 15.05.12 incad391 TFC Changes 01
C10 =S009&EQ1/2 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/20 15.05.12 incad391 TFC Changes 01
C10 =S009&EQ1/1 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/21 15.05.12 incad391 TFC Changes 01
C10 =S008&TD1/4 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/22 15.05.12 incad391 TFC Changes 01
C10 =S008&TD1/3 15.05.12 incad391 TFC Changes 01 C10 =S001&EQ1/4 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/9 15.05.12 incad391 TFC Changes 01 C10 =S006&EQ1/3 15.05.12 incad391 TFC Changes 01
C10 =S008&TD1/2 15.05.12 incad391 TFC Changes 01 C10 =S006&EQ1/2 15.05.12 incad391 TFC Changes 01
C10 =S008&TD1/1 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/23 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/10 15.05.12 incad391 TFC Changes 01 C10 =S005&TD1/7 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/11 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/24 15.05.12 incad391 TFC Changes 01
C10 =S008&EQ1/4 15.05.12 incad391 TFC Changes 01 C10 =A001&TD1/6 15.05.12 incad391 TFC Changes 01
C10 =S008&EQ1/3 15.05.12 incad391 TFC Changes 01 C10 =S005&TD1/6 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/12 15.05.12 incad391 TFC Changes 01 C10 =S005&TD1/5 15.05.12 incad391 TFC Changes 01
C10 =S001&EQ1/5 15.05.12 incad391 TFC Changes 01 C10 =S005&TD1/4 15.05.12 incad391 TFC Changes 01
C10 =S008&EQ1/2 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/25 15.05.12 incad391 TFC Changes 01
C10 =S008&EQ1/1 15.05.12 incad391 TFC Changes 01 C10 =S005&TD1/3 15.05.12 incad391 TFC Changes 01
C10 =S007&TD1/7 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/26 15.05.12 incad391 TFC Changes 01
C10 =S007&TD1/6 15.05.12 incad391 TFC Changes 01 C10 =S005&TD1/2 15.05.12 incad391 TFC Changes 01
C10 =S007&TD1/5 15.05.12 incad391 TFC Changes 01 C10 =S005&TD1/1 15.05.12 incad391 TFC Changes 01
8 10
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/9
Design Document No. - G71053- J5663 (EF-1) Page 9
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
C10 =A000&CMD1/27 15.05.12 incad391 TFC Changes 01 C10 =S002&TD1/1 15.05.12 incad391 TFC Changes 01
C10 =S001&EQ1/1 15.05.12 incad391 TFC Changes 01 C10 =S001&EQ1/2 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/28 15.05.12 incad391 TFC Changes 01 C10 =Z001&EQ1/1 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/29 15.05.12 incad391 TFC Changes 01 C10 =S002&EQ1/4 15.05.12 incad391 TFC Changes 01
C10 =S005&EQ1/3 15.05.12 incad391 TFC Changes 01 C10 =S002&EQ1/3 15.05.12 incad391 TFC Changes 01
C10 =S005&EQ1/2 15.05.12 incad391 TFC Changes 01 C10 =S002&EQ1/2 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/30 15.05.12 incad391 TFC Changes 01 C10 =S002&EQ1/1 15.05.12 incad391 TFC Changes 01
C10 =S005&EQ1/1 15.05.12 incad391 TFC Changes 01 C10 =A001+P029&WD1/19 15.05.12 incad391 TFC Changes 01
C10 =S004&TD1/5 15.05.12 incad391 TFC Changes 01 C10 =S001&TD1/2 15.05.12 incad391 TFC Changes 01
C10 =S004&TD1/4 15.05.12 incad391 TFC Changes 01 C10 =S001&TD1/1 15.05.12 incad391 TFC Changes 01
C10 =S004&TD1/3 15.05.12 incad391 TFC Changes 01 C10 =S001+P003&WD1/15 15.05.12 incad391 TFC Changes 01
C10 =S004&TD1/2 15.05.12 incad391 TFC Changes 01 C10 =A001&TD1/1 15.05.12 incad391 TFC Changes 01
C10 =S004&TD1/1 15.05.12 incad391 TFC Changes 01 C10 =A001&TD1/2 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/34 15.05.12 incad391 TFC Changes 01 C10 =A001&TD1/3 15.05.12 incad391 TFC Changes 01
C10 =S004&EQ1/2 15.05.12 incad391 TFC Changes 01 C10 =C001&PCD1/5 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/35 15.05.12 incad391 TFC Changes 01 C10 =C001&PCD1/6 15.05.12 incad391 TFC Changes 01
C10 =S004&EQ1/1 15.05.12 incad391 TFC Changes 01 C10 =C001&PCD1/7 15.05.12 incad391 TFC Changes 01
C10 =S003&TD1/4 15.05.12 incad391 TFC Changes 01 C10 =C001&PCD1/8 15.05.12 incad391 TFC Changes 01
C10 =S003&TD1/1 15.05.12 incad391 TFC Changes 01 C10 =C001&PCD1/9 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/37 15.05.12 incad391 TFC Changes 01 C10 =C001&PCD1/10 15.05.12 incad391 TFC Changes 01
C10 =S003+P017&WD1/12 15.05.12 incad391 TFC Changes 01 C10 =C001&PCD1/11 15.05.12 incad391 TFC Changes 01
C10 =S003+P016&WD1/8 15.05.12 incad391 TFC Changes 01 C10 =C001&PCD1/12 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/38 15.05.12 incad391 TFC Changes 01 C10 =C001&TD1/1 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/39 15.05.12 incad391 TFC Changes 01 C10 =C001&TD1/2 15.05.12 incad391 TFC Changes 01
C10 =A001&EQ1/1 15.05.12 incad391 TFC Changes 01 C10 =C001&TD1/3 15.05.12 incad391 TFC Changes 01
C10 =S003&EQ1/4 15.05.12 incad391 TFC Changes 01 C10 =C001&TD1/4 15.05.12 incad391 TFC Changes 01
C10 =A001&EQ1/2 15.05.12 incad391 TFC Changes 01 C10 =J001&EQ1/1 15.05.12 incad391 TFC Changes 01
C10 =S003&EQ1/3 15.05.12 incad391 TFC Changes 01 C10 =J001&TD1/1 15.05.12 incad391 TFC Changes 01
C10 =A001&EQ1/3 15.05.12 incad391 TFC Changes 01 C10 =J002&EQ1/1 15.05.12 incad391 TFC Changes 01
C10 =S003&EQ1/2 15.05.12 incad391 TFC Changes 01 C10 =A000&RD1/1 15.05.12 incad391 TFC Changes 01
C10 =A001&EQ1/4 15.05.12 incad391 TFC Changes 01 C10 =C001&PCD1/4 15.05.12 incad391 TFC Changes 01
C10 =S003&EQ1/1 15.05.12 incad391 TFC Changes 01 C10 =C001&PCD1/3 15.05.12 incad391 TFC Changes 01
C10 =A001&EQ1/5 15.05.12 incad391 TFC Changes 01 C10 =A000&RD1/2 15.05.12 incad391 TFC Changes 01
C10 =S002&TD1/5 15.05.12 incad391 TFC Changes 01 C10 =C001&PCD1/2 15.05.12 incad391 TFC Changes 01
C10 =S002&TD1/4 15.05.12 incad391 TFC Changes 01 C10 =J002&TD1/1 15.05.12 incad391 TFC Changes 01
C10 =S002&TD1/3 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/31 15.05.12 incad391 TFC Changes 01
C10 =S002&TD1/2 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/5 15.05.12 incad391 TFC Changes 01
C10 =S001&EQ1/3 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/24 15.05.12 incad391 TFC Changes 01
9 11
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/10
Design Document No. - G71053- J5663 (EF-1) Page 10
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
C10 =A000&CMD1/1 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/10 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/38 15.05.12 incad391 TFC Changes 01 C10 =C001&PCD1/11 15.05.12 incad391 TFC Changes 01
C10 =J001&EQ1/1 15.05.12 incad391 TFC Changes 01 C10 =C001&PCD1/12 15.05.12 incad391 TFC Changes 01
C10 =J001+RS002&WD1/2 15.05.12 incad391 TFC Changes 01 C10 =S001&EQ1/4 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/2 15.05.12 incad391 TFC Changes 01 C10 =S009+P026&WD1/4 15.05.12 incad391 TFC Changes 01
C10 =S001+P003&WD1/10 15.05.12 incad391 TFC Changes 01 C10 =S006+P019&WD1/4 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/3 15.05.12 incad391 TFC Changes 01 C10 =S006+P018&WD1/3 15.05.12 incad391 TFC Changes 01
C10 =S001&TD1/1 15.05.12 incad391 TFC Changes 01 C10 =S009+P026&WD1/6 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/11 15.05.12 incad391 TFC Changes 01 C10 =A001&TD1/5 15.05.12 incad391 TFC Changes 01
C10 =S005&TD1/1 15.05.12 incad391 TFC Changes 01 C10 =A000&RD1/13 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/4 15.05.12 incad391 TFC Changes 01 C10 =S008&TD1/1 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/5 15.05.12 incad391 TFC Changes 01 C10 =S006+P018&WD1/2 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/6 15.05.12 incad391 TFC Changes 01 C10 =C001&TD1/1 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/12 15.05.12 incad391 TFC Changes 01 C10 =S006+P018&WD1/1 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/7 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/7 15.05.12 incad391 TFC Changes 01
C10 =S001+P001&WD1/1 15.05.12 incad391 TFC Changes 01 C10 =S007+P024&WD1/13 15.05.12 incad391 TFC Changes 01
C10 =S005&TD1/2 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/22 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/8 15.05.12 incad391 TFC Changes 01 C10 =S004+P013&WD1/2 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/9 15.05.12 incad391 TFC Changes 01 C10 =S010&TD1/2 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/10 15.05.12 incad391 TFC Changes 01 C10 =S007+P026&WD1/5 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/1 15.05.12 incad391 TFC Changes 01 C10 =C001&TD1/2 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/13 15.05.12 incad391 TFC Changes 01 C10 =S004&EQ1/2 15.05.12 incad391 TFC Changes 01
C10 =S008&TD1/1 15.05.12 incad391 TFC Changes 01 C10 =S007&EQ1/1 15.05.12 incad391 TFC Changes 01
C10 =A000&RO1/25 15.05.12 incad391 TFC Changes 01 C10 =C001&TD1/3 15.05.12 incad391 TFC Changes 01
C10 =A000&RO1/24 15.05.12 incad391 TFC Changes 01 C10 =C001&TD1/4 15.05.12 incad391 TFC Changes 01
C10 =A000&RO1/23 15.05.12 incad391 TFC Changes 01 C10 =S006&EQ1/3 15.05.12 incad391 TFC Changes 01
C10 =S009+P026&WD1/13 15.05.12 incad391 TFC Changes 01 C10 =S006+P018&WD1/9 15.05.12 incad391 TFC Changes 01
C10 =S009&EQ1/2 15.05.12 incad391 TFC Changes 01 C10 =S004&EQ1/1 15.05.12 incad391 TFC Changes 01
C10 =S006+P019&WD1/5 15.05.12 incad391 TFC Changes 01 C10 =A000&RD1/1 15.05.12 incad391 TFC Changes 01
C10 =C001&PCD1/8 15.05.12 incad391 TFC Changes 01 C10 =S006+P018&WD1/8 15.05.12 incad391 TFC Changes 01
C10 =S009+P026&WD1/1 15.05.12 incad391 TFC Changes 01 C10 =S006&EQ1/2 15.05.12 incad391 TFC Changes 01
C10 =S010&TD1/1 15.05.12 incad391 TFC Changes 01 C10 =S007+P024&WD1/10 15.05.12 incad391 TFC Changes 01
C10 =S006+P018&WD1/10 15.05.12 incad391 TFC Changes 01 C10 =S006+P018&WD1/7 15.05.12 incad391 TFC Changes 01
C10 =S009+P026&WD1/3 15.05.12 incad391 TFC Changes 01 C10 =A000&RD1/12 15.05.12 incad391 TFC Changes 01
C10 =S007+P024&WD1/4 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/23 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/21 15.05.12 incad391 TFC Changes 01 C10 =S003&TD1/1 15.05.12 incad391 TFC Changes 01
C10 =C001&PCD1/9 15.05.12 incad391 TFC Changes 01 C10 =S003+P016&WD1/15 15.05.12 incad391 TFC Changes 01
C10 =C001&PCD1/10 15.05.12 incad391 TFC Changes 01 C10 =S011+P019&WD1/3 15.05.12 incad391 TFC Changes 01
10 12
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/11
Design Document No. - G71053- J5663 (EF-1) Page 11
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
C10 =S003+P016&WD1/14 15.05.12 incad391 TFC Changes 01 C10 =S003&EQ1/2 15.05.12 incad391 TFC Changes 01
C10 =S003+P016&WD1/13 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/5 15.05.12 incad391 TFC Changes 01
C10 =S009+P026&WD1/7 15.05.12 incad391 TFC Changes 01 C10 =S007&EQ1/3 15.05.12 incad391 TFC Changes 01
C10 =S011+P019&WD1/4 15.05.12 incad391 TFC Changes 01 C10 =S011&TD1/3 15.05.12 incad391 TFC Changes 01
C10 =S003+P017&WD1/12 15.05.12 incad391 TFC Changes 01 C10 =S003&EQ1/1 15.05.12 incad391 TFC Changes 01
C10 =S006&EQ1/1 15.05.12 incad391 TFC Changes 01 C10 =S006&TD1/2 15.05.12 incad391 TFC Changes 01
C10 =S007+P024&WD1/12 15.05.12 incad391 TFC Changes 01 C10 =S001&EQ1/3 15.05.12 incad391 TFC Changes 01
C10 =S006&TD1/4 15.05.12 incad391 TFC Changes 01 C10 =S005&TD1/3 15.05.12 incad391 TFC Changes 01
C10 =S007+P024&WD1/3 15.05.12 incad391 TFC Changes 01 C10 =S007+P024&WD1/11 15.05.12 incad391 TFC Changes 01
C10 =S003+P017&WD1/11 15.05.12 incad391 TFC Changes 01 C10 =S007+P024&WD1/8 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/11 15.05.12 incad391 TFC Changes 01 C10 =S008+P024&WD1/4 15.05.12 incad391 TFC Changes 01
C10 =S003+P017&WD1/10 15.05.12 incad391 TFC Changes 01 C10 =A000&RD1/8 15.05.12 incad391 TFC Changes 01
C10 =S005&TD1/6 15.05.12 incad391 TFC Changes 01 C10 =S005&TD1/2 15.05.12 incad391 TFC Changes 01
C10 =S003+P017&WD1/9 15.05.12 incad391 TFC Changes 01 C10 =S009&TD1/2 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/6 15.05.12 incad391 TFC Changes 01 C10 =S009&TD1/3 15.05.12 incad391 TFC Changes 01
C10 =S009+P026&WD1/9 15.05.12 incad391 TFC Changes 01 C10 =S009&TD1/4 15.05.12 incad391 TFC Changes 01
C10 =S009+P026&WD1/10 15.05.12 incad391 TFC Changes 01 C10 =L001&TD1/1 15.05.12 incad391 TFC Changes 01
C10 =S009+P026&WD1/12 15.05.12 incad391 TFC Changes 01 C10 =L001&TD1/2 15.05.12 incad391 TFC Changes 01
C10 =S005+P013&WD1/15 15.05.12 incad391 TFC Changes 01 C10 =S002&TD1/1 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/13 15.05.12 incad391 TFC Changes 01 C10 =S002+P001&WD1/15 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/24 15.05.12 incad391 TFC Changes 01 C10 =S002+P001&WD1/14 15.05.12 incad391 TFC Changes 01
C10 =S003+P016&WD1/8 15.05.12 incad391 TFC Changes 01 C10 =S002+P009&WD1/13 15.05.12 incad391 TFC Changes 01
C10 =S007+P024&WD1/9 15.05.12 incad391 TFC Changes 01 C10 =S007&EQ1/2 15.05.12 incad391 TFC Changes 01
C10 =S001+P001&WD1/1 15.05.12 incad391 TFC Changes 01 C10 =A001&TD1/4 15.05.12 incad391 TFC Changes 01
C10 =S003+P016&WD1/7 15.05.12 incad391 TFC Changes 01 C10 =S002+P009&WD1/12 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/10 15.05.12 incad391 TFC Changes 01 C10 =S010&EQ1/2 15.05.12 incad391 TFC Changes 01
C10 =S003+P016&WD1/5 15.05.12 incad391 TFC Changes 01 C10 =S002+P008&WD1/11 15.05.12 incad391 TFC Changes 01
C10 =S009&TD1/1 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/11 15.05.12 incad391 TFC Changes 01
C10 =S003+P015&WD1/4 15.05.12 incad391 TFC Changes 01 C10 =A000&RD1/7 15.05.12 incad391 TFC Changes 01
C10 =S005&TD1/5 15.05.12 incad391 TFC Changes 01 C10 =S002+P011&WD1/9 15.05.12 incad391 TFC Changes 01
C10 =S011+P019&WD1/8 15.05.12 incad391 TFC Changes 01 C10 =S005&TD1/1 15.05.12 incad391 TFC Changes 01
C10 =S003+P017&WD1/3 15.05.12 incad391 TFC Changes 01 C10 =S002+P010&WD1/8 15.05.12 incad391 TFC Changes 01
C10 =S003+P015&WD1/2 15.05.12 incad391 TFC Changes 01 C10 =C001+P015&WD1/24 15.05.12 incad391 TFC Changes 01
C10 =S005&TD1/4 15.05.12 incad391 TFC Changes 01 C10 =S002+P008&WD1/7 15.05.12 incad391 TFC Changes 01
C10 =S003+P015&WD1/1 15.05.12 incad391 TFC Changes 01 C10 =C001+P015&WD1/25 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/9 15.05.12 incad391 TFC Changes 01 C10 =S002+P009&WD1/5 15.05.12 incad391 TFC Changes 01
C10 =S003&EQ1/3 15.05.12 incad391 TFC Changes 01 C10 =S010+P020&WD1/3 15.05.12 incad391 TFC Changes 01
C10 =S006&TD1/3 15.05.12 incad391 TFC Changes 01 C10 =S002+P003&WD1/4 15.05.12 incad391 TFC Changes 01
11 13
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/12
Design Document No. - G71053- J5663 (EF-1) Page 12
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
C10 =A000&CMD1/27 15.05.12 incad391 TFC Changes 01 C10 =C001+P015&WD1/34 15.05.12 incad391 TFC Changes 01
C10 =S008+P022&WD1/8 15.05.12 incad391 TFC Changes 01 C10 =S005+P013&WD1/4 15.05.12 incad391 TFC Changes 01
C10 =S002+P009&WD1/3 15.05.12 incad391 TFC Changes 01 C10 =C001+P015&WD1/35 15.05.12 incad391 TFC Changes 01
C10 =S010+P020&WD1/4 15.05.12 incad391 TFC Changes 01 C10 =C001+P015&WD1/36 15.05.12 incad391 TFC Changes 01
C10 =S002+P009&WD1/2 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/17 15.05.12 incad391 TFC Changes 01
C10 =S002+P009&WD1/1 15.05.12 incad391 TFC Changes 01 C10 =C001+P015&WD1/37 15.05.12 incad391 TFC Changes 01
C10 =S001&EQ1/2 15.05.12 incad391 TFC Changes 01 C10 =S001&TD1/1 15.05.12 incad391 TFC Changes 01
C10 =S002&EQ1/4 15.05.12 incad391 TFC Changes 01 C10 =A000&RD1/3 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/6 15.05.12 incad391 TFC Changes 01 C10 =S001+P003&WD1/17 15.05.12 incad391 TFC Changes 01
C10 =S005+P013&WD1/14 15.05.12 incad391 TFC Changes 01 C10 =S001+P003&WD1/15 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/3 15.05.12 incad391 TFC Changes 01 C10 =S006&TD1/1 15.05.12 incad391 TFC Changes 01
C10 =S005+P013&WD1/13 15.05.12 incad391 TFC Changes 01 C10 =S001+P003&WD1/13 15.05.12 incad391 TFC Changes 01
C10 =S002&EQ1/3 15.05.12 incad391 TFC Changes 01 C10 =A000&CMD1/30 15.05.12 incad391 TFC Changes 01
C10 =C001+P015&WD1/26 15.05.12 incad391 TFC Changes 01 C10 =C001+P015&WD1/39 15.05.12 incad391 TFC Changes 01
C10 =C001+P015&WD1/27 15.05.12 incad391 TFC Changes 01 C10 =S001+P003&WD1/12 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/1 15.05.12 incad391 TFC Changes 01 C10 =C001+P015&WD1/55 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/19 15.05.12 incad391 TFC Changes 01 C10 =S001+P003&WD1/11 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/12 15.05.12 incad391 TFC Changes 01 C10 =C001&PCD1/2 15.05.12 incad391 TFC Changes 01
C10 =A000&CMD1/28 15.05.12 incad391 TFC Changes 01 C10 =S001+P003&WD1/10 15.05.12 incad391 TFC Changes 01
C10 =C001+P015&WD1/28 15.05.12 incad391 TFC Changes 01 C10 =S008+P022&WD1/9 15.05.12 incad391 TFC Changes 01
C10 =C001+P015&WD1/29 15.05.12 incad391 TFC Changes 01 C10 =A000&RD1/2 15.05.12 incad391 TFC Changes 01
C10 =S001&EQ1/1 15.05.12 incad391 TFC Changes 01 C10 =S001+P005&WD1/9 15.05.12 incad391 TFC Changes 01
C10 =S005+P013&WD1/12 15.05.12 incad391 TFC Changes 01 C10 =S004&TD1/4 15.05.12 incad391 TFC Changes 01
C10 =S001+P004&WD1/8 15.05.12 incad391 TFC Changes 01 C10 =S004+P013&WD1/6 15.05.12 incad391 TFC Changes 01
C10 =S005+P013&WD1/11 15.05.12 incad391 TFC Changes 01 C10 =C001&PCD1/3 15.05.12 incad391 TFC Changes 01
C10 =S002&EQ1/2 15.05.12 incad391 TFC Changes 01 C10 =S008+P022&WD1/10 15.05.12 incad391 TFC Changes 01
C10 =S005+P012&WD1/10 15.05.12 incad391 TFC Changes 01 C10 =S001+P003&WD1/4 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/5 15.05.12 incad391 TFC Changes 01 C10 =S004&TD1/3 15.05.12 incad391 TFC Changes 01
C10 =C001+P015&WD1/30 15.05.12 incad391 TFC Changes 01 C10 =C001&PCD1/4 15.05.12 incad391 TFC Changes 01
C10 =C001+P015&WD1/31 15.05.12 incad391 TFC Changes 01 C10 =S001+P003&WD1/3 15.05.12 incad391 TFC Changes 01
C10 =S005+P012&WD1/9 15.05.12 incad391 TFC Changes 01 C10 =S006+P018&WD1/13 15.05.12 incad391 TFC Changes 01
C10 =S010+P020&WD1/7 15.05.12 incad391 TFC Changes 01 C10 =S004&TD1/2 15.05.12 incad391 TFC Changes 01
C10 =C001+P015&WD1/32 15.05.12 incad391 TFC Changes 01 C10 =S007&TD1/1 15.05.12 incad391 TFC Changes 01
C10 =C001+P015&WD1/33 15.05.12 incad391 TFC Changes 01 C10 =C001&PCD1/5 15.05.12 incad391 TFC Changes 01
C10 =S005+P012&WD1/8 15.05.12 incad391 TFC Changes 01 C10 =S006+P018&WD1/12 15.05.12 incad391 TFC Changes 01
C10 =S007+P024&WD1/15 15.05.12 incad391 TFC Changes 01 C10 =S004+P013&WD1/11 15.05.12 incad391 TFC Changes 01
C10 =A000&RD1/4 15.05.12 incad391 TFC Changes 01 C10 =C001&PCD1/6 15.05.12 incad391 TFC Changes 01
C10 =S001&TD1/2 15.05.12 incad391 TFC Changes 01 C10 =S003+P016&WD1/16 15.05.12 incad391 TFC Changes 01
12 14
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/13
Design Document No. - G71053- J5663 (EF-1) Page 13
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
C10 =S008+P022&WD1/11 15.05.12 incad391 TFC Changes 01 B09 =A000&CMD1/16 26.03.12 in213825 Changes (Manufacturing)
C10 =C001&PCD1/7 15.05.12 incad391 TFC Changes 01 B09 =A000&CMD1/20 26.03.12 in213825 Changes (Manufacturing)
C10 =S004+P013&WD1/10 15.05.12 incad391 TFC Changes 01 B09 =S006&EQ1/3 26.03.12 in213825 Changes (Manufacturing)
C10 =S006+P018&WD1/11 15.05.12 incad391 TFC Changes 01 B09 =A000&CMD1/14 26.03.12 in213825 Changes (Manufacturing)
C10 =S004+P013&WD1/9 15.05.12 incad391 TFC Changes 01 B09 =A000&RD1/1 26.03.12 in213825 Changes (Manufacturing)
C10 =S004+P013&WD1/7 15.05.12 incad391 TFC Changes 01 B09 =S001&EQ1/4 26.03.12 in213825 Changes (Manufacturing)
C10 =S010+P020&WD1/10 15.05.12 incad391 TFC Changes 01 B09 =S006&EQ1/2 26.03.12 in213825 Changes (Manufacturing)
C10 =S010+P020&WD1/13 15.05.12 incad391 TFC Changes 01 B09 =A000&CMD1/13 26.03.12 in213825 Changes (Manufacturing)
C10 =S010+P020&WD1/14 15.05.12 incad391 TFC Changes 01 B09 =S008&TD1/1 26.03.12 in213825 Changes (Manufacturing)
C10 =S006&TD1/4 15.05.12 incad391 TFC Changes 01 B09 =S003&EQ1/3 26.03.12 in213825 Changes (Manufacturing)
C10 =C001&PCD1/12 15.05.12 incad391 TFC Changes 01 B09 =A000&CMD1/23 26.03.12 in213825 Changes (Manufacturing)
C10 =C001&PCD1/11 15.05.12 incad391 TFC Changes 01 B09 =A000&CMD1/28 26.03.12 in213825 Changes (Manufacturing)
C10 =C001&PCD1/10 15.05.12 incad391 TFC Changes 01 B09 =A000&CMD1/9 26.03.12 in213825 Changes (Manufacturing)
C10 =C001&PCD1/9 15.05.12 incad391 TFC Changes 01 B09 =A000&RD1/13 26.03.12 in213825 Changes (Manufacturing)
C10 =C001&PCD1/8 15.05.12 incad391 TFC Changes 01 B09 =S007&EQ1/1 26.03.12 in213825 Changes (Manufacturing)
C10 =C001&PCD1/6 15.05.12 incad391 TFC Changes 01 B09 =A000&CMD1/34 26.03.12 in213825 Changes (Manufacturing)
C10 =A000&RO1/22 15.05.12 incad391 TFC Changes 01 B09 =S006&EQ1/1 26.03.12 in213825 Changes (Manufacturing)
C10 =S005&TD1/5 15.05.12 incad391 TFC Changes 01 B09 =S004&EQ1/2 26.03.12 in213825 Changes (Manufacturing)
C10 =C001&PCD1/4 15.05.12 incad391 TFC Changes 01 B09 =S004&EQ1/1 26.03.12 in213825 Changes (Manufacturing)
C10 =S005&TD1/4 15.05.12 incad391 TFC Changes 01 B09 =A000&CMD1/35 26.03.12 in213825 Changes (Manufacturing)
C10 =C001&PCD1/5 15.05.12 incad391 TFC Changes 01 B09 =A000&RD1/6 26.03.12 in213825 Changes (Manufacturing)
C10 =C001&PCD1/7 15.05.12 incad391 TFC Changes 01 B09 =A000&CMD1/6 26.03.12 in213825 Changes (Manufacturing)
B09 =A000&CMD1/8 26.03.12 in213825 Changes (Manufacturing) B09 =A000&CMD1/24 26.03.12 in213825 Changes (Manufacturing)
B09 =A000&CMD1/11 26.03.12 in213825 Changes (Manufacturing) B09 =A000&CMD1/29 26.03.12 in213825 Changes (Manufacturing)
B09 =A000&CMD1/4 26.03.12 in213825 Changes (Manufacturing) B09 =S002&EQ1/2 26.03.12 in213825 Changes (Manufacturing)
B09 =A000&CMD1/21 26.03.12 in213825 Changes (Manufacturing) B09 =S002&EQ1/4 26.03.12 in213825 Changes (Manufacturing)
B09 =S001&EQ1/2 26.03.12 in213825 Changes (Manufacturing) B09 =S002&EQ1/3 26.03.12 in213825 Changes (Manufacturing)
B09 =A000&CMD1/18 26.03.12 in213825 Changes (Manufacturing) B09 =S003&EQ1/2 26.03.12 in213825 Changes (Manufacturing)
B09 =A000&CMD1/37 26.03.12 in213825 Changes (Manufacturing) B09 =A000&CMD1/15 26.03.12 in213825 Changes (Manufacturing)
B09 =A000&CMD1/38 26.03.12 in213825 Changes (Manufacturing) B09 =A000&RD1/10 26.03.12 in213825 Changes (Manufacturing)
B09 =A000&CMD1/27 26.03.12 in213825 Changes (Manufacturing) B09 =S007&EQ1/3 26.03.12 in213825 Changes (Manufacturing)
B09 =A000&CMD1/12 26.03.12 in213825 Changes (Manufacturing) B09 =A000&CMD1/19 26.03.12 in213825 Changes (Manufacturing)
B09 =A000&CMD1/7 26.03.12 in213825 Changes (Manufacturing) B09 =A000&RD1/5 26.03.12 in213825 Changes (Manufacturing)
B09 =A000&CMD1/22 26.03.12 in213825 Changes (Manufacturing) B09 =A000&CMD1/17 26.03.12 in213825 Changes (Manufacturing)
B09 =A000&RD1/7 26.03.12 in213825 Changes (Manufacturing) B09 =A000&CMD1/5 26.03.12 in213825 Changes (Manufacturing)
B09 =S007&TD1/1 26.03.12 in213825 Changes (Manufacturing) B09 =A000&CMD1/25 26.03.12 in213825 Changes (Manufacturing)
B09 =A000&CMD1/10 26.03.12 in213825 Changes (Manufacturing) B09 =S002&EQ1/1 26.03.12 in213825 Changes (Manufacturing)
B09 =A000&CMD1/3 26.03.12 in213825 Changes (Manufacturing) B09 =S001&EQ1/3 26.03.12 in213825 Changes (Manufacturing)
13 15
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/14
Design Document No. - G71053- J5663 (EF-1) Page 14
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
B09 =A000&CMD1/30 26.03.12 in213825 Changes (Manufacturing) B08 =A000&RD1/10 09.03.12 IN213825 Changes (Manufacturing)
B09 =S003&EQ1/1 26.03.12 in213825 Changes (Manufacturing) B08 =A000&RD1/2 09.03.12 IN213825 Changes (Manufacturing)
B09 =A000&RD1/4 26.03.12 in213825 Changes (Manufacturing) B08 =A000&RD1/1 09.03.12 IN213825 Changes (Manufacturing)
B09 =S005&TD1/2 26.03.12 in213825 Changes (Manufacturing) B08 =S001&TD1/1 09.03.12 IN213825 Changes (Manufacturing)
B09 =A000&RD1/11 26.03.12 in213825 Changes (Manufacturing) B08 =A000&CMD1/23 09.03.12 IN213825 Changes (Manufacturing)
B09 =S007&EQ1/2 26.03.12 in213825 Changes (Manufacturing) B08 =A000&RD1/9 09.03.12 IN213825 Changes (Manufacturing)
B09 =A000&CMD1/26 26.03.12 in213825 Changes (Manufacturing) B08 =S001&EQ1/3 09.03.12 IN213825 Changes (Manufacturing)
B09 =S001&TD1/1 26.03.12 in213825 Changes (Manufacturing) B08 =S005&EQ1/1 09.03.12 IN213825 Changes (Manufacturing)
B09 =A000&CMD1/36 26.03.12 in213825 Changes (Manufacturing) B08 =S005&TD1/6 09.03.12 IN213825 Changes (Manufacturing)
B09 =A000&RD1/3 26.03.12 in213825 Changes (Manufacturing) B08 =A000&CMD1/24 09.03.12 IN213825 Changes (Manufacturing)
B09 =A000&RD1/8 26.03.12 in213825 Changes (Manufacturing) B08 =S007&TD1/1 09.03.12 IN213825 Changes (Manufacturing)
B09 =A000&CMD1/39 26.03.12 in213825 Changes (Manufacturing) B08 =A000&RD1/6 09.03.12 IN213825 Changes (Manufacturing)
B09 =A000&RD1/12 26.03.12 in213825 Changes (Manufacturing) B08 =A000&RD1/7 09.03.12 IN213825 Changes (Manufacturing)
B09 =A000&RD1/9 26.03.12 in213825 Changes (Manufacturing) B08 =S001+P003&WD1/2 09.03.12 IN213825 Changes (Manufacturing)
B09 =A000&RD1/2 26.03.12 in213825 Changes (Manufacturing) B08 =S011&EQ1/1 09.03.12 IN213825 Changes (Manufacturing)
B09 =S005&TD1/1 26.03.12 in213825 Changes (Manufacturing) B08 =S005&TD1/3 09.03.12 IN213825 Changes (Manufacturing)
B09 =S006&EQ1/3 26.03.12 in213825 Changes (Manufacturing) B08 =A000&RD1/13 09.03.12 IN213825 Changes (Manufacturing)
B09 =A000&CMD1/1 26.03.12 in213825 Changes (Manufacturing) B08 =S005&TD1/2 09.03.12 IN213825 Changes (Manufacturing)
B08 =A000&CMD1/21 09.03.12 IN213825 Changes (Manufacturing) B08 =S010&EQ1/1 09.03.12 IN213825 Changes (Manufacturing)
B08 =A000&CMD1/17 09.03.12 IN213825 Changes (Manufacturing) B08 =A000&RD1/8 09.03.12 IN213825 Changes (Manufacturing)
B08 =A000&CMD1/32 09.03.12 IN213825 Changes (Manufacturing) B08 =A000&RD1/11 09.03.12 IN213825 Changes (Manufacturing)
B08 =A000&CMD1/22 09.03.12 IN213825 Changes (Manufacturing) B08 =A000&RD1/3 09.03.12 IN213825 Changes (Manufacturing)
B08 =A000&CMD1/19 09.03.12 IN213825 Changes (Manufacturing) B08 =S010&EQ1/2 09.03.12 IN213825 Changes (Manufacturing)
B08 =A000&CMD1/12 09.03.12 IN213825 Changes (Manufacturing) B08 =S001&EQ1/4 09.03.12 IN213825 Changes (Manufacturing)
B08 =A000&CMD1/5 09.03.12 IN213825 Changes (Manufacturing) B08 =S005&TD1/1 09.03.12 IN213825 Changes (Manufacturing)
B08 =S004+P013&WD1/2 09.03.12 IN213825 Changes (Manufacturing) B08 =S001&EQ1/2 09.03.12 IN213825 Changes (Manufacturing)
B08 =S003+P017&WD1/3 09.03.12 IN213825 Changes (Manufacturing) B08 =A000&RD1/12 09.03.12 IN213825 Changes (Manufacturing)
B08 =S001+P003&WD1/3 09.03.12 IN213825 Changes (Manufacturing) B08 =A000&RD1/4 09.03.12 IN213825 Changes (Manufacturing)
B08 =S006+P018&WD1/2 09.03.12 IN213825 Changes (Manufacturing) B08 =S006&TD1/1 09.03.12 IN213825 Changes (Manufacturing)
B08 =A000&CMD1/5 09.03.12 IN213825 Changes (Manufacturing) B08 =A000&NP1/4 09.03.12 IN213825 Changes (Manufacturing)
B08 =S001+P003&WD1/4 09.03.12 IN213825 Changes (Manufacturing) B08 =A000&NP1/3 09.03.12 IN213825 Changes (Manufacturing)
B08 =S002+P003&WD1/4 09.03.12 IN213825 Changes (Manufacturing) B08 =S001&EQ1/1 09.03.12 IN213825 Changes (Manufacturing)
B08 =S010+P020&WD1/4 09.03.12 IN213825 Changes (Manufacturing) B08 =A000&RD1/5 09.03.12 IN213825 Changes (Manufacturing)
B08 =S005&EQ1/2 09.03.12 IN213825 Changes (Manufacturing) B08 =A000&NP1/2 09.03.12 IN213825 Changes (Manufacturing)
B08 =S001+P003&WD1/10 09.03.12 IN213825 Changes (Manufacturing) B08 =A000&RO1/21 09.03.12 IN213825 Changes (Manufacturing)
B08 =S003&TD1/1 09.03.12 IN213825 Changes (Manufacturing) B08 =A000&RO1/20 09.03.12 IN213825 Changes (Manufacturing)
B08 =A000&NP1/1 09.03.12 IN213825 Changes (Manufacturing) B08 =A000&NP1/4 09.03.12 IN213825 Changes (Manufacturing)
B08 =S008&TD1/1 09.03.12 IN213825 Changes (Manufacturing) B08 =S011+P019&WD1/4 09.03.12 IN213825 Changes (Manufacturing)
14 16
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/15
Design Document No. - G71053- J5663 (EF-1) Page 15
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
B08 =S002+P009&WD1/2 09.03.12 IN213825 Changes (Manufacturing) B07 =S001&EQ1/1 18.01.12 in213825 Changes (Manufacturing)
B08 =S004+P013&WD1/1 09.03.12 IN213825 Changes (Manufacturing) B07 =S005&EQ1/1 18.01.12 in213825 Changes (Manufacturing)
B08 =A001+P028&WD1/21 09.03.12 IN213825 Changes (Manufacturing) B07 =S011&TD1/3 18.01.12 in213825 Changes (Manufacturing)
B08 =A001+P028&WD1/18 09.03.12 IN213825 Changes (Manufacturing) B07 =S004&TD1/4 18.01.12 in213825 Changes (Manufacturing)
B08 =A001+P031&WD1/3 09.03.12 IN213825 Changes (Manufacturing) B07 =S004&TD1/3 18.01.12 in213825 Changes (Manufacturing)
B08 =S010+P020&WD1/4 09.03.12 IN213825 Changes (Manufacturing) B07 =S004&TD1/2 18.01.12 in213825 Changes (Manufacturing)
B08 =S001+P003&WD1/2 09.03.12 IN213825 Changes (Manufacturing) B07 =S004&TD1/1 18.01.12 in213825 Changes (Manufacturing)
B08 =S005+P013&WD1/12 09.03.12 IN213825 Changes (Manufacturing) B07 =S008&EQ1/2 18.01.12 in213825 Changes (Manufacturing)
B08 =S005+P013&WD1/11 09.03.12 IN213825 Changes (Manufacturing) B07 =S004+P013&WD1/6 18.01.12 in213825 Changes (Manufacturing)
B08 =S005+P012&WD1/10 09.03.12 IN213825 Changes (Manufacturing) B07 =A000&RD1/13 18.01.12 in213825 Changes (Manufacturing)
B08 =S005+P013&WD1/14 09.03.12 IN213825 Changes (Manufacturing) B07 =A000&RD1/4 18.01.12 in213825 Changes (Manufacturing)
B08 =S005+P012&WD1/8 09.03.12 IN213825 Changes (Manufacturing) B07 =S001&TD1/2 18.01.12 in213825 Changes (Manufacturing)
B07 =A000&CMD1/1 18.01.12 in213825 Changes (Manufacturing) B07 =S006&TD1/2 18.01.12 in213825 Changes (Manufacturing)
B07 =A000&CMD1/23 18.01.12 in213825 Changes (Manufacturing) B07 =S001&EQ1/4 18.01.12 in213825 Changes (Manufacturing)
B07 =S005+P012&WD1/9 18.01.12 in213825 Changes (Manufacturing) B07 =A001&TD1/4 18.01.12 in213825 Changes (Manufacturing)
B07 =S005+P012&WD1/8 18.01.12 in213825 Changes (Manufacturing) B07 =S001&TD1/1 18.01.12 in213825 Changes (Manufacturing)
B07 =A000&RD1/12 18.01.12 in213825 Changes (Manufacturing) B07 =A000&RD1/3 18.01.12 in213825 Changes (Manufacturing)
B07 =S011&EQ1/1 18.01.12 in213825 Changes (Manufacturing) B07 =S007+P024&WD1/8 18.01.12 in213825 Changes (Manufacturing)
B07 =S008&TD1/1 18.01.12 in213825 Changes (Manufacturing) B07 =A000&RD1/8 18.01.12 in213825 Changes (Manufacturing)
B07 =S008&TD1/3 18.01.12 in213825 Changes (Manufacturing) B07 =S003&TD1/1 18.01.12 in213825 Changes (Manufacturing)
B07 =S006&EQ1/2 18.01.12 in213825 Changes (Manufacturing) B07 =S006&TD1/1 18.01.12 in213825 Changes (Manufacturing)
B07 =S006&EQ1/1 18.01.12 in213825 Changes (Manufacturing) B07 =S007&TD1/1 18.01.12 in213825 Changes (Manufacturing)
B07 =A000&CMD1/6 18.01.12 in213825 Changes (Manufacturing) B07 =S001&EQ1/2 18.01.12 in213825 Changes (Manufacturing)
B07 =S005&TD1/6 18.01.12 in213825 Changes (Manufacturing) B07 =A000&RD1/5 18.01.12 in213825 Changes (Manufacturing)
B07 =S009+P026&WD1/2 18.01.12 in213825 Changes (Manufacturing) B07 =A000&RD1/2 18.01.12 in213825 Changes (Manufacturing)
B07 =S008&EQ1/1 18.01.12 in213825 Changes (Manufacturing) B07 =S011&TD1/1 18.01.12 in213825 Changes (Manufacturing)
B07 =A000&CMD1/5 18.01.12 in213825 Changes (Manufacturing) B07 =S002&TD1/1 18.01.12 in213825 Changes (Manufacturing)
B07 =S005&TD1/3 18.01.12 in213825 Changes (Manufacturing) B07 =S011&TD1/2 18.01.12 in213825 Changes (Manufacturing)
B07 =S005&TD1/2 18.01.12 in213825 Changes (Manufacturing) B07 =S003&EQ1/2 18.01.12 in213825 Changes (Manufacturing)
B07 =A000&CMD1/26 18.01.12 in213825 Changes (Manufacturing) B07 =S008&EQ1/3 18.01.12 in213825 Changes (Manufacturing)
B07 =S001&EQ1/3 18.01.12 in213825 Changes (Manufacturing) B07 =A000&RD1/11 18.01.12 in213825 Changes (Manufacturing)
B07 =S010&EQ1/1 18.01.12 in213825 Changes (Manufacturing) B07 =A000&RD1/6 18.01.12 in213825 Changes (Manufacturing)
B07 =S005&TD1/1 18.01.12 in213825 Changes (Manufacturing) B07 =S006&TD1/3 18.01.12 in213825 Changes (Manufacturing)
B07 =S010&EQ1/2 18.01.12 in213825 Changes (Manufacturing) B07 =A000&RD1/7 18.01.12 in213825 Changes (Manufacturing)
B07 =S008&TD1/4 18.01.12 in213825 Changes (Manufacturing) B07 =A000&RD1/9 18.01.12 in213825 Changes (Manufacturing)
B07 =A000&CMD1/28 18.01.12 in213825 Changes (Manufacturing) B07 =S007+P024&WD1/10 18.01.12 in213825 Changes (Manufacturing)
B07 =S005&EQ1/2 18.01.12 in213825 Changes (Manufacturing) B07 =S004&EQ1/1 18.01.12 in213825 Changes (Manufacturing)
B07 =A000&CMD1/30 18.01.12 in213825 Changes (Manufacturing) B07 =S003&EQ1/3 18.01.12 in213825 Changes (Manufacturing)
15 17
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/16
Design Document No. - G71053- J5663 (EF-1) Page 16
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
B07 =C001&TD1/1 18.01.12 in213825 Changes (Manufacturing) B07 =S001&EQ1/3 18.01.12 in213825 Changes (Manufacturing)
B07 =A000&RD1/1 18.01.12 in213825 Changes (Manufacturing) B07 =S008&EQ1/1 18.01.12 in213825 Changes (Manufacturing)
B07 =A000&RD1/10 18.01.12 in213825 Changes (Manufacturing) B07 =S003&EQ1/2 18.01.12 in213825 Changes (Manufacturing)
B07 =C001&TD1/2 18.01.12 in213825 Changes (Manufacturing) B07 =A000&CMD1/24 18.01.12 in213825 Changes (Manufacturing)
B07 =C001&TD1/3 18.01.12 in213825 Changes (Manufacturing) B07 =S002&EQ1/4 18.01.12 in213825 Changes (Manufacturing)
B07 =C001&TD1/4 18.01.12 in213825 Changes (Manufacturing) B07 =S011&EQ1/1 18.01.12 in213825 Changes (Manufacturing)
B07 =S003&EQ1/1 18.01.12 in213825 Changes (Manufacturing) B07 =S001&EQ1/1 18.01.12 in213825 Changes (Manufacturing)
B07 =A000&CMD1/21 18.01.12 in213825 Changes (Manufacturing) B07 =S004&EQ1/1 18.01.12 in213825 Changes (Manufacturing)
B07 =S008+P022&WD1/2 18.01.12 in213825 Changes (Manufacturing) B07 =A000&CMD1/23 18.01.12 in213825 Changes (Manufacturing)
B07 =A000&CMD1/22 18.01.12 in213825 Changes (Manufacturing) B07 =A000&RD1/5 18.01.12 in213825 Changes (Manufacturing)
B07 =A000&CMD1/24 18.01.12 in213825 Changes (Manufacturing) B07 =S008&EQ1/3 18.01.12 in213825 Changes (Manufacturing)
B07 =A000&CMD1/17 18.01.12 in213825 Changes (Manufacturing) B07 =S007+P024&WD1/3 18.01.12 in213825 Changes (Manufacturing)
B07 =C001&TD1/4 18.01.12 in213825 Changes (Manufacturing) B07 =S008&EQ1/2 18.01.12 in213825 Changes (Manufacturing)
B07 =A000&RD1/13 18.01.12 in213825 Changes (Manufacturing) B07 =S003&EQ1/3 18.01.12 in213825 Changes (Manufacturing)
B07 =C001&TD1/2 18.01.12 in213825 Changes (Manufacturing) B07 =S004+P013&WD1/2 18.01.12 in213825 Changes (Manufacturing)
B07 =C001&TD1/3 18.01.12 in213825 Changes (Manufacturing) B07 =A000&RD1/1 18.01.12 in213825 Changes (Manufacturing)
B07 =S005&TD1/6 18.01.12 in213825 Changes (Manufacturing) B07 =S008+P024&WD1/4 18.01.12 in213825 Changes (Manufacturing)
B07 =A000&CMD1/23 18.01.12 in213825 Changes (Manufacturing) B07 =S006&EQ1/1 18.01.12 in213825 Changes (Manufacturing)
B07 =S009+P026&WD1/2 18.01.12 in213825 Changes (Manufacturing) B07 =A000&CMD1/17 18.01.12 in213825 Changes (Manufacturing)
B07 =A000&CMD1/21 18.01.12 in213825 Changes (Manufacturing) B07 =A000&RD1/6 18.01.12 in213825 Changes (Manufacturing)
B07 =A000&RD1/2 18.01.12 in213825 Changes (Manufacturing) B07 =A000&RD1/3 18.01.12 in213825 Changes (Manufacturing)
B07 =S002&EQ1/3 18.01.12 in213825 Changes (Manufacturing) B07 =S006&EQ1/2 18.01.12 in213825 Changes (Manufacturing)
B07 =A000&RD1/8 18.01.12 in213825 Changes (Manufacturing) B07 =S011+P019&WD1/2 18.01.12 in213825 Changes (Manufacturing)
B07 =S005&EQ1/2 18.01.12 in213825 Changes (Manufacturing) B07 =S008+P022&WD1/2 18.01.12 in213825 Changes (Manufacturing)
B07 =S005+P013&WD1/3 18.01.12 in213825 Changes (Manufacturing) B07 =A000&RD1/11 18.01.12 in213825 Changes (Manufacturing)
B07 =S010+P020&WD1/2 18.01.12 in213825 Changes (Manufacturing) B07 =S002+P009&WD1/3 18.01.12 in213825 Changes (Manufacturing)
B07 =S010&EQ1/2 18.01.12 in213825 Changes (Manufacturing) B07 =S002&EQ1/2 18.01.12 in213825 Changes (Manufacturing)
B07 =S003+P017&WD1/3 18.01.12 in213825 Changes (Manufacturing) B07 =S005&EQ1/1 18.01.12 in213825 Changes (Manufacturing)
B07 =A000&RD1/4 18.01.12 in213825 Changes (Manufacturing) B07 =A000&RD1/12 18.01.12 in213825 Changes (Manufacturing)
B07 =A000&RD1/9 18.01.12 in213825 Changes (Manufacturing) B07 =S001&EQ1/2 18.01.12 in213825 Changes (Manufacturing)
B07 =S001+P003&WD1/3 18.01.12 in213825 Changes (Manufacturing) B07 =A000&CMD1/22 18.01.12 in213825 Changes (Manufacturing)
B07 =S010&EQ1/1 18.01.12 in213825 Changes (Manufacturing) B07 =S003&EQ1/1 18.01.12 in213825 Changes (Manufacturing)
B07 =A000&CMD1/26 18.01.12 in213825 Changes (Manufacturing) B07 =S006+P018&WD1/2 18.01.12 in213825 Changes (Manufacturing)
B07 =A000&RD1/7 18.01.12 in213825 Changes (Manufacturing) B07 =S008&TD1/1 18.01.12 in213825 Changes (Manufacturing)
B07 =S001&EQ1/4 18.01.12 in213825 Changes (Manufacturing) B07 =A000&RO1/19 18.01.12 in213825 Changes (Manufacturing)
B07 =S001&TD1/1 18.01.12 in213825 Changes (Manufacturing) B07 =A000&RO1/17 18.01.12 in213825 Changes (Manufacturing)
B07 =A000&RD1/10 18.01.12 in213825 Changes (Manufacturing) B07 =A000&RO1/18 18.01.12 in213825 Changes (Manufacturing)
B07 =S002&EQ1/1 18.01.12 in213825 Changes (Manufacturing) B06 =S003+P016&WD1/5 13.12.11 in213825 Changes (Manufacturing)
16 18
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/17
Design Document No. - G71053- J5663 (EF-1) Page 17
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
B06 =A001+P028&WD1/23 13.12.11 in213825 Changes (Manufacturing) A05 =S003+P017&WD1/3 27.09.11 in213825 Approval Changes 01
B06 =A001+P028&WD1/27 13.12.11 in213825 Changes (Manufacturing) A05 =S003+P015&WD1/4 27.09.11 in213825 Approval Changes 01
B06 =A000&CMD1/21 13.12.11 in213825 Changes (Manufacturing) A05 =S003+P016&WD1/5 27.09.11 in213825 Approval Changes 01
B06 =A000&CMD1/17 13.12.11 in213825 Changes (Manufacturing) A05 =S003+P016&WD1/7 27.09.11 in213825 Approval Changes 01
B06 =A000&CMD1/31 13.12.11 in213825 Changes (Manufacturing) A05 =S003+P016&WD1/8 27.09.11 in213825 Approval Changes 01
B06 =A000&CMD1/12 13.12.11 in213825 Changes (Manufacturing) A05 =S003+P017&WD1/9 27.09.11 in213825 Approval Changes 01
B06 =A000&CMD1/22 13.12.11 in213825 Changes (Manufacturing) A05 =S003+P017&WD1/10 27.09.11 in213825 Approval Changes 01
B06 =A000&CMD1/5 13.12.11 in213825 Changes (Manufacturing) A05 =S003+P017&WD1/11 27.09.11 in213825 Approval Changes 01
B06 =A000&CMD1/32 13.12.11 in213825 Changes (Manufacturing) A05 =S003+P017&WD1/12 27.09.11 in213825 Approval Changes 01
B06 =A000&CMD1/36 13.12.11 in213825 Changes (Manufacturing) A05 =S003+P016&WD1/14 27.09.11 in213825 Approval Changes 01
B06 =A000&CMD1/19 13.12.11 in213825 Changes (Manufacturing) A05 =S003+P016&WD1/15 27.09.11 in213825 Approval Changes 01
A05 =S001+P003&WD1/15 27.09.11 in213825 Approval Changes 01 A05 =S003+P016&WD1/16 27.09.11 in213825 Approval Changes 01
A05 =S001+P003&WD1/16 27.09.11 in213825 Approval Changes 01 A05 =S003&TD1/1 27.09.11 in213825 Approval Changes 01
A05 =S001+P003&WD1/17 27.09.11 in213825 Approval Changes 01 A05 =S004+P013&WD1/1 27.09.11 in213825 Approval Changes 01
A05 =S001&TD1/1 27.09.11 in213825 Approval Changes 01 A05 =S004+P013&WD1/2 27.09.11 in213825 Approval Changes 01
A05 =S002&EQ1/1 27.09.11 in213825 Approval Changes 01 A05 =S004+P013&WD1/3 27.09.11 in213825 Approval Changes 01
A05 =S002&EQ1/2 27.09.11 in213825 Approval Changes 01 A05 =S004+P015&WD1/4 27.09.11 in213825 Approval Changes 01
A05 =S002&EQ1/3 27.09.11 in213825 Approval Changes 01 A05 =S004+P013&WD1/5 27.09.11 in213825 Approval Changes 01
A05 =S002&EQ1/4 27.09.11 in213825 Approval Changes 01 A05 =S004+P013&WD1/6 27.09.11 in213825 Approval Changes 01
A05 =S002+P009&WD1/1 27.09.11 in213825 Approval Changes 01 A05 =S004+P013&WD1/7 27.09.11 in213825 Approval Changes 01
A05 =S002+P009&WD1/2 27.09.11 in213825 Approval Changes 01 A05 =S004+P013&WD1/8 27.09.11 in213825 Approval Changes 01
A05 =S002+P009&WD1/3 27.09.11 in213825 Approval Changes 01 A05 =S004+P013&WD1/9 27.09.11 in213825 Approval Changes 01
A05 =S002+P003&WD1/4 27.09.11 in213825 Approval Changes 01 A05 =S004+P013&WD1/10 27.09.11 in213825 Approval Changes 01
A05 =S002+P009&WD1/5 27.09.11 in213825 Approval Changes 01 A05 =S004+P013&WD1/11 27.09.11 in213825 Approval Changes 01
A05 =S002+P007&WD1/6 27.09.11 in213825 Approval Changes 01 A05 =S004&TD1/2 27.09.11 in213825 Approval Changes 01
A05 =S002+P008&WD1/7 27.09.11 in213825 Approval Changes 01 A05 =S004&TD1/3 27.09.11 in213825 Approval Changes 01
A05 =S002+P010&WD1/8 27.09.11 in213825 Approval Changes 01 A05 =S005+P012&WD1/8 27.09.11 in213825 Approval Changes 01
A05 =S002+P011&WD1/9 27.09.11 in213825 Approval Changes 01 A05 =S005+P012&WD1/9 27.09.11 in213825 Approval Changes 01
A05 =S002+P008&WD1/11 27.09.11 in213825 Approval Changes 01 A05 =S005+P012&WD1/10 27.09.11 in213825 Approval Changes 01
A05 =S002+P009&WD1/12 27.09.11 in213825 Approval Changes 01 A05 =S005+P013&WD1/11 27.09.11 in213825 Approval Changes 01
A05 =S002+P009&WD1/13 27.09.11 in213825 Approval Changes 01 A05 =S005+P013&WD1/12 27.09.11 in213825 Approval Changes 01
A05 =S002+P001&WD1/14 27.09.11 in213825 Approval Changes 01 A05 =S005+P013&WD1/13 27.09.11 in213825 Approval Changes 01
A05 =S002+P001&WD1/15 27.09.11 in213825 Approval Changes 01 A05 =S005+P013&WD1/14 27.09.11 in213825 Approval Changes 01
A05 =S003&EQ1/1 27.09.11 in213825 Approval Changes 01 A05 =S005+P013&WD1/15 27.09.11 in213825 Approval Changes 01
A05 =S003&EQ1/2 27.09.11 in213825 Approval Changes 01 A05 =S006+P018&WD1/1 27.09.11 in213825 Approval Changes 01
A05 =S003&EQ1/3 27.09.11 in213825 Approval Changes 01 A05 =S006+P018&WD1/2 27.09.11 in213825 Approval Changes 01
A05 =S003+P015&WD1/1 27.09.11 in213825 Approval Changes 01 A05 =S006+P018&WD1/3 27.09.11 in213825 Approval Changes 01
A05 =S003+P015&WD1/2 27.09.11 in213825 Approval Changes 01 A05 =S006+P019&WD1/4 27.09.11 in213825 Approval Changes 01
17 19
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/18
Design Document No. - G71053- J5663 (EF-1) Page 18
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
A05 =S006+P019&WD1/5 27.09.11 in213825 Approval Changes 01 A05 =S009+P026&WD1/5 27.09.11 in213825 Approval Changes 01
A05 =S006+P018&WD1/6 27.09.11 in213825 Approval Changes 01 A05 =S009+P026&WD1/6 27.09.11 in213825 Approval Changes 01
A05 =S006+P018&WD1/7 27.09.11 in213825 Approval Changes 01 A05 =S009+P026&WD1/7 27.09.11 in213825 Approval Changes 01
A05 =S006+P018&WD1/8 27.09.11 in213825 Approval Changes 01 A05 =S009+P026&WD1/8 27.09.11 in213825 Approval Changes 01
A05 =S006+P018&WD1/9 27.09.11 in213825 Approval Changes 01 A05 =S009+P026&WD1/9 27.09.11 in213825 Approval Changes 01
A05 =S006+P018&WD1/10 27.09.11 in213825 Approval Changes 01 A05 =S009+P026&WD1/10 27.09.11 in213825 Approval Changes 01
A05 =S006+P018&WD1/11 27.09.11 in213825 Approval Changes 01 A05 =S009+P026&WD1/11 27.09.11 in213825 Approval Changes 01
A05 =S006+P018&WD1/13 27.09.11 in213825 Approval Changes 01 A05 =S009+P026&WD1/12 27.09.11 in213825 Approval Changes 01
A05 =S007+P024&WD1/1 27.09.11 in213825 Approval Changes 01 A05 =S009+P026&WD1/13 27.09.11 in213825 Approval Changes 01
A05 =S007+P024&WD1/3 27.09.11 in213825 Approval Changes 01 A05 =S010+P020&WD1/1 27.09.11 in213825 Approval Changes 01
A05 =S007+P024&WD1/4 27.09.11 in213825 Approval Changes 01 A05 =S010+P020&WD1/2 27.09.11 in213825 Approval Changes 01
A05 =S007+P026&WD1/5 27.09.11 in213825 Approval Changes 01 A05 =S010+P020&WD1/3 27.09.11 in213825 Approval Changes 01
A05 =S007+P024&WD1/8 27.09.11 in213825 Approval Changes 01 A05 =S010+P020&WD1/4 27.09.11 in213825 Approval Changes 01
A05 =S007+P024&WD1/9 27.09.11 in213825 Approval Changes 01 A05 =S010+P020&WD1/5 27.09.11 in213825 Approval Changes 01
A05 =S007+P024&WD1/10 27.09.11 in213825 Approval Changes 01 A05 =S010+P020&WD1/6 27.09.11 in213825 Approval Changes 01
A05 =S007+P024&WD1/12 27.09.11 in213825 Approval Changes 01 A05 =S010+P020&WD1/7 27.09.11 in213825 Approval Changes 01
A05 =S007+P024&WD1/13 27.09.11 in213825 Approval Changes 01 A05 =S010+P020&WD1/8 27.09.11 in213825 Approval Changes 01
A05 =S007+P024&WD1/16 27.09.11 in213825 Approval Changes 01 A05 =S010+P020&WD1/9 27.09.11 in213825 Approval Changes 01
A05 =S008+P022&WD1/1 27.09.11 in213825 Approval Changes 01 A05 =S010+P003&WD1/11 27.09.11 in213825 Approval Changes 01
A05 =S008+P022&WD1/2 27.09.11 in213825 Approval Changes 01 A05 =S010+P020&WD1/12 27.09.11 in213825 Approval Changes 01
A05 =S008+P024&WD1/4 27.09.11 in213825 Approval Changes 01 A05 =S010+P020&WD1/13 27.09.11 in213825 Approval Changes 01
A05 =S008+P022&WD1/5 27.09.11 in213825 Approval Changes 01 A05 =S010+P020&WD1/14 27.09.11 in213825 Approval Changes 01
A05 =S008+P022&WD1/6 27.09.11 in213825 Approval Changes 01 A05 =S010&TD1/2 27.09.11 in213825 Approval Changes 01
A05 =S008+P022&WD1/7 27.09.11 in213825 Approval Changes 01 A05 =S011+P019&WD1/1 27.09.11 in213825 Approval Changes 01
A05 =S008+P022&WD1/8 27.09.11 in213825 Approval Changes 01 A05 =S011+P019&WD1/2 27.09.11 in213825 Approval Changes 01
A05 =S008+P022&WD1/9 27.09.11 in213825 Approval Changes 01 A05 =S011+P019&WD1/4 27.09.11 in213825 Approval Changes 01
A05 =S008+P022&WD1/10 27.09.11 in213825 Approval Changes 01 A05 =S011+P019&WD1/5 27.09.11 in213825 Approval Changes 01
A05 =S008+P022&WD1/11 27.09.11 in213825 Approval Changes 01 A05 =S011+P019&WD1/6 27.09.11 in213825 Approval Changes 01
A05 =S008+P022&WD1/12 27.09.11 in213825 Approval Changes 01 A05 =S011+P019&WD1/7 27.09.11 in213825 Approval Changes 01
A05 =S008+P022&WD1/13 27.09.11 in213825 Approval Changes 01 A05 =S011+P019&WD1/8 27.09.11 in213825 Approval Changes 01
A05 =S008+P022&WD1/14 27.09.11 in213825 Approval Changes 01 A05 =S011+P019&WD1/10 27.09.11 in213825 Approval Changes 01
A05 =S008&TD1/1 27.09.11 in213825 Approval Changes 01 A05 =L001&TD1/1 27.09.11 in213825 Approval Changes 01
A05 =S008&TD1/2 27.09.11 in213825 Approval Changes 01 A05 =C001+P015&WD1/15 27.09.11 in213825 Approval Changes 01
A05 =S008&TD1/3 27.09.11 in213825 Approval Changes 01 A05 =C001+P015&WD1/16 27.09.11 in213825 Approval Changes 01
A05 =S009+P026&WD1/1 27.09.11 in213825 Approval Changes 01 A05 =C001+P015&WD1/21 27.09.11 in213825 Approval Changes 01
A05 =S009+P026&WD1/2 27.09.11 in213825 Approval Changes 01 A05 =C001+P015&WD1/24 27.09.11 in213825 Approval Changes 01
A05 =S009+P026&WD1/3 27.09.11 in213825 Approval Changes 01 A05 =C001+P015&WD1/25 27.09.11 in213825 Approval Changes 01
A05 =S009+P026&WD1/4 27.09.11 in213825 Approval Changes 01 A05 =C001+P015&WD1/26 27.09.11 in213825 Approval Changes 01
18 20
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/19
Design Document No. - G71053- J5663 (EF-1) Page 19
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
A05 =C001+P015&WD1/27 27.09.11 in213825 Approval Changes 01 A05 =A000&CMD1/23 27.09.11 in213825 Approval Changes 01
A05 =C001+P015&WD1/28 27.09.11 in213825 Approval Changes 01 A05 =A000&CMD1/24 27.09.11 in213825 Approval Changes 01
A05 =C001+P015&WD1/29 27.09.11 in213825 Approval Changes 01 A05 =A000&CMD1/25 27.09.11 in213825 Approval Changes 01
A05 =C001+P015&WD1/30 27.09.11 in213825 Approval Changes 01 A05 =A000&CMD1/26 27.09.11 in213825 Approval Changes 01
A05 =C001+P015&WD1/31 27.09.11 in213825 Approval Changes 01 A05 =A000&CMD1/27 27.09.11 in213825 Approval Changes 01
A05 =C001+P015&WD1/32 27.09.11 in213825 Approval Changes 01 A05 =A000&CMD1/28 27.09.11 in213825 Approval Changes 01
A05 =C001+P015&WD1/33 27.09.11 in213825 Approval Changes 01 A05 =A000&CMD1/29 27.09.11 in213825 Approval Changes 01
A05 =C001+P015&WD1/34 27.09.11 in213825 Approval Changes 01 A05 =A000&CMD1/30 27.09.11 in213825 Approval Changes 01
A05 =C001+P015&WD1/35 27.09.11 in213825 Approval Changes 01 A05 =A001&EQ1/1 27.09.11 in213825 Approval Changes 01
A05 =C001+P015&WD1/36 27.09.11 in213825 Approval Changes 01 A05 =A001&EQ1/2 27.09.11 in213825 Approval Changes 01
A05 =C001+P015&WD1/37 27.09.11 in213825 Approval Changes 01 A05 =A001&EQ1/3 27.09.11 in213825 Approval Changes 01
A05 =C001+P015&WD1/38 27.09.11 in213825 Approval Changes 01 A05 =A001&EQ1/4 27.09.11 in213825 Approval Changes 01
A05 =C001+P015&WD1/39 27.09.11 in213825 Approval Changes 01 A05 =A001&EQ1/5 27.09.11 in213825 Approval Changes 01
A05 =C001+P015&WD1/55 27.09.11 in213825 Approval Changes 01 A05 =A001+P027&WD1/2 27.09.11 in213825 Approval Changes 01
A05 =A000&RD1/1 27.09.11 in213825 Approval Changes 01 A05 =A001+P028&WD1/4 27.09.11 in213825 Approval Changes 01
A05 =A000&RD1/2 27.09.11 in213825 Approval Changes 01 A05 =A001+P028&WD1/10 27.09.11 in213825 Approval Changes 01
A05 =A000&RD1/5 27.09.11 in213825 Approval Changes 01 A05 =A001&TD1/3 27.09.11 in213825 Approval Changes 01
A05 =A000&RD1/6 27.09.11 in213825 Approval Changes 01 A05 =A001&TD1/4 27.09.11 in213825 Approval Changes 01
A05 =A000&RD1/7 27.09.11 in213825 Approval Changes 01 A05 =A001&TD1/5 27.09.11 in213825 Approval Changes 01
A05 =A000&RD1/8 27.09.11 in213825 Approval Changes 01 A05 =S001&EQ1/1 27.09.11 in213825 Approval Changes 01
A05 =A000&RD1/9 27.09.11 in213825 Approval Changes 01 A05 =S001&EQ1/2 27.09.11 in213825 Approval Changes 01
A05 =A000&RD1/10 27.09.11 in213825 Approval Changes 01 A05 =S011+P019&WD1/9 27.09.11 in213825 Approval Changes 01
A05 =A000&RD1/11 27.09.11 in213825 Approval Changes 01 A05 =S001&EQ1/3 27.09.11 in213825 Approval Changes 01
A05 =A000&RD1/12 27.09.11 in213825 Approval Changes 01 A05 =J001&EQ1/1 27.09.11 in213825 Approval Changes 01
A05 =A000&CMD1/1 27.09.11 in213825 Approval Changes 01 A05 =S001&EQ1/4 27.09.11 in213825 Approval Changes 01
A05 =A000&CMD1/2 27.09.11 in213825 Approval Changes 01 A05 =S001+P001&WD1/1 27.09.11 in213825 Approval Changes 01
A05 =A000&CMD1/3 27.09.11 in213825 Approval Changes 01 A05 =S001+P003&WD1/3 27.09.11 in213825 Approval Changes 01
A05 =A000&CMD1/5 27.09.11 in213825 Approval Changes 01 A05 =S001+P003&WD1/4 27.09.11 in213825 Approval Changes 01
A05 =A000&CMD1/6 27.09.11 in213825 Approval Changes 01 A05 =S001+P001&WD1/5 27.09.11 in213825 Approval Changes 01
A05 =A000&CMD1/7 27.09.11 in213825 Approval Changes 01 A05 =S001+P004&WD1/8 27.09.11 in213825 Approval Changes 01
A05 =A000&CMD1/11 27.09.11 in213825 Approval Changes 01 A05 =S001+P005&WD1/9 27.09.11 in213825 Approval Changes 01
A05 =A000&CMD1/12 27.09.11 in213825 Approval Changes 01 A05 =S001+P003&WD1/10 27.09.11 in213825 Approval Changes 01
A05 =A000&CMD1/17 27.09.11 in213825 Approval Changes 01 A05 =S001+P003&WD1/11 27.09.11 in213825 Approval Changes 01
A05 =A000&CMD1/18 27.09.11 in213825 Approval Changes 01 A05 =S001+P003&WD1/12 27.09.11 in213825 Approval Changes 01
A05 =A000&CMD1/19 27.09.11 in213825 Approval Changes 01 A05 =S001+P003&WD1/13 27.09.11 in213825 Approval Changes 01
A05 =A000&CMD1/20 27.09.11 in213825 Approval Changes 01 A05 =S001+P003&WD1/14 27.09.11 in213825 Approval Changes 01
A05 =A000&CMD1/21 27.09.11 in213825 Approval Changes 01 A05 =A001+P028&WD1/4 27.09.11 in213825 Approval Changes 01
A05 =A000&CMD1/22 27.09.11 in213825 Approval Changes 01 A05 =A000&SP1/5 27.09.11 in213825 Approval Changes 01
19 21
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/20
Design Document No. - G71053- J5663 (EF-1) Page 20
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
A05 =A001+P028&WD1/10 27.09.11 in213825 Approval Changes 01 A05 =A000&RD1/10 27.09.11 in213825 Approval Changes 01
A05 =J001+RS002&WD1/1 27.09.11 in213825 Approval Changes 01 A05 =S001&EQ1/2 27.09.11 in213825 Approval Changes 01
A05 =A001+P027&WD1/2 27.09.11 in213825 Approval Changes 01 A05 =S001&EQ1/1 27.09.11 in213825 Approval Changes 01
A05 =A000&SP1/4 27.09.11 in213825 Approval Changes 01 A05 =A000&RD1/9 27.09.11 in213825 Approval Changes 01
A05 =A000&SP1/5 27.09.11 in213825 Approval Changes 01 A05 =S005&EQ1/1 27.09.11 in213825 Approval Changes 01
A05 =S001+P001&WD1/1 27.09.11 in213825 Approval Changes 01 A05 =A000&RD1/8 27.09.11 in213825 Approval Changes 01
A05 =A001&EQ1/5 27.09.11 in213825 Approval Changes 01 A05 =A001&TD1/6 27.09.11 in213825 Approval Changes 01
A05 =A000&RD1/7 27.09.11 in213825 Approval Changes 01 A05 =A000&RO1/16 27.09.11 in213825 Approval Changes 01
A05 =A000&RD1/2 27.09.11 in213825 Approval Changes 01 A05 =A001+P028&WD1/27 27.09.11 in213825 Approval Changes 01
A05 =S004&TD1/3 27.09.11 in213825 Approval Changes 01 A05 =S001+P003&WD1/4 27.09.11 in213825 Approval Changes 01
A05 =A001&EQ1/4 27.09.11 in213825 Approval Changes 01 A05 =S004+P013&WD1/2 27.09.11 in213825 Approval Changes 01
A05 =A000&RD1/4 27.09.11 in213825 Approval Changes 01 A05 =A000&CMD1/5 27.09.11 in213825 Approval Changes 01
A05 =A001&TD1/3 27.09.11 in213825 Approval Changes 01 A05 =A001+P029&WD1/20 27.09.11 in213825 Approval Changes 01
A05 =A000&CMD1/6 27.09.11 in213825 Approval Changes 01 A05 =S011+P019&WD1/2 27.09.11 in213825 Approval Changes 01
A05 =A001+P028&WD1/10 27.09.11 in213825 Approval Changes 01 A05 =S009+P026&WD1/2 27.09.11 in213825 Approval Changes 01
A05 =A001&TD1/1 27.09.11 in213825 Approval Changes 01 A05 =C001+P015&WD1/39 27.09.11 in213825 Approval Changes 01
A05 =S001&EQ1/3 27.09.11 in213825 Approval Changes 01 A05 =S001+P003&WD1/17 27.09.11 in213825 Approval Changes 01
A05 =A000&RD1/3 27.09.11 in213825 Approval Changes 01 A05 =S008+P022&WD1/2 27.09.11 in213825 Approval Changes 01
A05 =A001&EQ1/3 27.09.11 in213825 Approval Changes 01 A05 =C001+P015&WD1/9 27.09.11 in213825 Approval Changes 01
A05 =A001&TD1/2 27.09.11 in213825 Approval Changes 01 A05 =A001+P027&WD1/2 27.09.11 in213825 Approval Changes 01
A05 =A001&TD1/5 27.09.11 in213825 Approval Changes 01 A05 =S003+P017&WD1/3 27.09.11 in213825 Approval Changes 01
A05 =A000&RD1/6 27.09.11 in213825 Approval Changes 01 A05 =S007+P024&WD1/3 27.09.11 in213825 Approval Changes 01
A05 =A000&RD1/5 27.09.11 in213825 Approval Changes 01 A05 =S001+P001&WD1/1 27.09.11 in213825 Approval Changes 01
A05 =S002&EQ1/3 27.09.11 in213825 Approval Changes 01 A05 =S006+P018&WD1/2 27.09.11 in213825 Approval Changes 01
A05 =A000&CMD1/5 27.09.11 in213825 Approval Changes 01 A05 =S010+P020&WD1/2 27.09.11 in213825 Approval Changes 01
A05 =S001&EQ1/4 27.09.11 in213825 Approval Changes 01 A05 =A001+P028&WD1/10 27.09.11 in213825 Approval Changes 01
A05 =A001&EQ1/2 27.09.11 in213825 Approval Changes 01 A05 =A000&CMD1/21 27.09.11 in213825 Approval Changes 01
A05 =A001&TD1/4 27.09.11 in213825 Approval Changes 01 A05 =A000&CMD1/19 27.09.11 in213825 Approval Changes 01
A05 =A000&CMD1/3 27.09.11 in213825 Approval Changes 01 A05 =A000&CMD1/32 27.09.11 in213825 Approval Changes 01
A05 =S008&TD1/1 27.09.11 in213825 Approval Changes 01 A05 =A000&CMD1/31 27.09.11 in213825 Approval Changes 01
A05 =A001&EQ1/1 27.09.11 in213825 Approval Changes 01 A05 =A000&CMD1/12 27.09.11 in213825 Approval Changes 01
A05 =S001&TD1/1 27.09.11 in213825 Approval Changes 01 A05 =A000&CMD1/5 27.09.11 in213825 Approval Changes 01
A05 =A000&RD1/1 27.09.11 in213825 Approval Changes 01 A05 =A000&CMD1/17 27.09.11 in213825 Approval Changes 01
A05 =A001+P028&WD1/7 27.09.11 in213825 Approval Changes 01 A05 =A000&CMD1/36 27.09.11 in213825 Approval Changes 01
A05 =A000&RD1/12 27.09.11 in213825 Approval Changes 01 A05 =A000&CMD1/22 27.09.11 in213825 Approval Changes 01
A05 =A001&TD1/6 27.09.11 in213825 Approval Changes 01 X04 =A000&CMD1/38 20.09.11 in213825 Changes (CEL 04)
A05 =A000&RD1/11 27.09.11 in213825 Approval Changes 01 X04 =A000&CMD1/39 20.09.11 in213825 Changes (CEL 04)
A05 =S002+P003&WD1/4 27.09.11 in213825 Approval Changes 01 X04 =A000&RD1/4 20.09.11 in213825 Changes (CEL 04)
20 22
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/21
Design Document No. - G71053- J5663 (EF-1) Page 21
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
X04 =A001&EQ1/4 20.09.11 in213825 Changes (CEL 04) X04 =A000&RD1/3 20.09.11 in213825 Changes (CEL 04)
X04 =A001&TD1/1 20.09.11 in213825 Changes (CEL 04) X04 =A000&RD1/10 20.09.11 in213825 Changes (CEL 04)
X04 =A000&RD1/3 20.09.11 in213825 Changes (CEL 04) X04 =S008&TD1/1 20.09.11 in213825 Changes (CEL 04)
X04 =A001&EQ1/3 20.09.11 in213825 Changes (CEL 04) X04 =S003&EQ1/1 20.09.11 in213825 Changes (CEL 04)
X04 =A001+P028&WD1/10 20.09.11 in213825 Changes (CEL 04) X04 =A000&RD1/11 20.09.11 in213825 Changes (CEL 04)
X04 =A001+P028&WD1/9 20.09.11 in213825 Changes (CEL 04) X04 =S004&EQ1/1 20.09.11 in213825 Changes (CEL 04)
X04 =A001&TD1/4 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/39 20.09.11 in213825 Changes (CEL 04)
X04 =A000&RD1/8 20.09.11 in213825 Changes (CEL 04) X04 =S011&EQ1/1 20.09.11 in213825 Changes (CEL 04)
X04 =A000&RD1/2 20.09.11 in213825 Changes (CEL 04) X04 =S002&EQ1/4 20.09.11 in213825 Changes (CEL 04)
X04 =S004&TD1/3 20.09.11 in213825 Changes (CEL 04) X04 =S008&EQ1/1 20.09.11 in213825 Changes (CEL 04)
X04 =A001&TD1/5 20.09.11 in213825 Changes (CEL 04) X04 =A000&RD1/2 20.09.11 in213825 Changes (CEL 04)
X04 =A000&RD1/10 20.09.11 in213825 Changes (CEL 04) X04 =A000&RD1/12 20.09.11 in213825 Changes (CEL 04)
X04 =A000&RD1/5 20.09.11 in213825 Changes (CEL 04) X04 =A000&RD1/4 20.09.11 in213825 Changes (CEL 04)
X04 =A000&RD1/9 20.09.11 in213825 Changes (CEL 04) X04 =S001&EQ1/2 20.09.11 in213825 Changes (CEL 04)
X04 =A001&TD1/3 20.09.11 in213825 Changes (CEL 04) X04 =S001&TD1/1 20.09.11 in213825 Changes (CEL 04)
X04 =A001+P027&WD1/2 20.09.11 in213825 Changes (CEL 04) X04 =A000&RD1/5 20.09.11 in213825 Changes (CEL 04)
X04 =A000&RD1/1 20.09.11 in213825 Changes (CEL 04) X04 =S002&EQ1/3 20.09.11 in213825 Changes (CEL 04)
X04 =A000&RD1/6 20.09.11 in213825 Changes (CEL 04) X04 =S007&EQ1/1 20.09.11 in213825 Changes (CEL 04)
X04 =A000&RD1/7 20.09.11 in213825 Changes (CEL 04) X04 =J001&EQ1/1 20.09.11 in213825 Changes (CEL 04)
X04 =A000&RD1/11 20.09.11 in213825 Changes (CEL 04) X04 =A001&EQ1/1 20.09.11 in213825 Changes (CEL 04)
X04 =S001&TD1/1 20.09.11 in213825 Changes (CEL 04) X04 =A000&RD1/6 20.09.11 in213825 Changes (CEL 04)
X04 =A000&RD1/12 20.09.11 in213825 Changes (CEL 04) X04 =S001&EQ1/1 20.09.11 in213825 Changes (CEL 04)
X04 =A001&EQ1/1 20.09.11 in213825 Changes (CEL 04) X04 =S006&EQ1/1 20.09.11 in213825 Changes (CEL 04)
X04 =A001&EQ1/5 20.09.11 in213825 Changes (CEL 04) X04 =J002&EQ1/1 20.09.11 in213825 Changes (CEL 04)
X04 =S001+P001&WD1/1 20.09.11 in213825 Changes (CEL 04) X04 =S010&EQ1/1 20.09.11 in213825 Changes (CEL 04)
X04 =A001+P029&WD1/19 20.09.11 in213825 Changes (CEL 04) X04 =A001&EQ1/2 20.09.11 in213825 Changes (CEL 04)
X04 =A001&EQ1/2 20.09.11 in213825 Changes (CEL 04) X04 =S009&EQ1/1 20.09.11 in213825 Changes (CEL 04)
X04 =S008&TD1/1 20.09.11 in213825 Changes (CEL 04) X04 =A000&RD1/9 20.09.11 in213825 Changes (CEL 04)
X04 =A000&RO1/15 20.09.11 in213825 Changes (CEL 04) X04 =A000&RO1/13 20.09.11 in213825 Changes (CEL 04)
X04 =S004&TD1/3 20.09.11 in213825 Changes (CEL 04) X04 =A000&RO1/14 20.09.11 in213825 Changes (CEL 04)
X04 =A000&RD1/7 20.09.11 in213825 Changes (CEL 04) X04 =J001+RS002&WD1/1 20.09.11 in213825 Changes (CEL 04)
X04 =S001&EQ1/4 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/39 20.09.11 in213825 Changes (CEL 04)
X04 =S005&EQ1/1 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/38 20.09.11 in213825 Changes (CEL 04)
X04 =A000&RD1/8 20.09.11 in213825 Changes (CEL 04) X04 =J001+RS002&WD1/2 20.09.11 in213825 Changes (CEL 04)
X04 =S001&EQ1/3 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/17 20.09.11 in213825 Changes (CEL 04)
X04 =A000&RD1/1 20.09.11 in213825 Changes (CEL 04) X04 =S001+P005&WD1/9 20.09.11 in213825 Changes (CEL 04)
X04 =S002&EQ1/1 20.09.11 in213825 Changes (CEL 04) X04 =A001&EQ1/4 20.09.11 in213825 Changes (CEL 04)
X04 =S002&EQ1/2 20.09.11 in213825 Changes (CEL 04) X04 =A001+P028&WD1/21 20.09.11 in213825 Changes (CEL 04)
21 23
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/22
Design Document No. - G71053- J5663 (EF-1) Page 22
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
X04 =A000&RD1/4 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/30 20.09.11 in213825 Changes (CEL 04)
X04 =S003&EQ1/1 20.09.11 in213825 Changes (CEL 04) X04 =J002&EQ1/1 20.09.11 in213825 Changes (CEL 04)
X04 =S008&TD1/1 20.09.11 in213825 Changes (CEL 04) X04 =A001+P027&WD1/2 20.09.11 in213825 Changes (CEL 04)
X04 =A001&TD1/2 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/8 20.09.11 in213825 Changes (CEL 04)
X04 =S002&EQ1/3 20.09.11 in213825 Changes (CEL 04) X04 =S005&EQ1/1 20.09.11 in213825 Changes (CEL 04)
X04 =A001+P028&WD1/25 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/21 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/6 20.09.11 in213825 Changes (CEL 04) X04 =L001&EQ1/1 20.09.11 in213825 Changes (CEL 04)
X04 =A001&EQ1/3 20.09.11 in213825 Changes (CEL 04) X04 =A001+P028&WD1/24 20.09.11 in213825 Changes (CEL 04)
X04 =S004&TD1/1 20.09.11 in213825 Changes (CEL 04) X04 =A000&RD1/8 20.09.11 in213825 Changes (CEL 04)
X04 =A000&RD1/5 20.09.11 in213825 Changes (CEL 04) X04 =S001+P003&WD1/15 20.09.11 in213825 Changes (CEL 04)
X04 =A001&EQ1/2 20.09.11 in213825 Changes (CEL 04) X04 =S001+P003&WD1/11 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/23 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/9 20.09.11 in213825 Changes (CEL 04)
X04 =A001&EQ1/1 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/15 20.09.11 in213825 Changes (CEL 04)
X04 =S006&EQ1/1 20.09.11 in213825 Changes (CEL 04) X04 =J001&EQ1/1 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/7 20.09.11 in213825 Changes (CEL 04) X04 =S011&TD1/1 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/10 20.09.11 in213825 Changes (CEL 04) X04 =S001&EQ1/1 20.09.11 in213825 Changes (CEL 04)
X04 =S004&TD1/2 20.09.11 in213825 Changes (CEL 04) X04 =A000&RD1/9 20.09.11 in213825 Changes (CEL 04)
X04 =S001&EQ1/3 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/37 20.09.11 in213825 Changes (CEL 04)
X04 =S001&TD1/1 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/29 20.09.11 in213825 Changes (CEL 04)
X04 =S008&TD1/2 20.09.11 in213825 Changes (CEL 04) X04 =A001&TD1/4 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/16 20.09.11 in213825 Changes (CEL 04) X04 =S002&EQ1/2 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/39 20.09.11 in213825 Changes (CEL 04) X04 =A001+P028&WD1/26 20.09.11 in213825 Changes (CEL 04)
X04 =A001+P028&WD1/11 20.09.11 in213825 Changes (CEL 04) X04 =A001+P031&WD1/3 20.09.11 in213825 Changes (CEL 04)
X04 =S001+P003&WD1/14 20.09.11 in213825 Changes (CEL 04) X04 =A001+P028&WD1/4 20.09.11 in213825 Changes (CEL 04)
X04 =A001&EQ1/5 20.09.11 in213825 Changes (CEL 04) X04 =A001+P028&WD1/5 20.09.11 in213825 Changes (CEL 04)
X04 =J002&TD1/1 20.09.11 in213825 Changes (CEL 04) X04 =S001+P003&WD1/4 20.09.11 in213825 Changes (CEL 04)
X04 =A001+P027&WD1/1 20.09.11 in213825 Changes (CEL 04) X04 =A000&RD1/10 20.09.11 in213825 Changes (CEL 04)
X04 =S004&TD1/3 20.09.11 in213825 Changes (CEL 04) X04 =A001+P028&WD1/13 20.09.11 in213825 Changes (CEL 04)
X04 =A000&RD1/6 20.09.11 in213825 Changes (CEL 04) X04 =A001+P028&WD1/6 20.09.11 in213825 Changes (CEL 04)
X04 =A001+P028&WD1/12 20.09.11 in213825 Changes (CEL 04) X04 =S001&EQ1/4 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/22 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/14 20.09.11 in213825 Changes (CEL 04)
X04 =A001&TD1/3 20.09.11 in213825 Changes (CEL 04) X04 =S001+P003&WD1/12 20.09.11 in213825 Changes (CEL 04)
X04 =J002+RS003&WD1/2 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/13 20.09.11 in213825 Changes (CEL 04)
X04 =L001&TD1/3 20.09.11 in213825 Changes (CEL 04) X04 =S009&EQ1/1 20.09.11 in213825 Changes (CEL 04)
X04 =A001&TD1/1 20.09.11 in213825 Changes (CEL 04) X04 =A000&RD1/11 20.09.11 in213825 Changes (CEL 04)
X04 =L001&TD1/2 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/20 20.09.11 in213825 Changes (CEL 04)
X04 =A000&RD1/7 20.09.11 in213825 Changes (CEL 04) X04 =A001+P028&WD1/14 20.09.11 in213825 Changes (CEL 04)
X04 =L001&TD1/1 20.09.11 in213825 Changes (CEL 04) X04 =A001+P028&WD1/27 20.09.11 in213825 Changes (CEL 04)
22 24
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/23
Design Document No. - G71053- J5663 (EF-1) Page 23
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
X04 =A000&CMD1/28 20.09.11 in213825 Changes (CEL 04) X04 =S001+P004&WD1/8 20.09.11 in213825 Changes (CEL 04)
X04 =S011&EQ1/1 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/3 20.09.11 in213825 Changes (CEL 04)
X04 =S001+P003&WD1/10 20.09.11 in213825 Changes (CEL 04) X04 =A001+P029&WD1/19 20.09.11 in213825 Changes (CEL 04)
X04 =S003&TD1/1 20.09.11 in213825 Changes (CEL 04) X04 =A001&TD1/5 20.09.11 in213825 Changes (CEL 04)
X04 =A001+P028&WD1/7 20.09.11 in213825 Changes (CEL 04) X04 =S001&EQ1/2 20.09.11 in213825 Changes (CEL 04)
X04 =A001+P028&WD1/23 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/4 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/12 20.09.11 in213825 Changes (CEL 04) X04 =S010&EQ1/1 20.09.11 in213825 Changes (CEL 04)
X04 =A001+P028&WD1/8 20.09.11 in213825 Changes (CEL 04) X04 =A001+P028&WD1/22 20.09.11 in213825 Changes (CEL 04)
X04 =S008&EQ1/1 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/24 20.09.11 in213825 Changes (CEL 04)
X04 =S001+P003&WD1/13 20.09.11 in213825 Changes (CEL 04) X04 =S007&EQ1/1 20.09.11 in213825 Changes (CEL 04)
X04 =A001+P028&WD1/9 20.09.11 in213825 Changes (CEL 04) X04 =A001+P028&WD1/10 20.09.11 in213825 Changes (CEL 04)
X04 =A000&RD1/12 20.09.11 in213825 Changes (CEL 04) X04 =A000&RD1/3 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/35 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/5 20.09.11 in213825 Changes (CEL 04)
X04 =S010&TD1/2 20.09.11 in213825 Changes (CEL 04) X04 =A001+P029&WD1/20 20.09.11 in213825 Changes (CEL 04)
X04 =S010&TD1/1 20.09.11 in213825 Changes (CEL 04) X04 =S002&EQ1/4 20.09.11 in213825 Changes (CEL 04)
X04 =S002&EQ1/1 20.09.11 in213825 Changes (CEL 04) X04 =A001&EQ1/5 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/27 20.09.11 in213825 Changes (CEL 04) X04 =A001&EQ1/3 20.09.11 in213825 Changes (CEL 04)
X04 =S001+P003&WD1/16 20.09.11 in213825 Changes (CEL 04) X04 =A001&EQ1/4 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/19 20.09.11 in213825 Changes (CEL 04) X04 =A001&EQ1/2 20.09.11 in213825 Changes (CEL 04)
X04 =A001+P028&WD1/15 20.09.11 in213825 Changes (CEL 04) X04 =A000&RO1/11 20.09.11 in213825 Changes (CEL 04)
X04 =S004&EQ1/1 20.09.11 in213825 Changes (CEL 04) X04 =A000&RO1/12 20.09.11 in213825 Changes (CEL 04)
X04 =A000&RD1/1 20.09.11 in213825 Changes (CEL 04) X04 =A001&EQ1/1 20.09.11 in213825 Changes (CEL 04)
X04 =S001+P001&WD1/6 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/38 20.09.11 in213825 Changes (CEL 04)
X04 =A000&NP1/2 20.09.11 in213825 Changes (CEL 04) X04 =A001+P028&WD1/11 20.09.11 in213825 Changes (CEL 04)
X04 =A001+P028&WD1/17 20.09.11 in213825 Changes (CEL 04) X04 =A001&TD1/5 20.09.11 in213825 Changes (CEL 04)
X04 =A001+P028&WD1/18 20.09.11 in213825 Changes (CEL 04) X04 =A001+P028&WD1/10 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/26 20.09.11 in213825 Changes (CEL 04) X04 =A001+P028&WD1/9 20.09.11 in213825 Changes (CEL 04)
X04 =A000&NP1/3 20.09.11 in213825 Changes (CEL 04) X04 =A001+P028&WD1/8 20.09.11 in213825 Changes (CEL 04)
X04 =S008&TD1/3 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/23 20.09.11 in213825 Changes (CEL 04)
X04 =A000&NP1/1 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/31 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/18 20.09.11 in213825 Changes (CEL 04) X04 =A001+P028&WD1/7 20.09.11 in213825 Changes (CEL 04)
X04 =S001+P002&WD1/7 20.09.11 in213825 Changes (CEL 04) X04 =A001+P028&WD1/6 20.09.11 in213825 Changes (CEL 04)
X04 =A000&RD1/2 20.09.11 in213825 Changes (CEL 04) X04 =A001+P028&WD1/5 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/34 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/35 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/11 20.09.11 in213825 Changes (CEL 04) X04 =A001+P028&WD1/4 20.09.11 in213825 Changes (CEL 04)
X04 =S001+P003&WD1/17 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/39 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/25 20.09.11 in213825 Changes (CEL 04) X04 =A001+P031&WD1/3 20.09.11 in213825 Changes (CEL 04)
X04 =S002&EQ1/4 20.09.11 in213825 Changes (CEL 04) X04 =A001&TD1/4 20.09.11 in213825 Changes (CEL 04)
23 25
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/24
Design Document No. - G71053- J5663 (EF-1) Page 24
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
X04 =A001+P027&WD1/2 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/24 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/27 20.09.11 in213825 Changes (CEL 04) X04 =A001+P028&WD1/14 20.09.11 in213825 Changes (CEL 04)
X04 =A001+P027&WD1/1 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/36 20.09.11 in213825 Changes (CEL 04)
X04 =A001&TD1/3 20.09.11 in213825 Changes (CEL 04) X04 =A001+P028&WD1/13 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/22 20.09.11 in213825 Changes (CEL 04) X04 =A001&TD1/1 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/21 20.09.11 in213825 Changes (CEL 04) X04 =A001+P028&WD1/12 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/38 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/28 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/30 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/14 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/20 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/7 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/19 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/18 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/18 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/4 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/17 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/35 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/16 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/26 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/15 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/10 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/34 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/11 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/14 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/20 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/12 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/15 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/11 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/3 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/10 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/16 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/9 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/8 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/26 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/34 20.09.11 in213825 Changes (CEL 04)
X04 =A001+P028&WD1/22 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/28 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/29 20.09.11 in213825 Changes (CEL 04) X04 =A000&CMD1/37 20.09.11 in213825 Changes (CEL 04)
X04 =A000&CMD1/8 20.09.11 in213825 Changes (CEL 04) X03 =A000&CMD1/34 13.06.11 IN216289 Changes (CEL 03)
X04 =A000&CMD1/7 20.09.11 in213825 Changes (CEL 04) X03 =A000&CMD1/37 13.06.11 IN216289 Changes (CEL 03)
X04 =A001+P028&WD1/21 20.09.11 in213825 Changes (CEL 04) X03 =A000&CMD1/37 13.06.11 IN216289 Changes (CEL 03)
X04 =A000&CMD1/37 20.09.11 in213825 Changes (CEL 04) X03 =A000&CMD1/34 13.06.11 IN216289 Changes (CEL 03)
X04 =A000&CMD1/25 20.09.11 in213825 Changes (CEL 04) X03 =A000&CMD1/37 13.06.11 IN216289 Changes (CEL 03)
X04 =A001+P029&WD1/20 20.09.11 in213825 Changes (CEL 04) X03 =S003&EQ1/1 13.06.11 IN216289 Changes (CEL 03)
X04 =A000&CMD1/5 20.09.11 in213825 Changes (CEL 04) X03 =S008&TD1/1 13.06.11 IN216289 Changes (CEL 03)
X04 =A000&CMD1/4 20.09.11 in213825 Changes (CEL 04) X03 =A000&CMD1/18 13.06.11 IN216289 Changes (CEL 03)
X04 =A001+P029&WD1/19 20.09.11 in213825 Changes (CEL 04) X03 =S003&EQ1/2 13.06.11 IN216289 Changes (CEL 03)
X04 =A000&CMD1/3 20.09.11 in213825 Changes (CEL 04) X03 =S003&EQ1/3 13.06.11 IN216289 Changes (CEL 03)
X04 =A000&CMD1/32 20.09.11 in213825 Changes (CEL 04) X03 =A000&RD1/8 13.06.11 IN216289 Changes (CEL 03)
X04 =A001&TD1/2 20.09.11 in213825 Changes (CEL 04) X03 =A000&CMD1/11 13.06.11 IN216289 Changes (CEL 03)
X04 =A000&CMD1/1 20.09.11 in213825 Changes (CEL 04) X03 =S008&EQ1/1 13.06.11 IN216289 Changes (CEL 03)
X04 =A001+P028&WD1/18 20.09.11 in213825 Changes (CEL 04) X03 =S004&TD1/1 13.06.11 IN216289 Changes (CEL 03)
X04 =A001+P028&WD1/15 20.09.11 in213825 Changes (CEL 04) X03 =A000&CMD1/12 13.06.11 IN216289 Changes (CEL 03)
24 26
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/25
Design Document No. - G71053- J5663 (EF-1) Page 25
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
X03 =A001&TD1/3 13.06.11 IN216289 Changes (CEL 03) X03 =S002&EQ1/3 13.06.11 IN216289 Changes (CEL 03)
X03 =S004&TD1/2 13.06.11 IN216289 Changes (CEL 03) X03 =A000&RD1/5 13.06.11 IN216289 Changes (CEL 03)
X03 =A000&CMD1/25 13.06.11 IN216289 Changes (CEL 03) X03 =S009&EQ1/1 13.06.11 IN216289 Changes (CEL 03)
X03 =S010+P020&WD1/6 13.06.11 IN216289 Changes (CEL 03) X03 =A000&CMD1/20 13.06.11 IN216289 Changes (CEL 03)
X03 =S008&TD1/2 13.06.11 IN216289 Changes (CEL 03) X03 =A000&CMD1/16 13.06.11 IN216289 Changes (CEL 03)
X03 =S003+P016&WD1/7 13.06.11 IN216289 Changes (CEL 03) X03 =S001+P003&WD1/10 13.06.11 IN216289 Changes (CEL 03)
X03 =A000&CMD1/31 13.06.11 IN216289 Changes (CEL 03) X03 =S011&EQ1/1 13.06.11 IN216289 Changes (CEL 03)
X03 =S004+P013&WD1/6 13.06.11 IN216289 Changes (CEL 03) X03 =A000&RD1/6 13.06.11 IN216289 Changes (CEL 03)
X03 =A000&RD1/11 13.06.11 IN216289 Changes (CEL 03) X03 =S007+P024&WD1/8 13.06.11 IN216289 Changes (CEL 03)
X03 =S010&TD1/2 13.06.11 IN216289 Changes (CEL 03) X03 =S004&EQ1/1 13.06.11 IN216289 Changes (CEL 03)
X03 =S011+P019&WD1/6 13.06.11 IN216289 Changes (CEL 03) X03 =A000&CMD1/27 13.06.11 IN216289 Changes (CEL 03)
X03 =S008&TD1/3 13.06.11 IN216289 Changes (CEL 03) X03 =S001&EQ1/4 13.06.11 IN216289 Changes (CEL 03)
X03 =S004&TD1/3 13.06.11 IN216289 Changes (CEL 03) X03 =A000&RD1/7 13.06.11 IN216289 Changes (CEL 03)
X03 =A000&CMD1/17 13.06.11 IN216289 Changes (CEL 03) X03 =S001&EQ1/3 13.06.11 IN216289 Changes (CEL 03)
X03 =S011&TD1/1 13.06.11 IN216289 Changes (CEL 03) X03 =S001&TD1/1 13.06.11 IN216289 Changes (CEL 03)
X03 =A000&RD1/12 13.06.11 IN216289 Changes (CEL 03) X03 =S009+P026&WD1/6 13.06.11 IN216289 Changes (CEL 03)
X03 =S007&EQ1/1 13.06.11 IN216289 Changes (CEL 03) X03 =S008&EQ1/2 13.06.11 IN216289 Changes (CEL 03)
X03 =A000&RD1/3 13.06.11 IN216289 Changes (CEL 03) X03 =A000&RD1/2 13.06.11 IN216289 Changes (CEL 03)
X03 =S008&EQ1/3 13.06.11 IN216289 Changes (CEL 03) X03 =A000&CMD1/19 13.06.11 IN216289 Changes (CEL 03)
X03 =S006&EQ1/2 13.06.11 IN216289 Changes (CEL 03) X03 =A000&RD1/1 13.06.11 IN216289 Changes (CEL 03)
X03 =A000&CMD1/22 13.06.11 IN216289 Changes (CEL 03) X03 =A001&TD1/2 13.06.11 IN216289 Changes (CEL 03)
X03 =A000&RD1/4 13.06.11 IN216289 Changes (CEL 03) X03 =A000&RO1/10 13.06.11 IN216289 Changes (CEL 03)
X03 =A000&CMD1/21 13.06.11 IN216289 Changes (CEL 03) X03 =A000&CMD1/7 13.06.11 IN216289 Changes (CEL 03)
X03 =S006&EQ1/1 13.06.11 IN216289 Changes (CEL 03) X03 =A000&CMD1/26 13.06.11 IN216289 Changes (CEL 03)
X03 =A000&CMD1/30 13.06.11 IN216289 Changes (CEL 03) X03 =A000&CMD1/11 13.06.11 IN216289 Changes (CEL 03)
X03 =A000&RD1/9 13.06.11 IN216289 Changes (CEL 03) X03 =A000&CMD1/10 13.06.11 IN216289 Changes (CEL 03)
X03 =S006+P018&WD1/6 13.06.11 IN216289 Changes (CEL 03) X03 =A000&CMD1/18 13.06.11 IN216289 Changes (CEL 03)
X03 =S005&EQ1/1 13.06.11 IN216289 Changes (CEL 03) X03 =A000&CMD1/8 13.06.11 IN216289 Changes (CEL 03)
X03 =A000&CMD1/4 13.06.11 IN216289 Changes (CEL 03) X03 =A000&CMD1/4 13.06.11 IN216289 Changes (CEL 03)
X03 =A001+P027&WD1/2 13.06.11 IN216289 Changes (CEL 03) X03 =A000&CMD1/16 13.06.11 IN216289 Changes (CEL 03)
X03 =S005&EQ1/2 13.06.11 IN216289 Changes (CEL 03) X03 =A000&CMD1/28 13.06.11 IN216289 Changes (CEL 03)
X03 =S008+P022&WD1/7 13.06.11 IN216289 Changes (CEL 03) X03 =A000&CMD1/20 13.06.11 IN216289 Changes (CEL 03)
X03 =S010&EQ1/1 13.06.11 IN216289 Changes (CEL 03) X03 =A000&CMD1/3 13.06.11 IN216289 Changes (CEL 03)
X03 =A000&CMD1/29 13.06.11 IN216289 Changes (CEL 03) X03 =A000&CMD1/37 13.06.11 IN216289 Changes (CEL 03)
X03 =S002+P008&WD1/11 13.06.11 IN216289 Changes (CEL 03) X03 =A000&CMD1/34 13.06.11 IN216289 Changes (CEL 03)
X03 =S003&TD1/1 13.06.11 IN216289 Changes (CEL 03) X03 =A000&CMD1/35 13.06.11 IN216289 Changes (CEL 03)
X03 =A000&RD1/10 13.06.11 IN216289 Changes (CEL 03) X03 =A000&CMD1/14 13.06.11 IN216289 Changes (CEL 03)
X03 =S005+P012&WD1/8 13.06.11 IN216289 Changes (CEL 03) X03 =A000&CMD1/15 13.06.11 IN216289 Changes (CEL 03)
25 27
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/26
Design Document No. - G71053- J5663 (EF-1) Page 26
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
X03 =A000&CMD1/18 13.06.11 IN216289 Changes (CEL 03) X02 =A001&TD1/1 05.05.11 IN216289 Changes (CEL 02)
X03 =A000&CMD1/11 13.06.11 IN216289 Changes (CEL 03) X02 =A000&RD1/5 05.05.11 IN216289 Changes (CEL 02)
X03 =A000&CMD1/14 13.06.11 IN216289 Changes (CEL 03) X02 =S003+P016&WD1/7 05.05.11 IN216289 Changes (CEL 02)
X03 =A000&CMD1/20 13.06.11 IN216289 Changes (CEL 03) X02 =S010&TD1/2 05.05.11 IN216289 Changes (CEL 02)
X03 =A000&CMD1/37 13.06.11 IN216289 Changes (CEL 03) X02 =A000&RD1/8 05.05.11 IN216289 Changes (CEL 02)
X03 =A000&CMD1/35 13.06.11 IN216289 Changes (CEL 03) X02 =S011&TD1/1 05.05.11 IN216289 Changes (CEL 02)
X03 =A000&CMD1/7 13.06.11 IN216289 Changes (CEL 03) X02 =S001&EQ1/3 05.05.11 IN216289 Changes (CEL 02)
X03 =A000&CMD1/26 13.06.11 IN216289 Changes (CEL 03) X02 =S006&EQ1/1 05.05.11 IN216289 Changes (CEL 02)
X03 =A000&CMD1/10 13.06.11 IN216289 Changes (CEL 03) X02 =A001&TD1/5 05.05.11 IN216289 Changes (CEL 02)
X03 =A000&CMD1/28 13.06.11 IN216289 Changes (CEL 03) X02 =A000&RD1/6 05.05.11 IN216289 Changes (CEL 02)
X03 =A000&CMD1/16 13.06.11 IN216289 Changes (CEL 03) X02 =S006+P018&WD1/6 05.05.11 IN216289 Changes (CEL 02)
X03 =A000&CMD1/3 13.06.11 IN216289 Changes (CEL 03) X02 =S001+P003&WD1/10 05.05.11 IN216289 Changes (CEL 02)
X03 =A000&CMD1/34 13.06.11 IN216289 Changes (CEL 03) X02 =S007&EQ1/1 05.05.11 IN216289 Changes (CEL 02)
X03 =A000&CMD1/8 13.06.11 IN216289 Changes (CEL 03) X02 =A000&RD1/10 05.05.11 IN216289 Changes (CEL 02)
X03 =A000&CMD1/15 13.06.11 IN216289 Changes (CEL 03) X02 =A000&CMD1/36 05.05.11 IN216289 Changes (CEL 02)
X03 =A000&CMD1/4 13.06.11 IN216289 Changes (CEL 03) X02 =A000&RD1/9 05.05.11 IN216289 Changes (CEL 02)
X02 =S004&EQ1/1 05.05.11 IN216289 Changes (CEL 02) X02 =A001+P027&WD1/2 05.05.11 IN216289 Changes (CEL 02)
X02 =S008&EQ1/1 05.05.11 IN216289 Changes (CEL 02) X02 =S007+P024&WD1/8 05.05.11 IN216289 Changes (CEL 02)
X02 =S005+P012&WD1/8 05.05.11 IN216289 Changes (CEL 02) X02 =A000&RD1/3 05.05.11 IN216289 Changes (CEL 02)
X02 =S004&TD1/1 05.05.11 IN216289 Changes (CEL 02) X02 =A000&RD1/7 05.05.11 IN216289 Changes (CEL 02)
X02 =S002&EQ1/3 05.05.11 IN216289 Changes (CEL 02) X02 =A001&TD1/2 05.05.11 IN216289 Changes (CEL 02)
X02 =S005&EQ1/1 05.05.11 IN216289 Changes (CEL 02) X02 =S002+P008&WD1/11 05.05.11 IN216289 Changes (CEL 02)
X02 =S011+P019&WD1/6 05.05.11 IN216289 Changes (CEL 02) X02 =S008&TD1/3 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/33 05.05.11 IN216289 Changes (CEL 02) X02 =S009&EQ1/1 05.05.11 IN216289 Changes (CEL 02)
X02 =S008+P022&WD1/7 05.05.11 IN216289 Changes (CEL 02) X02 =A000&RO1/9 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/31 05.05.11 IN216289 Changes (CEL 02) X02 =A000&RO1/7 05.05.11 IN216289 Changes (CEL 02)
X02 =S001&TD1/1 05.05.11 IN216289 Changes (CEL 02) X02 =A000&RO1/8 05.05.11 IN216289 Changes (CEL 02)
X02 =S010&EQ1/1 05.05.11 IN216289 Changes (CEL 02) X02 =A000&RO1/6 05.05.11 IN216289 Changes (CEL 02)
X02 =S004+P013&WD1/6 05.05.11 IN216289 Changes (CEL 02) X02 =S003&EQ1/1 05.05.11 IN216289 Changes (CEL 02)
X02 =S003&EQ1/1 05.05.11 IN216289 Changes (CEL 02) X02 =S003&EQ1/2 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&RD1/4 05.05.11 IN216289 Changes (CEL 02) X02 =S003&EQ1/3 05.05.11 IN216289 Changes (CEL 02)
X02 =S009+P026&WD1/6 05.05.11 IN216289 Changes (CEL 02) X02 =A001+P028&WD1/26 05.05.11 IN216289 Changes (CEL 02)
X02 =S011&EQ1/1 05.05.11 IN216289 Changes (CEL 02) X02 =L001&TD1/3 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&RD1/12 05.05.11 IN216289 Changes (CEL 02) X02 =C001&EQ1/1 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&RD1/2 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/39 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&RD1/1 05.05.11 IN216289 Changes (CEL 02) X02 =A001&TD1/3 05.05.11 IN216289 Changes (CEL 02)
X02 =S010+P020&WD1/6 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/1 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&RD1/11 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/2 05.05.11 IN216289 Changes (CEL 02)
26 28
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/27
Design Document No. - G71053- J5663 (EF-1) Page 27
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
X02 =C001+P015&WD1/3 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/16 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/4 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/28 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/38 05.05.11 IN216289 Changes (CEL 02) X02 =S004&EQ1/1 05.05.11 IN216289 Changes (CEL 02)
X02 =S003+P016&WD1/7 05.05.11 IN216289 Changes (CEL 02) X02 =S007&EQ1/3 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/5 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/29 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/6 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/34 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/7 05.05.11 IN216289 Changes (CEL 02) X02 =S004&EQ1/2 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&RD1/6 05.05.11 IN216289 Changes (CEL 02) X02 =A001&TD1/2 05.05.11 IN216289 Changes (CEL 02)
X02 =S001&EQ1/1 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/30 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/8 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/33 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/9 05.05.11 IN216289 Changes (CEL 02) X02 =A000&RD1/4 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/37 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/31 05.05.11 IN216289 Changes (CEL 02)
X02 =S003+P017&WD1/10 05.05.11 IN216289 Changes (CEL 02) X02 =S002&EQ1/3 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/10 05.05.11 IN216289 Changes (CEL 02) X02 =S001&EQ1/2 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/11 05.05.11 IN216289 Changes (CEL 02) X02 =S004+P013&WD1/6 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/12 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/32 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/13 05.05.11 IN216289 Changes (CEL 02) X02 =S007&EQ1/2 05.05.11 IN216289 Changes (CEL 02)
X02 =S008&TD1/3 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/33 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/15 05.05.11 IN216289 Changes (CEL 02) X02 =A000&RD1/3 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/16 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/32 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/17 05.05.11 IN216289 Changes (CEL 02) X02 =A001+P028&WD1/10 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/36 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/34 05.05.11 IN216289 Changes (CEL 02)
X02 =S003+P016&WD1/15 05.05.11 IN216289 Changes (CEL 02) X02 =S004+P013&WD1/11 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/18 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/35 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/19 05.05.11 IN216289 Changes (CEL 02) X02 =S007&EQ1/1 05.05.11 IN216289 Changes (CEL 02)
X02 =S003+P016&WD1/16 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/36 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/20 05.05.11 IN216289 Changes (CEL 02) X02 =S004&TD1/1 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/21 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/17 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/22 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/31 05.05.11 IN216289 Changes (CEL 02)
X02 =S001+P001&WD1/5 05.05.11 IN216289 Changes (CEL 02) X02 =S004&TD1/2 05.05.11 IN216289 Changes (CEL 02)
X02 =S003&TD1/1 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/37 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/23 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/38 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/24 05.05.11 IN216289 Changes (CEL 02) X02 =S004&TD1/3 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/25 05.05.11 IN216289 Changes (CEL 02) X02 =A000&RD1/2 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/26 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/39 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/35 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/40 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&RD1/5 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/41 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/27 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/42 05.05.11 IN216289 Changes (CEL 02)
27 29
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/28
Design Document No. - G71053- J5663 (EF-1) Page 28
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
X02 =A000&CMD1/30 05.05.11 IN216289 Changes (CEL 02) X02 =A001&TD1/4 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/43 05.05.11 IN216289 Changes (CEL 02) X02 =S002+P008&WD1/11 05.05.11 IN216289 Changes (CEL 02)
X02 =S005&EQ1/1 05.05.11 IN216289 Changes (CEL 02) X02 =S009&EQ1/1 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/44 05.05.11 IN216289 Changes (CEL 02) X02 =A001+P027&WD1/2 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/45 05.05.11 IN216289 Changes (CEL 02) X02 =S006+P018&WD1/6 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/46 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/25 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/47 05.05.11 IN216289 Changes (CEL 02) X02 =S002+P009&WD1/13 05.05.11 IN216289 Changes (CEL 02)
X02 =S005&EQ1/2 05.05.11 IN216289 Changes (CEL 02) X02 =J001&EQ1/1 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/48 05.05.11 IN216289 Changes (CEL 02) X02 =S002+P001&WD1/15 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/29 05.05.11 IN216289 Changes (CEL 02) X02 =J001&TD1/1 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/49 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/21 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/50 05.05.11 IN216289 Changes (CEL 02) X02 =J002&EQ1/1 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/51 05.05.11 IN216289 Changes (CEL 02) X02 =A001+P027&WD1/1 05.05.11 IN216289 Changes (CEL 02)
X02 =A001&TD1/1 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/24 05.05.11 IN216289 Changes (CEL 02)
X02 =S005+P012&WD1/8 05.05.11 IN216289 Changes (CEL 02) X02 =S009&EQ1/2 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/52 05.05.11 IN216289 Changes (CEL 02) X02 =S006&EQ1/2 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/53 05.05.11 IN216289 Changes (CEL 02) X02 =J002&TD1/1 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/54 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/22 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/55 05.05.11 IN216289 Changes (CEL 02) X02 =Z001&EQ1/1 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/28 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/23 05.05.11 IN216289 Changes (CEL 02)
X02 =C001&PCD1/1 05.05.11 IN216289 Changes (CEL 02) X02 =S006&EQ1/1 05.05.11 IN216289 Changes (CEL 02)
X02 =C001&PCD1/2 05.05.11 IN216289 Changes (CEL 02) X02 =S008&TD1/1 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&RD1/1 05.05.11 IN216289 Changes (CEL 02) X02 =S008+P022&WD1/14 05.05.11 IN216289 Changes (CEL 02)
X02 =C001&PCD1/3 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/7 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/18 05.05.11 IN216289 Changes (CEL 02) X02 =A001+P028&WD1/23 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/8 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/9 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/27 05.05.11 IN216289 Changes (CEL 02) X02 =A001+P028&WD1/24 05.05.11 IN216289 Changes (CEL 02)
X02 =S001+P003&WD1/10 05.05.11 IN216289 Changes (CEL 02) X02 =S009+P026&WD1/6 05.05.11 IN216289 Changes (CEL 02)
X02 =S005+P013&WD1/15 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/6 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/19 05.05.11 IN216289 Changes (CEL 02) X02 =S001&TD1/1 05.05.11 IN216289 Changes (CEL 02)
X02 =S006+P018&WD1/13 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/5 05.05.11 IN216289 Changes (CEL 02)
X02 =A001+P028&WD1/8 05.05.11 IN216289 Changes (CEL 02) X02 =A001+P028&WD1/25 05.05.11 IN216289 Changes (CEL 02)
X02 =A001+P028&WD1/27 05.05.11 IN216289 Changes (CEL 02) X02 =S009+P026&WD1/13 05.05.11 IN216289 Changes (CEL 02)
X02 =S001&EQ1/4 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/10 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/20 05.05.11 IN216289 Changes (CEL 02) X02 =S008+P022&WD1/7 05.05.11 IN216289 Changes (CEL 02)
X02 =C001&TD1/1 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/4 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/26 05.05.11 IN216289 Changes (CEL 02) X02 =S010&EQ1/1 05.05.11 IN216289 Changes (CEL 02)
X02 =A001+P031&WD1/3 05.05.11 IN216289 Changes (CEL 02) X02 =S010&EQ1/2 05.05.11 IN216289 Changes (CEL 02)
28 30
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/29
Design Document No. - G71053- J5663 (EF-1) Page 29
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
X02 =A000&CMD1/3 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/32 05.05.11 IN216289 Changes (CEL 02)
X02 =S001+P003&WD1/17 05.05.11 IN216289 Changes (CEL 02) X02 =S010+P020&WD1/14 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/2 05.05.11 IN216289 Changes (CEL 02) X02 =S009+P026&WD1/13 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&NP1/3 05.05.11 IN216289 Changes (CEL 02) X02 =S006+P018&WD1/13 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/11 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/36 05.05.11 IN216289 Changes (CEL 02)
X02 =S010+P020&WD1/6 05.05.11 IN216289 Changes (CEL 02) X02 =S004+P013&WD1/11 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&NP1/2 05.05.11 IN216289 Changes (CEL 02) X02 =S005+P013&WD1/15 05.05.11 IN216289 Changes (CEL 02)
X02 =S008+P022&WD1/1 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/32 05.05.11 IN216289 Changes (CEL 02)
X02 =S001&EQ1/3 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/31 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&NP1/1 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/36 05.05.11 IN216289 Changes (CEL 02)
X02 =S008&EQ1/3 05.05.11 IN216289 Changes (CEL 02) X02 =S002+P001&WD1/15 05.05.11 IN216289 Changes (CEL 02)
X02 =A001&TD1/5 05.05.11 IN216289 Changes (CEL 02) X02 =S001+P003&WD1/17 05.05.11 IN216289 Changes (CEL 02)
X02 =S008&EQ1/2 05.05.11 IN216289 Changes (CEL 02) X02 =A001+P028&WD1/27 05.05.11 IN216289 Changes (CEL 02)
X02 =S002&EQ1/1 05.05.11 IN216289 Changes (CEL 02) X02 =A001+P028&WD1/26 05.05.11 IN216289 Changes (CEL 02)
X02 =S010+P020&WD1/14 05.05.11 IN216289 Changes (CEL 02) X02 =A001+P028&WD1/25 05.05.11 IN216289 Changes (CEL 02)
X02 =S010&TD1/1 05.05.11 IN216289 Changes (CEL 02) X02 =A001+P028&WD1/24 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&RD1/12 05.05.11 IN216289 Changes (CEL 02) X02 =S008+P022&WD1/14 05.05.11 IN216289 Changes (CEL 02)
X02 =S010&TD1/2 05.05.11 IN216289 Changes (CEL 02) X02 =S007+P024&WD1/16 05.05.11 IN216289 Changes (CEL 02)
X02 =S008&EQ1/1 05.05.11 IN216289 Changes (CEL 02) X02 =A001+P028&WD1/23 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/12 05.05.11 IN216289 Changes (CEL 02) X02 =S003+P016&WD1/15 05.05.11 IN216289 Changes (CEL 02)
X02 =S011&EQ1/1 05.05.11 IN216289 Changes (CEL 02) X02 =A000&RD1/12 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&RD1/11 05.05.11 IN216289 Changes (CEL 02) X02 =A000&RD1/11 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/13 05.05.11 IN216289 Changes (CEL 02) X02 =C001&TD1/1 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&RD1/10 05.05.11 IN216289 Changes (CEL 02) X02 =C001&PCD1/3 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/14 05.05.11 IN216289 Changes (CEL 02) X02 =C001&EQ1/1 05.05.11 IN216289 Changes (CEL 02)
X02 =S011+P019&WD1/6 05.05.11 IN216289 Changes (CEL 02) X02 =C001&PCD1/2 05.05.11 IN216289 Changes (CEL 02)
X02 =S007+P024&WD1/16 05.05.11 IN216289 Changes (CEL 02) X02 =C001&PCD1/1 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&RD1/9 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/55 05.05.11 IN216289 Changes (CEL 02)
X02 =S002&EQ1/2 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/54 05.05.11 IN216289 Changes (CEL 02)
X02 =S011&TD1/1 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/53 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&RD1/8 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/52 05.05.11 IN216289 Changes (CEL 02)
X02 =L001&EQ1/1 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/13 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/15 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/23 05.05.11 IN216289 Changes (CEL 02)
X02 =L001&EQ1/2 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/22 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&RD1/7 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/21 05.05.11 IN216289 Changes (CEL 02)
X02 =S007+P024&WD1/8 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/20 05.05.11 IN216289 Changes (CEL 02)
X02 =L001&TD1/1 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/19 05.05.11 IN216289 Changes (CEL 02)
X02 =L001&TD1/2 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/2 05.05.11 IN216289 Changes (CEL 02)
29 31
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/30
Design Document No. - G71053- J5663 (EF-1) Page 30
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
X02 =C001+P015&WD1/51 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/1 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/50 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/6 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/49 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/5 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/48 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/4 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/47 05.05.11 IN216289 Changes (CEL 02) X02 =C001+P015&WD1/3 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/46 05.05.11 IN216289 Changes (CEL 02) X02 =A000&RO1/3 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/45 05.05.11 IN216289 Changes (CEL 02) X02 =A000&RO1/4 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/44 05.05.11 IN216289 Changes (CEL 02) X02 =A000&RO1/5 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/12 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/10 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/11 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/31 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/43 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/18 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/42 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/28 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/41 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/8 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/40 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/32 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/39 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/30 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/38 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/17 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/37 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/16 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/36 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/14 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/35 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/26 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/34 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/24 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/33 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/34 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/32 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/27 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/31 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/25 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/30 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/9 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/29 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/19 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/28 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/15 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/27 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/29 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/26 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/35 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/25 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/7 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/24 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/5 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/18 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/20 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/15 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/11 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/10 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/12 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/9 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/22 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/8 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/37 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/7 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/3 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/17 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/21 05.05.11 IN216289 Changes (CEL 02)
X02 =C001+P015&WD1/16 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/36 05.05.11 IN216289 Changes (CEL 02)
30 32
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/31
Design Document No. - G71053- J5663 (EF-1) Page 31
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
X02 =A000&CMD1/23 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/24 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/4 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/7 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/15 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/4 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/8 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/3 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/27 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/29 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/9 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/9 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/11 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/5 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/19 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/12 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/16 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/30 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/37 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/17 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/36 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/31 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/35 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/18 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/12 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/22 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/7 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/16 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/29 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/20 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/34 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/32 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/32 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/34 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/28 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/35 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/31 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/28 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/20 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/36 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/4 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/37 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/30 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/21 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/22 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/10 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/14 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/26 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/17 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/19 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/24 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/27 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/25 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/14 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/3 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/11 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/21 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/7 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/10 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/8 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/26 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/37 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/23 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/36 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/5 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/35 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/18 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/34 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/25 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/15 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/15 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/32 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/8 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/31 05.05.11 IN216289 Changes (CEL 02)
X02 =A000&CMD1/23 05.05.11 IN216289 Changes (CEL 02) X02 =A000&CMD1/30 05.05.11 IN216289 Changes (CEL 02)
31 33
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/32
Design Document No. - G71053- J5663 (EF-1) Page 32
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
X02 =A000&CMD1/5 05.05.11 IN216289 Changes (CEL 02) X01 =S008&TD1/3 29.04.11 in213825 Changes (CEL 01)
X02 =A000&CMD1/29 05.05.11 IN216289 Changes (CEL 02) X01 =A000&CMD1/23 29.04.11 in213825 Changes (CEL 01)
X02 =A000&CMD1/17 05.05.11 IN216289 Changes (CEL 02) X01 =A000&CMD1/24 29.04.11 in213825 Changes (CEL 01)
X02 =A000&CMD1/22 05.05.11 IN216289 Changes (CEL 02) X01 =A001+P028&WD1/10 29.04.11 in213825 Changes (CEL 01)
X02 =A000&CMD1/16 05.05.11 IN216289 Changes (CEL 02) X01 =S010&EQ1/1 29.04.11 in213825 Changes (CEL 01)
X02 =A000&CMD1/28 05.05.11 IN216289 Changes (CEL 02) X01 =A000&RD1/7 29.04.11 in213825 Changes (CEL 01)
X02 =A000&CMD1/27 05.05.11 IN216289 Changes (CEL 02) X01 =A000&RD1/8 29.04.11 in213825 Changes (CEL 01)
X02 =A000&CMD1/20 05.05.11 IN216289 Changes (CEL 02) X01 =A000&RD1/5 29.04.11 in213825 Changes (CEL 01)
X02 =A000&CMD1/26 05.05.11 IN216289 Changes (CEL 02) X01 =A000&RD1/2 29.04.11 in213825 Changes (CEL 01)
X02 =A000&CMD1/9 05.05.11 IN216289 Changes (CEL 02) X01 =S002&EQ1/3 29.04.11 in213825 Changes (CEL 01)
X02 =A000&CMD1/25 05.05.11 IN216289 Changes (CEL 02) X01 =A000&CMD1/28 29.04.11 in213825 Changes (CEL 01)
X02 =A000&CMD1/19 05.05.11 IN216289 Changes (CEL 02) X01 =A000&RD1/4 29.04.11 in213825 Changes (CEL 01)
X02 =A000&CMD1/24 05.05.11 IN216289 Changes (CEL 02) X01 =S010&EQ1/2 29.04.11 in213825 Changes (CEL 01)
X02 =A000&CMD1/23 05.05.11 IN216289 Changes (CEL 02) X01 =A000&CMD1/15 29.04.11 in213825 Changes (CEL 01)
X02 =A000&CMD1/21 05.05.11 IN216289 Changes (CEL 02) X01 =S007&EQ1/2 29.04.11 in213825 Changes (CEL 01)
X02 =A000&CMD1/12 05.05.11 IN216289 Changes (CEL 02) X01 =S002&EQ1/1 29.04.11 in213825 Changes (CEL 01)
X02 =A000&CMD1/14 05.05.11 IN216289 Changes (CEL 02) X01 =A001+P027&WD1/1 29.04.11 in213825 Changes (CEL 01)
X02 =A000&CMD1/11 05.05.11 IN216289 Changes (CEL 02) X01 =A000&CMD1/11 29.04.11 in213825 Changes (CEL 01)
X02 =A000&CMD1/18 05.05.11 IN216289 Changes (CEL 02) X01 =A001&TD1/1 29.04.11 in213825 Changes (CEL 01)
X02 =A000&CMD1/4 05.05.11 IN216289 Changes (CEL 02) X01 =Z001&WD1/1 29.04.11 in213825 Changes (CEL 01)
X02 =A000&CMD1/3 05.05.11 IN216289 Changes (CEL 02) X01 =A000&RD1/10 29.04.11 in213825 Changes (CEL 01)
X02 =A000&CMD1/10 05.05.11 IN216289 Changes (CEL 02) X01 =A000&CMD1/33 29.04.11 in213825 Changes (CEL 01)
X01 =A000&RD1/1 29.04.11 in213825 Changes (CEL 01) X01 =S003&TD1/1 29.04.11 in213825 Changes (CEL 01)
X01 =S007&EQ1/3 29.04.11 in213825 Changes (CEL 01) X01 =A000&RO1/1 29.04.11 in213825 Changes (CEL 01)
X01 =A000&RD1/3 29.04.11 in213825 Changes (CEL 01) X01 =A000&RO1/2 29.04.11 in213825 Changes (CEL 01)
X01 =A001&TD1/2 29.04.11 in213825 Changes (CEL 01) X01 =A000&CMD1/38 29.04.11 in213825 Changes (CEL 01)
X01 =S002&EQ1/2 29.04.11 in213825 Changes (CEL 01) X01 =A000&CMD1/34 29.04.11 in213825 Changes (CEL 01)
X01 =A001+P031&WD1/3 29.04.11 in213825 Changes (CEL 01) X01 =A000&CMD1/30 29.04.11 in213825 Changes (CEL 01)
X01 =S011&EQ1/1 29.04.11 in213825 Changes (CEL 01) X01 =A000&CMD1/29 29.04.11 in213825 Changes (CEL 01)
X01 =S001&TD1/1 29.04.11 in213825 Changes (CEL 01) X01 =A000&CMD1/20 29.04.11 in213825 Changes (CEL 01)
X01 =A001&TD1/5 29.04.11 in213825 Changes (CEL 01) X01 =A000&CMD1/28 29.04.11 in213825 Changes (CEL 01)
X01 =A001&TD1/4 29.04.11 in213825 Changes (CEL 01) X01 =A000&CMD1/27 29.04.11 in213825 Changes (CEL 01)
X01 =S007&EQ1/1 29.04.11 in213825 Changes (CEL 01) X01 =A000&CMD1/26 29.04.11 in213825 Changes (CEL 01)
X01 =A001&TD1/3 29.04.11 in213825 Changes (CEL 01) X01 =A000&CMD1/24 29.04.11 in213825 Changes (CEL 01)
X01 =A001+P027&WD1/2 29.04.11 in213825 Changes (CEL 01) X01 =A000&CMD1/23 29.04.11 in213825 Changes (CEL 01)
X01 =A000&RD1/6 29.04.11 in213825 Changes (CEL 01) X01 =A000&CMD1/8 29.04.11 in213825 Changes (CEL 01)
X01 =A000&RD1/9 29.04.11 in213825 Changes (CEL 01) X01 =A000&CMD1/14 29.04.11 in213825 Changes (CEL 01)
X01 =Z001&EQ1/1 29.04.11 in213825 Changes (CEL 01) X01 =A000&CMD1/11 29.04.11 in213825 Changes (CEL 01)
32 34
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/33
Design Document No. - G71053- J5663 (EF-1) Page 33
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Revision overview
Rev.
Page name Date Creator Reason for Revision
Index
X01 =A000&CMD1/15 29.04.11 in213825 Changes (CEL 01) X01 =A000&CMD1/27 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/10 29.04.11 in213825 Changes (CEL 01) X01 =A000&CMD1/19 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/9 29.04.11 in213825 Changes (CEL 01) X01 =A000&CMD1/28 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/3 29.04.11 in213825 Changes (CEL 01) X01 =A000&CMD1/8 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/25 29.04.11 in213825 Changes (CEL 01) X01 =A000&CMD1/29 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/16 29.04.11 in213825 Changes (CEL 01) X01 =A000&CMD1/38 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/4 29.04.11 in213825 Changes (CEL 01) X01 =A000&CMD1/39 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/37 29.04.11 in213825 Changes (CEL 01) X01 =A000&CMD1/39 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/35 29.04.11 in213825 Changes (CEL 01) X01 =A000&CMD1/38 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/18 29.04.11 in213825 Changes (CEL 01) X01 =A000&CMD1/38 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/7 29.04.11 in213825 Changes (CEL 01) X01 =L001+RS001&WD1/2 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/10 29.04.11 in213825 Changes (CEL 01) X01 =L001+RS001&WD1/5 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/30 29.04.11 in213825 Changes (CEL 01) X01 =L001+RS001&WD1/6 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/32 29.04.11 in213825 Changes (CEL 01) X01 =L001+RS001&WD1/3 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/34 29.04.11 in213825 Changes (CEL 01) X01 =L001+RS001&WD1/7 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/20 29.04.11 in213825 Changes (CEL 01) X01 =L001+RS001&WD1/8 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/35 29.04.11 in213825 Changes (CEL 01) X01 =L001+RS001&WD1/9 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/3 29.04.11 in213825 Changes (CEL 01) X01 =L001+RS001&WD1/4 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/11 29.04.11 in213825 Changes (CEL 01) X01 =L001+RS001&WD1/10 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/15 29.04.11 in213825 Changes (CEL 01) X01 =L001+RS001&WD1/10 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/14 29.04.11 in213825 Changes (CEL 01) X01 =L001+RS001&WD1/8 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/22 29.04.11 in213825 Changes (CEL 01) X01 =L001+RS001&WD1/7 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/12 29.04.11 in213825 Changes (CEL 01) X01 =L001+RS001&WD1/6 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/23 29.04.11 in213825 Changes (CEL 01) X01 =L001+RS001&WD1/5 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/31 29.04.11 in213825 Changes (CEL 01) X01 =L001+RS001&WD1/3 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/18 29.04.11 in213825 Changes (CEL 01) X01 =L001+RS001&WD1/2 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/5 29.04.11 in213825 Changes (CEL 01) X01 =L001+RS001&WD1/4 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/24 29.04.11 in213825 Changes (CEL 01) X01 =L001+RS001&WD1/4 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/36 29.04.11 in213825 Changes (CEL 01) X01 =L001+RS001&WD1/2 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/4 29.04.11 in213825 Changes (CEL 01) X01 =L001+RS001&WD1/9 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/37 29.04.11 in213825 Changes (CEL 01) X01 =L001+RS001&WD1/4 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/17 29.04.11 in213825 Changes (CEL 01) X01 =L001+RS001&WD1/2 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/21 29.04.11 in213825 Changes (CEL 01) X01 =L001+RS001&WD1/9 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/16 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/7 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/25 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/9 29.04.11 in213825 Changes (CEL 01)
X01 =A000&CMD1/26 29.04.11 in213825 Changes (CEL 01)
33 &DMI1/1
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Revision overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & RO1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&RO1/34
Design Document No. - G71053- J5663 (EF-1) Page 34
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 34
1 2 3 4 5 6 7 8 9 10
Design/Manufacturing Instructions
(Testing as per QAP of Siemens Nashik Works)
Paint Shade (Front door)-Inside & Outside RAL 7035 Paint Shade-Inside & Outside NA
Paint Shade (Rear door)-Inside & Outside RAL7035 Cable Entry & Exit NA
Paint Shade (Frame, Base Channel/Stool)-Inside & Outside BLACK Mounting Type NA
Paint Shade (Side Cover, Top Cover, Finger Guard)-Inside & Outside RAL 7035
Rear Access No
Rear Door No
Earth Busbar of size '40 X 10 Al' with nuts, bolts & washers at each end is to be provided per panel.
Panel Shipping Section is denoted by 'SS (number)' in entire drawing. For example, SS1, SS2, etc.
Necessary Hardware is to be provided for connecting Earth Busbar between different Shipping Sections (wherever applicable) at site.
Necessary hardware is to be provided to connect all power connections between different shipping sections wherever required (as shown in Electrical Drawing).
For Inter-shipping Section Control wiring, necessary cables of proper lengths, duly lugged & feruled at both the ends, are to be kept inside one of the shipping sections.
Drilling of Gland Plates is to be done at site (not in Siemens Scope). Care must be taken to ensure that the bottom of panel becomes dust proof after the drilling is over.
Wire sizing for Protective Earth (Input & Output) connection of Power Devices is to be kept same as Incoming wire coming to that Device.
Devices are to be mounted on G.I. Plate (Unpainted, Conducting). Drives of rating more than 250KW are to be mounted on Panel Supports.
Panel Space heater is to be mounted in such a way that, Power & Control Cables must not run in close vicinity of it.
Each panel is to be marked with Panel Number on Front Door upper right (when viewed from Front). For example, panel P1 is to be marked '+P001'. In case of Rear Access, the same is to be marked on Rear Door also.
Device Designation is to be marked with Device Tag. For example, device H1 in Function Code S001 is to be written as '=S001-H1'. Terminal Strip X1 in Function code S001 is to be written as '=S001-X1'.
'Earth' cable from each Panel's Earth Busbar is to be connected separately to Earth Pit at site.
If Manufacturer/Supplier is different from standard vendors, then it will be mentioned in remarks column in equipment list. In such cases remarks supersedes standard manufacturers mentioned.
&RO1/34 2
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Design/Manufacturing Instructions Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & DMI1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&DMI1/1
Design Document No. - G71053- J5663 (EF-1) Page 1
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 2
1 2 3 4 5 6 7 8 9 10
Design/Manufacturing Instructions
(Testing as per QAP of Siemens Nashik Works)
Color codes for Wire/Cables used inside Panels are as per NW Standards.
Power Contactor of 'AC1' Duty Cycle is to be used in case of Standalone Drive System Input/ Output (Drive System without any Bypass arrangement).
For each Shipping section, 'Siemens' Emblem is to be placed on Top Centre of the last panel (for Single door panel). For each Shipping section, 'Siemens' Emblem is to be placed on Top Centre of Right hand side (when viewed from front) of the last panel (for double door panel).
Design & Placement of 'Siemens' Emblem is as per Siemens Nashik Works Standards.
1 &NP1/1
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Design/Manufacturing Instructions Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & DMI1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&DMI1/2
Design Document No. - G71053- J5663 (EF-1) Page 2
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 2
1 2 3 4 5 6 7 8 9 10
Name Plate Type-A Name Plate Type-C Name Plate Type-R Name Plate Type-I
18 mm
Notes:
55 mm
18 mm
60 mm
100 mm
&DMI1/2 2
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Name Plate Details Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & NP1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&NP1/1
Design Document No. - G71053- J5663 (EF-1) Page 1
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 4
1 2 3 4 5 6 7 8 9 10
Name Plate Type-A Name Plate Type-C Name Plate Type-R Name Plate Type-I
18 mm
Notes:
55 mm
18 mm
60 mm
100 mm
1 3
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Name Plate Details Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & NP1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&NP1/2
Design Document No. - G71053- J5663 (EF-1) Page 2
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 4
1 2 3 4 5 6 7 8 9 10
Name Plate Type-A Name Plate Type-C Name Plate Type-R Name Plate Type-I
18 mm
Notes:
55 mm
18 mm
60 mm
100 mm
2 4
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Name Plate Details Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & NP1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&NP1/3
Design Document No. - G71053- J5663 (EF-1) Page 3
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 4
1 2 3 4 5 6 7 8 9 10
Name Plate Type-A Name Plate Type-C Name Plate Type-R Name Plate Type-I
18 mm
Notes:
55 mm
18 mm
60 mm
100 mm
3 &SP1/1
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Name Plate Details Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & NP1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&NP1/4
Design Document No. - G71053- J5663 (EF-1) Page 4
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 4
1 2 3 4 5 6 7 8 9 10
Specification Sheet
Taps on Primary side +5%,-5%,+2.5%,-2.5% (Refer Schematic Diagram for more details)
'VA' rating for each Winding Enter'VA' Rating for each winding (E.g. 1500 VA, if total Transformer 'VA' rating is 3000 VA)
Lamination holding Bolts are to be isolated against Earth Potential to withstand 500 V AC for 60 seconds.
Name plate for Specification details, Manufacturer Name, Date of Manufacturering is to be engraved on Metallic Plate & attached to Transfomer body.
Winding-2
Permissible Temperature rise 65 degree centigrade (above ambient temperature) +2.5%
A 110 V
Insulation Resistance(Winding to Core) at 500 V DC minimum 100 megaohm
Winding-1
Voltage withstanding Capacity(Winding to Core) 2.5 kV for 60 seconds 690 V A0V
B 120 V
Efficiency not less than 98 %
-2.5%
Winding-3
B 110 V
-5%
0V B0V
&NP1/4 2
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Specification Sheet-Control Transformer(690 V to 230 V) Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & SP1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&SP1/1
Design Document No. - G71053- J5663 (EF-1) Page 1
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 5
1 2 3 4 5 6 7 8 9 10
Specification Sheet
Accuracy Class 1
PT Application Enter the purpose for using PT (E.g. Metering, Protection, etc)
Name plate for Specification details, Manufacturer Name, Date of Manufacturering is to be engraved on Metallic Plate & attached to Transfomer body.
1 3
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Specification Sheet-Potential Transformer(690 V) Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & SP1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&SP1/2
Design Document No. - G71053- J5663 (EF-1) Page 2
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 5
1 2 3 4 5 6 7 8 9 10
Specification Sheet
CT Ratio(A) 3200/5 A
CT Burden 15VA
Frequency 50 Hz
CT Application Metering
CT Accuracy Class 3
2 4
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Specification Sheet-Current Transformer Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & SP1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&SP1/3
Design Document No. - G71053- J5663 (EF-1) Page 3
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 5
1 2 3 4 5 6 7 8 9 10
Specification Sheet
Lamination holding Bolts are to be isolated against Earth Potential to withstand 500 V AC for 60 seconds.
Name plate for Specification details, Manufacturer Name, Date of Manufacturering is to be engraved on Metallic Plate & attached to Transfomer body.
Winding-1
Winding-2
Voltage withstanding Capacity(Winding to Core) 2.5 kV for 60 seconds
0V B0V
3 5
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Specification Sheet-Control Transformer(690 V to 230 V) Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & SP1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&SP1/4
Design Document No. - G71053- J5663 (EF-1) Page 4
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 5
1 2 3 4 5 6 7 8 9 10
Specification Sheet
Taps on Primary side +10%,-10%,+5%,-5% (Refer Schematic Diagram for more details)
Lamination holding Bolts are to be isolated against Earth Potential to withstand 500 V AC for 60 seconds.
Name plate for Specification details, Manufacturer Name, Date of Manufacturering is to be engraved on Metallic Plate & attached to Transfomer body.
Winding-2
Permissible Temperature rise 65 degree centigrade (above ambient temperature) +5%
A 110 V
Insulation Resistance(Winding to Core) at 500 V DC minimum 100 megaohm
Winding-1
Voltage withstanding Capacity(Winding to Core) 2.5 kV for 60 seconds 415 V A0V
B 120 V
Efficiency not less than 98 %
-5%
Winding-3
B 110 V
-10%
0V B0V
4 &CMD1/1
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Specification Sheet-Control Transformer(690 V to 230 V) Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & SP1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&SP1/5
Design Document No. - G71053- J5663 (EF-1) Page 5
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 5
1 2 3 4 5 6 7 8 9 10
Panel Overview Date for 1st Submission of F.V. to Client for Approval
800 mm 800 mm 1200 mm 800 mm 800 mm 600 mm 800 mm 800 mm 1200 mm 800 mm 800 mm 800 mm 600 mm 600 mm 1320 mm
650 mm
700 mm
800 mm
2600 mm
DC LINK
Connection
1000 mm
700 mm
S003,S005
S010 S010 S011 S011 S006,S011 S006 S003 ISOLATORS S005 S004 S008 S008 S007
S003,S006 S004,S005
LT-1 LT-1 LT-2 LT-2 DC Isolators AH-1 DC ISOLATORS MH-1 MH-STDBY ISOLATORS MH-2 AH-2 ISOLATOR MCT
+P020 +P033 +P019 +P029 +P017 +P018 +P031 +P016 +P015 +P014 +P013 +P012 +P021 +P022 +P023
600 mm 800 mm 600 mm 800 mm 1200 mm 1200 mm 800 mm 800 mm 1200 mm 800 mm 1200 mm 800 mm 600 mm 800 mm 600 mm
14000 mm
Evaporator
600 mm
300 mm
E HOUSE Top view * *
2100 mm
2800 mm
Panel Line 1 Panel Line 2
300
Overhead Busbars: Yes The wire mesh is provided at the top of the panel.
* 800 mm 1000 mm 700 mm 50
The canopy is not possible due to height constaints. 50
Paint Shade (Front door)-Inside & Outside: RAL 7035
Paint Shade (Rear door)-Inside & Outside: RAL7035 2600 mm
Paint Shade (Frame, Base Channel/Stool)-Inside & Outside: BLACK
Paint Shade (Side Coer, Top Cover, Fingure Guard)-Inside & Outside: RAL 7035
&SP1/5
E HOUSE Side view
2
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Panel Overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & CMD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&CMD1/1
Design Document No. - G71053- J5663 (EF-1) Page 1
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 39
1 2 3 4 5 6 7 8 9 10
Panel Overview
Incomer Panels
1000 mm 1000 mm 1200 mm
Main Isolator
1200 mm
1200 mm
Panel Protective Panel-1
Protective Panel-2
+P032
+P027
+P028
1 3
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Panel Overview Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & CMD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&CMD1/2
Design Document No. - G71053- J5663 (EF-1) Page 2
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 39
1 2 3 4 5 6 7 8 9 10
300 mm
2100 CFL
Legend Device Tag Type Number Description
50x10x2CU
-B -Y -R
2000 1 1 =S001-S1 3SE30200A Door Limit Switch
2 =S001-H1 DULUXSTAR T4 3U 20W-865 E27-HPF CFL
1900
3 =S001-V5 MF42010A RFI Filter
1800 6 =S001-Q8 3SB12002DB01+3SB14000A ALM 1-OFF-ALM 2
3
Sinamics S120
7 =S001-V1 6SL33007TG413AA0 Active Interface Module-1
NSL.FLTR.MF4201A
AIM-Chassis
1700 1750H X505W X 544D
Frame JI
1600
C10
1500
1400
1300
1200
80x10x1CU
1100 7
6
FRONT
1000
900
800
700
600
500
400
-Y
100x10x1CU
300 -R
-B
200
Earth Busbar 40 X 10x1Cu
100
Anti vibration pad Anti vibration pad Anti vibration pad
0 25 mm height 25 mm height 25 mm height
300
300
300
0
200
300
400
500
600
700
800
200
300
400
500
600
700
800
200
300
400
500
600
700
800
100
100
100
100 100
30
30
200
CABLE TRENCH
760 (Base Channel Depth)
200
CABLE TRENCH
CABLE TRENCH
CABLE TRENCH
30
30
2 FRONT
4
Previous page Foundation Plan Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - GA_H2200_W800_DOOR2_P1 Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & CMD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&CMD1/3
Design Document No. - G71053- J5663 (EF-1) Page 3
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 39
1 2 3 4 5 6 7 8 9 10
300 mm
2100 50x10x2CU 100x10x2CU 100x10x2CU
50x10x2CU Legend Device Tag Type Number Description
-B -Y -R -P -N
2000 1 =S001-S2 3SE30200A Door Limit Switch
3
1800 CFL 4 =S001-OP1 6SL30550AA004CA3 AOP30
5 =S001-A1 6SL30401MA000AA0 CU320-2_ALM1_ALM2
1700 =S001-V2 6SL33307TG413AA0 Active Line Module-1
6
1400
1300 4
Sinamics G130
AOP30
Sinamics S120
0.55kg. CU320 -2 Control Unit
(156Hx212Wx31D) 300H X 50W X 226D
FV
1200
1100 5
FRONT
1000 FV
6
900
800
700
=S001-X55(15x)
600 =S001-X56(15x)
500
-R -Y -B
400
100x10x1CU 100x10x1CU
300
200
-B -Y -R
Earth Busbar 40 X 10x1Cu
100
Anti vibration pad Anti vibration pad Anti vibration pad
0 25 mm height 25 mm height 25 mm height
300
300
300
0
200
300
400
500
600
700
800
200
300
400
500
600
700
800
200
300
400
500
600
700
800
100
100
100
100 100
30
30
200
CABLE TRENCH
760 (Base Channel Depth)
200
CABLE TRENCH
Bottom
200
CABLE TRENCH
30
30
300 mm
2100 50x10x2CU 100x10x2CU
100x10x2CU
-B -Y -R -P -N
2000
R R Y Y B B
61 8
1900 GI SHEET CFL CFL
W1100XH150
100x10x1CU
4
NSL.PT NSL.PT NSL.PT
1800
1 3
NSL.FLTR.MF4201A
NSL.PT
52 53 54 9
1700 GI SHEET
W1100XH150 3NH3430 3NH3430 3NH3430 3NH3430 3NH3430 3NH3430 3NH3430 3NH3430 3NH3430 3NH3430 3NH3430 3NH3430
13 21 14 15 22 16 17 18 19 20 23 24
GI SHEET
1500 W300XH600
Wire channel-40 mm
28 25 27
1400 NSL.RLY.RP24DO41COM
(72Hx80Wx60D)
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D 3RV102
97Hx90Wx96D
3RV102
97Hx90Wx96D
120x10x2CU
29 30
26
Wire channel-50 mm
1300
Wire channel-50 mm
3WL
(Fixed-mounted circuit Breaker)
Wire channel-40 mm 434H X 320W X 357D
1250A/1600A Wire channel-40 mm
31 33
1200 3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
3RV102
3VU13 3VU13 97Hx90Wx96D
86Hx54Wx70D 86Hx54Wx70D
47 58 59 60
1100 32 34
Wire channel-40 mm
Wire channel-40 mm
62 63 50 37
FRONT
42
1000 40
3RV102
97Hx90Wx96D
3RV102
97Hx90Wx96D
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
NSL.RLY.RP110AO11COM
NSL.RLY.RP24DO11COM
45 46
FUSE BASE FUSE BASE FUSE BASE
3NW 3NW 3NW
76H X 25W X60D 76H X 25W X60D 76H X 25W X60D
(77Hx24Wx60D)
20A/32AA 20A/32AA 20A/32AA
( 77Hx33Wx62D)
3WL- 1250A/1600A 3NW 3NW 3NW
3WL-1250A/1600A
900 51 41 120x10x2CU
GI SHEET
800 W1100XH150
35
C10 3KL821/2 3KL821/2
=S001-X17(2x)
134Hx205Wx160D
134Hx205Wx160D
(Handle-8UC68)
(Handle-8UC68)
3KL821/2
3KL821/2
700 49 48 5SX_2P 5SX_2P
=S001-X31(2x) 3KL82
36 =S001-X33(10x)
600 =S001-X34(10x)
=S001-X35(11x)
-B -Y -R
500 120x10x2CU =S001-X36(2x)
TERMINALS
TERMINALS
=S001-X37(22x)
400 =S001-X38(4x)
=S001-X39(4x)
=S001-X41(3x)
300
=S001-X51(2x)
=S001-X53(10x)
200
=S001-X54(17x)
Earth Busbar 40 X 10 x1Cu
=S001-X57(3x)
100
=S001-X201(5x)
Anti vibration pad =S001-X203(19x)
Anti vibration pad Anti vibration pad
0 25 mm height 25 mm height 25 mm height
=S001-X204(21x)
=S002-X204(1x)
300
300
300
0
200
300
400
500
600
700
800
900
1000
1100
1200
200
300
400
500
600
700
800
0
200
300
400
500
600
700
800
900
1000
1100
1200
100
100
100
100 100
30
30
-B
200
-Y
Top Cover Cutout No Rear Access No
800 (Panel depth)
50x10x2CU
200
-R
Overhead Busbars Yes Rear Door No
-N
200
CABLE TRENCH CABLE TRENCH Protection Class IP42* Cable Entry(Power) Bottom
100x10x2CU
-P Cable Entry(Aux.) Bottom
95
30
Legend Details
Legend Device Tag Type Number Description
300 mm
2100 100x10x2CU
50x10x2CU
100x10x2CU
-B -Y -R -P -N
Legend Device Tag Type Number Description
2000
1 =S001-S1 3SE30200A Door Limit Switch
1900 2 =S001-V1 MF42010A RFI Filter
1 3 =S001-H1 DULUXSTAR T4 3U 20W-865 E27-HPF CFL
1800 2
NSL.FLTR.MF4201A
1600
3
CFL
1500
1400
1300
1200
50x10x2CU 4
1100
FRONT
1000
900
800 =S001-X53(2x)
=S001-X201(5x)
TERMINALS
700 =S001-X203(5x)
=S001-X204(4x)
600 =S002-X204(2x)
500
400
-Y
100x10x1CU
300 -R
-B
200
Earth Busbar 40 X 10x1Cu
100
Anti vibration pad Anti vibration pad Anti vibration pad
0 25 mm height 25 mm height 25 mm height
300
300
300
0
200
300
400
500
600
700
800
200
300
400
500
600
700
800
200
300
400
500
600
700
800
100
100
100
100 100
30
30
200
CABLE TRENCH
760 (Base Channel Depth)
200
CABLE TRENCH
Bottom
200
CABLE TRENCH
30
30
6 FRONT
8
Previous page Foundation Plan Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - GA_H2200_W800_DOOR2_P4 Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & CMD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&CMD1/7
Design Document No. - G71053- J5663 (EF-1) Page 7
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 39
1 2 3 4 5 6 7 8 9 10
300 mm
2100
100x10x2CU
Legend Device Tag Type Number Description
-P -N
2000 1 =S001-S1 3SE30200A Door LImit Switch
1700
1400
1300
1200
1100
FRONT
1000
4
900
800
700
600
500
-R -Y -B
400
100x10x1CU 100x10x1CU
300
200
-B -Y -R
Earth Busbar 40 X 10x1Cu
100
Anti vibration pad Anti vibration pad Anti vibration pad
0 25 mm height 25 mm height 25 mm height
300
300
300
0
200
300
400
500
600
700
800
200
300
400
500
600
700
800
200
300
400
500
600
700
800
100
100
100
100 100
30
30
200
CABLE TRENCH
760 (Base Channel Depth)
200
CABLE TRENCH
Bottom
200
CABLE TRENCH
30
30
300 mm
2100 100x10x2CU 100x10x2CU
1600
1500
1400
1300
1200
1100
1000
900
800
100x10x2CU 100x10x2CU
700
600
500
400
300
200
Earth Busbar 40 X 10x1 Cu
100
Anti vibration pad Anti vibration pad
0 25 mm height 25 mm height
300
300
0
200
300
400
500
600
100
200
300
400
500
600
100
100 100
30
30
200
CABLE TRENCH
760 (Base Channel Depth)
800 (Panel depth)
CABLE TRENCH
CABLE TRENCH
Protection Class IP42* Cable Entry(Power) Bottom
CABLE TRENCH
30
30
300 mm
2100 CFL 100x10x2CU
Legend Device Tag Type Number Description
50x10x2CU
100x10x2CU
-B -Y -R -P -N 1 =S002-S1 3SE30200A Door Limit Switch
2000 2 1
NSL.FLTR.MF4201A
1600
1500
1400
1300
1200 4
50x10x2CU
1100
FRONT
1000
900
800
700
600
500
400
-Y
100x10x1CU
300 -R
-B
200
Earth Busbar 40 X 10x1Cu
100
Anti vibration pad Anti vibration pad Anti vibration pad
0 25 mm height 25 mm height 25 mm height
300
300
300
0
200
300
400
500
600
700
800
200
300
400
500
600
700
800
200
300
400
500
600
700
800
100
100
100
100 100
30
30
200
CABLE TRENCH
760 (Base Channel Depth)
200
CABLE TRENCH
Bottom
200
CABLE TRENCH
30
30
300 mm
2100
50x10x2CU 100x10x2CU
100x10x2CU Legend Device Tag Type Number Description
-B -Y -R -P -N
2000
1 =S002-S1 3SE30200A Door Limit Switch
1900 1 2 =S002-V1 MF42010A RFI Filter
2 3 3 =S002-H1 DULUXSTAR T4 3U 20W-865 E27-HPF CFL
1800
NSL.FLTR.MF4201A
CFL
4 =S002-OP1 6SL30550AA004CA3 AOP30
1400
Sinamics S120
4
CU320 -2 Control Unit
300H X 50W X 226D
1300
Sinamics G130
AOP30
0.55kg.
(156Hx212Wx31D)
FV
1200 5
1100
FV
FRONT
1000
900 6
800
700
=S002-X55(14x)
600 =S002-X56(14x)
500
-R -Y -B
400
100x10x1CU 100x10x1CU
300
200
-B -Y -R
Earth Busbar 40 X 10x1Cu
100
Anti vibration pad Anti vibration pad Anti vibration pad
0 25 mm height 25 mm height 25 mm height
300
300
300
0
200
300
400
500
600
700
800
200
300
400
500
600
700
800
200
300
400
500
600
700
800
100
100
100
100 100
30
30
200
CABLE TRENCH
760 (Base Channel Depth)
200
CABLE TRENCH
Bottom
200
CABLE TRENCH
30
30
300 mm
2100 50x10x2CU 100x10x2CU
100x10x2CU
-B -Y -R -P -N
2000
R R Y Y B B
1900 49
GI SHEET
CFL
W1100XH150 9
NSL.PT NSL.PT NSL.PT
CFL 100x10x1CU
1800 4
1 2 3
NSL.PT
NSL.FLTR.MF4201A
7 5 6 8
1700 GI SHEET
W1100XH150 3NH3430 3NH3430 3NH3430 3NH3430 3NH3430 3NH3430 3NH3430 3NH3430 3NH3430 3NH3430 3NH3430 3NH3430
10 11 12
1600 FUSE BASE
3NH3430
241H X 50W X102D
800A
FUSE BASE
3NH3430
241H X 50W X102D
800A
FUSE BASE
3NH3430
241H X 50W X102D
800A
FUSE BASE
3NH3430
241H X 50W X102D
800A
FUSE BASE
3NH3430
241H X 50W X102D
800A
FUSE BASE
3NH3430
241H X 50W X102D
800A
FUSE BASE
3NH3430
241H X 50W X102D
800A
FUSE BASE
3NH3430
241H X 50W X102D
800A
FUSE BASE
3NH3430
241H X 50W X102D
800A
FUSE BASE
3NH3430
241H X 50W X102D
800A
FUSE BASE
3NH3430
241H X 50W X102D
800A
FUSE BASE
3NH3430
241H X 50W X102D
800A
13 21 14 15 22 16 17 18 19 20 23 24
GI SHEET
1500 W300XH600
GI SHEET
Wire channel-40 mm Wire channel-40 mm W300XH600
27 25 26
1400 NSL.RLY.RP24DO41COM
(72Hx80Wx60D)
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D 3RV102
97Hx90Wx96D
3RV102
97Hx90Wx96D
120x10x2CU
28 29
Wire channel-50 mm
1300
Wire channel-50 mm
3WL
(Fixed-mounted circuit Breaker)
Wire channel-40 mm
C10
434H X 320W X 357D
1250A/1600A Wire channel-40 mm
30 31 32 34
1200 3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
5SX_2P 5SX_2P
1100 33 46
Wire channel-40 mm 35
Wire channel-40 mm
36
FRONT
41 43
1000 50
3RV102
97Hx90Wx96D
3RV102
97Hx90Wx96D
44 45
FUSE BASE FUSE BASE FUSE BASE FUSE BASE FUSE BASE
3NW 3NW 3NW 3NW 3NW
76H X 25W X60D 76H X 25W X60D 76H X 25W X60D 76H X 25W X60D 76H X 25W X60D
20A/32AA 20A/32AA 20A/32AA 20A/32AA 20A/32AA
GI SHEET
800 W1100XH150
3KL821/2 3KL821/2
=S001-X203(4x)
3VU13 3VU13
134Hx205Wx160D
134Hx205Wx160D
86Hx54Wx70D 86Hx54Wx70D
(Handle-8UC68)
(Handle-8UC68)
38 37
3KL821/2
3KL821/2
=S001-X204(8x)
700 48 47 3KL82
=S002-X16(3x)
=S002-X17(2x)
600
=S002-X31(2x)
=S002-X33(10x) -B -Y -R
500 120x10x2CU
=S002-X34(10x)
TERMINALS
TERMINALS
=S002-X35(6x)
400 =S002-X36(4x)
=S002-X42(2x)
300 =S002-X51(2x)
=S002-X53(11x)
200 =S002-X54(11x)
1200 Earth Busbar 40 X 10 x1Cu =S002-X55(15x)
100 =S002-X56(15x)
=S002-X60(6x)
Anti vibration pad Anti vibration pad Anti vibration pad
0 25 mm height 25 mm height
=S002-X201(5x) 25 mm height
=S002-X203(5x)
=S002-X204(19x)
300
300
300
0
200
300
400
500
600
700
800
900
1000
1100
1200
200
300
400
500
600
700
800
0
200
300
400
500
600
700
800
900
1000
1100
1200
100
100
100
100 100
30
30
-B
200
-Y
Top Cover Cutout No Rear Access No
800 (Panel depth)
50x10x2CU
200
-R
Overhead Busbars Yes Rear Door No
-P
200
CABLE TRENCH CABLE TRENCH Protection Class IP42* Cable Entry(Power) Bottom
100x10x2CU
-N Cable Entry(Aux.) Bottom
95
30
Legend Details
Legend Device Tag Type Number Description
27 =S002-K1 RP24DO41COM
28 =S002-Q4 3RV10211GA10 AIM 3 FAN SUPPLY
29 =S002-Q5 3RV10211GA10 ALM-3 Fan Supply
30 =S002-K21 3TH30400AU0+3TX74023JY1+(4NO) OFF 2 Chain
31 =S002-K22 3TH30220AU0+3TX74023JY1+(2NO,2N OFF 1 Chain
C)
12 14
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - GA_Legend Details_P9 Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & CMD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&CMD1/13
Design Document No. - G71053- J5663 (EF-1) Page 13
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 39
1 2 3 4 5 6 7 8 9 10
300 mm
2100 100x10x2CU
100x10x2CU 50x10x2CU Legend Device Tag Type Number Description
-B -Y -R -P -N
2000 1 =S002-S1 3SE30200A Door Limit Switch
2 =S002-V1 MF42010A RFI Filter
1900
3 =S002-H1 DULUXSTAR T4 3U 20W-865 E27-HPF CFL
1
1800 2
NSL.FLTR.MF4201A
4 =S002-V2 6SL33007TG413AA0 AIM4
Sinamics S120
AIM-Chassis
1700 1750H X505W X 544D
Frame JI
1600
3
CFL
1500
1400
1300
1200
50x10x2CU
1100 4
FRONT
1000
900
800
700
600
500
400
-Y
100x10x1CU
300 -R
-B
200
Earth Busbar 40 X 10x1Cu
100
Anti vibration pad Anti vibration pad Anti vibration pad
0 25 mm height 25 mm height 25 mm height
300
300
300
0
200
300
400
500
600
700
800
200
300
400
500
600
700
800
200
300
400
500
600
700
800
100
100
100
100 100
30
30
200
CABLE TRENCH
760 (Base Channel Depth)
200
CABLE TRENCH
Bottom
200
CABLE TRENCH
30
30
300 mm
2100
Legend Device Tag Type Number Description
100x10x2CU
-P -N
2000 1 =S002-S1 3SE30200A Door Limit Switch
1 2 =S002-V1 MF42010A RFI Filter
1900
3 =S002-H4 DULUXSTAR T4 3U 20W-865 E27-HPF CFL
2 3
1800
NSL.FLTR.MF4201A
1700
1400
1300
1200
1100
FRONT
1000
4
900
800
700
600
500
-R -Y -B
400
100x10x1CU 100x10x1CU
300
200
-B -Y -R
Earth Busbar 40 X 10x1Cu
100
Anti vibration pad Anti vibration pad Anti vibration pad
0 25 mm height 25 mm height 25 mm height
300
300
300
0
200
300
400
500
600
700
800
200
300
400
500
600
700
800
200
300
400
500
600
700
800
100
100
100
100 100
30
30
200
CABLE TRENCH
760 (Base Channel Depth)
200
CABLE TRENCH
Bottom
200
CABLE TRENCH
30
30
300 mm
2100 3 100x10x2CU
CFL 50x10x2CU Legend Device Tag Type Number Description
-P -N -P -N
2000 1 1 =S004-S1 3SE30200A Door Limit Switch
2
NSL.FLTR.MF4201A
1500
1400
Sinamics S120
CU320 -2 Control Unit
300H X 50W X 226D
1300 4
Sinamics G130
AOP30
0.55kg.
(156Hx212Wx31D)
FV
1200 5
1100 FV
FRONT
1000
900
800
700
600
500
100x10x1CU
400 7
300
B B
200 Y Y
300
300
0
200
300
400
500
600
700
800
200
300
400
500
600
700
800
200
300
400
500
600
700
100
100
100
100 100
30
30
200
CABLE TRENCH
660 (Base Channel Depth)
700 (Panel depth)
CABLE TRENCH
CABLE TRENCH
30
FRONT
All dimensions are in 'mm'(Scale 1:16)
Foundation Plan
15 17
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - GA_H2200_W800_DOOR2_P12 Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & CMD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&CMD1/16
Design Document No. - G71053- J5663 (EF-1) Page 16
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 39
1 2 3 4 5 6 7 8 9 10
-PANEL13 (Isolators)
Panel General Arrangement Details
B09 Equipment Layout
Front View (with Door) Front view (without Door) Side view
2200 Legend Details
300 mm
2100 100x10x2CU
100x10x2CU 50x10x2CU
Legend Device Tag Type Number Description
-P -N -P -N
2000 50x10x2CU 1 =S004-S2 3SE30200A Door Limit Switch
40 9 2 =S004-V2 MF42010A RFI Filter
1900 CFL
CFL
3 =S004-H1 3SB14012WZ3 DC LINK CHARGED
19 1
1800 Wire channel-50 mm 4 =S005-H1 3SB14012WZ3 DC LINK CHARGED
2
Wire channel-50 mm
10 12 5 6 7 8 NSL.FLTR.MF4201A
1700
Sinamics S120/SUPP Sinamics S120/SUPP Sinamics S120/SUPP
(Handle-8UC64) TM15/31/41 TM15/31/41 TM15/31/41
(150Hx30Wx111D)
(150Hx30Wx111D)
(150Hx30Wx111D)
(150Hx30Wx111D)
TM54F TM54F TM54F
120Hx23Wx91D
Terminal Board Terminal Board Terminal Board
Sinamics G130
Sinamics G130
Sinamics G130
Sinamics G130
SMC30/0.45kg
SMC30/0.45kg
SMC30/0.45kg
SMC30/0.45kg
150H X50W X 111D 150H X50W X 111D 150H X50W X 111D
=S003-X35(2x)
3RN1022
Weight-0.8kg. Weight-0.8kg. Weight-0.8kg.
Wire channel-50 mm
Wire channel-50 mm
20 21 22 14 16 18 =S005-A2 6SL30550AA005CA2 MH-2
=S004-X17(5x) 11
29
3TH30 3TH30 3TH30 3TH30 3TH30
78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D
1300 =S004-X31(2x)
12 =S005-A3 6SL30550AA005CA2 AH-1
GI SHEET 15 17 =S004-X33(10x)
W1100XH500 13 =S005-A1 6SL30550AA005CA2 MH-1
1200 Wire channel-50 mm =S004-X34(10x)
23 25 27 30313233 =S004-X37(2x) 14 =S004-K15 3TH30220AU0 MH-2 Brake Cont.
3TH30 3TH30 3TH30 3TH30 3TH30 3TH30
78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D
3RV102 3RV102
1100
97Hx90Wx96D 97Hx90Wx96D
=S004-X39(9x)
38 39 5SX_2P 5SX_2P 5SX_2P 5SX_2P 15 =S005-K1 3TH30220AU0+3TX74023JY1+(2NO,2N Encoder 1 Overspeed Switch
=S004-X42(2x) C)
24 26 28
FRONT
=S004-X51(2x)
1000 50x10x2CU =S005-K2 3TH30220AU0+3TX74023JY1+(2NO,2N Stdby as MH-1 Selection
Wire channel-50 mm =S004-X52(14x) 16
=S004-X53(12x)
C)
900
B07 =S004-X54(12x)
17 =S005-K3 3TH30220AU0+3TX74023JY1+(2NO,2N Std. as MH-2 Selection
=S004-X55(14x) C)
800
3TF68 3TF68 3TF68
H276XW230XD237 H276XW230XD237
GI SHEET
W1100XH300 =S004-X57(12x)
36 18 =S005-K4 3TH30220AU0 Std. as AH-1 Selection
37 =S004-X58(10x)
700
=S004-X59(10x) 19 =S004-Q1 3KA84413UE00 MH2-Input Isolator
=S004-X62(2x)
600 20 =S004-K40 PC230A082COB Relay Board
=S004-X204(3x)
=S004-X251(3x) 21 =S004-K41 PC24D08COB Relay Board
500 =S005-X16(1x) 22 =S005-K40 PC230A082COB Relay Board
100x10x1CU 100x10x1CU
TERMINALS
TERMINALS
=S005-X17(1x)
23 =S005-K42 3TH30220AU0+3TX74023JY1+(2NO,2N (MH-1+MH-2) Selection
400 =S005-X31(2x)
C)
=S005-X33(10x)
300 =S005-X34(10x) 24 =S005-K43 3TH30220AU0+3TX74023JY1+(2NO,2N MH-1 Mode Selection
B B
=S005-X35(9x) B C)
200 Y Y =S005-X39(9x) Y
25 =S005-K44 3TH30220AU0+3TX74023JY1+(2NO,2N MH-2 Mode Selection
R R =S005-X51(2x) R C)
Earth Busbar 40 X 10 x1Cu
100 =S005-X53(17x)
=S005-X54(17x) 26 =S005-K45 3TH30220AU0 Std as OFF Selection
Anti vibration pad Anti vibration pad Anti vibration pad
0 25 mm height 25 mm height =S005-X55(15x) 25 mm height 27 =S005-K46 3TH30220AU0+3TX74023JY1+(2NO,2N Encoder 2 Overspeed Switch
=S005-X56(15x) C)
=S005-X57(9x)
28 =S005-K47 3TH30220AU0 AH-1 Mode Selection
=S005-X58(9x)
300
300
300
=S005-X59(9x) 29 =S005-K41 RP24D082COMB5P 8-channel Relay Board
=S005-X60(1x) =S004-F1 5SX42167RC 240 VAC Supply MCB
30
=S005-X61(1x)
31 =S004-F2 5SX42047RC 24 VDC Power Supply MCB
=S005-X62(1x)
=S005-X63(9x) 32 =S005-F1 5SX42167RC 240 VAC Supply MCB
=S005-X203(19x) =S005-F2 5SX42047RC 24 VDC Power Supply MCB
33
=S005-X204(6x)
36 =S004-K16 3TF69440CM7 MH-2 O/P Contactor
=S006-X56(5x)
0
200
300
400
500
600
700
800
900
1000
1100
1200
200
300
400
500
600
700
0
200
300
400
500
600
700
800
900
1000
1100
1200
100
100
100
30
30
FRONT
All dimensions are in 'mm'(Scale 1:16)
Foundation Plan
16 18
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - GA_H2200_W1200_DOOR2_P13 Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & CMD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&CMD1/17
Design Document No. - G71053- J5663 (EF-1) Page 17
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 39
1 2 3 4 5 6 7 8 9 10
300 mm
2100 100x10x2CU
50x10x2CU
1300 4
5
Sinamics G130
AOP30
0.55kg.
(156Hx212Wx31D)
FV
1200
FV
1100
FRONT
1000 6
900
800
=S004-X58(1x)
700 =S005-X57(1x)
=S005-X58(1x)
600 =S005-X60(8x)
=S005-X61(8x)
=S005-X62(10x)
500
100x10x1CU
400
300
B B
8
200 Y Y
300
300
0
200
300
400
500
600
700
800
200
300
400
500
600
700
800
100
100
200
300
400
500
600
700
100
100 100
30
30
200
CABLE TRENCH
660 (Base Channel Depth)
700 (Panel depth)
CABLE TRENCH
CABLE TRENCH
30
FRONT
All dimensions are in 'mm'(Scale 1:16)
Foundation Plan
17 19
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - GA_H2200_W800_DOOR2_P14 Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & CMD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&CMD1/18
Design Document No. - G71053- J5663 (EF-1) Page 18
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 39
1 2 3 4 5 6 7 8 9 10
-PANEL15 (Isolators)
Panel General Arrangement Details
B09 Equipment Layout
Front View (with Door) Front view (without Door) Side view
2200 Legend Details
C10
300 mm
2100 100x10x2CU
50x10x2CU
Legend Device Tag Type Number Description
-P -N -P -N
2000
1 =S003-V3 MF42010A RFI Filter
5
1700 2 GI SHEET
W1100XH300 4 6 =S005-Q1 3KA84413UE00 MH-STD Input Isolator
1600 7 =S003-K7 3TH30220AU0 MH-Null Position
50x10x2CU
8 =S003-K8 3TH30400AU0+3TX74023JY1+(4NO) Hoist(Step 1)
1500
9 =S003-K9 3TH30400AU0+3TX74023JY1+(4NO) Lower (Step 1)
Wire channel-50 mm
1400 16 15 21 22 24 26 28 30 10 =S003-K10 3TH30400AU0+3TX74023JY1+(4NO) Step 2
GI SHEET PS307
5A
CPU315-2 PN/DP
11
Sinamics S120/SUPP BF 2 X1
0 X1 0 0 X1 0 0 X1 0 0 X1 0 0 X1 0 0 X1 0 0 X1 0
X1
TM15/31/41
W1100XH600
DC24V DC5V 1 1 1 1 1 1 1 1 1 1 1 1 1 1
(150Hx30Wx111D)
TM54F FRCE 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Terminal Board RUN
Sinamics G130
3 3 3 3 3 3 3 3
SMC30/0.45kg
3 3 3 3 3 3
150H X50W X 111D 230V VOLTAGE STOP 4 4 4 4 4 4 4 4 4 4 4 4 4 4
1300
SELECTOR
Weight-0.8kg. PUSH
5 5 5 5 5 5 5 5 5 5 5 5 5 5
6 6 6 6 6 6 6 6 6 6 6 6 6 6
RUN
STOP 7 7 7 7 7 7 7 7 7 7 7 7 7 7
MRES
X1 MPI/DP
LINK
Wire channel-50 mm
RX/TX I0 I4
12
I1 I5 0 0 0 0 0 0 0 0 0 0 0 0 0 0
L1
I2 I6 1 1 1 1 1 1 1 1 1 1 1 1 1 1
N X2 PN I3 I7 2 2 2 2 2 2 2 2 2 2 2 2 2 2
L+
Wire channel-50 mm
Q0 Q4 3 3 3 3 3 3 3 3 3 3 3 3 3 3
M
Q1 Q5 4 4 4 4 4 4 4 4 4 4 4 4 4 4
L+
Q2 Q6 5 5 5 5 5 5 5 5 5 5 5 5 5 5
M
L+ Q3 Q7 6 6 6 6 6 6 6 6 6 6 6 6 6 6
=S001-X203(2x)
L+
DC 24V
M 7 7 7 7 7 7 7 7 7 7 7 7 7 7
M
1200
FV
20 23 25 27 29 =S001-X204(2x) 13 =S003-K13 3TH30400AU0+3TX74023JY1+(4NO) Step 5
Wire channel-50 mm =S003-B1 3RN10221DW00 Monitoring Relay
=S003-X33(10x) 14
1100 14
7 8 9 10 11 12 13 1732 =S003-X34(10x)
15 =S003-A3 6SL30550AA003FA0 TM 15 Module
120Hx23Wx91D
3TH30 3TH30 3TH30 3TH30 3TH30 3TH30 3TH30
=S003-X38(7x)
3RN1022
78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D
FRONT
16 =S003-A1 6SL30550AA005CA2 SMC30
1000
5SX_2P 5SX_2P
=S003-X53(3x)
C10 =S003-X54(1x) 17 =C001-F1 5SX42047RC 24 VDC Power Supply MCB
50x10x2CU
900 Wire channel-50 mm =S003-X55(14x)
18 =S005-K48 3TF69440CM7 MH-1
=S003-X56(12x)
19 =S003-K17 3TF69440CM7 Main Contactor
800 =S003-X57(11x)
GI SHEET 3TF68
H276XW230XD237
3TF68
H276XW230XD237
=S003-X201(2x) 3TF68
20 =C001-A1 6ES7315-2EH13-0AB0
W1100XH300 =S003-X203(10x)
700 21 =C001-A2 6ES7307-1EA00-0AA0
18 19 =S003-X204(14x)
=S003-X207(2x) 22 =C001-A3 6ES7350-2AH01-0AE0
600
=S003-X251(3x) 23 =C001-A4 6ES7321-1BL00-0AA0
=S004-X53(1x)
500 24 =C001-A5 6ES7321-1BL00-0AA0
100x10x1CU =S004-X55(1x)
100x10x1CU
TERMINALS
TERMINALS
=S004-X56(15x) 25 =C001-A6 6ES7321-1BL00-0AA0
400 =S004-X62(2x) 26 =C001-A7 6ES7321-1BL00-0AA0
=S005-X56(8x)
300 27 =C001-A8 6ES7321-1BL00-0AA0
=S005-X58(3x)
B B B
=S005-X203(10x) 28 =C001-A9 6ES7322-1BL00-0AA0
200 Y Y
=S005-X204(3x) Y
29 =C001-A10 6ES7322-1BL00-0AA0
R Earth Busbar 40 X 10 x1Cu R
=C001-X53(21x) R
30 =C001-A11 6ES7334-0KE80-0AB0
100 =C001-X54(21x)
=C001-X55(2x) 31 =S003-H3 DULUXSTAR T4 3U 20W-865 E27-HPF CFL
Anti vibration pad Anti vibration pad Anti vibration pad
0 25 mm height 25 mm height
=C001-X57(3x) 25 mm height
32 =S003-F1 5SX42167RC
=C001-X59(6x)
=C001-X60(5x)
=C001-X61(8x)
300
300
300
=C001-X62(11x)
=C001-X63(13x)
=C001-X64(5x)
=C001-X65(10x)
=C001-X66(4x)
=C001-X121(5x)
=C001-X122(7x)
=C001-X123(7x)
0
200
300
400
500
600
700
800
900
1000
1100
1200
200
300
400
500
600
700
0
200
300
400
500
600
700
800
900
1000
1100
1200
100
100
100
=C001-X124(7x)
=C001-X125(7x)
100 100
=C001-X126(4x)
=C001-X127(3x)
30
30
=C001-X204(4x)
200
30
18 Foundation Plan 20
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - GA_H2200_W1200_DOOR2_P15 Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & CMD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&CMD1/19
Design Document No. - G71053- J5663 (EF-1) Page 19
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 39
1 2 3 4 5 6 7 8 9 10
300 mm
2100 100x10x2CU
50x10x2CU
1400
Sinamics G130
AOP30
0.55kg.
(156Hx212Wx31D)
FV
1200
5
1100
FV
FRONT
1000
900
800
700
=S003-65(2x)
600 =S003-X17(4x)
=S003-X53(1x)
500 =S003-X54(1x)
100x10x1CU
=S003-X57(9x)
400 =S003-X58(9x)
=S003-X203(2x) 8 7
300 =S005-X61(2x)
B B
=S006-X61(1x)
200 Y Y
300
300
0
200
300
400
500
600
700
800
200
300
400
500
600
700
800
200
300
400
500
600
700
100
100
100
100 100
30
30
200
CABLE TRENCH
660 (Base Channel Depth)
700 (Panel depth)
CABLE TRENCH
CABLE TRENCH
30
FRONT
All dimensions are in 'mm'(Scale 1:16)
Foundation Plan
19 21
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - GA_H2200_W800_DOOR2_P16 Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & CMD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&CMD1/20
Design Document No. - G71053- J5663 (EF-1) Page 20
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 39
1 2 3 4 5 6 7 8 9 10
300 mm
2100
100x10x2CU
23 -P -N -P -N Legend Device Tag Type Number Description
2000 CFL
3
CFL
1 =S003-S1 3SE30200A Door Limit Switch
1900 100x10x2CU
1 2 =S003-V1 MF42010A RFI Filter
100x10x2CU
2 3 =S003-H1 DULUXSTAR T4 3U 20W-865 E27-HPF CFL
1800 NSL.FLTR.MF4201A
Wire channel-50 mm
=S003-X16(2x)
1200 7 8 9 10 11 12 13 14 15 16 17 18 19
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
Wire channel-50 mm
=S003-X36(6x)
W1100XH500 14 =S003-K15 3TH30220AU0 MH-1 Brake Cont.
Wire channel-50 mm C10 =S003-X37(6x)
FRONT
1000 24 15 =S003-K16 3TH30220AU0+3TX74023JY1+(2NO,2N MH_Counter Wt. Bypass Int. Cont.
TERMINALS
TERMINALS
=S003-X38(4x)
3RV102
97Hx90Wx96D C)
=S003-X39(8x)
5SX_2P
22
900 =S003-X42(2x) 16 =S003-K42 3TH30220AU0+3TX74023JY1+(2NO,2N Spare
100x10x2CU =S003-X51(2x) C)
Wire channel-50 mm
800 =S003-X53(15x)
17 =S003-K40 PC230A082COB Relay Board
=S003-X54(15x)
700 =S003-X55(14x) 18 =S003-K41 PC24D08COB Relay Board
B07 =S003-X56(12x) 19 =S003-K43 PC24D08COB 8-channel 24V DC Relay Board
600 =S003-X57(8x)
22 =S003-Q2 3RV10211DA10 MH-1 fan supply
100x10x2CU =S003-X58(4x)
-P -N -P -N
500 =S003-X59(1x) 23 =S003-H2 DULUXSTAR T4 3U 20W-865 E27-HPF CFL
=S003-X65(8x) 24 =S003-F2 5SX42047RC
400 =S003-X202(1x)
=S003-X203(19x)
300 =S003-X204(12x)
=S003-X207(2x)
=S003-X594(2x)
200
=S003-X202(1x)
Earth Busbar 40 X 10 x1Cu
=S004-X55(15x)
100
=S004-X57(2x)
Anti vibration pad =S004-X58(2x)
Anti vibration pad Anti vibration pad
0 25 mm height 25 mm height 25 mm height
=S004-X204(4x)
=S005-X55(4x)
=S005-X57(3x)
300
300
300
=S005-X58(1x)
=S005-X203(3x)
=S005-X204(3x)
=S007-X203(1x)
200
300
400
500
600
700
100
0
200
300
400
500
600
700
800
900
1000
1100
1200
0
200
300
400
500
600
700
800
900
1000
1100
1200
100
100
100 100
30
30
200
30
FRONT
All dimensions are in 'mm'(Scale 1:16)
Foundation Plan
20 22
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - GA_H2200_W1200_DOOR2_P17 Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & CMD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&CMD1/21
Design Document No. - G71053- J5663 (EF-1) Page 21
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 39
1 2 3 4 5 6 7 8 9 10
300 mm
2100 100x10x2CU
50x10x1CU
Legend Device Tag Type Number Description
-P -N -P -N
2000 =S006-S1 3SE30200A Door Limit Switch
22 1
CFL
2
1900 CFL 2 =S006-H1 DULUXSTAR T4 3U 20W-865 E27-HPF CFL
C10
1 3 =S006-A3 6SL30550AA003FA0 TM15 Module
12
1800 4 =S006-A1 6SL30550AA005CA2 SMC30 Encoder Module(AH-1)
Sinamics S120
3 4
Sinamics S120/SUPP
TM15/31/41
TM54F
Sinamics S120/SMM 6 =S006-V1 MF42010A RFI Filter
Framesize JX
Terminal Board
(150Hx30Wx111D)
150H X50W X 111D
Sinamics G130
SMC30/0.45kg
Weight-0.8kg.
1600 5
1400H X704W X 545D
Weight=450 kg 7 =S006-OP1 6SL30550AA004CA3 AOP30
GI SHEET
W350XH1450
8 =S006-K40 PC230A082COB 8-Channel 230 VAC relay board
1500 FV
Wire channel-50 mm
1100 =S006-K6 3TH30400AU0+3TX74023JY1+(4NO) End Limit switch
Wire channel-50 mm 15
9
FRONT
1000 10 16 =S006-K42 3TH30400AU0+3TX74023JY1+(4NO) Spare
120Hx23Wx91D
3RN1022
17 =S006-K45 3TH30220AU0 Counter Wt Bypass Int Contactor
900 18 =S006-F1 5SX42167RC 240 VAC Supply MCB
11 Wire channel-50 mm 19 =S006-F2 5SX42047RC 24 VDC Supply MCB
800 =S001-X204(1x) 13 15 17 =S006-Q2 3RV10211DA10 AH1_Fan Supply
TERMINALS
3TH30 3TH30 3TH30 3TH30 3TH30
21
=S002-X204(2x) 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D
=S006-X16(2x)
300 =S006-X33(10x)
=S006-X34(10x)
200 =S006-X35(5x)
=S006-X36(3x)
Earth Busbar 40 X 10 x1Cu
=S006-X37(2x)
100
=S006-X38(7x)
Anti vibration pad Anti vibration pad Anti vibration pad
=S006-X39(8x)
0 25 mm height 25 mm height 25 mm height
=S006-X40(16x)
=S006-X42(2x)
=S006-X51(2x)
300
300
300
=S006-X53(10x)
=S006-X54(10x)
=S006-X55(29x)
=S006-X56(11x)
=S006-X57(19x)
=S006-X59(2x)
=S006-X66(5x)
=S006-X132(1x)
200
300
400
500
600
700
100
0
200
300
400
500
600
700
800
900
1000
1100
1200
0
200
300
400
500
600
700
800
900
1000
1100
1200
100
100
=S006-X203(5x)
=S006-X204(1x)
30
200
30
FRONT
All dimensions are in 'mm'(Scale 1:16)
Foundation Plan
21 23
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - GA_H2200_W1200_DOOR2_P18 Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & CMD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&CMD1/22
Design Document No. - G71053- J5663 (EF-1) Page 22
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 39
1 2 3 4 5 6 7 8 9 10
300 mm
2100
100x10x2CU Legend Device Tag Type Number Description
2000
1 =S011-S1 3SE30200A Door limit Switch
5
234Hx333Wx222D
(Handle-8UC63)
1700
6 =S011-A1 6SL30550AA005CA2 LT-2
3KA831/2
1600 GI SHEET
7 =S011-K40 PC230A082COB 8-Channel Relay Board
W500XH1400
8 =S011-V1 MF42010A RFI Filter
1500
9 =S011-B1 3RN10221DW00 Monitoring Relay
Cutout
1400 10 =S011-B2 3RN10221DW00 Monitoring Relay
Wire channel-50 mm
6 5 11 =S011-K41 PC24D08COB 8-Channel Relay Board
1300 Sinamics S120/SUPP
TM15/31/41
(150Hx30Wx111D)
TM54F
Sinamics G130
Terminal Board
SMC30/0.45kg
7 =S011-Q3 3SB12002AB01+3SB14000A RUN/Maint.
150H X50W X 111D
13
Weight-0.8kg.
Wire channel-50 mm
15 =S011-F2 5SX42047RC 24 VDC Power Supply MCB
1100 Wire channel-50 mm
18 =S011-F3 3UA58305C+3UX14210XA
8 9
11 =S011-F4 3UA58305C+3UX14210XA
Wire channel-50 mm
1000
NSL.FLTR.MF4201A
19
120Hx23Wx91D
120Hx23Wx91D
3RV102
3RN1022
3RN1022
97Hx90Wx96D
=S011-X19(2x)
700 =S011-X31(2x)
5SX_2P 5SX_2P
TERMINALS
=S011-X33(10x)
600 =S011-X34(10x) Wire channel-50 mm
=S011-X39(11x)
500 =S011-X51(2x)
=S011-X53(10x)
400 =S011-X54(10x)
=S011-X56(10x)
300 =S011-X56](1x)
=S011-X57(19x)
200 =S011-X251(12x)
300
0
200
300
400
500
600
200
300
400
500
600
100
100
100 100
30
30
200
CABLE TRENCH
760 (Base Channel Depth)
800 (Panel depth)
CABLE TRENCH
CABLE TRENCH
Protection Class IP42* Cable Entry(Power) Bottom
CABLE TRENCH
30
30
300 mm
2100
Legend Device Tag Type Number Description
100x10x2CU
2000 1 =S010-S1 3SE30200A Door Limit Switch
3 =S010-H1 DULUXSTAR T4 3U 20W-865 E27-HPF CFL
1900 3 4 =S010-V1 MF42010A RFI Filter
CFL
3KA831/2
1600 8 =S010-B1 3RN10221DW00 Monitoring Relay
GI SHEET
W500XH1550 9 =S010-B2 3RN10221DW00 Monitoring Relay
4
1500 NSL.FLTR.MF4201A
(150Hx30Wx111D)
10
TM54F
Sinamics G130
Terminal Board
SMC30/0.45kg
150H X50W X 111D
Weight-0.8kg.
120Hx23Wx91D
120Hx23Wx91D
3RN1022
3RN1022
14 =S010-K9 3TH30400AU0+3TX74023JY1+(4NO) Left (Step 1)
1200 FV
Wire channel-50 mm
15 =S010-K10 3TH30400AU0+3TX74023JY1+(4NO) Step 2
9
1100 Wire channel-50 mm 16 =S010-K41 PC24D08COB Relay Board
16 11 13 15 18 =S010-K11 3TH30400AU0+3TX74023JY1+(4NO) Step 3
=S001-X203(2x)
C10
Wire channel-50 mm
1000
3TH30 3TH30 3TH30 3TH30 3TH30
78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D
300
0
200
300
400
500
600
200
300
400
500
600
100
100
100 100
30
30
200
CABLE TRENCH
760 (Base Channel Depth)
800 (Panel depth)
CABLE TRENCH
CABLE TRENCH
Protection Class IP42* Cable Entry(Power) Bottom
CABLE TRENCH
30
30
300 mm
2100 3 Legend Device Tag Type Number Description
CFL
100x10x2CU
1 =S008-S1 3SE30200A Door Limit Switch
2000
1 2 =S008-V1 MF42010A RFI Filter
1900 2
NSL.FLTR.MF4201A
1500
1300 4
Sinamics G130
5
AOP30
0.55kg.
(156Hx212Wx31D)
FV
1200
FV
1100
1000
900
800
700
600
500
=S008-X17(4x)
TERMINALS
=S008-X55(30x)
400
=S008-X56(10x)
=S008-X57(20x)
300
200
Earth Busbar 40 X 10x1 Cu
100
Anti vibration pad Anti vibration pad
0 25 mm height 25 mm height
300
300
0
200
300
400
500
600
200
300
400
500
600
100
100
100 100
30
30
200
CABLE TRENCH
660 (Base Channel Depth)
700 (Panel depth)
CABLE TRENCH
CABLE TRENCH
Protection Class IP42* Cable Entry(Power) Bottom
Bottom
30
30
Cable Entry(Aux.)
FRONT
All dimensions are in 'mm'(Scale 1:16)
Foundation Plan
24 26
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - GA_H2200_W600_DOOR1_P21 Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & CMD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&CMD1/25
Design Document No. - G71053- J5663 (EF-1) Page 25
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 39
1 2 3 4 5 6 7 8 9 10
-PANEL22 (Isolators)
Panel General Arrangement Details
Equipment Layout
Front View (with Door) Front view (without Door) Side view
2200
Legend Details
300 mm
2100 100x10x2CU Legend Device Tag Type Number Description
100x10x2CU
-P -N
2000 1 =S008-S1 3SE30200A Door Limit Switch
2
CFL 2 =S008-H1 DULUXSTAR T4 3U 20W-865 E27-HPF CFL
1900 3 =S008-B1 3RN10221DW00 Monitoring Relay
(150Hx30Wx111D)
(150Hx30Wx111D)
4
3KA831/2
Sinamics G130
Sinamics G130
SMC30/0.45kg
SMC30/0.45kg
234Hx333Wx222D
120Hx23Wx91D
(Handle-8UC63)
1700
3RN1022
6 =S008-A4 6SL30550AA005CA2 SMC30
7
NSL.FLTR.MF4201A
3KA831/2
FV FV
Wire channel-50 mm
1600
8 =S008-K41 PC24D08COB Relay Board
GI SHEET
W700XH1000 8
1500 9 =S008-Q1 3KA83513UE00 Input Isolator
Cutout
10 =S008-K4 3TH30400AU0+3TX74023JY1+(4NO) Counter wt. LS
1400
Wire channel-50 mm 11 =S008-K5 3TH30400AU0+3TX74023JY1+(4NO) Pre Limit switch
17 10 11 12 13 14 15 16 =S008-K6 3TH30400AU0+3TX74023JY1+(4NO) End Limit switch
1300 3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
12
13 =S008-K7 3TH30400AU0+3TX74023JY1+(4NO) AH2-Null Position
1200
=S008-K8 3TH30400AU0+3TX74023JY1+(4NO) Hoist (Step 1)
Wire channel-50 mm
14
Wire channel-50 mm
1100 18 19 20 21 22 23 24 2627
3TH30 3TH30 3TH30 3TH30 3TH30 3TH30 3TH30
15 =S008-K9 3TH30400AU0+3TX74023JY1+(4NO) Lower (Step 1)
3RV102
25
78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D
97Hx90Wx96D
5SX_2P 5SX_2P
32 B07 16 =S008-K10 3TH30400AU0+3TX74023JY1+(4NO) Step 2
FRONT
1000 17 =S008-K40 PC230A082COB Relay Board
29 Wire channel-50 mm
18 =S008-K11 3TH30400AU0+3TX74023JY1+(4NO) Step 3
900
19 =S008-K12 3TH30400AU0+3TX74023JY1+(4NO) Step 4
GI SHEET =S001-X203(1x)
800 W700XH200 20 =S008-K13 3TH30400AU0+3TX74023JY1+(4NO) Step 5
=S007-X204(1x)
=S008-X16(1x) 21 =S008-K15 3TH30220AU0 AH-2 Brake Cont.
700 3TF53
180H X 158W X 185D
3TF50
150H X 143W X 150D
31 30 =S008-X17(1x) 3TF53
22 =S008-K44 3TH30220AU0 AH2 as MCT Selection
=S008-X31(2x)
600 =S008-X33(10x)
23 =S008-K45 3TH30220AU0 MCT Mode Selection
=S008-X34(10x) 24 =S008-K46 3TH30220AU0 AH-2 as OFF Selection
500 =S008-X35(3x) =S008-Q3 3SB12002AB01+3SB14000A RUN/Maint.
25
TERMINALS
TERMINALS
100x10x2CU =S008-X36(3x)
400 -P 26 =S008-F1 5SX42167RC 240 VAC Supply MCB
=S008-X37(2x) -N
=S008-X38(7x) 27 =S008-F2 5SX42047RC 24 VDC Supply MCB
300 =S008-X39(13x) 29 =S008-Q4 3SB12002AB01+3SB14000A AH-2 -OFF- MCT
=S008-X41(2x)
30 =S008-K43 3TF50020AU0 To MCT
200 =S008-X42(2x)
=S008-X201(2x)
=S008-X204(1x)
=S008-X251(3x)
300
300
300
0
200
300
400
500
600
700
800
200
300
400
500
600
700
800
200
300
400
500
600
700
100
100
100
100 100
30
30
200
CABLE TRENCH
660 (Base Channel Depth)
700 (Panel depth)
CABLE TRENCH
CABLE TRENCH
30
FRONT
All dimensions are in 'mm'(Scale 1:16)
Foundation Plan
25 27
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - GA_H2200_W800_DOOR2_P22 Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & CMD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&CMD1/26
Design Document No. - G71053- J5663 (EF-1) Page 26
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 39
1 2 3 4 5 6 7 8 9 10
300 mm
2100 Legend Device Tag Type Number Description
1400 4
SINAMICS
1300 5
FV
Sinamics G130
AOP30
0.55kg.
(156Hx212Wx31D)
FV
1200
1100 6 7
Sinamics S120/SUPP Sinamics S120/SUPP
TM15/31/41 TM15/31/41
TM54F TM54F
Terminal Board Terminal Board
150H X50W X 111D 150H X50W X 111D
Weight-0.8kg. Weight-0.8kg.
1000
=S007-X2O3(1x)
900 =S007-X17(3x)
=S007-X55(30x)
800 =S007-X56(20x)
=S007-X57(9x)
700 =S007-X111(2x)
Sinamics S120/SMM
=S007-X201(2x) Framesize FX
1400H X326W X 356D
=S007-X521(20x)
=S007-X522(9x)
500
TERMINALS
400
300
200
Earth Busbar 40 X 10x1 Cu
100
Anti vibration pad Anti vibration pad
0 25 mm height 25 mm height
300
300
0
200
300
400
500
600
200
300
400
500
600
100
100
100 100
30
30
200
CABLE TRENCH
660 (Base Channel Depth)
700 (Panel depth)
CABLE TRENCH
CABLE TRENCH
Protection Class IP42* Cable Entry(Power) Bottom
Bottom
30
30
Cable Entry(Aux.)
FRONT
All dimensions are in 'mm'(Scale 1:16)
Foundation Plan
26 28
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - GA_H2200_W600_DOOR1_P23 Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & CMD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&CMD1/27
Design Document No. - G71053- J5663 (EF-1) Page 27
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 39
1 2 3 4 5 6 7 8 9 10
-PANEL24
Panel General Arrangement Details
(Isolators)
Equipment Layout
Front View (with Door) Front view (without Door) Side view
2200 Legend Details
300 mm
2100 100x10x2CU
(150Hx30Wx111D)
(150Hx30Wx111D)
C10
Sinamics G130
Sinamics G130
SMC30/0.45kg
SMC30/0.45kg
120Hx23Wx91D
120Hx23Wx91D
7 7 =S007-S1 3SE30200A Door Limit Switch
3RN1022
3RN1022
3KA821/2
Wire channel-50 mm
1600 FV FV
8 =S007-H1 DULUXSTAR T4 3U 20W-865 E27-HPF CFL
3
Wire channel-50 mm 9 =S007-V1 MF42010A RFI Filter
1500
GI SHEET Cutout 10 10 =S007-K40 PC230A082COB Relay Board
9
NSL.FLTR.MF4201A
W700XH1050
1400 C10 11 =S007-Q1 3KA82313HE00 Input_DC_Isolator
12 =S007-K11 3TH30400AU0+3TX74023JY1+(4NO) Step 3
1300 Wire channel-50 mm
Wire channel-50 mm
13 =S007-K12 3TH30400AU0+3TX74023JY1+(4NO) Step 4
12 13 14 15 16 17 18 19 20 21 22 23
=S007-K13 3TH30400AU0+3TX74023JY1+(4NO) Step 5
3TH30 3TH30 3TH30 3TH30 3TH30 3TH30 3TH30 3TH30 3TH30 3TH30 3TH30 3TH30
1200 14
78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D
FRONT
37 17 =S007-K47 3TH30220AU0 ACT Mode Selection
1000 3TH30
78H X 45W X 85D
3RV102
97Hx90Wx96D
3UA58-00
Contactor Mounting
87.5H X 60W X 127D
3UA58-00
Contactor Mounting
87.5H X 60W X 127D
=S007-X17(7x) 23
117H X 113W X 123D
600 32 33 3TF50
=S007-X18(7x)
24 =S007-K10 3TH30400AU0+3TX74023JY1+(4NO) Step 2
=S007-X31(2x)
500 =S007-X33(10x) 26 =S007-F1 5SX42167RC 240 VAC Supply MCB
TERMINALS
TERMINALS
=S007-X34(10x) 27 =S007-F2 5SX42047RC 24 VDC Supply MCB
400 100x10x2CU =S007-X35(2x) -P -N
=S007-Q2 3RV10210FA10 MCT_FAN_Supply
31
=S007-X36(2x)
300 =S007-X37(2x) 32 =S007-K45 3TF47020AU0ZA01 Contactor to ACT
=S007-X38(7x) 33 =S007-K44 3TF51020AU0 Main Contactor_MCT
200 =S007-X39(9x)
34 =S007-F3 3UA58002FZ1+3UX1421 OLR1
=S007-X41(2x)
Earth Busbar 40 X 10x1Cu
35 =S007-F4 3UA58002FZ1+3UX1421 OLR2
100 =S007-X42(2x)
=S007-X51(2x) 36 =S007-H2 3SB52356HC10 DC LINK CHARGED
Anti vibration pad Anti vibration pad Anti vibration pad
0 25 mm height
=S007-X53(13x)
25 mm height 25 mm height
37 =S007-Q3 3SB50002AB01+3SB54000A RUN/Maint.
=S007-X54(13x)
=S007-X55(14x) 38 =S007-Q4 3SB50002AB01+3SB54000A MCT OFF ACT
=S007-X56(14x)
300
300
300
=S007-X61(8x)
=S007-X111(2x)
=S007-X201(2x)
=S007-X203(1x)
=S007-X204(10x)
=S007-X251(6x)
=S007-X255(2x)
0
200
300
400
500
600
700
800
200
300
400
500
600
700
800
200
300
400
500
600
700
100
100
100
=S007-X521(13x)
=S007-X522(1x)
=S007-X523(1x)
30
=S008-X204(1x)
200
CABLE TRENCH
660 (Base Channel Depth)
700 (Panel depth)
CABLE TRENCH
CABLE TRENCH
30
FRONT
All dimensions are in 'mm'(Scale 1:16)
Foundation Plan
27 29
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - GA_H2200_W800_DOOR2_P24 Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & CMD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&CMD1/28
Design Document No. - G71053- J5663 (EF-1) Page 28
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 39
1 2 3 4 5 6 7 8 9 10
300 mm
2100 Legend Device Tag Type Number Description
100x10x2CU
2000 1 1 =S009-H1 DULUXSTAR T4 3U 20W-865 E27-HPF CFL
CFL =S009-V1 MF42010A RFI Filter
2
1900
3 =S009-S1 3SE30200A Door Limit Switch
1500
1400 4
SINAMICS
1300 5
Sinamics G130
AOP30
FV
0.55kg.
(156Hx212Wx31D)
FV
1200
6
1100 Sinamics S120/SUPP
TM15/31/41
TM54F
Terminal Board
150H X50W X 111D
Weight-0.8kg.
1000
900
800
700
Sinamics S120/SMM
Framesize FX
1400H X326W X 356D
600 Weight=88 kg
500
TERMINALS
400
300
200
Earth Busbar 40 X 10x1 Cu
100
Anti vibration pad Anti vibration pad
0 25 mm height 25 mm height
300
300
0
200
300
400
500
600
200
300
400
500
600
100
100
100 100
30
30
200
CABLE TRENCH
660 (Base Channel Depth)
700 (Panel depth)
CABLE TRENCH
CABLE TRENCH
Protection Class IP42* Cable Entry(Power) Bottom
Bottom
30
30
Cable Entry(Aux.)
FRONT
All dimensions are in 'mm'(Scale 1:16)
Foundation Plan
28 30
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - GA_H2200_W600_DOOR1_P25 Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & CMD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&CMD1/29
Design Document No. - G71053- J5663 (EF-1) Page 29
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 39
1 2 3 4 5 6 7 8 9 10
-PANEL26 (Isolators)
Panel General Arrangement Details
Equipment Layout
Front View (with Door) Front view (without Door)
2200 Legend Details
300 mm
2100
100x10x2CU Legend Device Tag Type Number Description
2000
1 =S009-V1 MF42010A RFI Filter
1900 3 =S009-H1 DULUXSTAR T4 3U 20W-865 E27-HPF CFL
3 4 =S009-S1 3SE30200A Door Limit Switch
1800 7 CFL
25
NSL.FLTR.MF4201A
(150Hx30Wx111D)
GI SHEET 8 =S009-K40 PC230A082COB Relay Board
Sinamics G130
SMC30/0.45kg
FULL
Cutout 9 =S009-K41 PC24D08COB Relay Board
1500 FV
120Hx23Wx91D
=S009-K8 3TH30400AU0+3TX74023JY1+(4NO) Forward (Step 1)
3RN1022
12
Wire channel-50 mm
Wire channel-50 mm
1300
13 =S009-K9 3TH30400AU0+3TX74023JY1+(4NO) Reverse (Step 1)
=S001-X203(3x)
Wire channel-50 mm
1200 =S009-X16(1x) 14 =S009-K10 3TH30400AU0+3TX74023JY1+(4NO) Step 2
10 12 14 16
=S009-X17(5x) =S009-K11 3TH30400AU0+3TX74023JY1+(4NO) Step 3
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
3TH30
78H X 45W X 85D
15
1100 =S009-X31(2x)
18 16 =S009-K12 3TH30400AU0+3TX74023JY1+(4NO) Step 4
=S009-X33(10x) 11 13 15 17
1000 =S009-X34(10x) Wire channel-50 mm 17 =S009-K13 3TH30400AU0+3TX74023JY1+(4NO) Step 5
=S009-X35(2x) 19 20 2122
3TH30 3TH30 18 =S009-Q3 3SB12002AB01+3SB14000A RUN/Maint.
78H X 45W X 85D 78H X 45W X 85D
3RV102
97Hx90Wx96D
=S009-X36(2x)
900 5SX_2P 5SX_2P 23 19 =S009-K15 3TH30220AU0 ACT Brake Cont.
=S009-X37(2x)
=S009-X38(7x) 20 =S009-K43 3TH30400AU0+3TX74023JY1+(4NO) End Limit switch Reverse
800 Wire channel-50 mm
=S009-X39(9x) =S009-F1 5SX42167RC 240 VAC Supply MCB
21
=S009-X42(2x)
700 22 =S009-F2 5SX42047RC 24 VDC Supply MCB
=S009-X51(2x) 3TF47
117H X 113W X 123D
TERMINALS
=S009-X57(10x)
400 =S009-X63(4x)
=S009-X251(3x)
300 =S009-X252(3x)
200
Earth Busbar 40 X 10x1 Cu
100
Anti vibration pad Anti vibration pad
0 25 mm height 25 mm height
300
300
0
200
300
400
500
600
200
300
400
500
600
100
100
100 100
30
30
200
CABLE TRENCH
660 (Base Channel Depth)
700 (Panel depth)
CABLE TRENCH
CABLE TRENCH
Protection Class IP42* Cable Entry(Power) Bottom
Bottom
30
30
Cable Entry(Aux.)
FRONT
All dimensions are in 'mm'(Scale 1:16)
Foundation Plan
29 31
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - GA_H2200_W600_DOOR1_P26 Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & CMD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&CMD1/30
Design Document No. - G71053- J5663 (EF-1) Page 30
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 39
1 2 3 4 5 6 7 8 9 10
-PANEL27
Panel General Arrangement Details
Equipment Layout
Side view
Front View (with Door) Front view (without Door)
2200
GI SHEET
2100 W700XH200
2000
NSL.PT NSL.PT NSL.PT
FUSE BASE
3NW
76H X 25W X60D
FUSE BASE
3NW
76H X 25W X60D
FUSE BASE
3NW
76H X 25W X60D
FUSE BASE
3NW
76H X 25W X60D
FUSE BASE
3NW
76H X 25W X60D
CFL
Legend Details
20A/32AA 20A/32AA 20A/32AA 20A/32AA 20A/32AA
NSL.FLTR.MF4201A
1900
1800
3WL
(Fixed-mounted circuit Breaker)
4000A
1700
1600
1500
1300
1200 100x10x3Cu
1100
1000
900 120x10x2CU -B -Y -R -N
800
700
600
120x10x2CU
500 -B -Y -R -N
400
300
200
Earth Busbar 40 X 10 x1Cu
100
Anti vibration pad Anti vibration pad Anti vibration pad
0 25 mm height 25 mm height 25 mm height
300
300
300
0
200
300
400
500
600
700
800
900
1000
100
200
300
400
500
600
700
800
900
1000
100
200
300
400
500
600
700
800
900
1000
1100
1200
100
100 100
30
30
200
200
30
30 32
Previous page Next page
FRONT
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - GA_H2200_W1000_DOOR2_P27 Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & CMD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&CMD1/31
Design Document No. - G71053- J5663 (EF-1) Page 31
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 39
1 2 3 4 5 6 7 8 9 10
-PANEL28
Panel General Arrangement Details
Equipment Layout
Front View (with Door) Front view (without Door)
2200
Wire channel-50 mm
2100 CFL
SIEMENS SITOP SIEMENS SITOP
Legend Details
6EP1 336-3BA00 6EP1 336-3BA00
6EP1 436-3BA00 6EP1 436-3BA00
SITOP (130Hx160Wx120.5D) SITOP (130Hx160Wx120.5D)
120Hx22.5Wx91D
POWER 5 POWER 5 3TH30 3TH30 3TH30 3TH30 3TH30 3TH30
78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D 78H X 45W X 85D
3RP15
2000
Wire channel-75 mm
1900 NSL.FLTR.MF4201A
Wire channel-50 mm
3TF34 3TF34
5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P
1700
5SX_2P
FULL
EM
Conzerve
1500 3VL160X
3UA50/2/5
Contactor Mounting
MCCB
3VL160X upto 63A-160A 87.5H X 45W X 110D
(105Wx107Dx157H) 3RV1421
97Hx45Wx91D
5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P
1400
1100
1000
Wire channel-50 mm
900
Cutout 3VL160/250
3VL160X 3VL160X
MCCB
800
3VL160/250 upto 250A MCCB
(104.5Wx106.5Dx174.5H) MCCB
3VL160X upto 63A-160A 3VL160X upto 63A-160A
(105Wx107Dx157H) (105Wx107Dx157H)
SENTRON VL400
MCCB
3VL400
700
315A/400A
(139Wx138Dx279H)
40x5x1Cu
500
TERMINALS
TERMINALS
40x5x1Cu
400 R Y B
300
R Y B
200
Earth Busbar 40 X 10 x1Cu
100
Anti vibration pad Anti vibration pad
0 25 mm height 25 mm height
300
300
200
300
400
500
600
700
800
900
1000
1100
1200
100
0
200
300
400
500
600
700
800
900
1000
1100
1200
100
100 100
30
30
200
200
Bottom
200
30
31 33
Previous page FRONT Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - GA_H2200_W1200_DOOR2_P28 Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & CMD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&CMD1/32
Design Document No. - G71053- J5663 (EF-1) Page 32
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 39
1 2 3 4 5 6 7 8 9 10
32 34
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - GA_Legend Details_P28 Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & CMD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&CMD1/33
Design Document No. - G71053- J5663 (EF-1) Page 33
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 39
1 2 3 4 5 6 7 8 9 10
300 mm
2100
Legend Device Tag Type Number Description
100x10x2CU
2000 1 =S011-OP1 6SL30550AA004CA3 AOP30
6 2 =S011-A2 6SL30401MA000AA0 CU320-2_LT-2
1900 CFL
3 =S011-G2 6SL33201TG341AA0 Long Travel-2
1800 4 4 =S011-S24 3SE30200A Door Limit Switch
5 =S011-V1 MF42010A RFI Filter
1700
6 =S011-H9 DULUXSTAR T4 3U 20W-865 E27-HPF CFL
1500
1400
1300 1 3
Sinamics S120
Sinamics G130 CU320 -2 Control Unit
AOP30 300H X 50W X 226D
0.55kg.
(156Hx212Wx31D)
FV
1200
2
1100
1000 FV
900
800
700
600
500
400
300
200
Earth Busbar 40 X 10x1Cu
100
Anti vibration pad Anti vibration pad
0 25 mm height 25 mm height
300
300
0
200
300
400
500
600
700
800
200
300
400
500
600
700
800
100
100
100 100
30
30
200
CABLE TRENCH
660 (Base Channel Depth)
700 (Panel depth)
CABLE TRENCH
CABLE TRENCH
30
FRONT
All dimensions are in 'mm'(Scale 1:16)
Foundation Plan
33 35
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - GA_H2200_W800_DOOR2_P29 Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & CMD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&CMD1/34
Design Document No. - G71053- J5663 (EF-1) Page 34
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 39
1 2 3 4 5 6 7 8 9 10
-PANEL31 (Isolators)
Panel General Arrangement Details
Equipment Layout
Front View (with Door) Front view (without Door) Side view
2200 Legend Details
300 mm
2100 100x10x2CU
50x10x1CU
Legend Device Tag Type Number Description
-P -N -P -N
2000 1 =S006-S2 3SE30200A Door Limit Switch
FRONT
1000
900 GI SHEET
W700XH250
800
3TF68 3TF68 3TF68
H276XW230XD237 H276XW230XD237
14
15
700
600
500
400
300
200
Earth Busbar 40 X 10x1Cu
100
Anti vibration pad Anti vibration pad Anti vibration pad
0 25 mm height 25 mm height 25 mm height
300
300
300
0
200
300
400
500
600
700
800
200
300
400
500
600
700
800
200
300
400
500
600
700
100
100
100
100 100
30
30
200
CABLE TRENCH
660 (Base Channel Depth)
700 (Panel depth)
CABLE TRENCH
CABLE TRENCH
30
34 Foundation Plan 36
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - GA_H2200_W800_DOOR2_P31 Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & CMD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&CMD1/35
Design Document No. - G71053- J5663 (EF-1) Page 35
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 39
1 2 3 4 5 6 7 8 9 10
-PANEL12
Panel General Arrangement Details
Equipment Layout
Front View (with Door) Front view (without Door) Side view
2200
2100
Legend Details
2000
CFL
1900
1800 NSL.FLTR.MF4201A
100x10x3Cu
1700
1600
1400
1300
1200 100x10x3Cu
1100
1000
900 120x10x2CU -B -Y -R -N
800
100x10x3Cu
700
600
120x10x2CU
500 -B -Y -R -N
400
300
200
Earth Busbar 40 X 10 x1Cu
100
Anti vibration pad Anti vibration pad Anti vibration pad
0 25 mm height 25 mm height 25 mm height
300
300
300
0
200
300
400
500
600
700
800
900
1000
1100
1200
100
0
200
300
400
500
600
700
800
900
1000
0
200
300
400
500
600
700
800
900
1000
100
100
100 100
30
30
200
200
35
30
30
37
Previous page Next page
FRONT
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - GA_H2200_W1000_DOOR2_P32 Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & CMD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&CMD1/36
Design Document No. - G71053- J5663 (EF-1) Page 36
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 39
1 2 3 4 5 6 7 8 9 10
300 mm
2100
100x10x2CU
Legend Device Tag Type Number Description
2000
1 =S010-OP1 6SL30550AA004CA3 AOP30
6 2 =S010-A2 6SL30401MA000AA0 CU320-2_LT-1
1900 CFL
3 =S010-G2 6SL33201TG341AA0 Long Travel-1
1800 4 4 =S010-S1 3SE30200A Door Limit Switch
5 =S010-V1 MF42010A RFI Filter
1700
6 =S010-H1 DULUXSTAR T4 3U 20W-865 E27-HPF CFL
1600 Sinamics S120/SMM 5
Framesize HX NSL.FLTR.MF4201A
1500
1400
1300 1 3
Sinamics S120
Sinamics G130 CU320 -2 Control Unit
AOP30 300H X 50W X 226D
0.55kg.
(156Hx212Wx31D)
FV
1200
2
1100
1000 FV
900
800
700
600
500
400
300
200
Earth Busbar 40 X 10x1Cu
100
Anti vibration pad Anti vibration pad
0 25 mm height 25 mm height
300
300
0
200
300
400
500
600
700
800
200
300
400
500
600
700
800
100
100
100 100
30
30
200
CABLE TRENCH
660 (Base Channel Depth)
700 (Panel depth)
CABLE TRENCH
CABLE TRENCH
30
36 Foundation Plan 38
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - GA_H2200_W800_DOOR2_P33 Sales Order No. - 3002447129 Current Project Status - As Commissioned = A000
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & CMD1
Function - Overview
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A000&CMD1/37
Design Document No. - G71053- J5663 (EF-1) Page 37
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 39
1 2 3 4 5 6 7 8 9 10
Legend Details
Legend Device Tag Type Number Description
(with Door) Front view (without Door) Side view 13 =J001-F13 5SX42207RC Bay Illumination MCB
14 =J001-F9 5SX42107RC E-Room Illumination MCB
15 =J001-F3 5SX42107RC Trafo. Primary MCB
1 15 16 17 18
500 500 500
5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P
Wire channel-50 mm
Wire channel-50 mm
400 400 2 4
400
628 mm
14 11 19 13
300 300 300
5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P 5SX_2P
0 0 0
0
200
300
400
500
0
100
100
210
0
200
300
400
500
100
-REMOTE_STATION3
Panel General Arrangement Details
Legend Details
Legend Device Tag Type Number Description
500 500 13 =J002-H13 3SB14012WZ3 Common Off-2 Healthy (E-Stop & Corner
Switch)
1 2 3 4
14 =J002-H14 3SB14012WZ3 Spare
400 400 15 =J002-H15 3SB14012WZ3 Spare
5 6 7 10 16 =J002-H16 3SB14012WZ3 Spare
300 300
528 mm
11 12 13 14
200 200
15 16
100 100
0 0
160
0
100
0
200
300
400
100
Equipment list
Type No. Description Qty Supplier/Make Device Tag Cross Reference Remarks
OETL3150K3 3 pole switch disconnector, AC21A, 690V, 3150 A, supplied with handle & extension shaft 1 ABB =A001+P032-Q1 (=A001&WD1/1.1)
3WL12324DG424GT2Z 1
4 Pole ACB 3WL: Rated Voltage 690V, Rated Current 3200A, Breaking Capacity 100kA, LSING protection(ETU 27), Mounting - Rear horizontal (Fixed), Charging Siemens =A001+P027-Q1 (=A001&WD1/2.1)
Mechanism- Manual/Motorized(220V AC/DC) ,with 1st shunt trip(220V AC/DC) and 2nd UV release(380-415V AC),with 2 NO + 2 NC , Size II , with Z options
+T40 ACB 3WL Options: DOOR SEALING FRAME 1 Siemens =A001+P027-Q1 (=A001&WD1/2.1)
3NWNS2 HRC Fuse 3NW (BS Type): Rated Voltage 415V AC, Rated Current 2A 1 Siemens =A001+P027-F9 (=A001&WD1/2.3)
3NW20NNSF HRC Fuse Base for (3NW NS type): Rated Voltage 415V AC, Rated Current 20A 1 Siemens =A001+P027-F9 (=A001&WD1/2.3)
3NWNS2 HRC Fuse 3NW (BS Type): Rated Voltage 415V AC, Rated Current 2A 1 Siemens =A001+P027-F10 (=A001&WD1/2.3)
3NW20NNSF HRC Fuse Base for (3NW NS type): Rated Voltage 415V AC, Rated Current 20A 1 Siemens =A001+P027-F10 (=A001&WD1/2.3)
3NWNS2 HRC Fuse 3NW (BS Type): Rated Voltage 415V AC, Rated Current 2A 1 Siemens =A001+P027-F11 (=A001&WD1/2.3)
3NW20NNSF HRC Fuse Base for (3NW NS type): Rated Voltage 415V AC, Rated Current 20A 1 Siemens =A001+P027-F11 (=A001&WD1/2.3)
3SB14012WZ3 Wide band LED pilot light(Red) for AC 42 to 240V and DC 42 to 220V 1 Siemens =A001+P027-H1 (=A001&WD1/2.3)
PT 750/Root3:110/Root3.10VA Potential Transformer:Primary 750/Root3, Secondary 110/Root3,Burden 10VA, Rated voltage 1100 VAC, Accuracy Class 1 1 AEI/UNITEC/ EPI/Power & Communications =A001+P027-T1 (=A001&WD1/2.3) Make: AEI/UNITEC/EPI/POWER
& COMMUNICATIONS
3SB14072WZ3 Wide band LED pilot light(Yellow) for AC 42 to 240V and DC 42 to 220V 1 Siemens =A001+P027-H2 (=A001&WD1/2.4)
PT 750/Root3:110/Root3.10VA Potential Transformer:Primary 750/Root3, Secondary 110/Root3,Burden 10VA, Rated voltage 1100 VAC, Accuracy Class 1 1 AEI/UNITEC/ EPI/Power & Communications =A001+P027-T2 (=A001&WD1/2.4) Make: AEI/UNITEC/EPI/POWER
& COMMUNICATIONS
3SB14042WZ3 Wide band LED pilot light(Blue) for AC 42 to 240V and DC 42 to 220V 1 Siemens =A001+P027-H3 (=A001&WD1/2.5)
PT 750/Root3:110/Root3.10VA Potential Transformer:Primary 750/Root3, Secondary 110/Root3,Burden 10VA, Rated voltage 1100 VAC, Accuracy Class 1 1 AEI/UNITEC/ EPI/Power & Communications =A001+P027-T3 (=A001&WD1/2.5) Make: AEI/UNITEC/EPI/POWER
& COMMUNICATIONS
Current Transformer Current Transformer (Refer Spec Sheet) 1 ABB/JAYSHREE/PRAGATI/KAPPA =A001+P027-L1 (=A001&WD1/2.6) Make: ABB/JAYSHREE/PRAGATI/
KAPPA
Current Transformer Current Transformer (Refer Spec Sheet) 1 ABB/JAYSHREE/PRAGATI/KAPPA =A001+P027-L2 (=A001&WD1/2.7) Make: ABB/JAYSHREE/PRAGATI/
KAPPA
3RV10211CA10 MPCB 3RV: Rated Voltage 415V,Rated current 2.5A,overload release 1.8 - 2.5A,s/c release 30A,Breaking Capacity 100kA 1 Siemens =A001+P027-Q2 (=A001&WD1/2.7)
Current Transformer Current Transformer (Refer Spec Sheet) 1 ABB/JAYSHREE/PRAGATI/KAPPA =A001+P027-L3 (=A001&WD1/2.7) Make: ABB/JAYSHREE/PRAGATI/
KAPPA
3VL17032DA360AA0 3-Pole MCCB (VL 160X) fixed O/L - S/C trip settings: Rated Voltage 690V AC ,Rated Current 32A ,Breaking Capacity 70kA at 415V AC (6kA at 690V AC) 1 Siemens =A001+P028-Q2 (=A001&WD1/3.5)
3VL17102DA360AA0 3-Pole MCCB (VL 160X) fixed O/L - S/C trip settings: Rated Voltage 690V AC ,Rated Current 100A ,Breaking Capacity 70kA at 415V AC (6kA at 690V AC)1 Siemens =A001+P028-Q3 (=A001&WD1/3.7)
3VL37252DC360AA0 3-Pole MCCB (VL 250) adjustable O/L - S/C trip settings: Rated Voltage 690V AC ,Rated Current 250A ,Breaking Capacity 70kA at 415V AC (6kA at 690V1AC) Siemens =A001+P028-Q4 (=A001&WD1/3.9)
Control Transformer Control Transformer: (Refer Spec Sheet) 1 AEI/UNITEC/ EPI/Power & Communications =A001+P028-T4 (=A001&WD1/4.3) Make: AEI/UNITEC/EPI/POWER
& COMMUNICATIONS
PT 750/Root3:110/Root3 Potential Transformer:Primary 750/Root3,Secondary 110/Root3,Burden 10VA,Accuracy Class 1(Refer Specification Sheet) 1 AEI/UNITEC/ EPI/Power & Communications =A001+P028-T5 (=A001&WD1/4.8) Make: AEI/UNITEC/EPI/POWER
& COMMUNICATIONS
PT 750/Root3:110/Root3 Potential Transformer:Primary 750/Root3,Secondary 110/Root3,Burden 10VA,Accuracy Class 1(Refer Specification Sheet) 1 AEI/UNITEC/ EPI/Power & Communications =A001+P028-T6 (=A001&WD1/4.9) Make: AEI/UNITEC/EPI/POWER
& COMMUNICATIONS
5SX42327RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 32A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F45 (=A001&WD1/5.5)
5SX42107RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 10A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F44 (=A001&WD1/6.5)
MF42010A EMI Filter: Rated Voltage 230V AC (1 Phase), Rated Current 10A 1 EMI solutions =A001+P027-V4 (=A001&WD1/7.4)
DULUXSTAR T4 3U 20W-865 E27-HPF CFL,240V AC,18W (DULUXSTAR T4 3U 20W-865 E27-HPF) 1 Osram =A001+P027-H8 (=A001&WD1/7.5)
MF42010A EMI Filter: Rated Voltage 230V AC (1 Phase), Rated Current 10A 1 EMI solutions =A001+P028-V4 (=A001&WD1/7.6)
DULUXSTAR T4 3U 20W-865 E27-HPF CFL,240V AC,18W (DULUXSTAR T4 3U 20W-865 E27-HPF) 1 Osram =A001+P028-H1 (=A001&WD1/7.6)
=A000&CMD1/39 2
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Equipment List Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & EQ1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001&EQ1/1
Design Document No. - G71053- J5663 (EF-1) Page 1
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 5
1 2 3 4 5 6 7 8 9 10
Equipment list
Type No. Description Qty Supplier/Make Device Tag Cross Reference Remarks
MF42010A EMI Filter: Rated Voltage 230V AC (1 Phase), Rated Current 10A 1 EMI solutions =A001+P032-V11 (=A001&WD1/7.8)
DULUXSTAR T4 3U 20W-865 E27-HPF CFL,240V AC,18W (DULUXSTAR T4 3U 20W-865 E27-HPF) 1 Osram =A001+P032-H9 (=A001&WD1/7.8)
3VL47402DC360AA0 3-Pole MCCB (VL 400) adjustable O/L - S/C trip settings: Rated Voltage 690V AC ,Rated Current 400A ,Breaking Capacity 70kA at 415V AC (8kA at 690V1AC) Siemens =A001+P028-Q5 (=A001&WD1/8.1)
3VL17102DA360AA0 3-Pole MCCB (VL 160X) fixed O/L - S/C trip settings: Rated Voltage 690V AC ,Rated Current 100A ,Breaking Capacity 70kA at 415V AC (6kA at 690V AC)1 Siemens =A001+P028-Q7 (=A001&WD1/8.4)
3VL17102DA360AA0 3-Pole MCCB (VL 160X) fixed O/L - S/C trip settings: Rated Voltage 690V AC ,Rated Current 100A ,Breaking Capacity 70kA at 415V AC (6kA at 690V AC)1 Siemens =A001+P028-Q8 (=A001&WD1/8.5)
3VL17102DA360AA0 3-Pole MCCB (VL 160X) fixed O/L - S/C trip settings: Rated Voltage 690V AC ,Rated Current 100A ,Breaking Capacity 70kA at 415V AC (6kA at 690V AC)1 Siemens =A001+P028-Q10 (=A001&WD1/8.7)
3VL17102DA360AA0 3-Pole MCCB (VL 160X) fixed O/L - S/C trip settings: Rated Voltage 690V AC ,Rated Current 100A ,Breaking Capacity 70kA at 415V AC (6kA at 690V AC)1 Siemens =A001+P028-Q9 (=A001&WD1/8.9)
3RV10314EA10 MPCB 3RV: Rated Voltage 415V,Rated current 32A,overload release 22 - 32A,s/c release 384A,Breaking Capacity 50kA 1 Siemens =A001+P028-Q12 (=A001&WD1/9.2)
3RV10314EA10 MPCB 3RV: Rated Voltage 415V,Rated current 32A,overload release 22 - 32A,s/c release 384A,Breaking Capacity 50kA 1 Siemens =A001+P028-Q6 (=A001&WD1/9.3)
3RV14211EA10 1
Circuit Breaker, 2.8-4 A N-Release 82 A, SIZE S0 Transformer protection, CL. 10, Screw Connection, Breaking Capacity 100kA at 400V;wihtout Auxiliary switch Siemens =A001+P028-Q11 (=A001&WD1/9.5)
es
Control Transformer Control Transformer: (Refer Spec Sheet) 1 AEI/UNITEC/ EPI/Power & Communications =A001+P028-T7 (=A001&WD1/10.2) Make: AEI/UNITEC/EPI/POWER
& COMMUNICATIONS
3RV10314EA10 MPCB 3RV: Rated Voltage 415V,Rated current 32A,overload release 22 - 32A,s/c release 384A,Breaking Capacity 50kA 1 Siemens =A001+P028-Q18 (=A001&WD1/10.3)
3RV10314EA10 MPCB 3RV: Rated Voltage 415V,Rated current 32A,overload release 22 - 32A,s/c release 384A,Breaking Capacity 50kA 1 Siemens =A001+P028-Q19 (=A001&WD1/10.3)
6EP13363BA00 SITOP MODULAR 20 STABILIZED POWER SUPPLY INPUT: 120/230 V AC OUTPUT: 24 V DC/20 A 1 Siemens =A001+P028-V1 (=A001&WD1/10.6)
6EP13363BA00 SITOP MODULAR 20 STABILIZED POWER SUPPLY INPUT: 120/230 V AC OUTPUT: 24 V DC/20 A 1 Siemens =A001+P028-V2 (=A001&WD1/10.8)
5SX42067RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 06A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F16 (=A001&WD1/11.2)
5SX42067RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 06A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F17 (=A001&WD1/11.4)
5SX42067RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 06A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F18 (=A001&WD1/11.6)
5SX42067RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 06A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F19 (=A001&WD1/11.7)
5SX42067RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 06A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F20 (=A001&WD1/11.9)
5SX42067RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 06A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F21 (=A001&WD1/12.2)
5SX42067RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 06A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F22 (=A001&WD1/12.4)
5SX42067RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 06A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F23 (=A001&WD1/12.5)
5SX42067RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 06A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F24 (=A001&WD1/12.7)
1 3
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Equipment List Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & EQ1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001&EQ1/2
Design Document No. - G71053- J5663 (EF-1) Page 2
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 5
1 2 3 4 5 6 7 8 9 10
Equipment list
Type No. Description Qty Supplier/Make Device Tag Cross Reference Remarks
5SX42067RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 06A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F25 (=A001&WD1/12.9)
5SX42107RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 10A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F26 (=A001&WD1/13.1)
5SX42107RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 10A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F27 (=A001&WD1/13.3)
5SX42107RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 10A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F28 (=A001&WD1/13.5)
5SX42107RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 10A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F29 (=A001&WD1/13.6)
5SX42107RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 10A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F30 (=A001&WD1/13.8)
5SX42107RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 10A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F31 (=A001&WD1/13.9)
5SX42107RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 10A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F32 (=A001&WD1/14.1)
5SX42107RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 10A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F33 (=A001&WD1/14.3)
5SX42107RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 10A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F34 (=A001&WD1/14.5)
5SX42107RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 10A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F35 (=A001&WD1/14.7)
5SX42107RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 10A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F36 (=A001&WD1/14.8)
5SX42167RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 16A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F37 (=A001&WD1/15.2)
5SX42167RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 16A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F38 (=A001&WD1/15.3)
5SX42167RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 16A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F39 (=A001&WD1/15.5)
5SX42167RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 16A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F40 (=A001&WD1/15.7)
5SX42167RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 16A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F41 (=A001&WD1/15.8)
5SX42047RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 04A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F15 (=A001&WD1/15.9)
3VL17032DA360AA0 3-Pole MCCB (VL 160X) fixed O/L - S/C trip settings: Rated Voltage 690V AC ,Rated Current 32A ,Breaking Capacity 70kA at 415V AC (6kA at 690V AC) 1 Siemens =A001+P028-Q16 (=A001&WD1/17.7)
3VL17032DA360AA0 3-Pole MCCB (VL 160X) fixed O/L - S/C trip settings: Rated Voltage 690V AC ,Rated Current 32A ,Breaking Capacity 70kA at 415V AC (6kA at 690V AC) 1 Siemens =A001+P028-Q17 (=A001&WD1/17.9)
5SX42027RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 02A ,Breaking Capacity 10 KA 1 Siemens =A001+P028-F46 (=A001&WD1/18.2)
2 4
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Equipment List Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & EQ1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001&EQ1/3
Design Document No. - G71053- J5663 (EF-1) Page 3
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 5
1 2 3 4 5 6 7 8 9 10
Equipment list
Type No. Description Qty Supplier/Make Device Tag Cross Reference Remarks
EM6400 Energy meter: Aux Supply 44 to 300V AC/DC 1 Conzerv =A001+P028-V1 (=A001&WD1/18.3)
3SB50000UC01 Mushroom push Button actuator with holder rear connection normal with P.F.R. latched (Red) 1 Siemens =A001+P027-S1 (=A001&WD1/19.2)
3SB59210AB Yellow contrast lable for Mashroom PB with inscription 'Emergency Stop' 1 Siemens =A001+P027-S1 (=A001&WD1/19.2)
3SB54000A Contact block rear connection for PB/SS (1NO+1NC) 2 Siemens =A001+P027-S1 (=A001&WD1/19.2)
=A001+P027-S1 (=A001&WD1/19.2)
3TH30400AU0 Auxiliary Contactor, 10A AC15, 4 NO, Coil Voltage: 240V AC, 50 Hz 1 Siemens =A001+P028-K21 (=A001&WD1/19.5)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 1 Siemens =A001+P028-K21 (=A001&WD1/19.5)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 1 Siemens =A001+P028-K21 (=A001&WD1/19.5)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =A001+P028-K21 (=A001&WD1/19.5)
=A001+P028-K21 (=A001&WD1/19.5)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =A001+P028-K21.1 (=A001&WD1/19.6)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 1 Siemens =A001+P028-K21.1 (=A001&WD1/19.6)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 1 Siemens =A001+P028-K21.1 (=A001&WD1/19.6)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 1 Siemens =A001+P028-K21.1 (=A001&WD1/19.6)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 1 Siemens =A001+P028-K21.1 (=A001&WD1/19.6)
3TH30400AU0 Auxiliary Contactor, 10A AC15, 4 NO, Coil Voltage: 240V AC, 50 Hz 1 Siemens =A001+P028-K22 (=A001&WD1/19.7)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 1 Siemens =A001+P028-K22 (=A001&WD1/19.7)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 1 Siemens =A001+P028-K22 (=A001&WD1/19.7)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 1 Siemens =A001+P028-K22 (=A001&WD1/19.7)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 1 Siemens =A001+P028-K22 (=A001&WD1/19.7)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =A001+P028-K23 (=A001&WD1/20.2)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =A001+P028-K23 (=A001&WD1/20.2)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =A001+P028-K23 (=A001&WD1/20.2)
=A001+P028-K23 (=A001&WD1/20.2)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =A001+P028-K23 (=A001&WD1/20.2)
=A001+P028-K23 (=A001&WD1/20.2)
3RP15051BW30 Timing relays, multifunction, 15 time setting ranges(3RP): Voltage 24-240V AC/DC , Aux contact 2C/O 1 Siemens =A001+P028-K26 (=A001&WD1/20.4)
3TF34000AU0 Power Contactor: 3 Pole, 32A AC3 upto 415V AC and 65A AC1 upto 690V AC,with-out auxiliary contacts, Coil Voltage: 240V AC 50Hz 1 Siemens =A001+P028-K2 (=A001&WD1/20.5)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =A001+P028-K2 (=A001&WD1/20.5)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 1 Siemens =A001+P028-K2 (=A001&WD1/20.5)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 1 Siemens =A001+P028-K2 (=A001&WD1/20.5)
3TF34000AU0 Power Contactor: 3 Pole, 32A AC3 upto 415V AC and 65A AC1 upto 690V AC,with-out auxiliary contacts, Coil Voltage: 240V AC 50Hz 1 Siemens =A001+P028-K1 (=A001&WD1/20.6)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =A001+P028-K1 (=A001&WD1/20.6)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 1 Siemens =A001+P028-K1 (=A001&WD1/20.6)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 1 Siemens =A001+P028-K1 (=A001&WD1/20.6)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =A001+P028-K24 (=A001&WD1/20.8)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =A001+P028-K24 (=A001&WD1/20.8)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =A001+P028-K24 (=A001&WD1/20.8)
=A001+P028-K24 (=A001&WD1/20.8)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =A001+P028-K24 (=A001&WD1/20.8)
3 5
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Equipment List Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & EQ1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001&EQ1/4
Design Document No. - G71053- J5663 (EF-1) Page 4
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 5
1 2 3 4 5 6 7 8 9 10
Equipment list
Type No. Description Qty Supplier/Make Device Tag Cross Reference Remarks
=A001+P028-K24 (=A001&WD1/20.8)
3TF50020AU0 Power Contactor: 3 Pole, 110A AC3 upto 415V AC and 170A AC1 upto 690V AC, Auxiliary contacts2NO+2NC, Coil Voltage: 240V AC 50Hz 1 Siemens =A001+P028-K25 (=A001&WD1/20.9)
3TX74623GY1 Surge suppressor (varistor) for 3TF46-56: Coil Voltage 24-48VAC/24-70VDC 1 Siemens =A001+P028-K25 (=A001&WD1/20.9)
3SB12000AE01 Push Button actuator with holder rear connection normal with P.F.R.(Green) 1 Siemens =A001+P027-S2 (=A001&WD1/21.5)
3SB12000AC01 Push Button actuator with holder rear connection normal with P.F.R.(Red) 1 Siemens =A001+P027-S3 (=A001&WD1/21.5)
3SB14000A Contact block rear connection for PB/SS (1NO+1NC) 1 Siemens =A001+P027-S3 (=A001&WD1/21.5)
4 &WD1/1
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Equipment List Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & EQ1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001&EQ1/5
Design Document No. - G71053- J5663 (EF-1) Page 5
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 5
1 2 3 4 5 6 7 8 9 10
RI2 / (2.2)
TO ACB
YI2 / (2.2)
BI2 / (2.2)
N_2 / (2.2)
R2 Y2 B2
(3.6) (3.6) (3.6)
To Primary
Transformer
1 3 5 7
=A001+P032-Q1
3150A
2 4 6 8
RT1 / (3.5)
To Ligthing Transformer
BT1 / (3.5)
=A001+P032-X16 1 2 3 4
3 Phase,690 V AC Supply
from DSL
&EQ1/5 2
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Isolator Panel Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P027 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P027&WD1/1
Design Document No. - G71053- J5663 (EF-1) Page 1
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
RI1 / (3.2)
S2 S1
=A001+P027-L1 YI1 / (3.2)
3200:5A
Current Transformer S2 S1
=A001+P027-L2 BI1 / (3.2)
3200:5A
Current Transformer S2 S1
=A001+P027-L3
3200:5A NI1 / (3.2)
Current Transformer
CB_NO_11 / (2.8)
=A001+P027-X100 1 2 3 4 5 6
CB_NC_11 / (2.8)
CB_NO_21 / (22.2)
CB_NC_21 / (22.4)
CB_NO_31 / (27.5) CT1 CT2 CT3 CT4 CT5 CT6
2.5 SQ MM
CB_NC_31 / (=S001/1.9) (18.4) (18.4) (18.5) (18.5) (18.6) (18.6)
Under Revision
=A001+P027-X39 3
CB_NO_41 / (20.9)
=A001+P027-X36 1
CB_NC_41 / (=S002/1.9)
=A001+P027-Q1
3200A 2 4 6 8 -X6:12 10 4 2 -X5:10 8 6 4
(/2.7)
3WL-ACB
(/2.7) (10.1)
(/2.8)
(/2.9) L_1
(/2.10)
N_1 / (10.4)
S1 S2 S3 S4
=A001+P028-K21
63 D11
OFF2 CHAIN
(/19.5) 64
4 mm² 1 2
CB_NC_12 CB_NO_12
2.5 mm² (2.4) (2.4)
=A001+P027-F9
4 mm² 1 2
2A Y_UV / (4.8)
HRC Fuse 2.5 mm²
GREAY
=A001+P027-F10
4 mm² 1 2
2A B_UV / (4.8)
HRC Fuse 2.5 mm²
=A001+P027-F11
2A =A001+P027-Q1
(/2.1)
HRC Fuse 2.5 mm² 2.5 mm²
-X5:2 -X7:9 -X6:7 -X6:14 -X5:12
GREAY X7:13
L+/L L+/L L+/L L+/L L+/L
P1 P2 P1 P2 P1 P2
4
UNDER-VOLTAGE
S1 S2 S1 S2 S1 S2
1ST SHUNT
SOLENOID
CLOSING
RELEASE
RELEASE
3WL
MOTOR
2.5 mm² 2.5 mm² L-/N L-/N L-/N L-/N
3WL
3WL
3WL
3WL
GREAY R1 / (18.6)
-X5:1 -X6:8 -X6:13 -X5:11 X7:14 12
Y1 / (18.5)
B1 / (18.5) S24_NC / (27.7)
S24_NO / (22.6)
2.5 mm² 2.5 mm² 2.5 mm²
GREAY GREAY GREAY
X1 X1 X1 UV_VFD2
=A001+P027-H1 =A001+P027-H2 =A001+P027-H3 (4.8)
(1.9) / RI2
(1.9) / YI2
(1.9) / BI2
(1.9) / N_2
PE
1 3
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Incomer (Air Circuit Breaker) Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P027 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P027&WD1/2
Design Document No. - G71053- J5663 (EF-1) Page 2
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
(2.10) / NI1
3VL-MCCB
3VL-MCCB
3VL-MCCB
I> I> I> I> I> I> I> I> I>
1 3 5 1 3 5 1 3 5
4 mm² 4 mm²
PCP PCP
R4 B4 R7 Y7 B7
(4.3) (4.3) (4.6) (4.6) (4.6)
Suply to VFD Panels Supply for Lighting Supply for 200 KVA
Transformer Spare Transformer Primary
2 4
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Feeder Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P031 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P031&WD1/3
Design Document No. - G71053- J5663 (EF-1) Page 3
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
(2.6) / Y_UV
(2.6) / B_UV
the PP the PP
P1 P2 P1 P2
=A001+P028-X3 1 2 3 =A001+P028-X3 4 5
=A001+P028-X32 1 2
(2.9) / UV_VFD1
(2.9) / UV_VFD2
R8 Y8 B8
(8.1) (8.1) (8.1)
3 5
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Control Transformer Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P028 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P028&WD1/4
Design Document No. - G71053- J5663 (EF-1) Page 4
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
(3.3) / R_FAN
(3.3) / Y_FAN
4 mm² 4 mm²
PCP PCP
2 4
=A001+P028-F45
32A
2-Pole MCB 1 3
4 mm² 4 mm²
PCP PCP
=A001+P029-X31 =A001+P029-X32
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
(=S001/3.8) / R_ALM1
(=S002/3.8) / R_ALM2
(=S003/3.9) / R_MH1
(=S004/2.8) / R_MH2
(=S005/3.4) / R_MH_STD
(=S006/2.8) / R_AH1
(=S008/2.8) / R_AH2
(=S007/3.8) / R_MCT
(=S009/2.8) / R_ACT
(=S010/2.7) / R_LT1
(=S011/2.7) / R_LT2
/ SPARE 1
/ SPARE 2
/ SPARE3
/ SPARE 4
(=S001/3.8) / Y_ALM1
(=S002/3.8) / Y_ALM2
(=S003/3.9) / Y_MH1
(=S004/2.8) / Y_MH2
(=S005/3.4) / Y_MH_STD
(=S006/2.8) / Y_AH1
(=S008/2.8) / Y_AH2
(=S007/3.8) / Y_MCT
(=S009/2.8) / Y_ACT
(=S010/2.7) / Y_LT1
(=S011/2.7) / Y_LT2
/ SPARE 5
/ SPARE 6
/ SPARE 7
/ SPARE 8
690 VAC distribution Strip
For Motor Module Fan Supply
4 6
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Power Distribution Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P028 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P028&WD1/5
Design Document No. - G71053- J5663 (EF-1) Page 5
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
2 4
=A001+P028-F44
10A
2-Pole MCB 1 3
=A001+P029-X39 =A001+P029-X40
1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10
/ L240:1
/ L240:2
(22.2) / L240:3
(19.1) / L240:4
(18.1) / L240:5
/ L240:6
/ L240:7
/ L240:8
/ L240:9
/ L240:10
/ N240:1
/ N240:2
(22.2) / N240:3
(19.1) / N240:4
(18.1) / N240:5
(=J002/1.2) / N240:6
/ N240:7
/ N240:8
/ N240:9
/ N240:10
240 VAC distribution Strip
5 7
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Power Distribution Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P028 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P028&WD1/6
Design Document No. - G71053- J5663 (EF-1) Page 6
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
2.5 mm²
(10.3) / L_12 GREY
21 21 21
=A001+P027-S4 =A001+P028-S4 =A001+P032-S24
Door Limit Switch Door Limit Switch Door Limit Switch
22 22 22
CFL CFL CFL
1.5 mm² 240V AC,18W 1.5 mm² 240V AC,18W 1.5 mm² 240V AC,18W
1 2 =A001+P027-H8 1 2 =A001+P028-H1 1 2 =A001+P032-H9
1 1 1
1.5 mm² 1.5 mm² 1.5 mm²
PE PE PE
2.5 mm²
(10.6) / N_12 GREY
6 8
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Panel Auxiliary Circuits Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P028 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P028&WD1/7
Design Document No. - G71053- J5663 (EF-1) Page 7
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
(4.6) / B8 R3 / (9.1)
(4.6) / Y8 Y3 / (9.1)
(4.6) / R8 B3 / (9.1)
25 mm²
PCP
25 mm²
PCP
2X70 mm²
PCP =A001+P028-Q10
=A001+P028-Q8 100A 2 4 6
Supply for the E-room AC
3VL-MCCB
100A 2 4 6
AC for E- Room
3VL-MCCB
I> I> I>
25 mm² I> I> I> 25 mm²
PCP PCP
=A001+P028-Q5
400A 2 4 6
MCCB_400A
3VL-MCCB
1 3 5
1 3 5
I> I> I>
=A001+P028-Q7 =A001+P028-Q9
100A 2 4 6 100A 2 4 6
AC for Operator Cabin Supply for Brake rectifier Panel
3VL-MCCB
3VL-MCCB
1 3 5
I> I> I> I> I> I>
25 mm²
PCP
2X70 mm² 1 3 5 1 3 5
PCP
25 mm²
PCP
25 mm²
PCP
25 mm²
PCP
1 3 5
=A001+P028-K25
110A 2 4 6
(/20.9)
=A001+P032-X2 4 5 6
D11
=A001+P032-X1 4 5 6 =A001+P032-X1 7 8 9 =A001+P032-X2 1 2 3
(16.1) / R_BRAKE
(16.1) / Y_BRAKE
(16.1) / B_BRAKE
AC for Operator Cabin AC for E-Room Supply for E-Room AC Supply for Brake Rectifier Panel
7 9
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Feeders Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P028 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P028&WD1/8
Design Document No. - G71053- J5663 (EF-1) Page 8
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
(8.10) / R3 R4 / (10.2)
(8.10) / Y3 Y4 / (10.2)
(8.10) / B3
25 mm² 4 mm²
PCP PCP
4 mm²
PCP =A001+P028-Q13 =A001+P028-Q15
100A 2 4 6 32A 2 4 6
1 3 5 13 21 Supply for the E-room AC MCCB
3VL-MCCB
3VL-MCCB
25 mm²
=A001+P028-Q6 PCP
32A
Safety Brake Supply 14 22 I> I> I> I> I> I>
I> I> I>
2 4 6
2.5 mm²
PCP
1 3 5 1 3 5
4 mm²
PCP
=A001+P028-Q14
100A 2 4 6
Supply for the E-room AC
3VL-MCCB
4 mm²
PCP
1 3 5 13 21 1 3 5 13 21
=A001+P028-Q11
=A001+P028-Q12
1 3 5 I> I> I>
32A 2.8-4A
14 22 =A001+P028-K1 Supply for Solenoids 14 22
Disc Brake Supply
(/23.3)
32A I> I> I>
(/23.1)
2 4 6 25 mm²
I> I> I> (/20.6) PCP
2 4 6 2 4 6
1 3 5
4 mm²
PCP
1 3 5
=A001+P028-K2
32A 2 4 6 2.5 mm²
(/20.5) PCP
25 mm²
PCP
1 3 5
=A001+P028-F2
25-36A
OLR for Lubrication Motor 2 4 6
4 mm²
PCP
=A001+P028-X4 1 2 3 =A001+P028-X1 1 2 3
R6 Y6 B6
(10.6) (10.6) (10.6)
U1 V1 W1
-M1
M
3~
PE
Lubrication Motor Disc Brake Hydraulic Supply for Safety Supply for the Supply for the
Power Pack Motor Disc Brake Solenoids Standby E-Room AC Standby E-Room AC Supply for the UPS
8 10
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Feeders Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P028 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P028&WD1/9
Design Document No. - G71053- J5663 (EF-1) Page 9
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
(9.10) / R4
(9.10) / Y4
1 3 5 13 21
=A001+P028-Q18
(9.5) (9.5) (9.5) (15.9) (15.10)
22-32A R6 Y6 B6 L240_PS N240_PS
14 22
=A001+P028-T7
6.4 KVA
415V 0V L1 L2 L3 L1 L2
415/240V
1Ph with +/-5% 3 PE PE
&+/-10% tapping =A001+P028-V1 =A001+P028-V2
on primary 24V DC,20A 24V DC,20A
Control Transformer Power Supply 1 Power Supply 2
(/18.3)
+ - + -
=A001+P028-X52 1 2
1 3 5 13 21
=A001+P028-Q19
22-32A
14 22
=A001+P028-X53 =A001+P028-X54
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
(2.6) / L_1
(=S001/1.6) / L_2
(=S001/4.1) / L_3
(=S003/3.1) / L_4
(=S004/2.2) / L_5
(=S006/2.3) / L_6
(=S007/3.2) / L_7
(=S008/2.3) / L_8
(=S009/2.2) / L_9
(=S010/2.3) / L_10
(=S011/2.3) / L_11
(7.3) / L_12
(=S002/4.1) / L_13
/ L_14
/ L_15
(2.7) / N_1
(=S001/1.7) / N_2
(=S001/4.1) / N_3
(=S003/3.1) / N_4
(=S004/2.2) / N_5
(=S006/2.3) / N_6
(=S007/3.2) / N_7
(=S008/2.3) / N_8
(=S009/2.2) / N_9
(=S010/2.3) / N_10
(=S011/2.3) / N_11
(7.3) / N_12
(=S002/4.1) / N_13
/ N_14
/ N_15
Supply for VVFD
Panels
240V AC Supply
for Panel Lighting
9 11
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Power Supply Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P028 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P028&WD1/10
Design Document No. - G71053- J5663 (EF-1) Page 10
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm²
RED/BLACK RED/BLACK RED/BLACK RED/BLACK RED/BLACK
2 4 13 21 2 4 13 21 2 4 13 21
=A001+P028-F16 =A001+P028-F18 =A001+P028-F20
1NO+1NC 1NO+1NC 1NO+1NC
2-Pole MCB 1 3 14 22 2-Pole MCB 1 3 14 22 2-Pole MCB 1 3 14 22
(/23.3)
(/24.3)
(/24.5)
2 4 13 21 2 4 13 21
=A001+P028-F17 =A001+P028-F19
1NO+1NC 1NO+1NC
2-Pole MCB 1 3 14 22 2-Pole MCB 1 3 14 22
(/23.4)
(/24.4)
2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm²
RED/BLACK RED/BLACK RED/BLACK RED/BLACK RED/BLACK
To Aux Hoist-1 Panel To Aux Hoist-2 Panel To Main Cross Travel Panel To Aux Cross Travel Panel
To Main Hoist-1 Panel
D11
10 12
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Feeders Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P028 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P028&WD1/11
Design Document No. - G71053- J5663 (EF-1) Page 11
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
(11.10) / P2
(11.10) / M2
2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm²
RED/BLACK RED/BLACK RED/BLACK RED/BLACK RED/BLACK
2 4 13 21 2 4 13 21 2 4 13 21
=A001+P028-F21 =A001+P028-F23 =A001+P028-F25
1NO+1NC 1NO+1NC 1NO+1NC
2-Pole MCB 1 3 14 22 2-Pole MCB 1 3 14 22 2-Pole MCB 1 3 14 22
(/24.6)
(/24.7)
(/25.3)
2 4 13 21 2 4 13 21
=A001+P028-F22 =A001+P028-F24
1NO+1NC 1NO+1NC
2-Pole MCB 1 3 14 22 2-Pole MCB 1 3 14 22
(/24.7)
(/24.8)
2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm²
RED/BLACK RED/BLACK RED/BLACK RED/BLACK RED/BLACK
To Long Travel Panel To Active Infeed Group-1 To Active Infeed Group-2 To Main Hoist-2 Panel To Main Hoist StdBy Panel
D11
11 13
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Feeders Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P028 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P028&WD1/12
Design Document No. - G71053- J5663 (EF-1) Page 12
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
X45 1
L2 / (14.1)
X45 2
N2 / (14.1)
2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm²
GREAY GREAY GREAY GREAY GREAY GREAY
2 4 13 21 2 4 13 21 2 4 13 21
=A001+P028-F26 =A001+P028-F28 =A001+P028-F30
1NO+1NC 1NO+1NC 1NO+1NC
2-Pole MCB 1 3 14 22 2-Pole MCB 1 3 14 22 2-Pole MCB 1 3 14 22
(/25.4)
(/25.6)
(/25.8)
2 4 13 21 2 4 13 21 2 4 13 21
=A001+P028-F27 =A001+P028-F29 =A001+P028-F31
1NO+1NC 1NO+1NC 1NO+1NC
2-Pole MCB 1 3 14 22 2-Pole MCB 1 3 14 22 2-Pole MCB 1 3 14 22
(/25.5)
(/25.7)
(/25.9)
2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm²
GREAY GREAY GREAY GREAY GREAY GREAY
To Main Hoist-1 Panel To Aux Hoist-1 Panel To Aux Hoist-2 Panel To Main Cross Travel Panel To Aux Cross Travel Panel To Long Travel-1 Panel
D11
D11
12 14
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Feeders Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P028 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P028&WD1/13
Design Document No. - G71053- J5663 (EF-1) Page 13
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
(13.10) / L2 L3 / (15.1)
(13.10) / N2 N3 / (15.1)
2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm²
GREAY GREAY GREAY GREAY GREAY
2 4 13 21 2 4 13 21 2 4 13 21
=A001+P028-F32 =A001+P028-F34 =A001+P028-F36
10A 10A 10A
1NO+1NC 1 3 14 22 1NO+1NC 1 3 14 22 1NO+1NC 1 3 14 22
(/26.3)
(/26.5)
(/26.7)
2-Pole MCB 2-Pole MCB 2-Pole MCB
2 4 13 21 2 4 13 21
=A001+P028-F33 =A001+P028-F35
10A 10A
1NO+1NC 1 3 14 22 1NO+1NC 1 3 14 22
(/26.4)
(/26.6)
2-Pole MCB 2-Pole MCB
2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm²
GREAY GREAY GREAY GREAY GREAY
To Radio Remote
To Active Infeed Group-1 To Active Infeed Group-2 To Anticollision Device Interface Panel To Long Travel-2 Panel
D11
13 15
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Feeders Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P028 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P028&WD1/14
Design Document No. - G71053- J5663 (EF-1) Page 14
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
(14.10) / L3
(14.10) / N3
2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm²
GREAY GREAY GREAY GREAY GREAY GREAY
2 4 13 21 2 4 13 21 2 4 13 21
=A001+P028-F37 =A001+P028-F39 =A001+P028-F41
1NO+1NC 1NO+1NC 1NO+1NC
2-Pole MCB 1 3 14 22 2-Pole MCB 1 3 14 22 2-Pole MCB 1 3 14 22
(/26.8)
(/27.3)
(/27.4)
2 4 13 21 2 4 13 21 2 4 13 21
=A001+P028-F38 =A001+P028-F40 =A001+P028-F15
1NO+1NC 1NO+1NC 1NO+1NC
2-Pole MCB 1 3 14 22 2-Pole MCB 1 3 14 22 2-Pole MCB 1 3 14 22
(/26.9)
(/27.3)
2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm²
GREAY GREAY GREAY GREAY GREAY GREAY
To Lubrication Panel To Weighing Controller To Main Hoist-2 Panel To Main Hoist StdBy Panel Protective Panel Supply to 24 VDC
Supply Power Supply
D11
14 16
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Feeders Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P028 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P028&WD1/15
Design Document No. - G71053- J5663 (EF-1) Page 15
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
(8.9) / R_BRAKE
R_BRAKE1 / (17.1)
(8.9) / Y_BRAKE Y_BRAKE1 / (17.1)
B_BRAKE1 / (17.1)
(8.10) / B_BRAKE
Main Hoist-1 Main Hoist-1 Main Hoist-2 Main Hoist-2 Main Cross Travel Aux Hoist-1
Brake-1 Brake-2 Brake-1 Brake-2 Brake Brake Supply
Brake Feeders
15 17
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Feeders Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P028 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P028&WD1/16
Design Document No. - G71053- J5663 (EF-1) Page 16
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
(16.10) / R_BRAKE1
(16.10) / Y_BRAKE1
(16.10) / B_BRAKE1
=A001+P028-Q16
32A 2 4 6
Spare Brake Supply MCCB
3VL-MCCB
I> I> I>
1 3 5
=A001+P028-Q17
32A 2 4 6
Spare Brake Supply MCCB
3VL-MCCB
I> I> I>
1 3 5
Brake Feeders
16 18
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Feeders Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P028 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P028&WD1/17
Design Document No. - G71053- J5663 (EF-1) Page 17
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
MultiFunction Meter
CT Connections (1 or 5 A AC)
RS 485 Energymeter
Make- CONZERV
Type- EM6400
(6.4) / -L240:5
44 to 300V AC/DC
(6.6) / -N240:5 Aux Supply PT Connections (80 or 600V AC)
VN
V3
V2
V1
2 4 14 13 12 10 9 8
11
=A001+P028-F46
02A
Supply MCB for Multifunction Meter 1 3
2.5 mm² 2.5 mm²
GREAY GREAY
B1 Y1 R1
(2.6) (2.6) (2.6)
17 19
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Multi-Function Meter Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P028 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P028&WD1/18
Design Document No. - G71053- J5663 (EF-1) Page 18
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
1
(6.4) / L240:4 L1 / (20.1) INFEED1-1 / (=S001/12.6)
=A001+P028-X37
13
=A001+P028-X36 21 =A001+P028-K25
11 (/20.9)
=A001+P027-S1
PB_Mush_red
14
D11 Infeed 1
E-Stop 12 11
(/23.5) Crane Door LS1
43
=A001+P028-X38 1 =A001+P028-K21
12
OFF2 CHAIN
(/19.5) 44
22
(=S001/15.8) / INFEED1_E-STOP1
2
(=S001/15.8) / INFEED1_E-STOP2 INFEED1-2 / (=S001/12.6)
2 =A001+P028-X36 23
3
E-STOP_OPERATED / (=J002/2.5) D11
(=S002/14.8) / INFEED2_E-STOP1 11 3
Crane Door LS 2
(=S002/14.8) / INFEED2_E-STOP2 INFEED2-1 / (=S002/13.6)
4 37 =A001+P028-X37
12
5
43
24 =A001+P028-K25
(=L001/2.8) / -ACCD_ESTOP1 (/20.9)
Future Interlock
(=L001/2.8) / ACCD_ESTOP2
6 =A001+P028-X36 25
44
D11 Infeed 2
7
53
38 =A001+P028-K21
/ RRC_ESTOP1 11
Crane Door LS 3 OFF2 CHAIN
/ RRC_ESTOP2 (/19.5) 54
8
12
4
35
INFEED2-2 / (=S002/13.6)
=A001+P028-X36 1 26
30
7
Corner Switch 31
=A001+P028-X37
43
6 =A001+P028-K21.1
Future Interlock OFF2 CHAIN
7 (/19.6) 44
Spare
32
Corner Switch
43
=A001+P028-K22
A1 A1 A1
U U U Crane Door LS
=A001+P028-K21 =A001+P028-K21.1 =A001+P028-K22 Interposing Cont. 44
8
8 240V AC 240V AC 240V AC Common OFF1
A2 A2 A2 (/19.7)
OFF2 CHAIN OFF2 CHAIN Crane Door LS
Interposing Cont.
(6.6) / N240:4 Common OFF1 N1 / (20.1)
13 14 13 14 (/19.8) 13 14 (/19.8)
23 24 21 22 23 24 (/23.6)
33 34 31 32 33 34
43 44 (/19.8) 43 44 (/19.8)
43 44 (/19.8)
53 54 (/19.8) 53 54 53 54
63 64 (/2.8) 61 62 63 64
71 72 71 72 73 74
83 84
81 82 83 84
18 20
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Control Logic Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P029 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P029&WD1/19
Design Document No. - G71053- J5663 (EF-1) Page 19
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
(19.3) / L1
21
=A001+P028-K23
Disc Brake Close
(/20.2) 22
=A001+P028-X38 9 =A001+P028-X38 14
21
(=S003/11.4) (=S003/14.7) =A001+P028-K24
=S003-OS_1 ST_LUB1 Oil Level
Interposing Cont. 22
(/20.8) =A001+P028-X44 1
(2.4)
CB_NO_41
=S003-OS_2 ST_LUB2 16 18
(=S003/11.4) (=S003/14.7) =A001+P028-K26 Oil Level Switch
OFF delay timer
10 15 (/20.4) 15/17
=A001+P028-X44 2
CB_NO_42
(2.4)
=A001+P028-X38 16
8
11
Pressure B1
P
Switch 12
9
=A001+P028-X38 17
A1 A1 A1 A1 A1
U U U U U
=A001+P028-K23 A1 B1 =A001+P028-K2 =A001+P028-K1 =A001+P028-K24 =A001+P028-K25
240V AC =A001+P028-K26 32A, 240V AC 32A, 240V AC 240V AC 110A, 240V AC
A2 M A2 A2 A2 A2
Disc Brake Close OFF delay timer Lub Pump Cont. Safety Brake Cont. Oil Level
A2 Interposing Cont.
(19.7) / N1
D11
13 14 (/20.8) 13 14 1 3 5
21 22 (/20.6) 18 1 3 5 1 3 5 21 22 (/20.6) (/8.9)
31 32 16 15/17 (/20.5) (/9.2) (/9.3) 31 32
43 44 24/28 43 44 2 4 6
53 54 (/23.7) 22/26 21/25/27 2 4 6 2 4 6 53 54 (/23.9) 13 14 (/19.8)
61 62 33 34 (/23.7) 33 34 (/23.8)
61 62 21 22
71 72 71 72 31 32
83 84 83 84 43 44 (/19.8)
19 21
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Control Logic Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P029 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P029&WD1/20
Design Document No. - G71053- J5663 (EF-1) Page 20
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
Overspeed Healthy
Indication for ACU
OVERSPEED_HLY1 / (=L001/10.6)
(10.6) / P24_SB ACB ON Command
=A001+P028-X38 20
43
(2.8) / ON1 =A001+P028-K23 To ACCD
Disc Brake Close
44
21
=A001+P028-X33 1
31 (=L001/3.5) OVERSPEED_HLY2 / (=L001/10.6)
=A001+P028-K23 23
=L001-ACB_ON1
Disc Brake Close =A001+P027-S2
Under Revision
32 PB_Green ACB ON from ACCD
ACB ON 24
=A001+P028-X33 2
=A001+P028-X38 11
(2.8) / ON2
(2.9) / OFF1
Calipers Limit
Switches
=A001+P028-X33 3
(=L001/3.7)
=L001-ACB_OFF1
=A001+P028-X51 4 =A001+P028-X51 6
13
=A001+P027-S3
Red ACB OFF from ACCD
ACB OFF 14
=L001-ACB_OFF2
(=L001/3.7)
=A001+P028-X33 4
12
=A001+P028-X41 1
13
Supply to Safety Brake Solenoids =A001+P028-K24
Oil Level To ACCD
Interposing Cont. 14
=J002-OIL_LEVEL2 / (=J002/2.4)
20 22
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Control Logic Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P028 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P028&WD1/21
Design Document No. - G71053- J5663 (EF-1) Page 21
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
Indication Lamps
(6.4) / -L240:3
(6.6) / -N240:3
21 23
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Annunciator Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P028 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P028&WD1/22
Design Document No. - G71053- J5663 (EF-1) Page 22
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
D11
13 97 13 13 13 31
=A001+P028-Q12 =A001+P028-F2 =A001+P028-Q11 =A001+P028-F16 =A001+P028-F17 =A001+P027-S1
23 53 33 33 53
Disc Brake Supply Supply for Solenoids 2-Pole MCB 2-Pole MCB 2NC
(/9.2) (/9.5) (/11.2) (/11.4)
=A001+P028-K22 =A001+P028-K23 =A001+P028-K2 =A001+P028-K1 =A001+P028-K24
14 98 14 14 14 E-Stop 32
(/19.2)
Crane Door LS Disc Brake Close Lub Pump Cont. Safety Brake Cont. Oil Level
Interposing Cont. 24 (/20.2) 54 (/20.5) 34 (/20.6) 34 Interposing Cont. 54
Common OFF1 (/20.8)
(/19.7)
DISC BRAKE SUPPLY OLR FOR LUBRICATION MOTOR SUPPLY FOR SOLENOIDS 2-POLE MCB 2-POLE MCB_1 E-STOP_PP CRANE DOOR LS SAFETY BRAKE LUB PUMP CONT SAFETY BRAKE CONT OIL LEVEL
(=C001/25.4) (=C001/25.5) (=C001/25.6) (=C001/25.7) (=C001/25.8) (=C001/26.2) INTEROSING CONT OPERATED (=C001/26.5) (=C001/26.6) INTERPOSING CONT
COMMON OFF1 (=C001/26.4) (=C001/26.7)
(=C001/26.3)
To PLC
22 24
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - To PLC Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P028 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P028&WD1/23
Design Document No. - G71053- J5663 (EF-1) Page 23
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
13 13 13 13 13 13 13
=A001+P028-F18 =A001+P028-F19 =A001+P028-F20 =A001+P028-F21 =A001+P028-F22 =A001+P028-F23 =A001+P028-F24
2-Pole MCB 2-Pole MCB 2-Pole MCB 2-Pole MCB 2-Pole MCB 2-Pole MCB 2-Pole MCB
(/11.6) 14 (/11.7) 14 (/11.9) 14 (/12.2) 14 (/12.4) 14 (/12.5) 14 (/12.7) 14
2-POLE MCB_2 2-POLE MCB_3 2-POLE MCB_4 2-POLE MCB_5 2-POLE MCB_6 2-POLE MCB_7 2-POLE MCB_8
(=C001/27.2) (=C001/27.3) (=C001/27.4) (=C001/27.5) (=C001/27.6) (=C001/27.7) (=C001/27.8)
To PLC
23 25
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - To PLC Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P028 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P028&WD1/24
Design Document No. - G71053- J5663 (EF-1) Page 24
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
13 13 13 13 13 13 13
=A001+P028-F25 =A001+P028-F26 =A001+P028-F27 =A001+P028-F28 =A001+P028-F29 =A001+P028-F30 =A001+P028-F31
2-Pole MCB 2-Pole MCB 2-Pole MCB 2-Pole MCB 2-Pole MCB 2-Pole MCB 2-Pole MCB
(/12.9) 14 (/13.1) 14 (/13.3) 14 (/13.5) 14 (/13.6) 14 (/13.8) 14 (/13.9) 14
To PLC
24 26
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - To PLC Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P028 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P028&WD1/25
Design Document No. - G71053- J5663 (EF-1) Page 25
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
13 13 13 13 13 13 13
=A001+P028-F32 =A001+P028-F33 =A001+P028-F34 =A001+P028-F35 =A001+P028-F36 =A001+P028-F37 =A001+P028-F38
2-Pole MCB 2-Pole MCB 2-Pole MCB 2-Pole MCB 2-Pole MCB 2-Pole MCB 2-Pole MCB
(/14.1) 14 (/14.3) 14 (/14.5) 14 (/14.7) 14 (/14.8) 14 (/15.2) 14 (/15.3) 14
2-POLE MCB_16 2-POLE MCB_17 2-POLE MCB_18 2-POLE MCB_19 2-POLE MCB_20 2-POLE MCB_21 2-POLE MCB_22
(=C001/29.2) (=C001/29.3) (=C001/29.4) (=C001/29.5) (=C001/29.7) (=C001/29.8)
To PLC
25 27
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - To PLC Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P028 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P028&WD1/26
Design Document No. - G71053- J5663 (EF-1) Page 26
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
(2.4) / CB_NO_32
(10.9) (2.10) (2.9)
M_24_1 S24_NC N_REL
(2.4) / CB_NO_31
13 13 13
=A001+P028-F39 =A001+P028-F40 =A001+P028-F41
2-Pole MCB 2-Pole MCB 2-Pole MCB
(/15.5) (/15.7) (/15.8)
=A001+P028-K27 =A001+P028-K28
14 14 14
1-CH 1-CH
ACB ON/OFF 1+ 1- ACB Trip L1 N1
P1 O1 C1
P1 O1 C1
To PLC
(27.6) / P24_6
(=C001/39.3) / ACB_ON
(=C001/39.3) / ACB_OFF
(=C001/39.4) / ACB_TRIP
26 &TD1/1
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - To PLC Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P028 & WD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001+P028&WD1/27
Design Document No. - G71053- J5663 (EF-1) Page 27
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 27
1 2 3 4 5 6 7 8 9 10
Terminal diagram
=A001+P028-M1 W1 3 =A001+P028-K1 6 (=A001&WD1/9.4)
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=A001+P027-X18
Supply to VVFD 1 =A001+P027-Q1 6 (=A001&WD1/3.2) =A001+P028-X2
=A001+P028-F45 4 Supply for the E-room AC 7 =A001+P028-Q13 1 (=A001&WD1/9.6)
12 =A001+P028-Q14 5 (=A001&WD1/9.8)
Connection
Terminal
Jumper
Terminal
Target
Point
Supply for the E-room AC 13 =A001+P028-Q15 1 (=A001&WD1/9.9)
Function Text Target Terminal Strip Source Designation Cross Reference
14 =A001+P028-Q15 3 (=A001&WD1/9.10)
15 =A001+P028-Q15 5 (=A001&WD1/9.10)
=A001+P027-X36
Connection
=S002+P009-X36 1 1 =A001+P027-Q1-X5 4 (=A001&WD1/2.4)
Terminal
Jumper
Terminal
Target
Point
=S002+P009-X36 2 2 =A001+P027-Q1-X5 5 (=A001&WD1/2.4) Function Text Target Terminal Strip Source Designation Cross Reference
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference =A001+P028-X3
=A001+P028-Q5 2 1 =A001+P028-T5 3 (=A001&WD1/4.6)
Jumper
Terminal
Target
Connection
Point
Terminal
Function Text Target Terminal Strip Source Designation Cross Reference
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=A001+P027-X100
=A001+P028-X4
=A001+P028-V1 6 1 =A001+P027-L1 S2 (=A001&WD1/2.6)
Supply for LUB Pump 1 =A001+P028-F2 2 (=A001&WD1/9.2)
=A001+P028-V1 5 2 =A001+P027-L1 S1 (=A001&WD1/2.6)
2 =A001+P028-F2 4 (=A001&WD1/9.2)
=A001+P028-V1 4 3 =A001+P027-L2 S2 (=A001&WD1/2.6)
3 =A001+P028-F2 6 (=A001&WD1/9.2)
=A001+P028-V1 3 4 =A001+P027-L2 S1 (=A001&WD1/2.7)
Connection
=A001+P028-V1 2 5 =A001+P027-L3 S2 (=A001&WD1/2.7)
Terminal
Jumper
Terminal
Target
Point
=A001+P028-V1 1 6 =A001+P027-L3 S1 (=A001&WD1/2.8) Function Text Target Terminal Strip Source Designation Cross Reference
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference =A001+P028-X17
Supply to Lighting trafo =A001+P028-T4 690V 1 =A001+P028-Q2 3 (=A001&WD1/3.5)
&WD1/27 2
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001&TD1/1
Design Document No. - G71053- J5663 (EF-1) Page 1
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 6
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Connection
Connection
Terminal
Terminal
Jumper
Jumper
Terminal
Terminal
Target
Target
Point
Point
Function Text Target Terminal Strip Source Designation Cross Reference Function Text Target Terminal Strip Source Designation Cross Reference
=A001+P028-X17 =A001+P028-X36
Supply to Magnet Panel =A001+P028-T5 1 6 =A001+P028-Q4 1 (=A001&WD1/3.9) Future Interlock =+ 1 =A001+P028-X38 8 (=A001&WD1/19.2)
4 =+ (=A001&WD1/19.2)
Connection
Terminal
Jumper
Terminal
Target
Point
Future Interlock =+ 5 (=A001&WD1/19.2)
Function Text Target Terminal Strip Source Designation Cross Reference
6 =+ (=A001&WD1/19.2)
Connection
Terminal
Jumper
Terminal
Point
Function Text Target Terminal Strip Source Designation Cross Reference
24 =A001+P029-S1 12 (=A001&WD1/19.7)
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference Future Interlock =+ 33 (=A001&WD1/19.3)
34 =+ (=A001&WD1/19.3)
=A001+P028-H5 X2 =J002+RS003-X31 26
Connection
Terminal
Jumper
Terminal
Target
Point
=A001+P028-H6 X2
Function Text Target Terminal Strip Source Designation Cross Reference
ACB TRIP ON ACCD =L001+RS001-X37 5 5 =A001+P028-H6 X1 (=A001&WD1/22.7)
1 3
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001&TD1/2
Design Document No. - G71053- J5663 (EF-1) Page 2
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 6
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Connection
Connection
Terminal
Terminal
Jumper
Jumper
Terminal
Terminal
Target
Target
Point
Point
Function Text Target Terminal Strip Source Designation Cross Reference Function Text Target Terminal Strip Source Designation Cross Reference
=A001+P028-X37 =A001+P028-X44
OFF 2 f/b to VFD's =S001+P003-X38 3 5 =A001+P028-K21.1 13 (=A001&WD1/19.9) Oil Level Switch =A001+P028-K23 21 1 =A001+P028-K26 (=A001&WD1/20.8)
8 =A001+P028-K22 44 (=A001&WD1/19.9)
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=A001+P028-X51
=A001+P028-X38 24VDC Pressure Switch Supply =A001+P028-Y1 3 =A001+P028-K23 32 (=A001&WD1/21.2)
=A001+P027-S1 12 1 =S001+P003-X36 1 (=A001&WD1/19.2) 24VDC Pressure Switch Supply =A001+P028-X52 2 4 =A001+P028-Y1 (=A001&WD1/21.2)
E-stop From Infeed 2 3 =S002+P009-X36 3 (=A001&WD1/19.2) 24VDC Pressure Switch Supply =A001+P028-X52 2 6 =A001+P028-Y2 (=A001&WD1/21.3)
4 =S002+P009-X36 4 (=A001&WD1/19.2)
Connection
Terminal
Jumper
Terminal
Target
Point
E-stop From ACCD 5 =L001+RS001-X35 7 (=A001&WD1/19.2)
Function Text Target Terminal Strip Source Designation Cross Reference
E-stop From RRC 6 =L001+RS001-X35 8 (=A001&WD1/19.2)
7 (=A001&WD1/19.2)
=A001+P028-X52
=A001+P028-X36 1 8 (=A001&WD1/19.2) Supply for Emergency Disk Brake S
=A001+P028-K23 31 1 =A001+P028-V1 + (=A001&WD1/10.6)
olenoids
Overspeed Signal from PLC =S003+P017-X38 3 9 =A001+P027-S1 11 (=A001&WD1/20.2)
=A001+P028-X51 4 2 =A001+P028-V1 - (=A001&WD1/10.6)
=A001+P028-K26 A1
=A001+P028-X51 6
=A001+P028-K23 A1 10 =S003+P017-X38 4 (=A001&WD1/20.2)
Connection
Terminal
Jumper
Terminal
=A001+P028-K23 61 11 =S003+P017-X35 1 (=A001&WD1/21.8)
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P017-X36 1 12 =A001+P028-K23 62 (=A001&WD1/21.8)
Jumper
Terminal
=S007+P024-X42 1 7 (=A001&WD1/10.2)
Target
Point
=S009+P026-X42 1 9 (=A001&WD1/10.2)
=A001+P028-X41
=S010+P020-X42 1 10 (=A001&WD1/10.3)
Pad Wear Indication =J002+RS003-X31 24 1 =J002+RS003-X31 23 (=A001&WD1/21.8)
=S011+P019-X19 1 11 (=A001&WD1/10.3)
2 (=A001&WD1/21.8)
=A001+P027-S4 21 12 (=A001&WD1/10.3)
=S002+P009-X42 1 13 (=A001&WD1/10.3)
2 4
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001&TD1/3
Design Document No. - G71053- J5663 (EF-1) Page 3
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 6
1 2 3 4 5 6 7 8 9 10
Terminal diagram
11 (=A001&WD1/16.6)
Connection
Terminal
Jumper
Terminal
Target
Point
12 (=A001&WD1/16.6)
Function Text Target Terminal Strip Source Designation Cross Reference
MCT Brake Panel Supply 13 (=A001&WD1/16.7)
14 (=A001&WD1/16.7)
=A001+P028-X53
15 (=A001&WD1/16.8)
14 (=A001&WD1/10.3)
AH1 Brake Panel Supply 16 (=A001&WD1/16.9)
15 (=A001&WD1/10.4)
17 (=A001&WD1/16.9)
Connection
Terminal
Jumper
Terminal
18 (=A001&WD1/16.9)
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
AH2 Brake Panel Supply 19 (=A001&WD1/17.2)
20 (=A001&WD1/17.2)
=A001+P028-X54
21 (=A001&WD1/17.2)
240 VAC distribution strp Neutral =A001+P027-Q2 5 1 =A001+P028-Q19 6 (=A001&WD1/10.4)
ACT Brake Panel Supply 22 (=A001&WD1/17.3)
=S001+P003-X39 2 2 (=A001&WD1/10.4)
23 (=A001&WD1/17.4)
=S001+POO3-X42 2 3 (=A001&WD1/10.4)
24 (=A001&WD1/17.4)
=S003+P017-X42 2 4 (=A001&WD1/10.5)
LT Brake Panel-1 Supply 25 (=A001&WD1/17.5)
=S004+P013-X42 2 5 (=A001&WD1/10.5)
26 (=A001&WD1/17.5)
=S006+P018-X42 2 6 (=A001&WD1/10.5)
27 (=A001&WD1/17.5)
=S007+P024-X42 2 7 (=A001&WD1/10.5)
LT Brake Panel2 Supply 28 =A001+P028-Q16 2 (=A001&WD1/17.6)
=S008+P022-X42 2 8 (=A001&WD1/10.5)
29 =A001+P028-Q16 4 (=A001&WD1/17.7)
=S009+P026-X42 2 9 (=A001&WD1/10.6)
30 =A001+P028-Q16 6 (=A001&WD1/17.7)
=S010+P020-X42 2 10 (=A001&WD1/10.6)
LT Brake Panel-1 Supply 31 =A001+P028-Q16 1 (=A001&WD1/17.8)
=S011+P019-X19 2 11 (=A001&WD1/10.6)
32 =A001+P028-Q16 3 (=A001&WD1/17.8)
=A001+P027-V4 3 12 (=A001&WD1/10.6)
33 =A001+P028-Q16 5 (=A001&WD1/17.8)
=S002+P009-X42 2 13 (=A001&WD1/10.6)
LT Brake Panel2 Supply 34 =A001+P028-Q17 1 (=A001&WD1/17.9)
14 (=A001&WD1/10.7)
35 =A001+P028-Q17 3 (=A001&WD1/17.9)
15 (=A001&WD1/10.7)
36 =A001+P028-Q17 5 (=A001&WD1/17.9)
Connection
Terminal
Connection
Jumper
Terminal
Terminal
Target
Jumper
Terminal
Point
Target
Function Text Target Terminal Strip Source Designation Cross Reference
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=A001+P029-X1
=A001+P029-X31
MH Brake Panel Supply 1 =A001+P032-X2 1 (=A001&WD1/16.2)
690 VAC distribution strip R phase =S001+P003-X17 1 1 =A001+P028-F45 1 (=A001&WD1/5.3)
2 =A001+P032-X2 2 (=A001&WD1/16.2)
=S002+P009-X17 1 2 (=A001&WD1/5.3)
3 =A001+P032-X2 3 (=A001&WD1/16.2)
=S003+P017-X16 1 3 (=A001&WD1/5.3)
MH Brake Panel2 Supply 4 (=A001&WD1/16.3)
=S004+P013-X16 1 4 (=A001&WD1/5.3)
5 (=A001&WD1/16.3)
=S005+P013-X16 1 5 (=A001&WD1/5.4)
6 (=A001&WD1/16.3)
=S006+P031-X16 1 6 (=A001&WD1/5.4)
MH2 Brake Panel1 Supply 7 (=A001&WD1/16.4)
=S008+P022-X16 1 7 (=A001&WD1/5.4)
8 (=A001&WD1/16.5)
=S007+P024-X16 1 8 (=A001&WD1/5.4)
9 (=A001&WD1/16.5)
=S009+P026-X16 1 9 (=A001&WD1/5.4)
MH2 Brake Panel2 Supply 10 (=A001&WD1/16.6)
=S010+P020-X16 1 10 (=A001&WD1/5.5)
3 5
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001&TD1/4
Design Document No. - G71053- J5663 (EF-1) Page 4
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 6
1 2 3 4 5 6 7 8 9 10
Terminal diagram
=S009+P026-X17 2 9 (=A001&WD1/5.7)
Connection
Terminal
Jumper
Terminal
Target
Point
=S010+P020-X17 2 10 (=A001&WD1/5.8)
Function Text Target Terminal Strip Source Designation Cross Reference
=S011+P019-X17 2 11 (=A001&WD1/5.8)
12 (=A001&WD1/5.8)
=A001+P029-X31
13 (=A001&WD1/5.8)
=S011+P019-X16 1 11 (=A001&WD1/5.5)
14 (=A001&WD1/5.8)
12 (=A001&WD1/5.5)
15 (=A001&WD1/5.9)
13 (=A001&WD1/5.5)
Connection
240 VAC supply to Infeed 1 Panel 13 =A001+P028-F32 1 (=A001&WD1/14.1)
Terminal
Jumper
Terminal
Target
Point
14 (=A001&WD1/5.5) Function Text Target Terminal Strip Source Designation Cross Reference
14 =A001+P028-F32 3 (=A001&WD1/14.2)
15 (=A001&WD1/5.6) =A001+P029-X39
240 VAC supply to Infeed 2 Panel 15 =A001+P028-F33 1 (=A001&WD1/14.3) 240 VAC distribution strip Line 1 =A001+P028-F44 1 (=A001&WD1/6.3)
Connection
ler
Terminal
Jumper
Terminal
Target
Point
26 =A001+P028-F38 3 (=A001&WD1/15.3)
Function Text Target Terminal Strip Source Designation Cross Reference
240 VAC supply Spare 27 =A001+P028-F39 1 (=A001&WD1/15.5)
28 =A001+P028-F39 3 (=A001&WD1/15.5)
=A001+P029-X40
240 VAC supply spare 29 =A001+P028-F40 1 (=A001&WD1/15.7)
240 VAC distribution strp Neutral 1 =A001+P028-F44 3 (=A001&WD1/6.6)
30 =A001+P028-F40 3 (=A001&WD1/15.7)
2 (=A001&WD1/6.6)
Connection
=A001+P028-H4 X2 3 (=A001&WD1/6.6)
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference =A001+P028-X34 2
=A001+P028-K21 A2 4 (=A001&WD1/6.6)
690 VAC distribution strip Y Phase =S001+P003-X17 2 1 =A001+P028-F45 3 (=A001&WD1/5.6) =J002+RS003-X32 2 6 (=A001&WD1/6.7)
=S006+P031-X16 2 6 (=A001&WD1/5.7)
=S008+P022-X17 2 7 (=A001&WD1/5.7)
=S007+P024-X16 1 8 (=A001&WD1/5.7)
4 6
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001&TD1/5
Design Document No. - G71053- J5663 (EF-1) Page 5
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 6
1 2 3 4 5 6 7 8 9 10
Terminal diagram
=A001+P029-X1 2 2 =A001+P028-K25 4 (=A001&WD1/8.9)
Connection
Terminal
Jumper
Terminal
Target
Point
=A001+P029-X1 3 3 =A001+P028-K25 6 (=A001&WD1/8.10)
Function Text Target Terminal Strip Source Designation Cross Reference
Supply for the E-room AC 4 =A001+P028-Q10 1 (=A001&WD1/8.7)
5 =A001+P028-Q10 3 (=A001&WD1/8.8)
=A001+P029-X51
6 =A001+P028-Q10 5 (=A001&WD1/8.8)
24VDC Supply for Main Hoist Panel 1 =A001+P028-F16 1 (=A001&WD1/11.2)
Connection
2 =A001+P028-F16 3 (=A001&WD1/11.3)
Terminal
Jumper
Terminal
Target
Point
24VDC Supply for Aux Hoist 1 Panel 3 =A001+P028-F17 1 (=A001&WD1/11.4) Function Text Target Terminal Strip Source Designation Cross Reference
4 =A001+P028-F17 3 (=A001&WD1/11.4)
24VDC Supply for Long travel Panel 11 =A001+P028-F21 1 (=A001&WD1/12.2) 4 =A001+P032-Q1 8 (=A001&WD1/1.2)
12 =A001+P028-F21 3 (=A001&WD1/12.2)
14 =A001+P028-F22 3 (=A001&WD1/12.4)
16 =A001+P028-F23 3 (=A001&WD1/12.6)
18 =A001+P028-F24 3 (=A001&WD1/12.8)
20 =A001+P028-F25 3 (=A001&WD1/12.9)
Connection
Terminal
Jumper
Terminal
Target
Point
=A001+P032-X1
Supply for AC in Operator Cabin 4 =A001+P028-Q7 1 (=A001&WD1/8.5)
5 =A001+P028-Q7 3 (=A001&WD1/8.5)
6 =A001+P028-Q7 5 (=A001&WD1/8.5)
8 =A001+P028-Q8 3 (=A001&WD1/8.6)
9 =A001+P028-Q8 5 (=A001&WD1/8.6)
Connection
Terminal
Jumper
Terminal
Target
Point
=A001+P032-X2
Brake Rectifier Panel =A001+P029-X1 1 1 =A001+P028-K25 2 (=A001&WD1/8.9)
5 =S001&EQ1/1
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = A001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Protective Panel
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =A001&TD1/6
Design Document No. - G71053- J5663 (EF-1) Page 6
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 6
1 2 3 4 5 6 7 8 9 10
Equipment list
Type No. Description Qty Supplier/Make Device Tag Cross Reference Remarks
3SB12001AC20 Mushroom push Button actuator with holder rear connection normal with metal ring latched (Red) 1 Siemens =S001+P003-S1 (=A000&CMD1/5.1)
3SX1721 Yellow contrast lable for Mashroom PB with inscription 'Emergency Stop' 0 Siemens =S001+P003-S1 (=A000&CMD1/5.1)
3SB14000H Contact block rear connection for PB/SS (2NC) 1 Siemens =S001+P003-S1 (=A000&CMD1/5.1)
3WL12324EG324GS4Z 1
3 Pole ACB 3WL: Rated Voltage 690V, Rated Current 3200A, Size II,Breaking Capacity 100kA, ETU 45 LSIN protection, Mounting-rear horizontal(Fixed) , Charg Siemens =S001+P003-Q1 (=S001&WD1/1.1)
ing Mechanism- motorized(220 AC/DC) , with 1st shunt trip(220V AC/DC) , with 2ND undervolatge trip(220V AC/DC) ,4NO+4NC, with Z-option
+T40 ACB 3WL Options: DOOR SEALING FRAME 1 Siemens =S001+P003-Q1 (=S001&WD1/1.1)
3NWNS2 HRC Fuse 3NW (BS Type): Rated Voltage 415V AC, Rated Current 2A 1 Siemens =S001+P003-F13 (=S001&WD1/1.3)
3NW20NNSF HRC Fuse Base for (3NW NS type): Rated Voltage 415V AC, Rated Current 20A 1 Siemens =S001+P003-F13 (=S001&WD1/1.3)
3NWNS2 HRC Fuse 3NW (BS Type): Rated Voltage 415V AC, Rated Current 2A 1 Siemens =S001+P003-F14 (=S001&WD1/1.3)
3NW20NNSF HRC Fuse Base for (3NW NS type): Rated Voltage 415V AC, Rated Current 20A 1 Siemens =S001+P003-F14 (=S001&WD1/1.3)
3NWNS2 HRC Fuse 3NW (BS Type): Rated Voltage 415V AC, Rated Current 2A 1 Siemens =S001+P003-F15 (=S001&WD1/1.3)
3NW20NNSF HRC Fuse Base for (3NW NS type): Rated Voltage 415V AC, Rated Current 20A 1 Siemens =S001+P003-F15 (=S001&WD1/1.3)
3SB52356HC10 Wide band LED pilot light (Red) for AC 42 to 240V and DC 42 to 220V 1 Siemens =S001+P003-H1 (=S001&WD1/1.3)
PT 750/Root3:110/Root3 Potential Transformer:Primary 750/Root3,Secondary 110/Root3,Burden 10VA,Accuracy Class 1(Refer Specification Sheet) 1 AEI/UNITEC/ EPI/Power & Communications =S001+P003-T1 (=S001&WD1/1.3) Make: AEI/UNITEC/EPI/POWER
& COMMUNICATIONS
3SB50000AD01 Push Button actuator with holder rear connection normal with P.F.R.(Yellow) 1 Siemens =S001+P003-H2 (=S001&WD1/1.4)
PT 750/Root3:110/Root3 Potential Transformer:Primary 750/Root3,Secondary 110/Root3,Burden 10VA,Accuracy Class 1(Refer Specification Sheet) 1 AEI/UNITEC/ EPI/Power & Communications =S001+P003-T2 (=S001&WD1/1.4) Make: AEI/UNITEC/EPI/POWER
& COMMUNICATIONS
3SB50000AF01 Push Button actuator with holder rear connection normal with P.F.R.(Blue) 1 Siemens =S001+P003-H3 (=S001&WD1/1.5)
PT 750/Root3:110/Root3 Potential Transformer:Primary 750/Root3,Secondary 110/Root3,Burden 10VA,Accuracy Class 1(Refer Specification Sheet) 1 AEI/UNITEC/ EPI/Power & Communications =S001+P003-T3 (=S001&WD1/1.5) Make: AEI/UNITEC/EPI/POWER
& COMMUNICATIONS
3RV10211CA10 MPCB 3RV: Rated Voltage 415V,Rated current 2.5A,overload release 1.8 - 2.5A,s/c release 30A,Breaking Capacity 100kA 1 Siemens =S001+P003-Q9 (=S001&WD1/1.7)
5SX42167RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 16A ,Breaking Capacity 10 KA 1 Siemens =S001+P003-F20 (=S001&WD1/2.3)
5SX42047RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 04A ,Breaking Capacity 10 KA 1 Siemens =S001+P003-F21 (=S001&WD1/2.7)
3RV10211GA10 MPCB 3RV: Rated Voltage 415V,Rated current 6.3A,overload release 4.5 - 6.3A,s/c release 76A,Breaking Capacity 100kA 1 Siemens =S001+P003-Q2 (=S001&WD1/3.2)
3RV10211GA10 MPCB 3RV: Rated Voltage 415V,Rated current 6.3A,overload release 4.5 - 6.3A,s/c release 76A,Breaking Capacity 100kA 1 Siemens =S001+P003-Q3 (=S001&WD1/3.4)
3RV10211GA10 MPCB 3RV: Rated Voltage 415V,Rated current 6.3A,overload release 4.5 - 6.3A,s/c release 76A,Breaking Capacity 100kA 1 Siemens =S001+P003-Q4 (=S001&WD1/3.7)
3RV10211GA10 MPCB 3RV: Rated Voltage 415V,Rated current 6.3A,overload release 4.5 - 6.3A,s/c release 76A,Breaking Capacity 100kA 1 Siemens =S001+P003-Q5 (=S001&WD1/3.9)
MF42010A EMI Filter: Rated Voltage 230V AC (1 Phase), Rated Current 10A 1 EMI solutions =S001+P001-V5 (=S001&WD1/4.2)
DULUXSTAR T4 3U 20W-865 E27-HPF CFL,240V AC,18W (DULUXSTAR T4 3U 20W-865 E27-HPF) 1 Osram =S001+P001-H1 (=S001&WD1/4.2)
MF42010A EMI Filter: Rated Voltage 230V AC (1 Phase), Rated Current 10A 1 EMI solutions =S001+P002-V6 (=S001&WD1/4.3)
DULUXSTAR T4 3U 20W-865 E27-HPF CFL,240V AC,18W (DULUXSTAR T4 3U 20W-865 E27-HPF) 1 Osram =S001+P002-H2 (=S001&WD1/4.3)
=A001&TD1/6 2
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Equipment List Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & EQ1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001&EQ1/1
Design Document No. - G71053- J5663 (EF-1) Page 1
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 5
1 2 3 4 5 6 7 8 9 10
Equipment list
Type No. Description Qty Supplier/Make Device Tag Cross Reference Remarks
MF42010A EMI Filter: Rated Voltage 230V AC (1 Phase), Rated Current 10A 1 EMI solutions =S001+P003-V7 (=S001&WD1/4.4)
DULUXSTAR T4 3U 20W-865 E27-HPF CFL,240V AC,18W (DULUXSTAR T4 3U 20W-865 E27-HPF) 1 Osram =S001+P003-H7 (=S001&WD1/4.4)
DULUXSTAR T4 3U 20W-865 E27-HPF CFL,240V AC,18W (DULUXSTAR T4 3U 20W-865 E27-HPF) 1 Osram =S001+P003-H8 (=S001&WD1/4.5)
MF42010A EMI Filter: Rated Voltage 230V AC (1 Phase), Rated Current 10A 1 EMI solutions =S001+P004-V1 (=S001&WD1/4.7)
DULUXSTAR T4 3U 20W-865 E27-HPF CFL,240V AC,18W (DULUXSTAR T4 3U 20W-865 E27-HPF) 1 Osram =S001+P004-H1 (=S001&WD1/4.7)
MF42010A EMI Filter: Rated Voltage 230V AC (1 Phase), Rated Current 10A 1 EMI solutions =S001+P005-V1 (=S001&WD1/4.8)
DULUXSTAR T4 3U 20W-865 E27-HPF CFL,240V AC,18W (DULUXSTAR T4 3U 20W-865 E27-HPF) 1 Osram =S001+P005-H1 (=S001&WD1/4.8)
MF42010A EMI Filter: Rated Voltage 230V AC (1 Phase), Rated Current 10A 1 EMI solutions =S001+P006-V1 (=S001&WD1/4.9)
DULUXSTAR T4 3U 20W-865 E27-HPF CFL,240V AC,18W (DULUXSTAR T4 3U 20W-865 E27-HPF) 1 Osram =S001+P006-H1 (=S001&WD1/4.10)
3KL82313HA00 Switch Disconnector Fuse (3KL) for fuse size 00: Rated Voltage 690V,Rated Current 160A with Phase Barrier, Fuse Cover, Front Drive (Handle) 1 Siemens =S001+P003-F18 (=S001&WD1/5.3)
3NE80241 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 160A, DIN Size 00 3 Siemens =S001+P003-F18 (=S001&WD1/5.3)
3VU13401MS00 Fuse Monitor for 3KT and 3KL and 3KA 1 Siemens =S001+P003-Q6 (=S001&WD1/5.4)
3KL82313HA00 Switch Disconnector Fuse (3KL) for fuse size 00: Rated Voltage 690V,Rated Current 160A with Phase Barrier, Fuse Cover, Front Drive (Handle) 1 Siemens =S001+P003-F19 (=S001&WD1/5.7)
3NE80241 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 160A, DIN Size 00 3 Siemens =S001+P003-F19 (=S001&WD1/5.7)
3VU13401MS00 Fuse Monitor for 3KT and 3KL and 3KA 1 Siemens =S001+P003-Q7 (=S001&WD1/5.8)
3NE14382 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 800A, DIN Size 3 1 Siemens =S001+P003-F1 (=S001&WD1/6.3)
3NH34304RC LV HRC Fuse Bases 3NH (DIN Type): Rated Voltage 690V AC/ 440V DC, Rated Current 800A, Size 3 1 Siemens =S001+P003-F1 (=S001&WD1/6.3)
6SL33007TG413AA0 Sinamics S120 Active Interface Module for ALM in chassis format: Voltage 500-690 V 3 AC,I/P Current 1270A,Frame Size JI 1 Siemens =S001+P001-V1 (=S001&WD1/6.3)
3NE14382 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 800A, DIN Size 3 1 Siemens =S001+P003-F2 (=S001&WD1/6.3)
3NH34304RC LV HRC Fuse Bases 3NH (DIN Type): Rated Voltage 690V AC/ 440V DC, Rated Current 800A, Size 3 1 Siemens =S001+P003-F2 (=S001&WD1/6.3)
3NE14382 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 800A, DIN Size 3 1 Siemens =S001+P003-F3 (=S001&WD1/6.3)
3NH34304RC LV HRC Fuse Bases 3NH (DIN Type): Rated Voltage 690V AC/ 440V DC, Rated Current 800A, Size 3 1 Siemens =S001+P003-F3 (=S001&WD1/6.3)
3NE14382 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 800A, DIN Size 3 1 Siemens =S001+P003-F4 (=S001&WD1/6.3)
3NH34304RC LV HRC Fuse Bases 3NH (DIN Type): Rated Voltage 690V AC/ 440V DC, Rated Current 800A, Size 3 1 Siemens =S001+P003-F4 (=S001&WD1/6.3)
3NE14382 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 800A, DIN Size 3 1 Siemens =S001+P003-F5 (=S001&WD1/6.4)
3NH34304RC LV HRC Fuse Bases 3NH (DIN Type): Rated Voltage 690V AC/ 440V DC, Rated Current 800A, Size 3 1 Siemens =S001+P003-F5 (=S001&WD1/6.4)
3NE14382 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 800A, DIN Size 3 1 Siemens =S001+P003-F6 (=S001&WD1/6.4)
3NH34304RC LV HRC Fuse Bases 3NH (DIN Type): Rated Voltage 690V AC/ 440V DC, Rated Current 800A, Size 3 1 Siemens =S001+P003-F6 (=S001&WD1/6.4)
6SL33307TG413AA0 Sinamics S120 ALM in chassis format: Voltage 500-690 V 3 AC, Power 1400kW,I/P Current 1270A,Frame Size JX 1 Siemens =S001+P002-V2 (=S001&WD1/7.2)
3NE14382 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 800A, DIN Size 3 1 Siemens =S001+P003-F7 (=S001&WD1/8.3)
3NH34304RC LV HRC Fuse Bases 3NH (DIN Type): Rated Voltage 690V AC/ 440V DC, Rated Current 800A, Size 3 1 Siemens =S001+P003-F7 (=S001&WD1/8.3)
3NE14382 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 800A, DIN Size 3 1 Siemens =S001+P003-F8 (=S001&WD1/8.3)
3NH34304RC LV HRC Fuse Bases 3NH (DIN Type): Rated Voltage 690V AC/ 440V DC, Rated Current 800A, Size 3 1 Siemens =S001+P003-F8 (=S001&WD1/8.3)
6SL33007TG413AA0 Sinamics S120 Active Interface Module for ALM in chassis format: Voltage 500-690 V 3 AC,I/P Current 1270A,Frame Size JI 1 Siemens =S001+P004-V2 (=S001&WD1/8.3)
3NE14382 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 800A, DIN Size 3 1 Siemens =S001+P003-F9 (=S001&WD1/8.3)
3NH34304RC LV HRC Fuse Bases 3NH (DIN Type): Rated Voltage 690V AC/ 440V DC, Rated Current 800A, Size 3 1 Siemens =S001+P003-F9 (=S001&WD1/8.3)
1 3
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Equipment List Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & EQ1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001&EQ1/2
Design Document No. - G71053- J5663 (EF-1) Page 2
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 5
1 2 3 4 5 6 7 8 9 10
Equipment list
Type No. Description Qty Supplier/Make Device Tag Cross Reference Remarks
3NE14382 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 800A, DIN Size 3 1 Siemens =S001+P003-F10 (=S001&WD1/8.4)
3NH34304RC LV HRC Fuse Bases 3NH (DIN Type): Rated Voltage 690V AC/ 440V DC, Rated Current 800A, Size 3 1 Siemens =S001+P003-F10 (=S001&WD1/8.4)
3NE14382 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 800A, DIN Size 3 1 Siemens =S001+P003-F11 (=S001&WD1/8.4)
3NH34304RC LV HRC Fuse Bases 3NH (DIN Type): Rated Voltage 690V AC/ 440V DC, Rated Current 800A, Size 3 1 Siemens =S001+P003-F11 (=S001&WD1/8.4)
3NE14382 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 800A, DIN Size 3 1 Siemens =S001+P003-F12 (=S001&WD1/8.4)
3NH34304RC LV HRC Fuse Bases 3NH (DIN Type): Rated Voltage 690V AC/ 440V DC, Rated Current 800A, Size 3 1 Siemens =S001+P003-F12 (=S001&WD1/8.4)
6SL33307TG413AA0 Sinamics S120 ALM in chassis format: Voltage 500-690 V 3 AC, Power 1400kW,I/P Current 1270A,Frame Size JX 1 Siemens =S001+P005-V2 (=S001&WD1/9.2)
OETL2500K3 3 pole switch disconnector, AC21A, 690V, 2500 A, supplied with handle & extension shaft 1 ABB =S001+P017-Q1 (=S001&WD1/9.9)
6SL30401MA000AA0 SINAMICS CONTROL UNIT CU320-2 DP WITH PROFIBUS INTERFACE WITHOUT COMPACT FLASH CARD 1 Siemens =S001+P002-A1 (=S001&WD1/10.1)
6SL30540ED001BA0 SINAMICS S120 COMPACTFLASH CARD W/O PERFORMANCE EXTENSION INCLUDING CERTIFICATE OF LICENCE V4.03 1 Siemens =S001+P002-A1 (=S001&WD1/10.1)
6ES79720BA410XA0 1
SIMATIC DP,BUS CONNECTOR FOR PROFIBUS UP TO 12 MBIT/S WITH TILTED OUTGOING CABLE, 15,8 X 54 X 39,5 MM (WXHXD), TERMINAT. RESIST. WITH Siemens =S001+P002-A1 (=S001&WD1/10.1)
ISOLAT. FUNCTION, WITHOUT PG SOCKET
6FX20021DC001AB0 Signal Cable, Pre assembled(Sinamics Drive CliQ), Length 1.0 m; 2 Siemens =S001+P002-A1 (=S001&WD1/10.1)
6FX20021DC001AA2 Signal Cable, Pre assembled(Sinamics Drive CliQ), Length 0.2 m; 1 Siemens =S001+P002-A1 (=S001&WD1/10.1)
6FX20021DC001AA7 Signal Cable, Pre assembled(Sinamics Drive CliQ), Length 0.7 m; 1 Siemens =S001+P002-A1 (=S001&WD1/10.1)
6FX20021DC001AC0 SIGNAL CABLE, PREASSEMBLED (SINAMICS DRIVE CLIQ) CONNECTOR IP20/IP20, WITHOUT 24 V LENGTH (M) = 2M 4 Siemens =S001+P002-A1 (=S001&WD1/10.1)
6FX20021DC001AD0 Signal Cable, Pre assembled(Sinamics Drive CliQ), Length 3 m; 20 Siemens =S001+P002-A1 (=S001&WD1/10.1)
6FX20021DC001AE0 Signal Cable, Pre assembled(Sinamics Drive CliQ), Length 4 m; 1 Siemens =S001+P002-A1 (=S001&WD1/10.1)
6FX20021DC001AF0 Signal Cable, Pre assembled(Sinamics Drive CliQ), Length 5 m; 1 Siemens =S001+P002-A1 (=S001&WD1/10.1)
6FX80021AA011AE0 AOP Cable-RS232 4m plug-in cable ( AOP30 & CU320 ) 1 Siemens =S001+P002-OP1 (=S001&WD1/10.8)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =S001+P003-K23 (=S001&WD1/12.2)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S001+P003-K23 (=S001&WD1/12.2)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =S001+P003-K23 (=S001&WD1/12.2)
=S001+P003-K23 (=S001&WD1/12.2)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =S001+P003-K23 (=S001&WD1/12.2)
=S001+P003-K23 (=S001&WD1/12.2)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =S001+P003-K24 (=S001&WD1/12.3)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S001+P003-K24 (=S001&WD1/12.3)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =S001+P003-K24 (=S001&WD1/12.3)
=S001+P003-K24 (=S001&WD1/12.3)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =S001+P003-K24 (=S001&WD1/12.3)
=S001+P003-K24 (=S001&WD1/12.3)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =S001+P003-K22 (=S001&WD1/12.4)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S001+P003-K22 (=S001&WD1/12.4)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =S001+P003-K22 (=S001&WD1/12.4)
=S001+P003-K22 (=S001&WD1/12.4)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =S001+P003-K22 (=S001&WD1/12.4)
2 4
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Equipment List Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & EQ1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001&EQ1/3
Design Document No. - G71053- J5663 (EF-1) Page 3
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 5
1 2 3 4 5 6 7 8 9 10
Equipment list
Type No. Description Qty Supplier/Make Device Tag Cross Reference Remarks
=S001+P003-K22 (=S001&WD1/12.4)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =S001+P003-K21.2 (=S001&WD1/12.5)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S001+P003-K21.2 (=S001&WD1/12.5)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =S001+P003-K21.2 (=S001&WD1/12.5)
=S001+P003-K21.2 (=S001&WD1/12.5)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =S001+P003-K21.2 (=S001&WD1/12.5)
=S001+P003-K21.2 (=S001&WD1/12.5)
3TH30400AU0 Auxiliary Contactor, 10A AC15, 4 NO, Coil Voltage: 240V AC, 50 Hz 1 Siemens =S001+P003-K21 (=S001&WD1/12.6)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S001+P003-K21 (=S001&WD1/12.6)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 4 Siemens =S001+P003-K21 (=S001&WD1/12.6)
=S001+P003-K21 (=S001&WD1/12.6)
=S001+P003-K21 (=S001&WD1/12.6)
=S001+P003-K21 (=S001&WD1/12.6)
3TH30400AU0 Auxiliary Contactor, 10A AC15, 4 NO, Coil Voltage: 240V AC, 50 Hz 1 Siemens =S001+P003-K21.1 (=S001&WD1/12.7)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S001+P003-K21.1 (=S001&WD1/12.7)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 4 Siemens =S001+P003-K21.1 (=S001&WD1/12.7)
=S001+P003-K21.1 (=S001&WD1/12.7)
=S001+P003-K21.1 (=S001&WD1/12.7)
=S001+P003-K21.1 (=S001&WD1/12.7)
3TH30400AU0 Auxiliary Contactor, 10A AC15, 4 NO, Coil Voltage: 240V AC, 50 Hz 1 Siemens =S001+P003-K28 (=S001&WD1/12.9)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S001+P003-K28 (=S001&WD1/12.9)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 4 Siemens =S001+P003-K28 (=S001&WD1/12.9)
=S001+P003-K28 (=S001&WD1/12.9)
=S001+P003-K28 (=S001&WD1/12.9)
=S001+P003-K28 (=S001&WD1/12.9)
3TH30400AU0 Auxiliary Contactor, 10A AC15, 4 NO, Coil Voltage: 240V AC, 50 Hz 1 Siemens =S001+P003-K29 (=S001&WD1/12.10)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S001+P003-K29 (=S001&WD1/12.10)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 4 Siemens =S001+P003-K29 (=S001&WD1/12.10)
=S001+P003-K29 (=S001&WD1/12.10)
=S001+P003-K29 (=S001&WD1/12.10)
=S001+P003-K29 (=S001&WD1/12.10)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =S001+P003-K25 (=S001&WD1/13.5)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S001+P003-K25 (=S001&WD1/13.5)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =S001+P003-K25 (=S001&WD1/13.5)
=S001+P003-K25 (=S001&WD1/13.5)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =S001+P003-K25 (=S001&WD1/13.5)
=S001+P003-K25 (=S001&WD1/13.5)
3SB50000UC01 Mushroom push Button actuator with holder rear connection normal with P.F.R. latched (Red) 1 Siemens =S001+P003-S1 (=S001&WD1/15.7)
3SB59210AB Yellow contrast lable for Mashroom PB with inscription 'Emergency Stop' 1 Siemens =S001+P003-S1 (=S001&WD1/15.7)
3SB54000A Contact block rear connection for PB/SS (1NO+1NC) 2 Siemens =S001+P003-S1 (=S001&WD1/15.7)
3 5
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Equipment List Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & EQ1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001&EQ1/4
Design Document No. - G71053- J5663 (EF-1) Page 4
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 5
1 2 3 4 5 6 7 8 9 10
Equipment list
Type No. Description Qty Supplier/Make Device Tag Cross Reference Remarks
=S001+P003-S1 (=S001&WD1/15.7)
3SB12002DB01 Selector Switch with P.F.R. 3 positions maintained (Black) 1 Siemens =S001+P001-Q8 (=S001&WD1/15.8)
3SB14000A Contact block rear connection for PB/SS (1NO+1NC) 2 Siemens =S001+P001-Q8 (=S001&WD1/15.8)
=S001+P001-Q8 (=S001&WD1/15.8)
3SB19120AN Thrust pad for key & selector actuators (rotary actuators) to operate central contact block. 1 Siemens =S001+P001-Q8 (=S001&WD1/15.8)
3SB52356HC10 Wide band LED pilot light (Red) for AC 42 to 240V and DC 42 to 220V 1 Siemens =S001+P003-H4 (=S001&WD1/16.4)
3SB52356HE10 Wide band LED pilot light (Green) for AC 42 to 240V and DC 42 to 220V 1 Siemens =S001+P003-H5 (=S001&WD1/16.5)
3SB52356HL10 Wide band LED pilot light (Amber) for AC 42 to 240V and DC 42 to 220V 1 Siemens =S001+P003-H6 (=S001&WD1/16.6)
4 &WD1/1
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Equipment List Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & EQ1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001&EQ1/5
Design Document No. - G71053- J5663 (EF-1) Page 5
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 5
1 2 3 4 5 6 7 8 9 10
R1 / (6.1)
Y1 / (6.1)
B1 / (6.1)
CB_NO_11 / (1.8)
CB_NC_11 / (1.8)
(2 x 120 x 10 Cu) Busbar
D11 CB_NO_21 / (16.3)
CB_NC_21 / (16.5)
(11.5)
ALM_FLT CB_NC_31 /
CB_NO_41 / (17.7)
CB_NC_41 /
=S001+P003-Q1
3200A 2 4 6 -X6:11 9 3 1 -X5:10 8 6 4
(=A001/10.1)
ACB =A001-L_2 1
3WL-ACB
(/1.7)
(/1.7) =S001+P003-X39
(/1.8)
(/1.9) =S001+P003-X203 1
(/1.9)
S1 S2 S3 S4 =S001+P009-X203 1
=S001+P003-X39 3
13
=S001+P003-K23
21
Buffer Cont.
=S002+P009-K28
for ALM-1 14
Crane Disable
(/12.2) (=A001/2.4)
Interposing Cont. 22
1 3 5 -X6:12 10 4 2 9 7 5 3 (=A001/10.4) (=S002/13.9)
=A001-CB_NC_31
=A001-N_2
=S001+P003-X203 2
CB_NC_42 / 13
=S001+P003-X39 =S001+P003-K24
CB_NO_42 / (17.7) 2
Buffer Cont.
(3 x 80 x 10 Al) Busbar =S001+P009-X203 2 =A001-CB_NC_32
CB_NC_32 / 1 3 5 for ALM-2 14
=S001+P003-Q9 (/12.3) (=A001/2.4)
1.8-2.5A 4
CB_NC_22 / (16.5)
(1.4) (1.4)
CB_NO_22 / (16.3) I> I> I> CB_NC_11 CB_NO_11
CB_NC_12 / (1.8) 2 4 6
CB_NO_12 / (1.8)
(2.3)
50 SQ MM N CB_NC_12 CB_NO_12 -L240:8 D11
(1.6) (1.4) (1.4)
50 SQ MM RI1 / (5.2)
50 SQ MM YI1 / (5.2)
BI1 / (5.2)
6 mm² 1 2
2.5 mm²
+P003-F13
6 mm² 1 2
2.5 mm² =S001+P003-Q1
+P003-F14 (/1.1)
6 mm² 1 2 -X5:2 -X7:9 -X6:7 -X6:14 -X5:12
-X7:13
2.5 mm² L+/L L+/L L+/L L+/L L+/L
=S001+P003-F15
2A 4
PE
M 1 -F1 -F3
S24
A N A N
1~
UNDER-VOLTAGE
A N
1ST SHUNT
SOLENOID
CLOSING
RELEASE
RELEASE
750/Root3:110/Root3
3WL
MOTOR
Potential Transformer L-/N L-/N L-/N L-/N
3WL
3WL
3WL
3WL
A N A N A N
-X5:1 -X6:8 -X6:13 -X5:11 -X7:14 12
S24_NC / (17.9)
2.5 mm² 2.5 mm²
S24_NO / (16.6)
=S001+P003-X31 1 2 =S001+P003-X51 1 2
2 4 13 21 24 23 2 4 13 21 24 23
=S001+P003-F20 =S001+P003-F21
1NO+1NC 04A
240 VAC Supply MCB 1 3 14 22 23 24 24 VDC Supply MCB 1 3 14 22 23 24
(/12.4)
(/17.1)
(/12.4)
(/17.2)
2.5 mm² 2.5 mm²
2.5 mm 2.5
4 4
=S001+P004-X53 3 =S001+P001-X54 3
/ -L240:1
(16.3) / -L240:2
(3.1) / -L240:3
(12.1) / -L240:4
(11.5) / -L240:5
(13.2) / -L240:6
(15.1) / -L240:7
(1.9) / -L240:8
/ -L240:9
/ -L240:10
/ -N240:1
(16.3) / -N240:2
(3.1) / -N240:3
(12.1) / -N240:4
/ -N240:5
(13.2) / -N240:6
/ -N240:7
(1.9) / -N240:8
/ -N240:9
/ -N240:10
(6.4) / -P24:1
(7.4) / -P24:2
(8.5) / -P24:3
(9.3) / -P24:4
(7.5) / -P24:5
(9.4) / -P24:6
(10.2) / -P24:7
(10.1) / -P24:8
(17.1) / -P24:9
/ -P24:10
(6.5) / -M24:1
(7.4) / -M24:2
(8.5) / -M24:3
(9.3) / -M24:4
(7.5) / -M24:5
(9.4) / -M24:6
(10.2) / -M24:7
(10.8) / -M24:8
(11.2) / -M24:9
(17.8) / -M24:10
240V AC Distribution bus 24V DC Distribution bus
1 3
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Power Distribution Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P003 & WD1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001+P003&WD1/2
Design Document No. - G71053- J5663 (EF-1) Page 2
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 17
1 2 3 4 5 6 7 8 9 10
(=A001/5.6) / =A001-Y_ALM1
(=A001/5.3) / =A001-R_ALM1
=S001+P003-X17 1 2
6 SQ mm
6 mm²
(2.4) / -N240:3
6 SQ mm
(2.2) / -L240:3
6 mm²
1 3 5 13 21 1 3 5 13 21 1 3 5 13 21 1 3 5 13 21
=S001+P003-Q2 =S001+P003-Q3 =S001+P003-Q4 =S001+P003-Q5
4.5-6.3A 4.5-6.3A 4.5-6.3A 4.5-6.3A
AIM-1 Fan Supply 14 22 AIM-2 Fan Supply 14 22 ALM-1 Fan Supply 14 22 ALM-2 Fan Supply 14 22
(/12.4)
(/12.4)
(/12.4)
(/12.4)
I> I> I> I> I> I> I> I> I> I> I> I>
2 4 6 2 4 6 2 4 6 2 4 6
=S001+P003-X203 5 6
=S001+P003-X201 1 2
SS1
SS2
=S001+P004-X203 5 6
=S001+P004-X201 1 2
SS1
SS2
(6.5) / AIM1_FAN_L
(6.6) / AIM1_FAN_N
(8.5) / AIM2_FAN_L
(8.6) / AIM2_FAN_N
(7.5) / ALM1_FAN_R
(7.5) / ALM1_FAN_Y
(9.4) / ALM2_FAN_R
(9.5) / ALM2_FAN_Y
AIM Fan Supply ALM Fan Supply
2 4
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Power Distribution Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P003 & WD1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001+P003&WD1/3
Design Document No. - G71053- J5663 (EF-1) Page 3
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 17
1 2 3 4 5 6 7 8 9 10
(=A001/10.1) DB:L
=A001-L_3=S001+POO3-X42 7 DB:L
1 =S001+P003-X203 7
=S001+P004-X203
11 11 11 11 11 11
=S001+P001-S1 =S001+P002-S2 =S001+P003-S2 =S001+P004-S1 =S001+P005-S1 =S001+P006-S1
Door Limit Switch Door Limit Switch Door Limit Switch Door Limit Switch Door LImit Switch Door Limit Switch
12 12 12 12 12 12
CFL CFL CFL CFL CFL CFL CFL
1.5 mm² 240V AC,18W 1.5 mm² 240V AC,18W 1.5 mm² 240V AC,18W 240V AC,18W 1.5 mm² 240V AC,18W 1.5 mm² 240V AC,18W 1.5 mm² 240V AC,18W
LI LO =S001+P001-H1 LI LO =S001+P002-H2 LI LO =S001+P003-H7 =S001+P003-H8 LI LO =S001+P004-H1 LI LO =S001+P005-H1 LI LO =S001+P006-H1
x1 x1 x1 x1 x1 x1 x1
1.5 mm² 1.5 mm² 1.5 mm² 1.5 mm² 1.5 mm² 1.5 mm²
PE PE PE PE PE PE
8
2 =S001+P003-X203 8
=S001+POO3-X42 =S001+P004-X203
=A001-N_3 DB:N
(=A001/10.4) DB:N
3 5
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Panel Auxiliary Circuits Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P003 & WD1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001+P003&WD1/4
Design Document No. - G71053- J5663 (EF-1) Page 4
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 17
1 2 3 4 5 6 7 8 9 10
(1.5) / RI1
(1.5) / YI1
(1.5) / BI1
1 3 5 1 3 5 13 21 1 3 5 1 3 5 13 21
=S001+P003-Q6 =S001+P003-Q7
0.2A 0.2A
Fuse Monitoring MPCB1 14 22 Fuse Monitoring MPCB2 14 22
=S001+P003-F18 =S001+P003-F19
(/12.4)
(/12.4)
160A I> I> I> 160A I> I> I>
Switch Disconnector Fuse 2 4 6 Switch Disconnector Fuse 2 4 6
2 4 6 2 4 6
=S001+P003-X201 3 4 5
=S001+P004-X201 3 4 5
(6.6) / PC_AIM1_1
(6.6) / PC_AIM1_2
(6.6) / PC_AIM1_3
(8.5) / PC_AIM2_1
(8.5) / PC_AIM2_2
(8.5) / PC_AIM2_3
Pre Charging Circuit Pre Charging Circuit
for AIM-1 for AIM-2
4 6
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Pre-Charging Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P001 & WD1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001+P001&WD1/5
Design Document No. - G71053- J5663 (EF-1) Page 5
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 17
1 2 3 4 5 6 7 8 9 10
PC_AIM1_1 / (5.3)
PC_AIM1_2 / (5.3)
PC_AIM1_3 / (5.3)
1 1 1 1 1 1
=S001+P003-F1
+P003-F2 +P003-F3
+P003-F4 +P003-F5
+P003-F6
800A
SITOR Semiconductor Fuse 2 2 2 2 2 2
=S001+P001-V1
1270A -X1
Active Interface
Module-1 L1 L2 L3 PE1 2/T1 4/T2 6/T3
SINAMICS S120
ACTIVE INTERFACE MODULE CHASSIS
FRAME SIZE-HI AND JI
-X2 -X609 External 24V DC External 230V AC Pre-Charging Line Contactor Contactors
for Fan Contactor Activate Open
ALMside
connection +24V M 230V L 230V N
U2 V2 W2 PE2 PE
PE 1 2 3 4 5 6 7 8 9 10 11 12 13 14
(2.9) / M24:1
(3.2) / AIM1_FAN_L
(3.3) / AIM1_FAN_N
(7.4) / COMMON
(7.5) / PRE
(7.5) / BUFFER
U2 V2 W2
(7.3) (7.3) (7.3)
5 7
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - AIM1 Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P001 & WD1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001+P001&WD1/6
Design Document No. - G71053- J5663 (EF-1) Page 6
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 17
1 2 3 4 5 6 7 8 9 10
BUFFER_CONT1 / (12.2)
ALM1_FAN_R / (3.7)
ALM1_FAN_Y / (3.7)
COMMON / (6.6)
BUFFER / (6.7)
-M24:2 / (2.9)
-P24:2 / (2.6)
(6.3) (6.3) (6.3)
PRE / (6.6)
U2 V2 W2
(2 x 50 x 10 Cu) Busbar
=S001+P002-V2
1400kW,1270A -X9 1 2 3 4 5 6 L1 L2
Active Line
Module-1 U1 V1 W1
LED
SINAMICS S120 Ready
1 2 3 4 1 2 3 4 5 6 7 8
2.5 mm²
(2 x 100 x 10 Cu) Busbar
14
=S001+P003-K21
Common OFF 2 Chain -PE
(/12.6) 13
(2.9) / -M24:5
(2.7) / -P24:5
D1 / (9.1)
C1 / (9.1)
6 8
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - ALM1 Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P002 & WD1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001+P002&WD1/7
Design Document No. - G71053- J5663 (EF-1) Page 7
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 17
1 2 3 4 5 6 7 8 9 10
PC_AIM2_1 / (5.7)
PC_AIM2_2 / (5.7)
PC_AIM2_3 / (5.7)
(2 x 50 x 10 Cu) Busbar
1 1 1 1 1 1
=S001+P003-F7 =S001+P003-F9 =S001+P003-F11
800A 800A 800A
=S001+P003-F8 2 2 =S001+P003-F10 2 2 =S001+P003-F12 2 2
800A 800A 800A
(2 x 50 x 10 Cu) Busbar
=S001+P004-V2
1270A -X1
Active Interface
Module-2 L1 L2 L3 PE1 2/T1 4/T2 6/T3
SINAMICS S120
ACTIVE INTERFACE MODULE CHASSIS
FRAME SIZE-HI AND JI
-X2 -X609 External 24V DC External 230V AC Pre-Charging Line Contactor Contactors
for Fan Contactor Activate Open
ALMside
connection +24V M 230V L 230V N
U2 V2 W2 PE2 PE
PE 1 2 3 4 5 6 7 8 9 10 11 12 13 14
=S001+P004-X204 1 2
(2 x 50 x 10 Cu) Busbar -PE
=S001+P003-X204 1 2
2.5 mm² 2.5 mm²
(2.7) / P24:3
(2.9) / M24:3
(3.4) / AIM2_FAN_L
(3.5) / AIM2_FAN_N
(9.4) / COMMON
(9.4) / PRE
(9.4) / BUFFER
U3 V3 W3
(9.2) (9.2) (9.2)
7 9
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - AIM2 Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P004 & WD1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001+P004&WD1/8
Design Document No. - G71053- J5663 (EF-1) Page 8
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 17
1 2 3 4 5 6 7 8 9 10
BUFFER_CONT2 / (12.2)
ALM2_FAN_R / (3.9)
ALM2_FAN_Y / (3.9)
W3 / (8.4)
U3 / (8.3)
V3 / (8.3)
COMMON / (8.6)
BUFFER / (8.7)
-M24:4 / (2.9)
-P24:4 / (2.7)
PRE / (8.6)
(9.3) (9.3)
=S001+P003-X41 9
C2 D2
=S001+P003-X204 3 4
=S002+P004-X204 3 4
=S001+P005-V2
1400kW,1270A -X9 1 2 3 4 5 6 L1 L2
Active Line
Module-2 U1 V1 W1 (2 x 100 x 10 Cu) Busbar
1 3 5
13 21 21
LED =S001+P017-Q1
2500A
SINAMICS S120 Ready
Main DC Isolator 14 22 22
2 4 6
ACTIVE LINE MODULE
(/17.3)
(/10.2)
(=S002/11.2)
DC Link
FRAME SIZE - CHASSIS-HX-JX
1 2 3 4 1 2 3 4 5 6 7 8
-PE
=S001+P003-X204 5 6
(=S002/10.4) / C2
(=S002/10.4) / D2
44
=S001+P003-K21
Common OFF 2 Chain
(2 x 100 x 10 Cu) Busbar (/12.6)
(7.4) / D1 D2 / (9.9) 43
(7.4) / C1 C2 / (9.9)
(2.9) / -M24:6
(2.7) / -P24:6
8 10
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - ALM2 + DC Bus Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P005 & WD1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001+P005&WD1/9
Design Document No. - G71053- J5663 (EF-1) Page 9
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 17
1 2 3 4 5 6 7 8 9 10
(2.7) / -P24:8
=S001+P003-X204 9
23
=S001+P003-K21 =S001+P009-X204 1
Common OFF 2 Chain
(/12.6) 24 13
=S002+P009-K27 D11
Crane Enable
Int. Cont. 14
=S001+P009-X204 24 (=S002/13.8)
13 =S001+P009-X204 2
=S001+P003-K22 =S001+P003-X204 24 =S001+P003-X204
OFF 1 Chain 10 11
(/12.4)
=S001+P003-X204
14 43 11
=S001+P003-K25 =S001+P020-X204
23 (=S010/11.6) / =S010-RESET_ALM1-1
Master Cntr
=S001+P001-Q8
Null Interposing Cont. 44 (=S010/11.6) / =S010-RESET_ALM1-2
Position-1 (/13.6) 12
24 =S001+P020-X204
ALM 1-OFF-ALM 2 =S001+P003-X204
CRANE_ON_AFE1 / (11.3)
25 12
(/15.8)
=S001+P003-X204 7 =S001+P003-X204
13
DC_CHARGE / (11.3)
=S001+P003-X204
ALM_FAULT / (11.5)
=S001+P009-X204
7=S001+P017-X204 25 13
=S001+P020-X204
21
=S001+P017-Q1
Main DC Isolator
(/9.9) 22 =S001+P018-X204 14
D11
8 =S001+P017-X204
8 14
=S001+P003-X204
=S001+P003-X204
2.5 mm²
-M24:8 / (2.10)
=S001+P002-X55 1 2 3 4 5 6 7 8 9 10 11 12 13 14 =S001+P002-X56 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
15
=S001+P002-A1 =S001+P002-OP1
CU320-2 -X122 1 2 3 4 5 6 7 8 9 10 11 12 13 14 -X132 1 2 3 4 5 6 7 8 9 10 11 12 13 14 AOP30
CU320-2_ALM1_ALM2 AOP30
DI 0
DI 1
DI 2
DI 3
DI 16
DI 17
M1
DI/DO 8
DI/DO 9
DI/DO 10
DI/DO 11
DI 4
DI 5
DI 6
DI 7
DI 20
DI 21
M2
DI/DO 12
DI/DO 13
DI/DO 14
DI/DO 15
M
SINAMICS G130
Advanced Operating Panel AOP30
Option Board
SINAMICS S120 P24 M RxD TxD M
-X124 -X140
MP PE
+ + M M 2 3 5
(2.7) / -P24:7
(2.10) / -M24:7
-PE
9 11
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - CU320 Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P003 & WD1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001+P003&WD1/10
Design Document No. - G71053- J5663 (EF-1) Page 10
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 17
1 2 3 4 5 6 7 8 9 10
CRANE_ON_AFE2 / (=S002/11.7)
CRANE_ON_AFE1 / (10.7)
-DC_CHARGE / (10.6)
ALM_FAULT / (10.7)
D11
=S002+P009-X204 15
=S002+P003-X204 15
(2.10) / -M24:9
=S001+P003-K1
4-CH
24V DC 4-channel Relay Board 1+ 1- 2+ 2- 3+ 3- 4+ 4-
P1 O1 C1 P2 O2 C2 P3 O3 C3 P4 O4 C4
=S001+P003-X41 5 6
(12.9) / -ALM1_DC1
(12.9) / -ALM1_DC2
(=L001/10.5) / CRANE_ON1
(=L001/10.5) / CRANE_ON2
D11
(2.2) / L240:5
(1.2) / ALM_FLT
10 12
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Relay Boards Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P003 & WD1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001+P003&WD1/11
Design Document No. - G71053- J5663 (EF-1) Page 11
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 17
1 2 3 4 5 6 7 8 9 10
2.5 mm²
(2.2) / -L240:4
43
=S001+P003-K21.2
OFF 2 Chain
(/12.5) 44
=S001+P003-X38 1
24
=S001+P003-F20
240 VAC Supply MCB
(/2.3) 23 =A001-INFEED1-1 / (=A001/19.9)
24 =A001-INFEED1-2 / (=A001/19.9)
=S001+P003-F21
24 VDC Supply MCB
(/2.7) 2
23
13
=S001+P003-Q2
AIM-1 Fan Supply
(/3.2) 14
=S001+P003-X203 10
13
=S001+P003-Q3
AIM-2 Fan Supply
(/3.4)
=S001+P009-X203 10
14
13
=S001+P003-K21.2
13 (11.3) / ALM1_DC1 (=S002/12.3) / ALM2_DC1
OFF 2 Chain
=S001+P003-Q4 (/12.5) 14 (11.3) / ALM1_DC2 (=S002/12.3) / ALM2_DC2
ALM-1 Fan Supply
(9.4) / -BUFFER_CONT2
=S001+P003-X203
9 9
(/3.7) 14
=S001+P004-X203
=S001+P003-X38 3 =S001+P009-X203 11
13
=S001+P003-Q5
ALM-2 Fan Supply
(7.5) / -BUFFER_CONT1 (/3.9) 14 =A001-INFEED1-3 / (=A001/19.9)
=S001+P003-X203 11
13 =A001-INFEED1-4 / (=A001/19.9)
=S001+P003-Q6
Fuse Monitoring MPCB1
(/5.4) 4
14
13
=S001+P003-Q7
Fuse Monitoring MPCB2
(/5.8) 14
A1 A1 A1 A1 A1 A1 A1 A1
U U U U U U U U
=S001+P003-K23 =S001+P003-K24 =S001+P003-K22 =S001+P003-K21.2 =S001+P003-K21 =S001+P003-K21.1 =S001+P003-K28 =S001+P003-K29
240V AC A2 240V AC A2 240V AC A2 240V AC A2 240V AC A2 240V AC A2 240V AC A2 240V AC A2
Buffer Cont. Buffer Cont. OFF 1 Chain OFF 2 Chain Common OFF 2 Chain Common OFF 2 Chain DC Link Charge DC Link Charge
for ALM-1 for ALM-2 Interposing cont. Interposing cont.
2.5 mm²
(2.4) / -N240:4
11 13
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Control Logic Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P003 & WD1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001+P003&WD1/12
Design Document No. - G71053- J5663 (EF-1) Page 12
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 17
1 2 3 4 5 6 7 8 9 10
(2.2) / L240:6
=S001+P003-X203 12
=S001+P020-X203 12
33
=S010+P020-K7
LT1-Null Position
(=S010/12.3) 34
=S001+P020-X203 13
=S001+P003-X203 13
=S001+P003-X203 14
=S001+P026-X203 14
23
=S009+P026-K7
ACT-Null Position
(=S009/11.3) 24
=S001+P026-X203 15
=S001+P003-X203 15
=S001+P003-X203 16
=S001+P026-X203 16
23
=S008+P022-K7
AH2-Null Position
(=S008/12.3) 24
=S001+P022-X203 17
=S001+P003-X203 17
=S001+P003-X203 18
=S001+P024-X203 18
23
=S007+P024-K7
MCT-Null Position
(=S007/14.3) 24
=S001+P024-X203 19
=S001+P003-X203 19
=S001+P003-X203 20
=S001+P031-X203 21
13
=S006+P031-K7
AH1-Null Position
(=S006/11.3) 14
=S001+P031-X203 22
D11
=S001+P003-X203 21
=S001+P022-X203 22
=S001+P015-X203 3
33
=S003+P015-K7
MH-Null Position A1
(=S003/16.3) 34 U
=S001+P003-K25
=S001+P015-X203 4 240V AC A2
Master Cntr
=S001+P003-X203 23 Null Interposing Cont.
(2.5) / N240:6
13 14
21 22
31 32
43 44 (/10.3)
53 54 (/15.9)
61 62
71 72
83 84
43 44 (=S002/11.3)
12 14
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Control Logic Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P003 & WD1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001+P003&WD1/13
Design Document No. - G71053- J5663 (EF-1) Page 13
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 17
1 2 3 4 5 6 7 8 9 10
43
=S001+P003-K21.1
33 83
MH-1 AH-2 Common OFF 2 Chain LT-2
=S001+P003-K21 =S001+P003-K21
Common OFF 2 Chain Common OFF 2 Chain D11 (/12.7) 44
(/12.6) 34 84
2 10 18
MH1-2 / (=S003/9.3) AH2-2 / (=S008/9.3) OFF2_2 / (=S011/8.4)
3 11 19
MH2-1 / (=S004/8.4) MCT-1 / (=S007/11.4)
=S001+P003-X37 =S001+P003-X37 =S001+P003-X37
2.5 mm² 2.5 mm² 2.5 mm²
53 13 53
=S001+P003-K21 MH-2 =S001+P003-K21.1 MCT =S001+P003-K21.1 Spare
Common OFF 2 Chain Common OFF 2 Chain D11 Common OFF 2 Chain
(/12.6) 54 (/12.7) 14 54
4 12 20
MH2-2 / (=S004/8.4) MCT-2 / (=S007/11.4)
5 13 21
MH-STD1 / (=S005/11.3) ACT-1 / (=S009/8.3)
=S001+P003-X37 =S001+P003-X37 =S001+P003-X37
2.5 mm² 2.5 mm² 2.5 mm²
=S001+P003-K21
63
MH-STD =S001+P003-K21.1
23 D11 ACT =S001+P003-K21.1
63
Spare
Common OFF 2 Chain Common OFF 2 Chain Common OFF 2 Chain
(/12.6) 64 (/12.7) 24 64
6 14 22
MH-STD2 / (=S005/11.3) ACT-2 / (=S009/8.3)
7 15
AH1-1 / (=S006/8.3) LT1-1 / (=S010/8.3)
=S001+P003-X37 =S001+P003-X37
2.5 mm² 2.5 mm²
73 33
=S001+P003-K21 AH-1 =S001+P003-K21.1 LT-1
Common OFF 2 Chain Common OFF 2 Chain
(/12.6) 74 (/12.7) 34
8 16
AH1-2 / (=S006/8.3) LT1-2 / (=S010/8.3)
13 15
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Control Logic Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P003 & WD1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001+P003&WD1/14
Design Document No. - G71053- J5663 (EF-1) Page 14
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 17
1 2 3 4 5 6 7 8 9 10
1 2 3
23 11 31 43 43 63
=S001+P001-Q8
3-way
ALM 1-OFF-ALM 2 24 12 32 44 44 64
(/10.2)
(=S002/11.2)
(/15.7)
2.5 mm²
(2.2) / -L240:7
13 53 13
=S001+P003-K28 =S001+P003-K23 =S001+P003-K29
DC Link Charge Buffer Cont. DC Link Charge
Interposing cont. 14 for ALM-1 54 Interposing cont. 14
(/12.9) (/12.2) (/12.10)
63 23
=S001+P003-K28 =S001+P003-K29
DC Link Charge DC Link Charge
Interposing cont. 64 Interposing cont. 24
(/12.9) (/12.10)
23 1
=S001+P003-K28
73 33 =A001-INFEED1_E-STOP1 / (=A001/19.2)
DC Link Charge
=S001+P003-K28 =S001+P003-K29 =S001+P003-X36
Interposing cont. 24
(/12.9) DC Link Charge DC Link Charge
Interposing cont. 74 Interposing cont. 34
(/12.9) (/12.10) 2.5 mm²
43 83 43 11
=S001+P003-K28 =S001+P003-K28 =S001+P003-K29 =S001+P003-S1
DC Link Charge DC Link Charge DC Link Charge E-Stop on Infeed 1 panel
Interposing cont. 44 Interposing cont. 84 Interposing cont. 44 12
(/12.9) (/12.9) (/12.10)
2.5 mm²
2
=A001-INFEED1_E-STOP2 / (=A001/19.2)
=S001+P003-X35 1 2 3 4 5 6 7 8 9 10 11
(=S005/14.6) / DC_MH_STD
(=S004/10.6) / DC_MH-2
(=S003/14.3) / DC_MH-1
(=S006/12.2) / DC_RACK
(=S006/12.2) / DC_AH-1
(=S010/13.4) / DC_LT1
(=S011/10.3) / DC_LT2
(=S008/13.4) / DC_AH-2
(=S007/15.4) / DC_MCT
(=S009/12.4) / DC_ACT
19 21
=S001+P009-X204 =S001+P009-X204
=S001+P003-X204 21
=S001+P003-X204 19
53
=S001+P003-K25
63
(/15.8)
=S001+P003-X204 20 =S001+P003-X204 22
20 22
=S001+P009-X204 =S001+P009-X204
14 16
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Control Logic Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P003 & WD1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001+P003&WD1/15
Design Document No. - G71053- J5663 (EF-1) Page 15
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 17
1 2 3 4 5 6 7 8 9 10
(2.1) / -L240:2
X1 X1 X1
=S001+P003-H4 =S001+P003-H5 =S001+P003-H6
Lamp_Red Lamp_Green Lamp_Amber
ACB ON X2 ACB OFF X2 ACB TRIP X2
(2.4) / -N240:2
15 17
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Annunciation Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P003 & WD1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001+P003&WD1/16
Design Document No. - G71053- J5663 (EF-1) Page 16
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 17
1 2 3 4 5 6 7 8 9 10
240V AC SUPPLY MCB 24V DC SUPPLY MCB MAIN DC ISOLATOR BUFFER CONT FOR ALM-1 BUFFER CONT FOR ALM-2 OFF1 CHAIN COMMON OFF 2 CHAIN DC LINK
(=C001/30.6) (=C001/30.7) (=C001/31.3) (=C001/31.3) (=C001/31.4) (=C001/31.5) CHARGE INTERPOSING
CONT
(=C001/31.6)
P1 O1 C1
P1 O1 C1
=S001+P003-X57 1 2 3
(17.8) / P24_6
(=C001/39.5) / ACB_ON
(=C001/39.6) / ACB_OFF
(=C001/39.7) / ACB_TRIP
16 &TD1/1
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - To PLC Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P003 & WD1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001+P003&WD1/17
Design Document No. - G71053- J5663 (EF-1) Page 17
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 17
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Connection
Connection
Terminal
Terminal
Jumper
Jumper
Terminal
Terminal
Target
Target
Point
Point
Function Text Target Terminal Strip Source Designation Cross Reference Function Text Target Terminal Strip Source Designation Cross Reference
=S001+P001-X16 =S001+P002-X56
3 Phase,690 V AC Supply from PP 1 =S001+P003-Q1 1 (=S001&WD1/1.2) =S001+P002-A1-X132 1 1 =S001+P003-X204 10 (=S001&WD1/10.5)
Connection
Terminal
Jumper
Terminal
Target
Point
=S001+P002-A1-X132 11 11 (=S001&WD1/10.7)
Function Text Target Terminal Strip Source Designation Cross Reference
=S001+P002-A1-X132 12 12 (=S001&WD1/10.7)
Connection
Terminal
Connection
Jumper
Terminal
Terminal
Target
Jumper
Terminal
Point
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S001+P003-X17
=S001+P002-X55
690 VAC from PP =A001+P029-X31 1 1 =S001+P003-Q4 1 (=S001&WD1/3.8)
=S001+P002-A1-X122 1 1 =S001+P003-K21 24 (=S001&WD1/10.2)
=S001+P003-Q5 1
=S001+P002-A1-X122 2 2 =S001+P003-K22 14 (=S001&WD1/10.2)
=A001+P029-X32 1 2 =S001+P003-Q4 5 (=S001&WD1/3.8)
=S001+P002-A1-X122 3 3 =S001+P001-Q8 24 (=S001&WD1/10.2)
=S001+P003-Q5 5
=S001+P002-A1-X122 4 4 =S001+P003-X204 8 (=S001&WD1/10.2)
Connection
=S001+P002-A1-X122 5 5 (=S001&WD1/10.3)
Terminal
Jumper
Terminal
Target
Point
=S001+P002-A1-X122 6 6 (=S001&WD1/10.3) Function Text Target Terminal Strip Source Designation Cross Reference
=S001+P002-A1-X122 7 7 (=S001&WD1/10.3)
=S001+P002-A1-X122 11 11 (=S001&WD1/10.4)
Connection
Terminal
Jumper
Terminal
Target
Point
=S001+P002-A1-X122 12 12 (=S001&WD1/10.4)
Function Text Target Terminal Strip Source Designation Cross Reference
=S001+P002-A1-X122 13 13 (=S001&WD1/10.4)
=S001+P003-Q1-X6 3 2 (=S001&WD1/2.1)
&WD1/17 2
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001&TD1/1
Design Document No. - G71053- J5663 (EF-1) Page 1
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 6
1 2 3 4 5 6 7 8 9 10
Terminal diagram
DC Link Charge =S001+P003-K29 34 10 =S007+P024-X39 9 (=S001&WD1/15.6)
Connection
Terminal
Jumper
Terminal
Target
Point
DC Link Charge =S001+P003-K29 44 11 =S009+P026-X39 9 (=S001&WD1/15.6)
Function Text Target Terminal Strip Source Designation Cross Reference
Connection
Terminal
Jumper
Terminal
Target
Point
=S001+P003-X33 Function Text Target Terminal Strip Source Designation Cross Reference
=S001+P003-Q2 1 3 (=S001&WD1/2.2)
=S001+P003-K28 13 7 (=S001&WD1/2.2)
Connection
Terminal
Jumper
Terminal
Target
Point
=S001+P003-Q1-X5 12 8 (=S001&WD1/2.3)
Function Text Target Terminal Strip Source Designation Cross Reference
9 (=S001&WD1/2.3)
10 (=S001&WD1/2.3)
=S001+P003-X37
Connection
OFF2 f/b to MH-1 =S003+P017-X39 1 1 =S001+P003-K21 33 (=S001&WD1/14.3)
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference =S003+P017-X39 2 2 =S001+P003-K21 34 (=S001&WD1/14.3)
220V Neutral Terminal Strip 1 =S001+P003-F20 3 (=S001&WD1/2.4) OFF2 f/b to MH-STD =S005+P013-X39 3 5 =S001+P003-K21 63 (=S001&WD1/14.3)
Jumper
Terminal
Target
Point
Connection
DC Link Charge =S001+P003-K28 64 5 =S006+P031-X40 16 (=S001&WD1/15.4)
Terminal
Jumper
Terminal
Target
Point
DC Link Charge =S001+P003-K28 74 6 =S006+P031-X40 15 (=S001&WD1/15.4) Function Text Target Terminal Strip Source Designation Cross Reference
1 3
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001&TD1/2
Design Document No. - G71053- J5663 (EF-1) Page 2
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 6
1 2 3 4 5 6 7 8 9 10
Terminal diagram
=S001+P003-K21 13 5 (=S001&WD1/2.7)
Connection
Terminal
Jumper
Terminal
Target
Point
=S001+P003-K21 43 6 (=S001&WD1/2.7)
Function Text Target Terminal Strip Source Designation Cross Reference
=S001+P002-A1-X124 + 7 (=S001&WD1/2.7)
=S001+P003-K21 23 8 (=S001&WD1/2.7)
=S001+P003-X38
=S001+P003-F20 23 9 (=S001&WD1/2.8)
=S001+P003-K21.2 13
10 (=S001&WD1/2.8)
=S001+P003-K21.2 A1 2 =A001+P028-X37 2 (=S001&WD1/12.5)
Connection
=A001+P028-X37 5 3 =S001+P003-K21.2 14 (=S001&WD1/12.6)
Terminal
Jumper
Terminal
Target
Point
=S001+P003-K21 A1 4 =A001+P028-X37 6 (=S001&WD1/12.6) Function Text Target Terminal Strip Source Designation Cross Reference
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference =S001+P003-X54
24V Negative Terminal Strip =S001+P001-V1-X609 3 1 =S001+P003-F21 3 (=S001&WD1/2.9)
Connection
Terminal
Jumper
Terminal
=S001+P002-V2 1 5 (=S001&WD1/2.9)
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
5 (=S001&WD1/17.5)
=S001+P003-X204 5 6 (=S001&WD1/2.9)
=S001+P003-X41
6 (=S001&WD1/17.6)
Crane On signal to ACU =L001+RS001-X37 15 5 =S001+P003-K1 (=S001&WD1/11.3)
=S001+P002-A1-X124 M 7 (=S001&WD1/2.10)
Crane On signal to ACU =L001+RS001-X37 16 6 =S001+P003-K1 (=S001&WD1/11.4)
7 (=S001&WD1/17.7)
=S001+P005-V2-X9 4 9 =S001+P004-X203 9 (=S001&WD1/9.4)
=S001+P002-X56 14 8 (=S001&WD1/2.10)
Connection
=S001+P003-K1 1- 9 (=S001&WD1/2.10)
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference =S001+P003-K26 1- 10 (=S001&WD1/2.10)
Connection
Terminal
Jumper
Terminal
Target
Point
=S001+P003-X51 Function Text Target Terminal Strip Source Designation Cross Reference
1 =S001+P003-F21 2 (=S001&WD1/2.7)
2 =S001+P003-F21 4 (=S001&WD1/2.8)
=S001+P003-X57
Connection
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference 2 (=S001&WD1/17.8)
3 (=S001&WD1/17.10)
=S001+P003-X53
Connection
Terminal
Jumper
Terminal
Target
Point
24V Positive Terminal Strip =S001+P001-V1-X609 1 1 =S001+P003-F21 1 (=S001&WD1/2.6)
Function Text Target Terminal Strip Source Designation Cross Reference
=S001+P002-V2-X9 1 2 (=S001&WD1/2.6)
=S001+P004-X53 3 3 (=S001&WD1/2.7)
=S001+P003-X201
=S001+P004-X53 4 4 (=S001&WD1/2.7)
=S001+P004-X201 1 1 =S001+P003-Q5 4 (=S001&WD1/3.9)
2 4
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001&TD1/3
Design Document No. - G71053- J5663 (EF-1) Page 3
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 6
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Connection
Connection
Terminal
Terminal
Jumper
Jumper
Terminal
Terminal
Target
Target
Point
Point
Function Text Target Terminal Strip Source Designation Cross Reference Function Text Target Terminal Strip Source Designation Cross Reference
=S001+P003-X201 =S001+P003-X204
=S001+P004-X201 2 2 =S001+P003-Q5 6 (=S001&WD1/3.9) 1 (=S001&WD1/8.5)
=S001+P003-Q7 6 7 (=S001&WD1/10.2)
Connection
Terminal
Jumper
Terminal
Target
Point
=S001+P009-X204 1 9 =S001+P009-X204 24 (=S001&WD1/10.5)
Function Text Target Terminal Strip Source Designation Cross Reference
=S001+P002-X56 1 10 =S001+P009-X204 2 (=S001&WD1/10.5)
Connection
LT- Null f/b =S001+P026-X203 14 13 =S001+P020-X203 13 (=S001&WD1/13.3)
Terminal
Jumper
Terminal
Target
Point
LT- Null f/b =S009+P026-K7 23 14 =S010+P020-K7 34 (=S001&WD1/13.3) Function Text Target Terminal Strip Source Designation Cross Reference
Connection
Terminal
Jumper
Terminal
Target
Point
LT- Null f/b =S001+P031-X203 21 20 (=S001&WD1/13.3)
Function Text Target Terminal Strip Source Designation Cross Reference
LT- Null f/b 23 =S001+P024-X203 18 (=S001&WD1/13.3)
=S001+P004-X201
=S001+P003-X201 1 1 =S001+P005-V2-X9 L1 (=S001&WD1/3.9)
3 5
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001&TD1/4
Design Document No. - G71053- J5663 (EF-1) Page 4
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 6
1 2 3 4 5 6 7 8 9 10
Terminal diagram
E-stop Form Infeed 1 Panel 20 =S001+P003-X204 20 (=S001&WD1/15.8)
Connection
Terminal
Jumper
Terminal
Target
Point
E-stop Form Infeed 1 Panel 21 =S001+P003-X204 21 (=S001&WD1/15.9)
Function Text Target Terminal Strip Source Designation Cross Reference
E-stop Form Infeed 1 Panel 22 =S001+P003-X204 22 (=S001&WD1/15.9)
Connection
Terminal
Connection
Jumper
Terminal
Terminal
Target
Jumper
Terminal
Point
Target
Function Text Target Terminal Strip Source Designation Cross Reference
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S001+P009-X203
=S001+P004-X203
=S002+P009-K1 10 =S001+P009-X203 10 (=S002&WD1/12.3)
=S001+P004-V2-X609 5 5 =S001+P003-X203 5 (=S001&WD1/3.4)
=S002+P009-K1 11 =S001+P009-X203 11 (=S002&WD1/12.3)
=S001+P004-V2-X609 7 6 =S001+P003-X203 6 (=S001&WD1/3.5)
Connection
=S001+P004-S1 11 7 =S001+P003-X203 7 (=S001&WD1/4.6)
Terminal
Jumper
Terminal
Target
Point
=S001+P004-V1 NI 8 =S001+P003-X203 8 (=S001&WD1/4.6) Function Text Target Terminal Strip Source Designation Cross Reference
=S001+P015-X203
Connection
Terminal
Jumper
Terminal
Target
Point
LT- Null f/b =S003+P015-K7 33 3 =S001+P031-X203 22 (=S001&WD1/13.3)
Function Text Target Terminal Strip Source Designation Cross Reference
LT- Null f/b =S001+P003-K25 A1 4 =S003+P015-K7 34 (=S001&WD1/13.3)
Connection
=S001+P004-X204
Terminal
Jumper
Terminal
Target
Point
=S001+P004-X53 3 1 =S001+P004-V2-X609 1 (=S001&WD1/8.5) Function Text Target Terminal Strip Source Designation Cross Reference
24 (=S001&WD1/17.3)
Connection
Terminal
Jumper
Terminal
Target
Point
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S001+P009-X203
Crane Disable Command =S002+P009-K28 21 1 =S001+P003-X203 1 (=S001&WD1/1.9) =S001+P017-X204
Crane Disable Command 2 (=S001&WD1/1.9) =S001+P017-Q1 21 7 =S001+P001-Q8 23 (=S001&WD1/10.2)
Jumper
Terminal
Target
Point
24 =S001+P017-Q1 14 (=S001&WD1/17.3)
Function Text Target Terminal Strip Source Designation Cross Reference
Connection
Terminal
Jumper
Terminal
Target
Point
=S001+P009-X204 Function Text Target Terminal Strip Source Designation Cross Reference
4 6
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001&TD1/5
Design Document No. - G71053- J5663 (EF-1) Page 5
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 6
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Connection
Connection
Terminal
Terminal
Jumper
Jumper
Terminal
Terminal
Target
Target
Point
Point
Function Text Target Terminal Strip Source Designation Cross Reference Function Text Target Terminal Strip Source Designation Cross Reference
=S001+P020-X203 =S001+POO3-X42
LT- Null f/b 12 (=S001&WD1/13.3) =A001+P028-X53 3 1 =S001+P001-S1 11 (=S001&WD1/4.1)
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S001+P020-X204
Reset Command 11 (=S001&WD1/10.5)
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S001+P022-X203
LT- Null f/b =S001+P024-X203 18 17 =S001+P026-X203 15 (=S001&WD1/13.3)
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S001+P024-X203
LT- Null f/b =S001+P003-X203 23 18 =S001+P022-X203 17 (=S001&WD1/13.3)
Jumper
Terminal
Target
Point
=S001+P026-X203
LT- Null f/b 14 =S001+P003-X203 13 (=S001&WD1/13.3)
Jumper
Terminal
Target
Point
=S001+P031-X203
LT- Null f/b =S006+P031-K7 13 21 =S001+P003-X203 20 (=S001&WD1/13.3)
5 =S002&EQ1/1
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S001
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Incomer + AIM1 +ALM1 + AIM2 +ALM2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S001&TD1/6
Design Document No. - G71053- J5663 (EF-1) Page 6
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 6
1 2 3 4 5 6 7 8 9 10
Equipment list
Type No. Description Qty Supplier/Make Device Tag Cross Reference Remarks
3WL12324EG324GS4Z 1
3 Pole ACB 3WL: Rated Voltage 690V, Rated Current 3200A, Size II,Breaking Capacity 100kA, ETU 45 LSIN protection, Mounting-rear horizontal(Fixed) , Charg Siemens =S002+P009-Q1 (=S002&WD1/1.1)
ing Mechanism- motorized(220 AC/DC) , with 1st shunt trip(220V AC/DC) , with 2ND undervolatge trip(220V AC/DC) ,4NO+4NC, with Z-option
+T40 ACB 3WL Options: DOOR SEALING FRAME 1 Siemens =S002+P009-Q1 (=S002&WD1/1.1)
3NWNS2 HRC Fuse 3NW (BS Type): Rated Voltage 415V AC, Rated Current 2A 1 Siemens =S002+P009-F13 (=S002&WD1/1.2)
3NW20NNSF HRC Fuse Base for (3NW NS type): Rated Voltage 415V AC, Rated Current 20A 1 Siemens =S002+P009-F13 (=S002&WD1/1.2)
3NWNS2 HRC Fuse 3NW (BS Type): Rated Voltage 415V AC, Rated Current 2A 1 Siemens =S002+P009-F14 (=S002&WD1/1.3)
3NW20NNSF HRC Fuse Base for (3NW NS type): Rated Voltage 415V AC, Rated Current 20A 1 Siemens =S002+P009-F14 (=S002&WD1/1.3)
3NWNS2 HRC Fuse 3NW (BS Type): Rated Voltage 415V AC, Rated Current 2A 1 Siemens =S002+P009-F15 (=S002&WD1/1.3)
3NW20NNSF HRC Fuse Base for (3NW NS type): Rated Voltage 415V AC, Rated Current 20A 1 Siemens =S002+P009-F15 (=S002&WD1/1.3)
3SB14012WZ3 Wide band LED pilot light(Red) for AC 42 to 240V and DC 42 to 220V 1 Siemens =S002+P009-H1 (=S002&WD1/1.3)
PT 750/Root3:110/Root3 Potential Transformer:Primary 750/Root3,Secondary 110/Root3,Burden 10VA,Accuracy Class 1(Refer Specification Sheet) 1 AEI/UNITEC/ EPI/Power & Communications =S002+P009-T1 (=S002&WD1/1.3) Make: AEI/UNITEC/EPI/POWER
& COMMUNICATIONS
3SB14072WZ3 Wide band LED pilot light(Yellow) for AC 42 to 240V and DC 42 to 220V 1 Siemens =S002+P009-H2 (=S002&WD1/1.4)
PT 750/Root3:110/Root3 Potential Transformer:Primary 750/Root3,Secondary 110/Root3,Burden 10VA,Accuracy Class 1(Refer Specification Sheet) 1 AEI/UNITEC/ EPI/Power & Communications =S002+P009-T2 (=S002&WD1/1.4) Make: AEI/UNITEC/EPI/POWER
& COMMUNICATIONS
3SB14042WZ3 Wide band LED pilot light(Blue) for AC 42 to 240V and DC 42 to 220V 1 Siemens =S002+P009-H3 (=S002&WD1/1.5)
PT 750/Root3:110/Root3 Potential Transformer:Primary 750/Root3,Secondary 110/Root3,Burden 10VA,Accuracy Class 1(Refer Specification Sheet) 1 AEI/UNITEC/ EPI/Power & Communications =S002+P009-T3 (=S002&WD1/1.5) Make: AEI/UNITEC/EPI/POWER
& COMMUNICATIONS
3NWNS2 HRC Fuse 3NW (BS Type): Rated Voltage 415V AC, Rated Current 2A 1 Siemens =S002+P009-F16 (=S002&WD1/1.7)
3NW20NNSF HRC Fuse Base for (3NW NS type): Rated Voltage 415V AC, Rated Current 20A 1 Siemens =S002+P009-F16 (=S002&WD1/1.7)
3NWNS2 HRC Fuse 3NW (BS Type): Rated Voltage 415V AC, Rated Current 2A 1 Siemens =S002+P009-F17 (=S002&WD1/1.7)
3NW20NNSF HRC Fuse Base for (3NW NS type): Rated Voltage 415V AC, Rated Current 20A 1 Siemens =S002+P009-F17 (=S002&WD1/1.7)
5SX42167RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 16A ,Breaking Capacity 10 KA 1 Siemens =S002+P009-F20 (=S002&WD1/2.3)
5SX42047RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 04A ,Breaking Capacity 10 KA 1 Siemens =S002+P009-F21 (=S002&WD1/2.7)
3RV10211GA10 MPCB 3RV: Rated Voltage 415V,Rated current 6.3A,overload release 4.5 - 6.3A,s/c release 76A,Breaking Capacity 100kA 1 Siemens =S002+P009-Q4 (=S002&WD1/3.2)
3RV10211GA10 MPCB 3RV: Rated Voltage 415V,Rated current 6.3A,overload release 4.5 - 6.3A,s/c release 76A,Breaking Capacity 100kA 1 Siemens =S002+P009-Q7 (=S002&WD1/3.4)
3RV10211GA10 MPCB 3RV: Rated Voltage 415V,Rated current 6.3A,overload release 4.5 - 6.3A,s/c release 76A,Breaking Capacity 100kA 1 Siemens =S002+P009-Q5 (=S002&WD1/3.7)
3RV10211GA10 MPCB 3RV: Rated Voltage 415V,Rated current 6.3A,overload release 4.5 - 6.3A,s/c release 76A,Breaking Capacity 100kA 1 Siemens =S002+P009-Q6 (=S002&WD1/3.9)
MF42010A EMI Filter: Rated Voltage 230V AC (1 Phase), Rated Current 10A 1 EMI solutions =S002+P007-V1 (=S002&WD1/4.2)
DULUXSTAR T4 3U 20W-865 E27-HPF CFL,240V AC,18W (DULUXSTAR T4 3U 20W-865 E27-HPF) 1 Osram =S002+P007-H1 (=S002&WD1/4.3)
MF42010A EMI Filter: Rated Voltage 230V AC (1 Phase), Rated Current 10A 1 EMI solutions =S002+P008-V1 (=S002&WD1/4.3)
DULUXSTAR T4 3U 20W-865 E27-HPF CFL,240V AC,18W (DULUXSTAR T4 3U 20W-865 E27-HPF) 1 Osram =S002+P008-H1 (=S002&WD1/4.4)
=S001&TD1/6 2
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Equipment List Sales Order No. - 3002447129 Current Project Status - As Commissioned = S002
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & EQ1
Function - AIM3 + ALM3 + AIM4 + ALM4
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S002&EQ1/1
Design Document No. - G71053- J5663 (EF-1) Page 1
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 4
1 2 3 4 5 6 7 8 9 10
Equipment list
Type No. Description Qty Supplier/Make Device Tag Cross Reference Remarks
MF42010A EMI Filter: Rated Voltage 230V AC (1 Phase), Rated Current 10A 1 EMI solutions =S002+P009-V1 (=S002&WD1/4.5)
DULUXSTAR T4 3U 20W-865 E27-HPF CFL,240V AC,18W (DULUXSTAR T4 3U 20W-865 E27-HPF) 1 Osram =S002+P009-H7 (=S002&WD1/4.5)
DULUXSTAR T4 3U 20W-865 E27-HPF CFL,240V AC,18W (DULUXSTAR T4 3U 20W-865 E27-HPF) 1 Osram =S002+P009-H8 (=S002&WD1/4.6)
MF42010A EMI Filter: Rated Voltage 230V AC (1 Phase), Rated Current 10A 1 EMI solutions =S002+P010-V1 (=S002&WD1/4.7)
DULUXSTAR T4 3U 20W-865 E27-HPF CFL,240V AC,18W (DULUXSTAR T4 3U 20W-865 E27-HPF) 1 Osram =S002+P010-H1 (=S002&WD1/4.8)
MF42010A EMI Filter: Rated Voltage 230V AC (1 Phase), Rated Current 10A 1 EMI solutions =S002+P011-V1 (=S002&WD1/4.9)
DULUXSTAR T4 3U 20W-865 E27-HPF CFL,240V AC,18W (DULUXSTAR T4 3U 20W-865 E27-HPF) 1 Osram =S002+P011-H4 (=S002&WD1/4.9)
3KL82313HA00 Switch Disconnector Fuse (3KL) for fuse size 00: Rated Voltage 690V,Rated Current 160A with Phase Barrier, Fuse Cover, Front Drive (Handle) 1 Siemens =S002+P009-F22 (=S002&WD1/5.3)
3NE80241 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 160A, DIN Size 00 3 Siemens =S002+P009-F22 (=S002&WD1/5.3)
3VU13401MS00 Fuse Monitor for 3KT and 3KL and 3KA 1 Siemens =S002+P009-Q2 (=S002&WD1/5.5)
3KL82313HA00 Switch Disconnector Fuse (3KL) for fuse size 00: Rated Voltage 690V,Rated Current 160A with Phase Barrier, Fuse Cover, Front Drive (Handle) 1 Siemens =S002+P009-F23 (=S002&WD1/5.7)
3NE80241 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 160A, DIN Size 00 3 Siemens =S002+P009-F23 (=S002&WD1/5.7)
3VU13401MS00 Fuse Monitor for 3KT and 3KL and 3KA 1 Siemens =S002+P009-Q3 (=S002&WD1/5.8)
3NE14382 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 800A, DIN Size 3 1 Siemens =S002+P009-F1 (=S002&WD1/6.3)
3NH34304RC LV HRC Fuse Bases 3NH (DIN Type): Rated Voltage 690V AC/ 440V DC, Rated Current 800A, Size 3 1 Siemens =S002+P009-F1 (=S002&WD1/6.3)
3NE14382 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 800A, DIN Size 3 1 Siemens =S002+P009-F2 (=S002&WD1/6.3)
3NH34304RC LV HRC Fuse Bases 3NH (DIN Type): Rated Voltage 690V AC/ 440V DC, Rated Current 800A, Size 3 1 Siemens =S002+P009-F2 (=S002&WD1/6.3)
6SL33007TG413AA0 Sinamics S120 Active Interface Module for ALM in chassis format: Voltage 500-690 V 3 AC,I/P Current 1270A,Frame Size JI 1 Siemens =S002+P007-V2 (=S002&WD1/6.3)
3NE14382 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 800A, DIN Size 3 1 Siemens =S002+P009-F3 (=S002&WD1/6.3)
3NH34304RC LV HRC Fuse Bases 3NH (DIN Type): Rated Voltage 690V AC/ 440V DC, Rated Current 800A, Size 3 1 Siemens =S002+P009-F3 (=S002&WD1/6.3)
3NE14382 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 800A, DIN Size 3 1 Siemens =S002+P009-F4 (=S002&WD1/6.4)
3NH34304RC LV HRC Fuse Bases 3NH (DIN Type): Rated Voltage 690V AC/ 440V DC, Rated Current 800A, Size 3 1 Siemens =S002+P009-F4 (=S002&WD1/6.4)
3NE14382 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 800A, DIN Size 3 1 Siemens =S002+P009-F5 (=S002&WD1/6.4)
3NH34304RC LV HRC Fuse Bases 3NH (DIN Type): Rated Voltage 690V AC/ 440V DC, Rated Current 800A, Size 3 1 Siemens =S002+P009-F5 (=S002&WD1/6.4)
3NE14382 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 800A, DIN Size 3 1 Siemens =S002+P009-F6 (=S002&WD1/6.4)
3NH34304RC LV HRC Fuse Bases 3NH (DIN Type): Rated Voltage 690V AC/ 440V DC, Rated Current 800A, Size 3 1 Siemens =S002+P009-F6 (=S002&WD1/6.4)
6SL33307TG413AA0 Sinamics S120 ALM in chassis format: Voltage 500-690 V 3 AC, Power 1400kW,I/P Current 1270A,Frame Size JX 1 Siemens =S002+P008-V2 (=S002&WD1/7.3)
3NE14382 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 800A, DIN Size 3 1 Siemens =S002+P009-F7 (=S002&WD1/8.3)
3NH34304RC LV HRC Fuse Bases 3NH (DIN Type): Rated Voltage 690V AC/ 440V DC, Rated Current 800A, Size 3 1 Siemens =S002+P009-F7 (=S002&WD1/8.3)
3NE14382 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 800A, DIN Size 3 1 Siemens =S002+P009-F8 (=S002&WD1/8.3)
3NH34304RC LV HRC Fuse Bases 3NH (DIN Type): Rated Voltage 690V AC/ 440V DC, Rated Current 800A, Size 3 1 Siemens =S002+P009-F8 (=S002&WD1/8.3)
6SL33007TG413AA0 Sinamics S120 Active Interface Module for ALM in chassis format: Voltage 500-690 V 3 AC,I/P Current 1270A,Frame Size JI 1 Siemens =S002+P010-V2 (=S002&WD1/8.3)
3NE14382 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 800A, DIN Size 3 1 Siemens =S002+P009-F9 (=S002&WD1/8.3)
3NH34304RC LV HRC Fuse Bases 3NH (DIN Type): Rated Voltage 690V AC/ 440V DC, Rated Current 800A, Size 3 1 Siemens =S002+P009-F9 (=S002&WD1/8.3)
3NE14382 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 800A, DIN Size 3 1 Siemens =S002+P009-F10 (=S002&WD1/8.4)
3NH34304RC LV HRC Fuse Bases 3NH (DIN Type): Rated Voltage 690V AC/ 440V DC, Rated Current 800A, Size 3 1 Siemens =S002+P009-F10 (=S002&WD1/8.4)
3NE14382 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 800A, DIN Size 3 1 Siemens =S002+P009-F11 (=S002&WD1/8.4)
1 3
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Equipment List Sales Order No. - 3002447129 Current Project Status - As Commissioned = S002
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & EQ1
Function - AIM3 + ALM3 + AIM4 + ALM4
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S002&EQ1/2
Design Document No. - G71053- J5663 (EF-1) Page 2
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 4
1 2 3 4 5 6 7 8 9 10
Equipment list
Type No. Description Qty Supplier/Make Device Tag Cross Reference Remarks
3NH34304RC LV HRC Fuse Bases 3NH (DIN Type): Rated Voltage 690V AC/ 440V DC, Rated Current 800A, Size 3 1 Siemens =S002+P009-F11 (=S002&WD1/8.4)
3NE14382 SITOR Semi-conductor fuse 3NE (DIN Type): Rated Voltage 690, Rated Current 800A, DIN Size 3 1 Siemens =S002+P009-F12 (=S002&WD1/8.4)
3NH34304RC LV HRC Fuse Bases 3NH (DIN Type): Rated Voltage 690V AC/ 440V DC, Rated Current 800A, Size 3 1 Siemens =S002+P009-F12 (=S002&WD1/8.4)
6SL33307TG413AA0 Sinamics S120 ALM in chassis format: Voltage 500-690 V 3 AC, Power 1400kW,I/P Current 1270A,Frame Size JX 1 Siemens =S002+P011-V2 (=S002&WD1/9.2)
OETL2500K3 3 pole switch disconnector, AC21A, 690V, 2500 A, supplied with handle & extension shaft 1 ABB =S002+P017-Q1 (=S002&WD1/10.5)
6SL30401MA000AA0 SINAMICS CONTROL UNIT CU320-2 DP WITH PROFIBUS INTERFACE WITHOUT COMPACT FLASH CARD 1 Siemens =S002+P008-A1 (=S002&WD1/11.1)
6SL30540ED001BA0 SINAMICS S120 COMPACTFLASH CARD W/O PERFORMANCE EXTENSION INCLUDING CERTIFICATE OF LICENCE V4.03 1 Siemens =S002+P008-A1 (=S002&WD1/11.1)
6ES79720BA410XA0 1
SIMATIC DP,BUS CONNECTOR FOR PROFIBUS UP TO 12 MBIT/S WITH TILTED OUTGOING CABLE, 15,8 X 54 X 39,5 MM (WXHXD), TERMINAT. RESIST. WITH Siemens =S002+P008-A1 (=S002&WD1/11.1)
ISOLAT. FUNCTION, WITHOUT PG SOCKET
6FX20021DC001AB0 Signal Cable, Pre assembled(Sinamics Drive CliQ), Length 1.0 m; 2 Siemens =S002+P008-A1 (=S002&WD1/11.1)
6FX80021AA011AE0 AOP Cable-RS232 4m plug-in cable ( AOP30 & CU320 ) 1 Siemens =S002+P008-OP1 (=S002&WD1/11.8)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =S002+P009-K25 (=S002&WD1/13.3)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S002+P009-K25 (=S002&WD1/13.3)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =S002+P009-K25 (=S002&WD1/13.3)
=S002+P009-K25 (=S002&WD1/13.3)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =S002+P009-K25 (=S002&WD1/13.3)
=S002+P009-K25 (=S002&WD1/13.3)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =S002+P009-K26 (=S002&WD1/13.4)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S002+P009-K26 (=S002&WD1/13.4)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =S002+P009-K26 (=S002&WD1/13.4)
=S002+P009-K26 (=S002&WD1/13.4)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =S002+P009-K26 (=S002&WD1/13.4)
=S002+P009-K26 (=S002&WD1/13.4)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =S002+P009-K22 (=S002&WD1/13.5)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S002+P009-K22 (=S002&WD1/13.5)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =S002+P009-K22 (=S002&WD1/13.5)
=S002+P009-K22 (=S002&WD1/13.5)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =S002+P009-K22 (=S002&WD1/13.5)
=S002+P009-K22 (=S002&WD1/13.5)
3TH30400AU0 Auxiliary Contactor, 10A AC15, 4 NO, Coil Voltage: 240V AC, 50 Hz 1 Siemens =S002+P009-K21 (=S002&WD1/13.6)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S002+P009-K21 (=S002&WD1/13.6)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 4 Siemens =S002+P009-K21 (=S002&WD1/13.6)
=S002+P009-K21 (=S002&WD1/13.6)
=S002+P009-K21 (=S002&WD1/13.6)
=S002+P009-K21 (=S002&WD1/13.6)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =S002+P009-K27 (=S002&WD1/13.8)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S002+P009-K27 (=S002&WD1/13.8)
2 4
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Equipment List Sales Order No. - 3002447129 Current Project Status - As Commissioned = S002
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & EQ1
Function - AIM3 + ALM3 + AIM4 + ALM4
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S002&EQ1/3
Design Document No. - G71053- J5663 (EF-1) Page 3
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 4
1 2 3 4 5 6 7 8 9 10
Equipment list
Type No. Description Qty Supplier/Make Device Tag Cross Reference Remarks
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =S002+P009-K27 (=S002&WD1/13.8)
=S002+P009-K27 (=S002&WD1/13.8)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =S002+P009-K27 (=S002&WD1/13.8)
=S002+P009-K27 (=S002&WD1/13.8)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =S002+P009-K28 (=S002&WD1/13.9)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S002+P009-K28 (=S002&WD1/13.9)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =S002+P009-K28 (=S002&WD1/13.9)
=S002+P009-K28 (=S002&WD1/13.9)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =S002+P009-K28 (=S002&WD1/13.9)
=S002+P009-K28 (=S002&WD1/13.9)
3SB14012WZ3 Wide band LED pilot light(Red) for AC 42 to 240V and DC 42 to 220V 1 Siemens =S002+P009-H5 (=S002&WD1/14.3)
3SB14022WZ3 Wide band LED pilot light(Green) for AC 42 to 240V and DC 42 to 220V 1 Siemens =S002+P009-H4 (=S002&WD1/14.4)
3SB14032WZ3 Wide band LED pilot light(Amber) for AC 42 to 240V and DC 42 to 220V 1 Siemens =S002+P009-H6 (=S002&WD1/14.5)
3SB50000UC01 Mushroom push Button actuator with holder rear connection normal with P.F.R. latched (Red) 1 Siemens =S002+P009-S21 (=S002&WD1/14.7)
3SB59210AB Yellow contrast lable for Mashroom PB with inscription 'Emergency Stop' 1 Siemens =S002+P009-S21 (=S002&WD1/14.7)
3SB54000F Contact block rear connection for PB/SS (2NC) 1 Siemens =S002+P009-S21 (=S002&WD1/14.7)
3 &WD1/1
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Equipment List Sales Order No. - 3002447129 Current Project Status - As Commissioned = S002
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & EQ1
Function - AIM3 + ALM3 + AIM4 + ALM4
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S002&EQ1/4
Design Document No. - G71053- J5663 (EF-1) Page 4
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 4
1 2 3 4 5 6 7 8 9 10
R1 / (6.2)
Y1 / (6.2)
B1 / (6.2)
(3 x 80 x 10 Al) Busbar
CB_NO_11 / (1.8)
CB_NC_11 / (1.8)
D11 X6-3 / (14.3)
X6-1 / (14.4)
(12.6)
X5-10 /
ALM_FLT
CB_NC_31 /
CB_NO_41 /
CB_NC_41 /
=S002+P009-Q1
3200A 2 4 6 -X6:11 9 3 1 -X5:10 8 6 4
ACB
3WL-ACB
(/1.7)
(/1.7)
(/1.8) (2.1)
(/1.9)
(/1.9)
L240:1
2.5 mm²
S1 S2 S3 S4
=S002+P009-X36 1
13
=S002+P009-K25
Buffer Cont.
(=A001/2.4)
for ALM-3 14 31
=A001-CB_NC_41
(/13.3) =S002+P009-K28
1 3 5 -X6:12 10 4 2 9 7 5 3 Crane Disable
Interposing Cont. 32
(/13.9)
CB_NC_42 / 13
=S002+P009-K26 =A001-CB_NC_42
CB_NO_42 /
Buffer Cont. (=A001/2.4)
(3 x 80 x 10 Al) Busbar
CB_NC_32 / for ALM-4 14
(/13.4) 2
X5-9 /
X6-2 / (14.4)
(1.4) (1.4)
X6-4 / (14.3)
CB_NC_11 CB_NO_11
CB_NC_12 / (1.8)
CB_NO_12 / (1.8)
6 SQ MM
CB_NC_12 CB_NO_12
(1.4) (1.4)
6 SQ MM RI1 / (5.2)
(2.2) D11
6 SQ MM YI1 / (5.2) -L240:5
BI1 / (5.2)
1
6 mm² 1 2 =S002+P009-F16
2.5 mm² 2A
=S002+P009-F13 HRC Fuse 2
6 mm² 1 2
2A
HRC Fuse 2.5 mm² =S002+P009-Q1
=S002+P009-F14 (/1.1)
6 mm² 1 2 -X5:2 -X7:9 -X6:7 -X6:14 -X5:12
2A -X7:13
HRC Fuse 2.5 mm² L+/L L+/L L+/L L+/L L+/L
=S002+P009-F15
2A 4
M 1 -F1 -F3
S24
A N A N A N
1~
UNDER-VOLTAGE
PE
1ST SHUNT
SOLENOID
750/Root3:110/Root3
CLOSING
RELEASE
RELEASE
3WL
MOTOR
Potential Transformer
L-/N L-/N L-/N L-/N
3WL
3WL
3WL
3WL
A N A N A N
-X5:1 -X6:8 -X6:13 -X5:11 -X7:14 12
S24_NC /
2.5 mm² 2.5 mm²
2 X7-14 / (14.5)
=S002+P009-F17
2.5 mm² 2.5 mm² 2.5 mm² 2A
HRC Fuse 1 D11
X1 X1 X1 -N240:5
=S002+P009-H1 =S002+P009-H2 =S002+P009-H3 (2.4)
Lamp_Red Lamp_Yellow Lamp_Blue
X2 X2 X2 N240:1
=S002+P009-X16 1 2 3 (2.4)
2.5 mm² 2.5 mm²
3 Phase,690 V AC Supply
from PP
&EQ1/4 2
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Incomer (Air Circuit Breaker) Sales Order No. - 3002447129 Current Project Status - As Commissioned = S002
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P009 & WD1
Function - AIM3 + ALM3 + AIM4 + ALM4
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S002+P009&WD1/1
Design Document No. - G71053- J5663 (EF-1) Page 1
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
240V AC Control Supply from Protective Panel 24V DC Control Supply from Protective Panel
=S002+P009-X31 1 2 =S002+P009-X51 1 2
2 4 13 21 24 2 4 13 21 24
=S002+P009-F20 =S002+P009-F21
1NO+1NC 04A
240 VAC Supply MCB 1 3 14 22 23 24 VDC Supply MCB 1 3 14 22 23
(/13.5)
(/13.5)
2.5 mm² 2.5 mm²
(14.2) / X33-2
(3.2) / -L240:3
(13.2) / X33-4
(1.9) / -L240:5
(12.5) / -L240:6
/ -L240:7
/ -L240:8
/ -L240:9
/ -L240:10
(1.9) / -N240:1
(14.2) / X34-2
(3.2) / -N240:3
(13.2) / X34-4
(1.9) / -N240:5
/ -N240:6
/ -N240:7
/ -N240:8
/ -N240:9
/ -N240:10
(6.5) / X53:1
(7.4) / X53-2
(8.5) / X53-3
(9.4) / X53-4
(7.5) / X53-5
(9.5) / X53-6
(11.2) / X53-7
(11.1) / X53-8
(15.3) / -P24:9
/ -P24:10
(6.5) / X54:1
(7.4) / X54-2
(8.5) / X54-3
(9.4) / -X54-4
(7.5) / X54-5
(9.5) / X54-6
(11.2) / X54-7
(11.8) / X54-8
(12.2) / -M24:9
/ -M24:10
240V AC Distribution bus 24V DC Distribution bus
1 3
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Power Distribution Sales Order No. - 3002447129 Current Project Status - As Commissioned = S002
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P009 & WD1
Function - AIM3 + ALM3 + AIM4 + ALM4
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S002+P009&WD1/2
Design Document No. - G71053- J5663 (EF-1) Page 2
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
(=A001/5.6) / =A001-Y_ALM2
(=A001/5.3) / =A001-R_ALM2
=S002+P009-X17 1 2
(2.4) / -N240:3
(2.2) / -L240:3
1 3 5 13 21 1 3 5 13 21 1 3 5 13 21 1 3 5 13 21
=S002+P009-Q4 =S002+P009-Q7 =S002+P009-Q5 =S002+P009-Q6
4.5-6.3A 4.5-6.3A 4.5-6.3A 4.5-6.3A
AIM 3 FAN SUPPLY 14 22 AIM 4 FAN SUPPLY 14 22 ALM-3 Fan Supply 14 22 ALM-4 Fan Supply 14 22
(/13.5)
(/13.5)
(/13.5)
(/13.5)
I> I> I> I> I> I> I> I> I> I> I> I>
2 4 6 2 4 6 2 4 6 2 4 6
=S002+P009-X203 5 6 =S002+P009-X201 1 2
=S002+P010-X203 5 6 =S002+P010-X201 1 2
(6.5) / AIM1_FAN_L
(6.6) / AIM1_FAN_N
(8.5) / AIM2_FAN_L
(8.6) / AIM2_FAN_N
(7.5) / ALM1_FAN_R
(7.6) / ALM1_FAN_Y
(9.5) / ALM2_FAN_R
(9.5) / ALM2_FAN_Y
AIM Fan Supply ALM Fan Supply
2 4
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Power Distribution Sales Order No. - 3002447129 Current Project Status - As Commissioned = S002
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P009 & WD1
Function - AIM3 + ALM3 + AIM4 + ALM4
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S002+P009&WD1/3
Design Document No. - G71053- J5663 (EF-1) Page 3
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
21 21 21 21 21
=S002+P007-S1 =S002+P008-S1 =S002+P009-S1 =S002+P010-S1 =S002+P011-S1
Door Limit Switch Door Limit Switch Door Limit Switch Door Limit Switch Door Limit Switch
22 22 22 22 22
CFL CFL CFL CFL CFL CFL
1.5 mm² 240V AC,18W 1.5 mm² 240V AC,18W 1.5 mm² 240V AC,18W 240V AC,18W 1.5 mm² 240V AC,18W 1.5 mm² 240V AC,18W
LI LO =S002+P007-H1 LI LO =S002+P008-H1 LI LO =S002+P009-H7 =S002+P009-H8 LI LO =S002+P010-H1 LI LO =S002+P011-H4
x1 x1 x1 x1 x1 x1
1.5 mm² 1.5 mm² 1.5 mm² 1.5 mm² 1.5 mm² 1.5 mm²
PE PE PE PE PE
8
=S002+P009-X42 2 =S002+P009-X203 8
=A001-N_13 =S002+P010-X203
DB:N DB:N
(=A001/10.6)
3 5
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Panel Auxiliary Circuits Sales Order No. - 3002447129 Current Project Status - As Commissioned = S002
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P003 & WD1
Function - AIM3 + ALM3 + AIM4 + ALM4
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S002+P003&WD1/4
Design Document No. - G71053- J5663 (EF-1) Page 4
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
(1.5) / RI1
(1.5) / YI1
(1.5) / BI1
1 3 5 1 3 5 13 21 1 3 5 1 3 5 13 21
=S002+P009-Q2 =S002+P009-Q3
0.2A 0.2A
AIM3 Fan Supply 14 22 AIM4 Fan Supply 14 22
=S002+P009-F22 =S002+P009-F23
(/13.5)
(/13.5)
160A I> I> I> 160A I> I> I>
Switch Disconnector Fuse 2 4 6 Switch Disconnector Fuse 2 4 6
2 4 6 2 4 6
=S002+P009-X201 3 4 5
=S002+P010-X201 3 4 5
(6.5) / PC_AIM1_1
(6.5) / PC_AIM1_2
(6.5) / PC_AIM1_3
(8.5) / PC_AIM2_1
(8.5) / PC_AIM2_2
(8.5) / PC_AIM2_3
Pre Charging Circuit Pre Charging Circuit
for AIM-1 for AIM-2
4 6
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Pre Charging Sales Order No. - 3002447129 Current Project Status - As Commissioned = S002
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P009 & WD1
Function - AIM3 + ALM3 + AIM4 + ALM4
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S002+P009&WD1/5
Design Document No. - G71053- J5663 (EF-1) Page 5
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
(1.10) / R1 R2 / (8.2)
(1.10) / Y1 Y2 / (8.2)
(1.10) / B1 B2 / (8.2)
PC_AIM1_1 / (5.3)
PC_AIM1_2 / (5.3)
PC_AIM1_3 / (5.4)
1 1 1 1 1 1
=S002+P009-F1 =S002+P009-F3 =S002+P009-F5
800A 800A 800A
=S002+P009-F2 2 2 =S002+P009-F4 2 2 =S002+P009-F6 2 2
800A 800A 800A
=S002+P007-V2 -X1
1270A
L1 L2 L3 PE1 2/T1 4/T2 6/T3
AIM3
SINAMICS S120
ACTIVE INTERFACE MODULE CHASSIS
FRAME SIZE-HI AND JI
-X2 -X609 External 24V DC External 230V AC Pre-Charging Line Contactor Contactors
for Fan Contactor Activate Open
ALMside
connection +24V M 230V L 230V N
U2 V2 W2 PE2 PE
PE 1 2 3 4 5 6 7 8 9 10 11 12 13 14
(2.9) / X54:1
(3.2) / AIM1_FAN_L
(3.3) / AIM1_FAN_N
(7.5) / P8-V2-X9-3
(8.6) / PRE
(7.5) / P8-V2-X9-4
U2 V2 W2
(7.3) (7.3) (7.3)
5 7
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - AIM3 Sales Order No. - 3002447129 Current Project Status - As Commissioned = S002
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P007 & WD1
Function - AIM3 + ALM3 + AIM4 + ALM4
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S002+P007&WD1/6
Design Document No. - G71053- J5663 (EF-1) Page 6
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
ALM1_FAN_R / (3.7)
ALM1_FAN_Y / (3.8)
P8-V2-X9-3 / (6.6)
P8-V2-X9-4 / (6.7)
K25-A1 / (13.2)
P8-V2-X9-6 /
X53-2 / (2.6)
X54-2 / (2.9)
(6.3) (6.3) (6.4)
U2 V2 W2
=S002+P008-V2
1400kW,1270A -X9 1 2 3 4 5 6 L1 L2
Active Line
Module 3 U1 V1 W1
LED
SINAMICS S120 Ready
1 2 3 4 1 2 3 4 5 6 7 8
-PE
14
=S002+P009-K21
OFF 2 Chain
(/13.6) 13
(2.7) / X53-5
D1 / (9.2)
C1 / (9.2)
6 8
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - ALM3 Sales Order No. - 3002447129 Current Project Status - As Commissioned = S002
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P008 & WD1
Function - AIM3 + ALM3 + AIM4 + ALM4
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S002+P008&WD1/7
Design Document No. - G71053- J5663 (EF-1) Page 7
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
(6.8) / R2
(6.8) / Y2
(6.8) / B2
PC_AIM2_1 / (5.7)
PC_AIM2_2 / (5.7)
PC_AIM2_3 / (5.7)
1 1 1 1 1 1
=S002+P009-F7 =S002+P009-F9 =S002+P009-F11
800A 800A 800A
=S002+P009-F8 2 2 =S002+P009-F10 2 2 =S002+P009-F12 2 2
800A 800A 800A
=S002+P010-V2
1270A -X1
AIM4
L1 L2 L3 PE1 2/T1 4/T2 6/T3
SINAMICS S120
ACTIVE INTERFACE MODULE CHASSIS
FRAME SIZE-HI AND JI
-X2 -X609 External 24V DC External 230V AC Pre-Charging Line Contactor Contactors
for Fan Contactor Activate Open
ALMside
connection +24V M 230V L 230V N
U2 V2 W2 PE2 PE
PE 1 2 3 4 5 6 7 8 9 10 11 12 13 14
=S002+P010-X204 1 2
(2.9) / X54-3
(3.4) / AIM2_FAN_L
(3.5) / AIM2_FAN_N
(9.4) / COMMON
(6.6) / PRE
(9.5) / BUFFER
U3 V3 W3
(9.3) (9.3) (9.3)
7 9
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - AIM4 Sales Order No. - 3002447129 Current Project Status - As Commissioned = S002
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P010 & WD1
Function - AIM3 + ALM3 + AIM4 + ALM4
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S002+P010&WD1/8
Design Document No. - G71053- J5663 (EF-1) Page 8
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
BUFFER_CONT2 / (13.2)
ALM2_FAN_Y / (3.10)
ALM2_FAN_R / (3.9)
COMMON / (8.6)
BUFFER / (8.7)
-X54-4 / (2.9)
X53-4 / (2.7)
(8.3) (8.3) (8.4)
U3 V3 W3
PRE /
(1 x 100 x 10 Cu) Busbar
=S002+P009-X204 3 4
=S002+P010-X204 3 4
=S002+P011-V2
1400kW,1270A -X9 1 2 3 4 5 6 L1 L2
Active Line Module 4
U1 V1 W1
LED
SINAMICS S120 Ready
1 2 3 4 1 2 3 4 5 6 7 8
=S002+P010-X204 5 6
=S002+P009-X204 5 6 -PE
(2.7) / X53-6
(7.4) / D1 D2 / (10.5)
(7.4) / C1 C2 / (10.5)
8 10
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - ALM4 Sales Order No. - 3002447129 Current Project Status - As Commissioned = S002
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P011 & WD1
Function - AIM3 + ALM3 + AIM4 + ALM4
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S002+P011&WD1/9
Design Document No. - G71053- J5663 (EF-1) Page 9
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
DC bus Distribution
(9.4) (9.4)
C2 D2
1 3 5
13 21
=S002+P017-Q1
2500A
Main DC Isolator 14 22
2 4 6
(/15.3)
(2 x 100 x 10 Cu) Busbar
(=S001/9.9) / =S001-C2
(=S001/9.9) / =S001-D2
(=S003/5.2) / =S003-D_MH1
(=S004/4.2) / =S004-C_MH2
(=S004/4.2) / =S004-D_MH2
(=S005/4.2) / =S005-C_MH_STD
(=S005/4.2) / =S005-D_MH_STD
(=S006/4.2) / =S006-C_AH1
(=S006/4.2) / =S006-D_AH1
(=S010/4.2) / =S010-C_LT1
(=S010/4.2) / =S010-D_LT1
(=S011/4.3) / =S011-C_LT2
(=S011/4.3) / =S011-D_LT2
(=S007/5.3) / =S007-C_MCT
(=S007/5.3) / =S007-D_MCT
(=S008/4.3) / =S008-C_AH-2
(=S008/4.3) / =S008-D_AH-2
(=S009/4.2) / =S009-C_ACT
(=S009/4.2) / =S009-D_ACT
9 11
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - DC Bus Sales Order No. - 3002447129 Current Project Status - As Commissioned = S002
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P006 & WD1
Function - AIM3 + ALM3 + AIM4 + ALM4
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S002+P006&WD1/10
Design Document No. - G71053- J5663 (EF-1) Page 10
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
(2.7) / X53-8
23
=S002+P009-K21
43
OFF 2 Chain
(/13.6)
=S002+P009-K27
24
Crane Enable
D11 Int. Cont. 44
=S001-CRANE_ON_AFE2 / (=S001/11.4)
(/13.8)
43
=S002+P009-K22 =S002+P009-X204 9
OFF 1 Chain
(/13.5) 44
=S002+P020-X37 15
=S002+P009-X204 16 =S002+P009-X204 24
(=S010/11.6) / =S010-RESET_ALM2-1
ALM2_FAULT / (12.5)
DC_CHARGE / (12.3)
43 (=S010/11.6) / =S010-RESET_ALM2-2
=S001+P003-K25
43 =S002+P020-X37 16
Master Cntr
=S001+P001-Q8
Position-2 7 Null Interposing Cont.
(=S001/13.6)
44
=S002+P009-X204 10
D11
=S002+P009-X204 11
ALM 1-OFF-ALM 2 44 =S002+P009-X204
(=S001/15.8) 7 25 11
=S002+P017-X204 =S002+P018-X204
17
21
=S001+P017-Q1
Main DC Isolator
12
(=S001/9.9) 22 =S002+P018-X204 =S002+P009-X204 15
8 12
=S002+P009-X204
=S002+P017-X204
8 =S002+P009-X204 X54-8 / (2.10)
=S002+P009-X55 15=S002+P009-X56
1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
=S002+P008-X55 1 2 3 4 5 6 7 8 9 10 11 12 13 14 =S002+P008-X56 1 2 3 4 5 6 7 8 9 10 11 12 13 14
=S002+P008-OP1
=S002+P008-A1 AOP30
AOP30
CU320-2 -X122 1 2 3 4 5 6 7 8 9 10 11 12 13 14 -X132 1 2 3 4 5 6 7 8 9 10 11 12 13 14
CU320-2_ALM3_ALM4
DI 0
DI 1
DI 2
DI 3
DI 16
DI 17
M1
DI/DO 8
DI/DO 9
DI/DO 10
DI/DO 11
DI 4
DI 5
DI 6
DI 7
DI 20
DI 21
M2
DI/DO 12
DI/DO 13
DI/DO 14
DI/DO 15
M
SINAMICS G130
Advanced Operating Panel AOP30
-X124 -X140
MP PE
+ + M M 2 3 5
=S002+P009-X54 7
=S002+P009-X53 7
-PE
(2.7) / X53-7
(2.10) / X54-7
10 12
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - CU 320 Sales Order No. - 3002447129 Current Project Status - As Commissioned = S002
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P008 & WD1
Function - AIM3 + ALM3 + AIM4 + ALM4
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S002+P008&WD1/11
Design Document No. - G71053- J5663 (EF-1) Page 11
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
-DC_CHARGE / (11.6)
ALM2_FAULT / (11.7)
D11
(2.10) / -M24:9
=S002+P009-K1
4-CH
1+ 1- 2+ 2- 3+ 3- 4+ 4-
P1 O1 C1 P2 O2 C2 P3 O3 C3 P4 O4 C4
=S001+P009-X203 10 11
D11
(=S001/12.10) / =S001-ALM2_DC1
(=S001/12.10) / =S001-ALM2_DC2
(2.2) / L240:6
(1.2) / ALM_FLT
11 13
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Relay Boards Sales Order No. - 3002447129 Current Project Status - As Commissioned = S002
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P009 & WD1
Function - AIM3 + ALM3 + AIM4 + ALM4
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S002+P009&WD1/12
Design Document No. - G71053- J5663 (EF-1) Page 12
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
D11
24 (=A001/19.9) / =A001-INFEED2-2 83
=S002+P009-F21 =S002+P009-K27
24 VDC Supply MCB Crane Enable
(/2.7) 4 =S002+P009-X35 5
23 Int. Cont. 84
(/13.8)
(=L001/2.3)
13
=L001-CRANE_ENABLE1
=S002+P009-Q4
AIM 3 FAN SUPPLY
(/3.2) 14
From ACCD
13
=S002+P009-Q5 =L001-CRANE_ENABLE2
ALM-3 Fan Supply (=L001/2.3)
(/3.7) 14
6
13
=S002+P009-Q6
ALM-4 Fan Supply
2.5 mm² (/3.9) 2.5 mm² =S002+P009-X35 7
(9.5) / -BUFFER_CONT2 14
(=L001/2.4)
13
=L001-CRANE_DISABLE1
=S002+P009-Q7
AIM 4 FAN SUPPLY
2.5 mm² =S002+P010-X203 9 (/3.4)
(7.5) / K25-A1 14
=S002+P009-X203 9
13
=S002+P009-Q2 =L001-CRANE_DISABLE2
AIM3 Fan Supply (=L001/2.5)
(/5.5) 8
14
13
=S002+P009-Q3
AIM4 Fan Supply
(/5.8) 14
A1 A1 A1 A1 A1 A1
U U U U U U
=S002+P009-K25 =S002+P009-K26 =S002+P009-K22 =S002+P009-K21 =S002+P009-K27 =S002+P009-K28
240V AC A2 240V AC A2 240V AC A2 240V AC A2 240V AC A2 240V AC A2
Buffer Cont. Buffer Cont. OFF 1 Chain OFF 2 Chain Crane Enable Crane Disable
for ALM-3 for ALM-4 Int. Cont. Interposing Cont.
53 54 53 54 53 54 53 54 (/13.5) 53 54 (/15.7) 53 54
61 62 61 62 61 62 63 64 (/15.7) 61 62 61 62
71 72 71 72 71 72 73 74 71 72 71 72
83 84 83 84 83 84 83 84 (/13.7) 83 84 (/13.7)
83 84
12 14
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Control Logic Sales Order No. - 3002447129 Current Project Status - As Commissioned = S002
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P009 & WD1
Function - AIM3 + ALM3 + AIM4 + ALM4
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S002+P009&WD1/13
Design Document No. - G71053- J5663 (EF-1) Page 13
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
3
2.5 mm² 2.5 mm² 2.5 mm²
(1.4) / X6-3 (1.4) / X6-1 (1.10) / X7-14 =A001-INFEED2_E-STOP1 / (=A001/19.2)
=S002+P009-X36
2.5 mm²
11
=S002+P009-S21
E-Stop on Infeed 2 panel
12
2.5 mm²
4
=A001-INFEED2_E-STOP2 / (=A001/19.2)
X1 X1 X1
=S002+P009-H5 =S002+P009-H4 =S002+P009-H6
Lamp_Red Lamp_Green Lamp_Amber
ACB ON X2 ACB OFF X2 ACB TRIP X2
13 15
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Annunciation Sales Order No. - 3002447129 Current Project Status - As Commissioned = S002
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P001 & WD1
Function - AIM3 + ALM3 + AIM4 + ALM4
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S002+P001&WD1/14
Design Document No. - G71053- J5663 (EF-1) Page 14
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
(2.8) / P24:9
=S002+P009-X204 13
=S002+P017-X204 13
13 43 43 13 63 53 43
=S002+P017-Q1 =S002+P009-K25 =S002+P009-K26 =S002+P009-K22 =S002+P009-K21 =S002+P009-K27 =S002+P009-K28
Main DC Isolator Buffer Cont. Buffer Cont. OFF 1 Chain OFF 2 Chain Crane Enable Crane Disable
(/10.5) 14 for ALM-3 44 for ALM-4 44 (/13.5) 14 (/13.6) 64 Int. Cont. 54 Interposing Cont. 44
(/13.3) (/13.4) (/13.8) (/13.9)
=S002+P017-X204 14
=S001+P015-X204 15 =S002+P009-X60 1 2 3 4 5 6
MAIN DC ISOLATOR BUFFER CONT FOR ALM-3 BUFFER CONT FOR ALM-4 OFF1 CHAIN OFF 2 CHAIN CRANE ENABLE INT CONT CRANE DISABLE INT CONT
(=C001/31.8) (=C001/32.2) (=C001/32.3) (=C001/32.4) (=C001/32.5) (=C001/32.6)
14 &TD1/1
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - To PLC Sales Order No. - 3002447129 Current Project Status - As Commissioned = S002
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P001 & WD1
Function - AIM3 + ALM3 + AIM4 + ALM4
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S002+P001&WD1/15
Design Document No. - G71053- J5663 (EF-1) Page 15
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
Terminal diagram
=S002+P008-A1-X132 7 7 =S002+P009-X56 7 (=S002&WD1/11.6)
Connection
Terminal
Jumper
Terminal
Target
Point
=S002+P008-A1-X132 8 8 =S002+P009-X56 8 (=S002&WD1/11.6)
Function Text Target Terminal Strip Source Designation Cross Reference
=S002+P008-A1-X132 9 9 =S002+P009-X56 9 (=S002&WD1/11.6)
Connection
Terminal
Jumper
Terminal
=S002+P008-A1-X132 13 13 =S002+P009-X56 13 (=S002&WD1/11.7)
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S002+P008-A1-X132 14 14 =S002+P009-X56 14 (=S002&WD1/11.7)
Connection
Terminal
Jumper
Terminal
=S002+P004-X204
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
3 (=S001&WD1/9.3)
4 (=S001&WD1/9.3)
=S002+P009-X16
Connection
Terminal
Jumper
Terminal
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S002+P009-F22 1
=S002+P009-F13 1
=S002+P008-X55
2 =S002+P009-Q1 3 (=S002&WD1/1.2)
=S002+P008-A1-X122 1 1 =S002+P009-X55 1 (=S002&WD1/11.2)
=S002+P009-F22 3
=S002+P008-A1-X122 2 2 =S002+P009-X55 2 (=S002&WD1/11.2)
=S002+P009-F14 1
=S002+P008-A1-X122 3 3 =S002+P009-X55 3 (=S002&WD1/11.2)
3 =S002+P009-Q1 5 (=S002&WD1/1.2)
=S002+P008-A1-X122 4 4 =S002+P009-X55 4 (=S002&WD1/11.2)
=S002+P009-F22 5
=S002+P008-A1-X122 5 5 =S002+P009-X55 5 (=S002&WD1/11.2)
=S002+P009-F15 1
=S002+P008-A1-X122 6 6 =S002+P009-X55 6 (=S002&WD1/11.3)
Connection
Terminal
Jumper
Terminal
=S002+P008-A1-X122 7 7 =S002+P009-X55 7 (=S002&WD1/11.3)
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S002+P008-A1-X122 8 8 =S002+P009-X55 8 (=S002&WD1/11.3)
Connection
Terminal
Connection
Jumper
Terminal
Terminal
Target
Jumper
Terminal
Point
Target
=S002+P009-X31
=S002+P008-X56
240V AC Control Supply from Protec
1 =S002+P009-F20 2 (=S002&WD1/2.3)
=S002+P008-A1-X132 1 1 =S002+P009-X56 1 (=S002&WD1/11.5) tive Panel
2 =S002+P009-F20 4 (=S002&WD1/2.3)
=S002+P008-A1-X132 2 2 =S002+P009-X56 2 (=S002&WD1/11.5)
&WD1/15 2
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S002
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - AIM3 + ALM3 + AIM4 + ALM4
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S002&TD1/1
Design Document No. - G71053- J5663 (EF-1) Page 1
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 5
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Connection
Connection
Terminal
Terminal
Jumper
Jumper
Terminal
Terminal
Target
Target
Point
Point
Function Text Target Terminal Strip Source Designation Cross Reference Function Text Target Terminal Strip Source Designation Cross Reference
=S002+P009-X33 =S002+P009-X36
220V Phase Terminal Strip =S002+P009-F16 1 1 =S002+P009-F20 1 (=S002&WD1/2.1) PP ACB OFF F/B =A001+P027-X36 1 1 =S002+P009-K28 31 (=S002&WD1/1.9)
6 (=S002&WD1/2.2)
Connection
Terminal
Jumper
Terminal
Target
Point
7 (=S002&WD1/2.2)
Function Text Target Terminal Strip Source Designation Cross Reference
8 (=S002&WD1/2.3)
9 (=S002&WD1/2.3)
=S002+P009-X42
10 (=S002&WD1/2.3)
=A001+P028-X53 13 1 =S002+P007-S1 21 (=S002&WD1/4.2)
Connection
=A001+P028-X54 13 2 =S002+P007-V1 NI (=S002&WD1/4.2)
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S002+P009-X34
220V Neutral Terminal Strip =S002+P009-Q1-X6 13 1 =S002+P009-F20 3 (=S002&WD1/2.4)
=S002+P009-X51
=S002+P009-H5 X2 2 (=S002&WD1/2.4) 24V DC Control Supply from Protecti
1 =S002+P009-F21 2 (=S002&WD1/2.7)
ve Panel
=S002+P009-Q4 5 3 (=S002&WD1/2.4)
2 =S002+P009-F21 4 (=S002&WD1/2.8)
=S002+P009-K25 A2 4 (=S002&WD1/2.4)
Connection
Terminal
Jumper
Terminal
=S002+P009-Q1-X5 11 5 (=S002&WD1/2.4)
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
6 (=S002&WD1/2.5)
7 (=S002&WD1/2.5)
=S002+P009-X53
8 (=S002&WD1/2.5)
24V Positive Terminal Strip =S002+P007-V2-X609 1 1 =S002+P009-F21 1 (=S002&WD1/2.6)
9 (=S002&WD1/2.5)
=S002+P008-V2-X9 1 2 (=S002&WD1/2.6)
10 (=S002&WD1/2.5)
=S002+P009-X204 1 3 (=S002&WD1/2.7)
Connection
Terminal
Jumper
Terminal
=S002+P009-X204 3 4 (=S002&WD1/2.7)
Target
Point
=S002+P009-K21 33 6 (=S002&WD1/2.7)
=S002+P009-X35
=S002+P009-X54 7 7 (=S002&WD1/2.7)
Common OFF2 From PP =A001+P028-X37 3 3 =S002+P009-K21 53 (=S002&WD1/13.6)
=S002+P009-X54 7 7 =S002+P008-A1-X124 M (=S002&WD1/11.2)
=S002+P009-K28 83
=S002+P009-K21 23 8 (=S002&WD1/2.7)
=S002+P009-K21 A1 4 =A001+P028-X37 4 (=S002&WD1/13.6)
=S002+P009-X204 13 9 (=S002&WD1/2.8)
Crane Enable Command From ACCD =L001+RS001-X35 1 5 =S002+P009-K28 83 (=S002&WD1/13.8)
10 (=S002&WD1/2.8)
=S002+P009-K27 A1 6 =L001+RS001-X35 2 (=S002&WD1/13.8)
1 3
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S002
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - AIM3 + ALM3 + AIM4 + ALM4
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S002&TD1/2
Design Document No. - G71053- J5663 (EF-1) Page 2
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 5
1 2 3 4 5 6 7 8 9 10
Terminal diagram
=S002+P009-X204 10 2 =S002+P008-X56 2 (=S002&WD1/11.5)
Connection
Terminal
Jumper
Terminal
Target
Point
=S002+P009-X204 12 3 =S002+P008-X56 3 (=S002&WD1/11.5)
Function Text Target Terminal Strip Source Designation Cross Reference
4 =S002+P008-X56 4 (=S002&WD1/11.5)
5 =S002+P008-X56 5 (=S002&WD1/11.6)
=S002+P009-X54
6 =S002+P008-X56 6 (=S002&WD1/11.6)
24V Negative Terminal Strip =S002+P007-V2-X609 3 1 =S002+P009-F21 3 (=S002&WD1/2.9)
=S002+P009-X55 14 7 =S002+P008-X56 7 (=S002&WD1/11.6)
=S002+P008-V2-X9 2 2 (=S002&WD1/2.9)
8 =S002+P008-X56 8 (=S002&WD1/11.6)
=S002+P009-X204 2 3 (=S002&WD1/2.9)
=S002+P009-K1 1+ 9 =S002+P008-X56 9 (=S002&WD1/11.6)
=S002+P009-X204 4 4 (=S002&WD1/2.9)
=S002+P009-X204 15 10 =S002+P008-X56 10 (=S002&WD1/11.7)
=S002+P008-V2 1 5 (=S002&WD1/2.9)
11 =S002+P008-X56 11 (=S002&WD1/11.7)
=S002+P009-X204 5 6 (=S002&WD1/2.9)
12 =S002+P008-X56 12 (=S002&WD1/11.7)
=S002+P009-X53 7 7 (=S002&WD1/2.10)
=S002+P009-K1 4+ 13 =S002+P008-X56 13 (=S002&WD1/11.7)
=S002+P009-X53 7 7 =S002+P008-A1-X124 + (=S002&WD1/11.2)
=S002+P009-X54 8 14 =S002+P008-X56 14 (=S002&WD1/11.7)
=S002+P009-X56 14 8 (=S002&WD1/2.10)
15 (=S002&WD1/11.7)
=S002+P009-K1 1- 9 (=S002&WD1/2.10)
Connection
10 (=S002&WD1/2.10)
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S002+P009-X60
=C001+P015-X204 1 1 =S002+P009-K25 44 (=S002&WD1/15.4)
=S002+P009-X55
=C001+P015-X60 2 2 =S002+P009-K26 44 (=S002&WD1/15.5)
=S002+P009-K21 24 1 =S002+P008-X55 1 (=S002&WD1/11.2)
=C001+P015-X60 3 3 =S002+P009-K22 14 (=S002&WD1/15.6)
=S002+P009-K22 44 2 =S002+P008-X55 2 (=S002&WD1/11.2)
=C001+P015-X60 4 4 =S002+P009-K21 64 (=S002&WD1/15.7)
=S002+P009-X204 17 3 =S002+P008-X55 3 (=S002&WD1/11.2)
=C001+P015-X60 5 5 =S002+P009-K27 54 (=S002&WD1/15.7)
=S002+P017-X204 8 4 =S002+P008-X55 4 (=S002&WD1/11.2)
=C001+P015-X60 6 6 =S002+P009-K28 44 (=S002&WD1/15.8)
5 =S002+P008-X55 5 (=S002&WD1/11.2)
Connection
6 =S002+P008-X55 6 (=S002&WD1/11.3)
Terminal
Jumper
Terminal
Target
Point
7 =S002+P008-X55 7 (=S002&WD1/11.3) Function Text Target Terminal Strip Source Designation Cross Reference
8 =S002+P008-X55 8 (=S002&WD1/11.3)
15 (=S002&WD1/11.4) =S002+P009-Q3 4
Jumper
Terminal
Target
Point
=S002+P009-Q3 6
Function Text Target Terminal Strip Source Designation Cross Reference
=S002+P009-X56
=S002+P009-K27 44 1 =S002+P008-X56 1 (=S002&WD1/11.5)
2 4
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S002
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - AIM3 + ALM3 + AIM4 + ALM4
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S002&TD1/3
Design Document No. - G71053- J5663 (EF-1) Page 3
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 5
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Connection
Connection
Terminal
Terminal
Jumper
Jumper
Terminal
Terminal
Target
Target
Point
Point
Function Text Target Terminal Strip Source Designation Cross Reference Function Text Target Terminal Strip Source Designation Cross Reference
=S002+P009-X203 =S002+P010-X201
=S002+P010-X203 5 5 =S002+P009-Q7 4 (=S002&WD1/3.4) =S002+P011-V2-X9 L1 1 =S002+P009-X201 1 (=S002&WD1/3.9)
Connection
Connection
Terminal
Terminal
Jumper
Jumper
Terminal
Terminal
Target
Target
Point
Point
Function Text Target Terminal Strip Source Designation Cross Reference Function Text Target Terminal Strip Source Designation Cross Reference
=S002+P009-X204 =S002+P010-X203
=S002+P009-X53 3 1 =S002+P010-X204 1 (=S002&WD1/8.5) =S002+P010-V2-X609 5 5 =S002+P009-X203 5 (=S002&WD1/3.4)
Connection
Terminal
Jumper
Terminal
Target
Point
7 (=S002&WD1/11.2)
Function Text Target Terminal Strip Source Designation Cross Reference
8 (=S002&WD1/11.2)
Connection
Terminal
Jumper
Terminal
=S001+P001-Q8 43 16 =S002+P009-K22 43 (=S002&WD1/11.2)
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S002+P017-X204 7
3 5
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S002
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - AIM3 + ALM3 + AIM4 + ALM4
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S002&TD1/4
Design Document No. - G71053- J5663 (EF-1) Page 4
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 5
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S002+P018-X204
ACU/RRC Selection 11 =S002+P009-X204 11 (=S002&WD1/11.5)
=S002+P009-X204 12 12 (=S002&WD1/11.5)
4 =S003&EQ1/1
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S002
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - AIM3 + ALM3 + AIM4 + ALM4
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S002&TD1/5
Design Document No. - G71053- J5663 (EF-1) Page 5
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 5
1 2 3 4 5 6 7 8 9 10
Equipment list
Type No. Description Qty Supplier/Make Device Tag Cross Reference Remarks
5SX42167RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 16A ,Breaking Capacity 10 KA 1 Siemens =S003+P015-F1 (=A000&CMD1/19.5)
5SX42047RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 04A ,Breaking Capacity 10 KA 1 Siemens =S003+P017-F2 (=A000&CMD1/21.5)
5SX42167RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 16A ,Breaking Capacity 10 KA 1 Siemens =S003+P017-F1 (=S003&WD1/1.5)
5SX42047RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 04A ,Breaking Capacity 10 KA 1 Siemens =S003+P015-F2 (=S003&WD1/2.5)
MF42010A EMI Filter: Rated Voltage 230V AC (1 Phase), Rated Current 10A 1 EMI solutions =S003+P017-V1 (=S003&WD1/3.2)
DULUXSTAR T4 3U 20W-865 E27-HPF CFL,240V AC,18W (DULUXSTAR T4 3U 20W-865 E27-HPF) 1 Osram =S003+P017-H1 (=S003&WD1/3.2)
DULUXSTAR T4 3U 20W-865 E27-HPF CFL,240V AC,18W (DULUXSTAR T4 3U 20W-865 E27-HPF) 1 Osram =S003+P017-H2 (=S003&WD1/3.3)
MF42010A EMI Filter: Rated Voltage 230V AC (1 Phase), Rated Current 10A 1 EMI solutions =S003+P016-V2 (=S003&WD1/3.5)
DULUXSTAR T4 3U 20W-865 E27-HPF CFL,240V AC,18W (DULUXSTAR T4 3U 20W-865 E27-HPF) 1 Osram =S003+P016-H2 (=S003&WD1/3.5)
MF42010A EMI Filter: Rated Voltage 230V AC (1 Phase), Rated Current 10A 1 EMI solutions =S003+P015-V3 (=S003&WD1/3.6)
DULUXSTAR T4 3U 20W-865 E27-HPF CFL,240V AC,18W (DULUXSTAR T4 3U 20W-865 E27-HPF) 1 Osram =S003+P015-H1 (=S003&WD1/3.6)
DULUXSTAR T4 3U 20W-865 E27-HPF CFL,240V AC,18W (DULUXSTAR T4 3U 20W-865 E27-HPF) 1 Osram =S003+P015-H3 (=S003&WD1/3.7)
3RV10211DA10 MPCB 3RV: Rated Voltage 415V,Rated current 3.2A,overload release 2.2 - 3.2A,s/c release 38A,Breaking Capacity 100kA 1 Siemens =S003+P017-Q2 (=S003&WD1/3.9)
3RN10221DW00 Monitoring Relays: Thermistor Motor Protection rated control voltage 24 ... 240 V AC/DC, for PTC thermistor 1 Siemens =S003+P015-B1 (=S003&WD1/4.5)
6SL33201TG388AA0 Sinamics S120 Single Motor Module in chassis format: Voltage 675-1035 V DC,Power 900kW,O/P Current 910A,Frame Size:JX 1 Siemens =S003+P016-G1 (=S003&WD1/5.3)
3KA84413UE00 Swicth Disconnector 3KA: Rated volatge 690V,Rated Current 1000A 1 Siemens =S003+P015-Q1 (=S003&WD1/5.3)
3KX35821YC Auxiliary Switch (1NO+1NC) for 3KT841/42/43 and 3KL841/42/43 and 3KA8431/44/45/46 1 Siemens =S003+P015-Q1 (=S003&WD1/5.3)
HOG10D-1024I+FSL 1
Pulse Encoder, 1024 Pulses per Revolution, hollow-shaft incremental encoder (Digital-Tacho) with mechanical centrifugal switch FSL.Enter the FSL rpm in rema HUBNER =S003+P016-G2 (=S003&WD1/6.2)
rks.
HOG10-DN-1024I 1
Pulse Encoder, 1024 Pulses per Revolution, hollow-shaft incremental encoder , Two signals displaced by 90 Deg with HTL Level(UB = +9 ....+30V) with inverte HUBNER =S003+P016-G3 (=S003&WD1/6.9)
d signals and Marker Pulse
6SL30401MA000AA0 SINAMICS CONTROL UNIT CU320-2 DP WITH PROFIBUS INTERFACE WITHOUT COMPACT FLASH CARD 1 Siemens =S003+P016-A2 (=S003&WD1/7.1)
6SL30540ED001BA0 SINAMICS S120 COMPACTFLASH CARD W/O PERFORMANCE EXTENSION INCLUDING CERTIFICATE OF LICENCE V4.03 1 Siemens =S003+P016-A2 (=S003&WD1/7.1)
6ES79720BA410XA0 1
SIMATIC DP,BUS CONNECTOR FOR PROFIBUS UP TO 12 MBIT/S WITH TILTED OUTGOING CABLE, 15,8 X 54 X 39,5 MM (WXHXD), TERMINAT. RESIST. WITH Siemens =S003+P016-A2 (=S003&WD1/7.1)
ISOLAT. FUNCTION, WITHOUT PG SOCKET
6FX20021DC001AB0 Signal Cable, Pre assembled(Sinamics Drive CliQ), Length 1.0 m; 3 Siemens =S003+P016-A2 (=S003&WD1/7.1)
6FX80021AA011AE0 AOP Cable-RS232 4m plug-in cable ( AOP30 & CU320 ) 1 Siemens =S003+P016-OP1 (=S003&WD1/7.8)
=S002&TD1/5 2
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Equipment List Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & EQ1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003&EQ1/1
Design Document No. - G71053- J5663 (EF-1) Page 1
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 4
1 2 3 4 5 6 7 8 9 10
Equipment list
Type No. Description Qty Supplier/Make Device Tag Cross Reference Remarks
3TH30400AU0 Auxiliary Contactor, 10A AC15, 4 NO, Coil Voltage: 240V AC, 50 Hz 1 Siemens =S003+P017-K1 (=S003&WD1/12.2)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S003+P017-K1 (=S003&WD1/12.2)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 4 Siemens =S003+P017-K1 (=S003&WD1/12.2)
=S003+P017-K1 (=S003&WD1/12.2)
=S003+P017-K1 (=S003&WD1/12.2)
=S003+P017-K1 (=S003&WD1/12.2)
3TH30400AU0 Auxiliary Contactor, 10A AC15, 4 NO, Coil Voltage: 240V AC, 50 Hz 1 Siemens =S003+P017-K2 (=S003&WD1/12.3)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S003+P017-K2 (=S003&WD1/12.3)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 4 Siemens =S003+P017-K2 (=S003&WD1/12.3)
=S003+P017-K2 (=S003&WD1/12.3)
=S003+P017-K2 (=S003&WD1/12.3)
=S003+P017-K2 (=S003&WD1/12.3)
3TH30400AU0 Auxiliary Contactor, 10A AC15, 4 NO, Coil Voltage: 240V AC, 50 Hz 1 Siemens =S003+P017-K3 (=S003&WD1/12.4)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S003+P017-K3 (=S003&WD1/12.4)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 4 Siemens =S003+P017-K3 (=S003&WD1/12.4)
=S003+P017-K3 (=S003&WD1/12.4)
=S003+P017-K3 (=S003&WD1/12.4)
=S003+P017-K3 (=S003&WD1/12.4)
3TH30400AU0 Auxiliary Contactor, 10A AC15, 4 NO, Coil Voltage: 240V AC, 50 Hz 1 Siemens =S003+P017-K4 (=S003&WD1/12.5)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S003+P017-K4 (=S003&WD1/12.5)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 4 Siemens =S003+P017-K4 (=S003&WD1/12.5)
=S003+P017-K4 (=S003&WD1/12.5)
=S003+P017-K4 (=S003&WD1/12.5)
=S003+P017-K4 (=S003&WD1/12.5)
3TH30400AU0 Auxiliary Contactor, 10A AC15, 4 NO, Coil Voltage: 240V AC, 50 Hz 1 Siemens =S003+P017-K5 (=S003&WD1/12.6)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S003+P017-K5 (=S003&WD1/12.6)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 4 Siemens =S003+P017-K5 (=S003&WD1/12.6)
=S003+P017-K5 (=S003&WD1/12.6)
=S003+P017-K5 (=S003&WD1/12.6)
=S003+P017-K5 (=S003&WD1/12.6)
3TH30400AU0 Auxiliary Contactor, 10A AC15, 4 NO, Coil Voltage: 240V AC, 50 Hz 1 Siemens =S003+P017-K6 (=S003&WD1/12.7)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S003+P017-K6 (=S003&WD1/12.7)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 4 Siemens =S003+P017-K6 (=S003&WD1/12.7)
=S003+P017-K6 (=S003&WD1/12.7)
=S003+P017-K6 (=S003&WD1/12.7)
=S003+P017-K6 (=S003&WD1/12.7)
3TF69440CM7 Power Contactor: 3 Pole, Size 14, 820A AC3 upto 415V AC and 910A AC1 upto 690V AC, Auxiliary contacts 4NO+4NC, Coil Voltage: 220-240V AC 50/60Hz1 Siemens =S003+P015-K17 (=S003&WD1/12.8)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =S003+P017-K15 (=S003&WD1/12.9)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S003+P017-K15 (=S003&WD1/12.9)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =S003+P017-K15 (=S003&WD1/12.9)
1 3
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Equipment List Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & EQ1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003&EQ1/2
Design Document No. - G71053- J5663 (EF-1) Page 2
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 4
1 2 3 4 5 6 7 8 9 10
Equipment list
Type No. Description Qty Supplier/Make Device Tag Cross Reference Remarks
=S003+P017-K15 (=S003&WD1/12.9)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =S003+P017-K15 (=S003&WD1/12.9)
=S003+P017-K15 (=S003&WD1/12.9)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =S003+P017-K14 (=S003&WD1/13.4)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S003+P017-K14 (=S003&WD1/13.4)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =S003+P017-K14 (=S003&WD1/13.4)
=S003+P017-K14 (=S003&WD1/13.4)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =S003+P017-K14 (=S003&WD1/13.4)
=S003+P017-K14 (=S003&WD1/13.4)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =S003+P017-K16 (=S003&WD1/13.5)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S003+P017-K16 (=S003&WD1/13.5)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =S003+P017-K16 (=S003&WD1/13.5)
=S003+P017-K16 (=S003&WD1/13.5)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =S003+P017-K16 (=S003&WD1/13.5)
=S003+P017-K16 (=S003&WD1/13.5)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =S003+P017-K42 (=S003&WD1/13.6)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S003+P017-K42 (=S003&WD1/13.6)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =S003+P017-K42 (=S003&WD1/13.6)
=S003+P017-K42 (=S003&WD1/13.6)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =S003+P017-K42 (=S003&WD1/13.6)
=S003+P017-K42 (=S003&WD1/13.6)
3SB12002AB01 Selector Switch with P.F.R. 2 positions maintained (Black) 1 Siemens =S003+P016-Q4 (=S003&WD1/13.9)
3SB14000A Contact block rear connection for PB/SS (1NO+1NC) 2 Siemens =S003+P016-Q4 (=S003&WD1/13.9)
=S003+P016-Q4 (=S003&WD1/13.9)
3SB12002AB01 Selector Switch with P.F.R. 2 positions maintained (Black) 1 Siemens =S003+P016-Q2 (=S003&WD1/13.9)
3SB14000A Contact block rear connection for PB/SS (1NO+1NC) 2 Siemens =S003+P016-Q2 (=S003&WD1/13.9)
=S003+P016-Q2 (=S003&WD1/13.9)
3SB14012WZ3 Wide band LED pilot light(Red) for AC 42 to 240V and DC 42 to 220V 1 Siemens =S003+P015-H2 (=S003&WD1/14.4)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =S003+P015-K7 (=S003&WD1/16.3)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S003+P015-K7 (=S003&WD1/16.3)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =S003+P015-K7 (=S003&WD1/16.3)
=S003+P015-K7 (=S003&WD1/16.3)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =S003+P015-K7 (=S003&WD1/16.3)
=S003+P015-K7 (=S003&WD1/16.3)
3TH30400AU0 Auxiliary Contactor, 10A AC15, 4 NO, Coil Voltage: 240V AC, 50 Hz 1 Siemens =S003+P015-K8 (=S003&WD1/16.4)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S003+P015-K8 (=S003&WD1/16.4)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 4 Siemens =S003+P015-K8 (=S003&WD1/16.4)
=S003+P015-K8 (=S003&WD1/16.4)
=S003+P015-K8 (=S003&WD1/16.4)
=S003+P015-K8 (=S003&WD1/16.4)
2 4
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Equipment List Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & EQ1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003&EQ1/3
Design Document No. - G71053- J5663 (EF-1) Page 3
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 4
1 2 3 4 5 6 7 8 9 10
Equipment list
Type No. Description Qty Supplier/Make Device Tag Cross Reference Remarks
3TH30400AU0 Auxiliary Contactor, 10A AC15, 4 NO, Coil Voltage: 240V AC, 50 Hz 1 Siemens =S003+P015-K9 (=S003&WD1/16.5)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S003+P015-K9 (=S003&WD1/16.5)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 4 Siemens =S003+P015-K9 (=S003&WD1/16.5)
=S003+P015-K9 (=S003&WD1/16.5)
=S003+P015-K9 (=S003&WD1/16.5)
=S003+P015-K9 (=S003&WD1/16.5)
3TH30400AU0 Auxiliary Contactor, 10A AC15, 4 NO, Coil Voltage: 240V AC, 50 Hz 1 Siemens =S003+P015-K10 (=S003&WD1/16.6)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S003+P015-K10 (=S003&WD1/16.6)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 4 Siemens =S003+P015-K10 (=S003&WD1/16.6)
=S003+P015-K10 (=S003&WD1/16.6)
=S003+P015-K10 (=S003&WD1/16.6)
=S003+P015-K10 (=S003&WD1/16.6)
3TH30400AU0 Auxiliary Contactor, 10A AC15, 4 NO, Coil Voltage: 240V AC, 50 Hz 1 Siemens =S003+P015-K11 (=S003&WD1/16.7)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S003+P015-K11 (=S003&WD1/16.7)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 4 Siemens =S003+P015-K11 (=S003&WD1/16.7)
=S003+P015-K11 (=S003&WD1/16.7)
=S003+P015-K11 (=S003&WD1/16.7)
=S003+P015-K11 (=S003&WD1/16.7)
3TH30400AU0 Auxiliary Contactor, 10A AC15, 4 NO, Coil Voltage: 240V AC, 50 Hz 1 Siemens =S003+P015-K12 (=S003&WD1/16.8)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S003+P015-K12 (=S003&WD1/16.8)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 4 Siemens =S003+P015-K12 (=S003&WD1/16.8)
=S003+P015-K12 (=S003&WD1/16.8)
=S003+P015-K12 (=S003&WD1/16.8)
=S003+P015-K12 (=S003&WD1/16.8)
3TH30400AU0 Auxiliary Contactor, 10A AC15, 4 NO, Coil Voltage: 240V AC, 50 Hz 1 Siemens =S003+P015-K13 (=S003&WD1/16.9)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S003+P015-K13 (=S003&WD1/16.9)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 4 Siemens =S003+P015-K13 (=S003&WD1/16.9)
=S003+P015-K13 (=S003&WD1/16.9)
=S003+P015-K13 (=S003&WD1/16.9)
=S003+P015-K13 (=S003&WD1/16.9)
3 &WD1/1
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Equipment List Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & EQ1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003&EQ1/4
Design Document No. - G71053- J5663 (EF-1) Page 4
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 4
1 2 3 4 5 6 7 8 9 10
=S003+P017-X31 1 2
2 4 13 21 24
=S003+P017-F1
1NO+1NC
240 VAC Supply MCB 1 3 14 22 23
(/9.3)
2.5 mm²
2.5 mm²
=S003+P017-X33 1 2 3 4 5 6 7 8 9 10 =S003+P017-X34 1 2 3 4 5 6 7 8 9 10
/ -L240:1
(9.2) / -L240:2
(12.1) / -L240:3
/ -L240:4
(4.2) / -L240:5
(9.8) / -L240:6
/ -L240:7
/ -L240:8
/ -L240:9
/ -L240:10
/ -N240:1
(9.2) / -N240:2
(12.1) / -N240:3
(14.3) / -N240:4
(16.2) / -N240:5
(4.2) / -N240:6
/ -N240:7
/ -N240:8
/ -N240:9
/ -N240:10
240V AC Distribution bus
&EQ1/4 2
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Power Distribution Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P015 & WD1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003+P015&WD1/1
Design Document No. - G71053- J5663 (EF-1) Page 1
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 16
1 2 3 4 5 6 7 8 9 10
=S003+P017-X51 1 2
2 4 13 21
=S003+P015-F2
04A
24 VDC Power Supply MCB 1 3 14 22
2.5 mm²
2.5 mm²
=S003+P015-X53 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 =S003+P015-X54 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
(5.7) / -P24:1
(5.4) / -P24:2
(6.2) / -P24:3
(7.2) / -P24:4
(7.1) / -P24:5
(8.8) / -P24:6
(4.7) / -P24:7
(=C001/15.5) / -P24:8
(8.3) / -P24:9
(15.1) / -P24:10
(13.7) / -P24:11
/ -P24:12
/ -P24:13
/ -P24:14
/ -P24:15
(5.6) / -M24:1
(5.5) / -M24:2
(6.3) / -M24:3
(7.2) / -M24:4
(7.7) / -M24:5
(8.8) / -M24:6
(10.2) / -M24:7
(4.7) / -M24:8
(=C001/15.5) / -M24:9
(11.2) / -M24:10
/ -M24:11
/ -M24:12
/ -M24:13
/ -M24:14
/ -M24:15
24V DC Distribution bus
1 3
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Power Distribution Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P015 & WD1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003+P015&WD1/2
Design Document No. - G71053- J5663 (EF-1) Page 2
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 16
1 2 3 4 5 6 7 8 9 10
(=A001/5.6) / =A001-Y_MH1
(=A001/5.3) / =A001-R_MH1
=S003+P017-X16 1 2
6 mm²
6 mm²
(=A001/10.1)
1 1 3 5 13 21
=A001-L_4 1
-X42 1 =S003+P017-Q2
2.2-3.2A
=S003+P017-X203 =S003+P016-X203 MH-1 fan supply 14 22
(/9.3)
I> I> I>
21
2 4 6
=S003+P015-S3
21 21 Door Limit Switch
=S003+P017-S1 =S003+P016-S2 22
Door Limit Switch Door Limit Switch
22 22
CFL CFL CFL CFL CFL
6 mm²
1.5 mm² 240V AC,18W 240V AC,18W 1.5 mm² 240V AC,18W 1.5 mm² 240V AC,18W 240V AC,18W
1 3 =S003+P017-H1 =S003+P017-H2 1 3 =S003+P016-H2 1 3 =S003+P015-H1 =S003+P015-H3
x1 x1 x1 x1 x1
1.5 mm² 1.5 mm² 1.5 mm² 1.5 mm²
6 mm²
=S003+P017-V1 =S003+P016-V2 =S003+P015-V3
230V AC,10A 230V AC,10A 230V AC,10A =S003+P017-X207 1 2
RFI Filter RFI Filter RFI Filter
2 4 2 4 2 +P015 4
x2 x2 x2 x2 x2
1.5 mm² 1.5 mm² 1.5 mm² 1.5 mm² =S003+P015-X207 1 2
1.5 mm² 1.5 mm² 1.5 mm²
PE PE PE
2 2
-X42 2
(5.6) / MH1_FAN_R
(5.6) / MH1_FAN_Y
=A001-N_4 =S003+P017-X203 =S003+P016-X203
(=A001/10.5)
2 4
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Panel Auxiliary Circuits Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P017 & WD1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003+P017&WD1/3
Design Document No. - G71053- J5663 (EF-1) Page 3
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 16
1 2 3 4 5 6 7 8 9 10
-RESET_MPR1 / (9.6)
-RESET_MPR2 / (9.6)
=S003+P017-X203 5 6 -P24:7 / (2.4)
(1.4) (1.7)
-L240:5 -N240:6
=S003+P015-X203 5 6
=S003+P015-B1
Monitoring Relay
07 Y1 Y2 A1 95
Reset Contact L/P
13
Alarm
H3 H2 Trip
=S003+P017-K15 Contact Contact
MH-1 Brake Cont.
(/12.9) 14
K1 N N
H1 K2
2.5 mm²
GRAY
-M24:8 / (2.7)
MPR_TRIP / (10.3)
PTC TRIP
PTC TRIP
3 5
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Field Auxillaries Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P015 & WD1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003+P015&WD1/4
Design Document No. - G71053- J5663 (EF-1) Page 4
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 16
1 2 3 4 5 6 7 8 9 10
(=S002/10.2) / D_MH1
(=S002/10.1) / C_MH1
1 3 5
13 21
=S003+P015-Q1
1000A
MH-1 I/P Isolator 14 22
2 4 6
(/8.4)
=S003+P016-G1
900kW,910A
Main Hoist-1
DCP DCN DCPA DCNA DCPS DCNS
DC LINK
LED
SINAMICS S120 H200
M1_1
(380-480V AC/
EP EP Temp Temp
NC
NC
NC
NC
500-690V AC)
M1 +24V - +
U1 V1 W1 PE1
1 2 3 4 5 6 L1 L2 1 2 3 4
=S003+P017-X204 2 2 =S003+P015-X204
-MH1_EP2 / (9.5)
-PE
-MH1_EP1 / (9.4)
1 3 5
=S003+P017-X204 3
=S003+P015-K17
820A 2 4 6 =S003+P015-X204 3
(/12.8)
(2.6) / -M24:1
(2.3) / -P24:1
(2.6) / -M24:2
(3.9) / -MH1_FAN_R
(3.9) / -MH1_FAN_Y
(2.3) / -P24:2
(=S005/4.1) / =S005-MH1_U1
From MH-STD (=S005/4.1) / =S005-MH1_V1
(=S005/4.2) / =S005-MH1_W1
=S003+P016-X17 1 2 3 4
U1 V1 W1
=S003+P016-MH-1 M
Main Hoist
545KW at 690V
3~
Rated current 585A PE
4 6
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - MH-1 Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P016 & WD1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003+P016&WD1/5
Design Document No. - G71053- J5663 (EF-1) Page 5
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 16
1 2 3 4 5 6 7 8 9 10
SMC 30
(+) K1 K2
=S003+P016-G2 G D11
1024 PPR
(=S005/5.2) / MH1_ENC_K2
=S005-M4 / (=S005/5.5)
(=S005/5.2) / MH1_ENC_K1-
(=S005/5.2) / MH1_ENC_K1
/(6.3)
=S003+P015-A1
SMC30 -X521 1 2 3 4 5 6 7 8 -X531 1 2 3 4 5 6 7 8
SMC30
A
A*
B*
R*
CTRL
P_Enc 5/24V
-Temp
+Temp
Res.
Res.
Res.
Res.
M_Enc
Drum Encoders
Encoder conn. 2 for HTL/TTL Encoder conn. 2 for HTL/TTL
/ =C001:P24:6 K1 / (=C001/18.4)
K2 / (=C001/21.5)
LED READY + K1 K2
SINAMICS G130 OUT > 5V
M_Enc(M)
+24V M
M_Sense
P_Sense
K2- / (=C001/21.6)
/ =C001-M24:6 K1- / (=C001/18.5)
Res.
Res.
Res.
Res
R*
A*
B*
R
A
B
+ + M M 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
D11
(2.3) / -P24:3
(2.7) / -M24:3
(6.7)/
5 7
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - SMC30 Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P016 & WD1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003+P016&WD1/6
Design Document No. - G71053- J5663 (EF-1) Page 6
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 16
1 2 3 4 5 6 7 8 9 10
+P015-X204
(2.3) / -P24:5
4 4
=S003+P017-X204
33
(9.3) / OFF1_CHAIN1 13 =S003+P015-K12
33
=S003+P017-K4 Step 4
(9.3) / OFF1_CHAIN2 =S003+P015-K10 (/16.8) MH1_MPR_TRIP1 / (10.3)
Counter wt. LS 34
(/12.5)
Step 2
14 33 (/16.6) 34 13 MH1_MPR_TRIP2 / (10.4)
13 53
(9.5) / COMMON_OFF2_1 =S003+P015-K7 =S003+P015-K8 =S003+P015-K12
33
=S005+P013-K3 Hoist(Step 1) =S003+P015-K13 Step 4
(9.5) / COMMON_OFF2_2 Std. as MH-Null Position (/16.4) (/16.8)
(/16.3) 54 34 33 Step 5 14
MH-2 Selection
(=S005/13.4)
14
D11 =S003+P015-K11 (/16.9) 34 RESET1 / (9.5)
13 Step 3
33 (/16.7) 34 RESET2 / (9.5)
=S003+P017-K1 13
Safety Brake 13 =S003+P015-K9 =S003+P015-K13
Check Back 14 =S003+P017-K5 Lower (Step 1) Step 5
-M24:5 / (2.7)
(/16.5) 34
(/12.2) Pre Limit switch (/16.9) 14
(/12.6) 14
13
=S003+P017-K2
Encoder Overspeed 13
Switch 1 14 =S003+P017-K6
(/12.3) End Limit switch
(/12.7) 14 5=S003+P015-X54
=S003+P017-X55 1 2 3 4 5 6 7 8 9 10 11 12 13 14 =S003+P017-X56 1 2 3 4 5 6 7 8 9 10 11 12
=S003+P015-X55 1 2 3 4 5 6 7 8 9 10 11 12 13 14 =S003+P015-X56 1 2 3 4 5 6 7 8 9 10 11 12
=S003+P016-OP1
=S003+P016-A2 AOP30
CU320-2 -X122 1 2 3 4 5 6 7 8 9 10 11 12 13 14 -X132 1 2 3 4 5 6 7 8 9 10 11 12 13 14 AOP30
CU320-2_MH-1
DI 0
DI 1
DI 2
DI 3
DI 16
DI 17
M1
DI/DO 8
DI/DO 9
DI/DO 10
DI/DO 11
DI 4
DI 5
DI 6
DI 7
DI 20
DI 21
M2
DI/DO 12
DI/DO 13
DI/DO 14
DI/DO 15
M
SINAMICS G130
Advanced Operating Panel AOP30
-X124 -X140
MP PE
+ + M M 2 3 5
-PE
(2.3) / -P24:4
(2.7) / -M24:4
6 8
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - CU320 Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P016 & WD1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003+P016&WD1/7
Design Document No. - G71053- J5663 (EF-1) Page 7
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 16
1 2 3 4 5 6 7 8 9 10
=S003+P015-X204 6 6
=S003+P017-X204 =S003+P015-X53 11 12 13
=S003+P015-X204
(2.4) / -P24:9
5 5
=S003+P017-X204 15
-M24:6 / (2.7)
-P24:6 / (2.4)
(9.7) / STD_OFF_1
13 (9.7) / STD_OFF_2
=S003+P017-K14
23
Safety Brake Reset
=S003+P016-Q2
Int. Cont. 14 MH1_O/P_CONT_1 / (9.8)
(/13.4) Position-1
MH1_O/P_CONT_2 / (9.8) RUN/Maint. 24
(/13.9)
=S003+P013-X57 1 3 11 15 16 17 18
=S003+P017-X57 1 2 4 5 7 8 12 13 =S003+P016-X54 6
=S003+P016-X53 6
=S003+P015-X57 1 2 3 4 5 6 7 8 9 10 =S003+P015-X57 11 12 13 14 15 16 17 18 19 20
=S003+P015-A3
TM15 -X520 1 2 3 4 5 6 7 8 9 10 -X521 1 2 3 4 5 6 7 8 9 10 -X524 + + M M
DRIVE-CLiQ
TM 15 Module
L1+
DI/DO 0
DI/DO 1
DI/DO 2
DI/DO 3
DI/DO 4
DI/DO 5
DI/DO 6
DI/DO 7
M1
L2+
DI/DO 8
DI/DO 9
DI/DO 10
DI/DO 11
DI/DO 12
DI/DO 13
DI/DO 14
DI/DO 15
M2
+24V M
External source
24V DC
SINAMICS S120
Terminal Module TM15
-X522
L3+
DI/DO 16
DI/DO 17
DI/DO 18
DI/DO 19
DI/DO 20
DI/DO 21
DI/DO 22
DI/DO 23
M3
-PE
1 2 3 4 5 6 7 8 9 10
-PE
=S003+P016-X58 1 2 3 4 5 6 7 8 9
83
=S003+P015-X204 11 12 13 ER/BR from =S005+P013-K3
=S003+P017-X58 1 2 3
MH-1 Field
Std. as
84 MH-2 Selection
D11
(=S005/13.4)
(10.5) / MH1_INV_READY
(11.2) / MH1_INV_RUN
(10.2) / BRAKE_OPEN
(10.7) / OUT_CONT
(13.8) / OS_BYPASS_1
7 9
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - TM15 Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P016 & WD1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003+P016&WD1/8
Design Document No. - G71053- J5663 (EF-1) Page 8
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 16
1 2 3 4 5 6 7 8 9 10
=S003+P017-X39 1 =S003+P017-X39 5
(=S001/14.3) / =S001-MH1-1
(=S001/14.3) / =S001-MH1-2
24 2
MH-1 Brake rectifier Panel 1
=S003+P017-F1
240 VAC Supply MCB
(/1.5) 23
=S003+P017-X39 6 =S003+P017-X203 19
=S003+P017-X203 21
=S005+P013-X203 19
=S003+P017-X39 7
=S003+P015-X203 15
53
=S003+P015-K17
=S003+P017-X203 9 43
MH-1 O/P Contactor
D11
=S005+P013-K45 (/12.8)
24 MH-1 Brake rectifier Panel 2 54
Std as
=S003+P017-F2
OFF Selection 44
=S003+P013-X594 9 (=S005/13.10)
23
=S003+P017-X39 8 =S005+P017-X203 20
=S003+P015-X203 16
=S003+P017-X203 20
(1.6) / -N240:2
=S003+P017-K40
8-CH 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8
Relay Board
P1 O1 C1 P1 O1 C1 P2 O2 C2 P2 O2 C2 P3 O3 C3 P3 O3 C3 P4 O4 C4 P4 O4 C4 P5 O5 C5 P5 O5 C5 P6 O6 C6 P6 O6 C6 P7 O7 C7 P7 O7 C7 P8 O8 C8 P8 O8 C8
1 1 1 2 2 2 1 1 1 2 2 2 1 1 1 2 2 2 1 1 1 2 2 2 1 1 1 2 2 2 1 1 1 2 2 2 1 1 1 2 2 2 1 1 1 2 2 2
=S003+P017-X203 11 12 =S003+P017-X204 7 8
(8.5) / MH1_O/P_CONT_1
(8.5) / MH1_O/P_CONT_2
(=S005/9.2) / MH1_O/P_CONT_3
(=S005/9.2) / MH1_O/P_CONT_4
(7.1) / -OFF1_CHAIN1
(7.1) / -OFF1_CHAIN2
(8.5) / MH_STD_ISO1
(8.5) / MH_STD_ISO2
(5.7) / MH1_EP1
(5.7) / MH1_EP2
(7.1) / COMMON_OFF2_1
(7.1) / COMMON_OFF2_2
(7.7) / RESET1
(7.7) / RESET2
(4.6) / RESET_MPR1
(4.6) / RESET_MPR2
(8.3) / MH_BRAKE1_1
(8.3) / MH_BRAKE1_2
(=S005/11.7) / MH1_STD_BRAKE1
(=S005/11.7) / MH1_STD_BRAKE2
(8.6) / STD_OFF_1
(8.6) / STD_OFF_2
OFF 1 Chain Stdby MH Common OFF 2 Reset Command MH-1 Brake MH-1 O/P
Contactor f/b Chain Open f/b Contactor feedback
8 10
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Relay Board Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P017 & WD1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003+P017&WD1/9
Design Document No. - G71053- J5663 (EF-1) Page 9
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 16
1 2 3 4 5 6 7 8 9 10
-BRAKE_OPEN / (8.4)
MH1_INV_READY / (8.3)
MPR_TRIP / (4.7)
OUT_CONT / (8.4)
=S003+P017-X58 3
=S003+P017-X58 1 =S003+P017-X58 4
(2.7) / -M24:7
=S003+P015-X204 8
=S003+P017-X204 8
=S003+P017-K41
8-CH
Relay Board 1+ 1- 2+ 2- 3+ 3- 4+ 4- 5+ 5- 6+ 6- 7+ 7- 8+ 8-
P1 O1 C1 P2 O2 C2 P3 O3 C3 P4 O4 C4 P5 O5 C5 P6 O6 C6 P7 O7 C7 P8 O8 C8
=S004+P017-X204 3
(12.9) / MH1_BO2
(7.7) / MH1_MPR_TRIP1
(7.7) / MH1_MPR_TRIP2
(=S005/9.5) / MH_STD_MPR_TRIP1
(=S005/9.5) / MH_STD_MPR_TRIP2
(=S005/9.7) / MH1_INV_READY1
(=S005/9.7) / MH1_INV_READY2
(=S004/7.7) / MH1_INV_READY3
(=S004/7.7) / MH1_INV_READY4
(12.8) / OUT_CONT_1
(12.8) / OUT_CONT_2
Brake Open MPR trip MPR trip MH1_Ready MH1_Ready
Command f/b to MH-1 f/b to MH-STD f/b to Mh_STD f/b to MH2
9 11
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Relay Board Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P017 & WD1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003+P017&WD1/10
Design Document No. - G71053- J5663 (EF-1) Page 10
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 16
1 2 3 4 5 6 7 8 9 10
=C001-OVERSPPED_BYPASS /
MH1_INV_RUN / (8.4)
=S003+P017-X202 19
=S003+P017-X58 2
(2.8) / -M24:10
=S003+P015-X204 9
=S003+P017-X204 9
=S003+P017-K43
8-CH
8-channel 24V DC Relay Board 1+ 1- 2+ 2- 3+ 3- 4+ 4- 5+ 5- 6+ 6- 7+ 7- 8+ 8-
P1 O1 C1 P2 O2 C2 P3 O3 C3 P4 O4 C4 P5 O5 C5 P6 O6 C6 P7 O7 C7 P8 O8 C8
=S004+P017-X204 3
=S004+P017-X204 6
=S003+P017-X38 1 2
(=S005/9.7) / MH1_INV_RUN1
(=S005/9.7) / MH1_INV_RUN2
(=S004/7.7) / MH1_INV_RUN3
(=S004/7.7) / MH1_INV_RUN4
(=A001/20.2) / OS_1
(=A001/20.2) / OS_2
10 12
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Relay Board Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P017 & WD1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003+P017&WD1/11
Design Document No. - G71053- J5663 (EF-1) Page 11
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 16
1 2 3 4 5 6 7 8 9 10
2.5 mm²
(1.4) / -L240:3 L1 / (13.3)
OUT_CONT_1 / (10.7)
OUT_CONT_2 / (10.7)
2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm²
2.5 mm²
=S003+P017-X35 7
=S003+P017-X35 1 2 3 4 5 6
(=A001/21.9)
(=S005/12.1) / =S005-MH_STD_BO1 MH1_BO1 / (10.2)
=A001-MH_DB_FB1
(=S005/12.2) / =S005-MH_STD_BO2 MH1_BO2 / (10.3)
Encoder Overspeed Encoder Overspeed D11 Counter wt. LS Pre Limit switch End Limit switch
Switch 1 Switch 2
=A001-MH_DB_FB2 =S003+P017-X35 8
Brake open Command
(=A001/21.9) 2.5 mm² From MH1
Brake open Command
=S003+P017-X36 1 2 3 4 5 6 From MH_StandBy
2.5 mm²
2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm²
=S003+P017-X203 7
=S003+P015-X203 7
A1 A1 A1 A1 A1 A1 A1 A1
U U U U U U U U
=S003+P017-K1 =S003+P017-K2 =S003+P017-K3 =S003+P017-K4 =S003+P017-K5 =S003+P017-K6 =S003+P015-K17 =S003+P017-K15
240V AC A2 240V AC A2 240V AC A2 240V AC A2 240V AC A2 240V AC A2 820A, 240V AC A2 240V AC A2
Safety Brake Encoder Overspeed Encoder Overspeed Counter wt. LS Pre Limit switch End Limit switch MH-1 O/P Contactor MH-1 Brake Cont.
Check Back Switch 1 Switch 2
=S003+P015-X203 8
D11
=S003+P017-X203 8
2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm²
(1.6) / -N240:3 N1 / (13.3)
53 54 53 54 53 54 53 54 53 54 53 54 13 14 (/15.7) 53 54 (/9.6)
63 64 63 64 63 64 63 64 63 64 63 64 21 22 61 62
73 74 73 74 73 74 73 74 73 74 73 74 31 32 71 72
43 44 83 84
83 84 83 84 83 84 83 84 83 84 83 84
53 54 (/9.8)
61 62
71 72
83 84
11 13
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Control Logic Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P017 & WD1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003+P017&WD1/12
Design Document No. - G71053- J5663 (EF-1) Page 12
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 16
1 2 3 4 5 6 7 8 9 10
D11
23
=S003+P016-Q4
Position-1
Overspeed Bypass 24
ON/OFF
(/13.9)
(8.5) / OS_BYPASS_1
(=S004/7.4) / OS_BYPASS_2
(=S005/10.2) / OS_BYPASS_3
=S003+P017-X37 1 =S003+P017-X37 3 =S003+P017-X37 5
2 4 6
Run/Maintenance SS
1 2
23 11 43 31
=S003+P016-Q2
2-way(Black)
RUN/Maint. 24 12 44 32
(/8.6)
Overspeed Bypass SS
1 2
23 11 43 31
=S003+P016-Q4
2-way(Black)
Overspeed Bypass 24 12 44 32
ON/OFF
(/13.8)
A1 A1 A1
U U U
=S003+P017-K14 =S003+P017-K16 =S003+P017-K42
240V AC A2 240V AC A2 240V AC A2
Safety Brake Reset MH_Counter Wt. Bypass Spare
Int. Cont. Int. Cont.
(12.10) / N1
13 14 (/8.4) 13 14 (/8.4) 13 14
21 22 21 22 21 22
31 32 31 32 31 32
43 44 (=S004/7.4) 43 44 (=S004/7.4) 43 44 (/15.10)
53 54 (=S005/9.4) 53 54 (=S005/9.4) 53 54
61 62 61 62 61 62
71 72 71 72 71 72
83 84 (=S006/7.4) 83 84 (/15.9) 83 84
12 14
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Annunciation Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P016 & WD1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003+P016&WD1/13
Design Document No. - G71053- J5663 (EF-1) Page 13
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 16
1 2 3 4 5 6 7 8 9 10
2.5 mm²
(=S001/15.3) / =S001-DC_MH-1 =A001-ST_LUB1 / (=A001/20.4)
=S003+P015-X201 1
=S003+P015-X203 14
21
=S003+P015-K7
X1 MH-Null Position
(/16.3) 22
=S003+P015-H2
Lamp_Red
DC LINK CHARGED X2
=S003+P015-X203 13 =S003+P015-X201 2
=S003+P017-X203 13
2.5 mm²
(1.6) / -N240:4 =A001-ST_LUB2 / (=A001/20.4)
13 15
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Annunciation Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P016 & WD1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003+P016&WD1/14
Design Document No. - G71053- J5663 (EF-1) Page 14
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 16
1 2 3 4 5 6 7 8 9 10
=S003+P015-X204 7 10
(2.4) / -P24:10
=S003+P017-X204
33 33 13 43 83 43
=S003+P017-K5 =S003+P017-K6 =S003+P015-K17 =S003+P017-K15 =S003+P017-K16 =S003+P017-K42
Pre Limit switch End Limit switch MH-1 O/P Contactor MH-1 Brake Cont. MH_Counter Wt. Bypass Spare
(/12.6) 34 (/12.7) 34 (/12.8) 14 (/12.9) 44 Int. Cont. 84 (/13.6) 44
(/13.5)
43 33
=S003+P017-K1 =S003+P017-K4
Safety Brake Counter wt. LS
33 33 Check Back 44 (/12.5) 34
=S003+P017-K2 =S003+P017-K3 (/12.2)
Encoder Overspeed Encoder Overspeed
Switch 1 34 Switch 2 34
(/12.3) (/12.4)
=S003+P017-X65 1 2 3 4 5 6 7 8 9 10
ENCODER OVERSPEED SWITCH1 ENCODER OVERSPEED SWITCH2 SAFETY BRAKE CHECK BACK COUNTER WT LS PRE LIMIT SWITCH END LIMIT SWITCH MAIN CONTACTOR MH-1 BRAKE CONT MH-1 SPARE
(=C001/24.6) (=C001/24.7) (=C001/32.7) (=C001/33.4) (=C001/33.5) COUNTER WT (=C001/33.7)
BYPASS INT CONT
14 16
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - To PLC Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P016 & WD1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003+P016&WD1/15
Design Document No. - G71053- J5663 (EF-1) Page 15
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 16
1 2 3 4 5 6 7 8 9 10
(=L001/6.2) / MH1_NULL
(=L001/6.3) / MH1_HOIST
(=L001/6.3) / MH1_LOWER
(=L001/6.3) / MH1_STEP2
(=L001/6.3) / MH1_STEP3
(=L001/6.4) / MH1_STEP4
(=L001/6.4) / MH1_STEP5
=S003+P015-X38 1 2 3 4 5 6 7
2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm²
2.5 mm²
A1 A1 A1 A1 A1 A1 A1
U U U U U U U
=S003+P015-K7 =S003+P015-K8 =S003+P015-K9 =S003+P015-K10 =S003+P015-K11 =S003+P015-K12 =S003+P015-K13
240V AC A2 240V AC A2 240V AC A2 240V AC A2 240V AC A2 240V AC A2 240V AC A2
MH-Null Position Hoist(Step 1) Lower (Step 1) Step 2 Step 3 Step 4 Step 5
=S003+P017-X203
11 11 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm²
(1.7) / -N240:5
=S003+P015-X203
53 54 (=S005/8.4)
15 &TD1/1
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Master Controller Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P016 & WD1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003+P016&WD1/16
Design Document No. - G71053- J5663 (EF-1) Page 16
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 16
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Connection
Connection
Terminal
Terminal
Jumper
Jumper
Terminal
Terminal
Target
Target
Point
Point
Function Text Target Terminal Strip Source Designation Cross Reference Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P013-X35 =S003+P013-X594
=S005+P013-K41 7 =S003+P017-X35 7 (=S005&WD1/12.1) =S005+P013-X203 9 9 =S003+P017-X203 9 (=S003&WD1/9.4)
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P015-X33
=S003+P013-X53 220V Phase Terminal Strip 1 =S003+P017-F1 1 (=S003&WD1/1.3)
4 (=S003&WD1/1.4)
Connection
Terminal
Jumper
Terminal
Target
Point
=S003+P017-K15 13 5 (=S003&WD1/1.4)
Function Text Target Terminal Strip Source Designation Cross Reference
=S004+P013-K16 53 6 (=S003&WD1/1.4)
7 (=S003&WD1/1.5)
=S003+P013-X57
8 (=S003&WD1/1.5)
=S003+P017-X57 1 1 =S005+P013-K42 44 (=S003&WD1/8.3)
9 (=S003&WD1/1.5)
=S003+P015-X57 3 3 =S005+P013-K43 14 (=S003&WD1/8.4)
10 (=S003&WD1/1.5)
11 (=S003&WD1/8.6)
Connection
=S003+P016-X57 15 15 =S004+P013-X57 15 (=S003&WD1/8.7)
Terminal
Jumper
Terminal
Target
Point
=S003+P016-X57 16 16 =S004+P013-X57 17 (=S003&WD1/8.7) Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P016-X57 17 17 (=S003&WD1/8.7)
=S003+P017-K40 1 2 (=S003&WD1/1.6)
Connection
Terminal
Jumper
Terminal
Target
Point
=S003+P017-K1 A2 3 (=S003&WD1/1.6)
Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P017-X203 13 4 (=S003&WD1/1.6)
=S003+P017-X203 11 5 (=S003&WD1/1.7)
=S003+P013-X203
=S003+P015-X203 4 6 (=S003&WD1/1.7)
=S007+P017-X203 16 16 (=S005&WD1/13.2)
7 (=S003&WD1/1.7)
Connection
Terminal
Jumper
Terminal
8 (=S003&WD1/1.7)
Target
Point
10 (=S003&WD1/1.7)
=S003+P013-X204
Connection
Terminal
Jumper
Terminal
=S004+P013-X204 1 1 =S004+P015-X55 13 (=S004&WD1/6.2)
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P015-X53 11 6 =S004+P013-K41 (=S004&WD1/9.6)
=S003+P015-X53 12
=S003+P015-X38
7 (=S004&WD1/9.8)
=L001+RS001-X38 1 1 =S003+P015-K7 A1 (=S003&WD1/16.3)
&WD1/16 2
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003&TD1/1
Design Document No. - G71053- J5663 (EF-1) Page 1
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 7
1 2 3 4 5 6 7 8 9 10
Terminal diagram
=S003+P016-A2-X122 12 12 =S003+P017-X55 12 (=S003&WD1/7.4)
Connection
Terminal
Jumper
Terminal
Target
Point
=S003+P016-A2-X122 13 13 =S003+P017-X55 13 (=S003&WD1/7.4)
Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P016-A2-X122 14 14 =S003+P017-X55 14 (=S003&WD1/7.4)
Connection
=S003+P015-X38
Terminal
Jumper
Terminal
Target
Point
=L001+RS001-X38 3 3 =S003+P015-K9 A1 (=S003&WD1/16.5) Function Text Target Terminal Strip Source Designation Cross Reference
Connection
Terminal
Jumper
Terminal
Target
Point
=S003+P016-A2-X132 4 4 =S003+P017-X56 4 (=S003&WD1/7.5)
Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P016-A2-X132 5 5 =S003+P017-X56 5 (=S003&WD1/7.5)
Connection
Terminal
Connection
Jumper
Terminal
Terminal
Target
Jumper
Terminal
Point
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P015-X57
=S003+P015-X54
=S003+P015-A3-X520 2 1 =S003+P017-X57 1 (=S003&WD1/8.3)
=S003+P016-A2-X132 14 5 =S003+P017-X54 5 (=S003&WD1/7.7)
=S003+P015-A3-X520 3 2 =S003+P017-X57 2 (=S003&WD1/8.4)
Connection
Terminal
Jumper
Terminal
Point
Connection
Terminal
Jumper
Terminal
=S003+P016-A2-X122 7 7 =S003+P017-X55 7 (=S003&WD1/7.3)
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P016-A2-X122 8 8 =S003+P017-X55 8 (=S003&WD1/7.3)
1 3
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003&TD1/2
Design Document No. - G71053- J5663 (EF-1) Page 2
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 7
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Connection
Connection
Terminal
Terminal
Jumper
Jumper
Terminal
Terminal
Target
Target
Point
Point
Function Text Target Terminal Strip Source Designation Cross Reference Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P015-X201 =S003+P015-X207
DC link Chrge from ALM Panel =S003+P015-K7 22 2 (=S003&WD1/14.6) =S003+P017-X207 1 1 =S003+P016-G1-X9 L1 (=S003&WD1/3.9)
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P015-X203
4 =S003+P015-X34 6 (=S003&WD1/4.2) =S003+P015-X251
=S003+P015-B1 Y1 5 =S003+P017-X203 5 (=S003&WD1/4.6) Hoist Motor PTC thermistor =+ 1 =S003+P015-B1 1T1 (=S003&WD1/4.6)
Connection
Terminal
Jumper
Terminal
Target
Point
=S003+P017-X203 11 11 =S003+P015-K7 A2 (=S003&WD1/16.2)
Function Text Target Terminal Strip Source Designation Cross Reference
DC link Chrge from ALM Panel 13 =S003+P015-H2 X2 (=S003&WD1/14.4)
Connection
Terminal
Connection
Jumper
Terminal
Terminal
Target
Jumper
Terminal
Point
Target
Function Text Target Terminal Strip Source Designation Cross Reference
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P015-X204
=S003+P016-X17
Hoist Motor PTC thermistor =S003+P017-X204 2 1 =S003+P015-B1 96 (=S003&WD1/4.7)
1 =S003+P015-K17 2 (=S003&WD1/5.3)
=S003+P017-K40 2 =S003+P016-G1-X41 2 (=S003&WD1/5.7)
=S005+P015-K48 2
=S003+P017-X53 1 3 =S003+P017-X204 3 (=S003&WD1/5.7)
2 =S003+P015-K17 4 (=S003&WD1/5.3)
=S003+P017-X204 4 4 =S003+P015-K7 53 (=S003&WD1/7.1)
=S005+P015-K48 4
=S003+P015-X53 15 5 =S003+P017-X204 5 (=S003&WD1/8.3)
3 =S003+P015-K17 6 (=S003&WD1/5.4)
=S003+P017-X53 9 6 =S003+P017-X204 6 (=S003&WD1/8.3)
=S005+P015-K48 6
=S003+P015-K17 13 7 =S003+P017-X204 10 (=S003&WD1/15.1)
4 =S003+P016-G1 PE1 (=S003&WD1/5.4)
=S003+P017-X204 8 8 =S003+P017-X54 7 (=S003&WD1/10.3)
Connection
Terminal
Jumper
Terminal
=S003+P017-X204 9 9 =S003+P017-X54 10 (=S003&WD1/11.3)
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P017-X58 1 11 =S003+P016-X58 1 (=S003&WD1/8.3)
2 4
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003&TD1/3
Design Document No. - G71053- J5663 (EF-1) Page 3
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 7
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Connection
Connection
Terminal
Terminal
Jumper
Jumper
Terminal
Terminal
Target
Target
Point
Point
Function Text Target Terminal Strip Source Designation Cross Reference Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P016-X54 =S003+P017-X16
=S003+P015-A3-X524 M 6 =S003+P017-X54 6 (=S003&WD1/8.8) 690VAC from PP =A001+P029-X31 3 1 =S003+P017-Q2 1 (=S003&WD1/3.9)
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P016-X57
=S003+P015-A3-X521 3 12 (=S003&WD1/8.6) =S003+P017-X31
240V AC Control Supply from Protec
=S003+P015-A3-X521 4 13 =S003+P017-K40 (=S003&WD1/8.6) 1 =S003+P017-F1 2 (=S003&WD1/1.5)
tive Panel
Connection
Terminal
Jumper
Terminal
Target
Point
=S003+P015-A3-X521 7 16 =S003+P013-X57 16 (=S003&WD1/8.7)
Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P015-A3-X521 8 17 =S003+P013-X57 17 (=S003&WD1/8.7)
Connection
Encoder Overspeed Switch 2 3 (=S003&WD1/12.4)
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference Counter wt. LS 4 (=S003&WD1/12.5)
=S003+P015-X204 11 1 =S003+P015-A3-X522 2 (=S003&WD1/8.3) Emergency Disc Brake f/b =S003+P017-K41 7 =S003+P013-X35 7 (=S003&WD1/12.9)
=S003+P015-X204 12 2 =S003+P015-A3-X522 3 (=S003&WD1/8.4) Emergency Disc Brake f/b =S003+P017-K15 A1 8 =S003+P013-X35 8 (=S003&WD1/12.9)
Connection
Terminal
Jumper
Terminal
Target
Point
=S003+P017-X58 4 4 =S003+P015-A3-X522 5 (=S003&WD1/8.4)
Function Text Target Terminal Strip Source Designation Cross Reference
=S004+P013-X59 7 5 =S003+P015-A3-X522 6 (=S003&WD1/8.4)
=S003+P017-K4 A1 4 (=S003&WD1/12.5)
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference =S003+P017-K5 A1 5 (=S003&WD1/12.6)
=S003+P017-K6 A1 6 (=S003&WD1/12.7)
=S003+P016-X203
=S003+P017-X203 1 1 =S003+P016-S2 21 (=S003&WD1/3.4)
3 5
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003&TD1/4
Design Document No. - G71053- J5663 (EF-1) Page 4
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 7
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Connection
Connection
Terminal
Terminal
Jumper
Jumper
Terminal
Terminal
Target
Target
Point
Point
Function Text Target Terminal Strip Source Designation Cross Reference Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P017-X37 =S003+P017-X51
24
Disk Brake Reset from ACU =L001+RS001-X35 17 1 =S003+P017-K41 (=S003&WD1/13.4) 1 =S003+P015-F2 2 (=S003&WD1/2.5)
VDC Supply from Protective Panel.
Connection
Terminal
Jumper
Terminal
Target
Point
=S003+P017-K16 A1 4 =L001+RS001-X36 2 (=S003&WD1/13.5)
Function Text Target Terminal Strip Source Designation Cross Reference
MH_Counter Wt. Bypass 5 (=S003&WD1/13.6)
=S003+P017-K42 A1 6 (=S003&WD1/13.6)
=S003+P017-X53
Connection
24V Positive Terminal Strip =S003+P015-X204 3 1 =S003+P015-F2 1 (=S003&WD1/2.3)
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference =S003+P016-G1-X9 1 2 (=S003&WD1/2.3)
=S003+P015-A1-X524 + 3 (=S003&WD1/2.3)
=S003+P015-X204 6 9 (=S003&WD1/2.4)
Connection
Terminal
Jumper
Terminal
Target
Point
=S003+P015-X53 15
Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P015-K17 13 10 (=S003&WD1/2.4)
=S003+P016-Q4 23 11 (=S003&WD1/2.5)
=S003+P017-X39
12 (=S003&WD1/2.5)
=S003+P017-F1 24 1 =S001+P003-X37 1 (=S003&WD1/9.4)
13 (=S003&WD1/2.5)
=S003+P017-X203 9 2 =S001+P003-X37 2 (=S003&WD1/9.4)
14 (=S003&WD1/2.5)
3 =S010+P020-X37 1 (=S003&WD1/9.5)
15 (=S003&WD1/2.5)
=S003+P017-K40 4 4 =S010+P020-X37 2 (=S003&WD1/9.5)
Connection
MH-1 Brake Recifier Panel, LS f/b =S003+P017-X203 19 5 (=S003&WD1/9.6)
Terminal
Jumper
Terminal
Target
Point
MH-1 Brake Recifier Panel, LS f/b 6 (=S003&WD1/9.6) Function Text Target Terminal Strip Source Designation Cross Reference
Jumper
Terminal
Target
Point
=S003+P016-G1-X9 2 2 (=S003&WD1/2.6)
Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P015-A1-X524 M 3 (=S003&WD1/2.7)
=S003+P016-A2-X124 M 4 (=S003&WD1/2.7)
=S003+P017-X42
=S003+P015-X54 5 5 (=S003&WD1/2.7)
=A001+P028-X53 4 1 =S003+P017-S1 21 (=S003&WD1/3.1)
=S003+P016-X54 6 6 (=S003&WD1/2.7)
=A001+P028-X54 4 2 =S003+P017-V1 2 (=S003&WD1/3.1)
=S003+P015-X204 8 7 (=S003&WD1/2.7)
=S003+P015-B1 A2 8 (=S003&WD1/2.7)
=S003+P013-X53 9 9 (=S003&WD1/2.8)
4 6
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003&TD1/5
Design Document No. - G71053- J5663 (EF-1) Page 5
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 7
1 2 3 4 5 6 7 8 9 10
Terminal diagram
=S003+P015-X56 8 8 (=S003&WD1/7.6)
Connection
Terminal
Jumper
Terminal
Target
Point
=S003+P015-X56 9 9 =S003+P015-K12 14 (=S003&WD1/7.6)
Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P015-X56 10 10 =S003+P015-K13 14 (=S003&WD1/7.6)
Connection
11 (=S003&WD1/2.8)
Terminal
Jumper
Terminal
Target
Point
12 (=S003&WD1/2.8) Function Text Target Terminal Strip Source Designation Cross Reference
13 (=S003&WD1/2.8)
14 (=S003&WD1/2.9) =S003+P017-X57
15 (=S003&WD1/2.9) =S003+P015-X57 1 1 =S003+P013-X57 1 (=S003&WD1/8.3)
Connection
Terminal
Jumper
Terminal
Target
Point
=S003+P015-X57 4 4 =S003+P017-K14 14 (=S003&WD1/8.4)
Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P015-X57 5 5 =S003+P017-K16 14 (=S003&WD1/8.4)
Connection
=S003+P015-X55 4 4 =S003+P017-K2 14 (=S003&WD1/7.2)
Terminal
Jumper
Terminal
Target
Point
=S003+P015-X55 5 5 =S005+P013-K3 14 (=S003&WD1/7.2) Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P015-X55 6 6 (=S003&WD1/7.3)
Connection
Terminal
Jumper
Terminal
Target
Point
=S003+P015-X55 13 13 =S003+P015-K7 54 (=S003&WD1/7.4)
Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P015-X55 14 14 =S003+P017-X56 7 (=S003&WD1/7.4)
Connection
=S003+P017-X59
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference =S003+P017-X202 18 18 =S003+P016-X58 6 (=S003&WD1/11.5)
Connection
Terminal
Jumper
Terminal
Target
Point
=S003+P017-X56 Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P015-X56 1 1 =S003+P015-K8 34 (=S003&WD1/7.5)
5 7
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003&TD1/6
Design Document No. - G71053- J5663 (EF-1) Page 6
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 7
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Connection
Connection
Terminal
Terminal
Jumper
Jumper
Terminal
Terminal
Target
Target
Point
Point
Function Text Target Terminal Strip Source Designation Cross Reference Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P017-X65 =S003+P017-X204
=C001+P015-X65 7 8 =S003+P017-K15 44 (=S003&WD1/15.8) Hoist Motor PTC thermistor =S003+P017-K41 2+ 2 =S003+P015-X204 1 (=S003&WD1/4.7)
Connection
Terminal
Jumper
Terminal
Target
Point
=S003+P017-K40 4 =S003+P015-X204 4 (=S003&WD1/7.2)
Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P015-X204 5 5 =S003+P017-K40 (=S003&WD1/8.3)
Connection
Terminal
Jumper
Terminal
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P017-K43 1- 9 =S003+P015-X204 9 (=S003&WD1/11.3)
Connection
Terminal
Jumper
Terminal
=S003+P016-X203 1 1 =S003+P017-S1 21 (=S003&WD1/3.3)
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P016-X203 2 2 =S003+P017-V1 2 (=S003&WD1/3.3)
3 =S003+P017-K15 14 (=S003&WD1/4.2)
=S003+P017-X207
=S003+P015-X203 5 5 =S003+P017-K40 (=S003&WD1/4.6)
=S003+P015-X207 1 1 =S003+P017-Q2 4 (=S003&WD1/3.9)
=S003+P015-B1 Y2 6 =S003+P017-K40 (=S003&WD1/4.6)
=S003+P015-X207 2 2 =S003+P017-Q2 6 (=S003&WD1/3.9)
=S003+P015-X203 7 7 =S003+P017-K41 (=S003&WD1/12.8)
Connection
=S003+P017-K6 A2 8 =S003+P015-X203 8 (=S003&WD1/12.8)
Terminal
Jumper
Terminal
Target
Point
=S003+P017-K15 A2 Function Text Target Terminal Strip Source Designation Cross Reference
Connection
Terminal
Jumper
Terminal
Target
Point
=S005+P013-X203 15 15 =S003+P017-K2 23 (=S005&WD1/13.2)
Function Text Target Terminal Strip Source Designation Cross Reference
=S005+P013-X35 17 17 =S003+P017-K3 23 (=S005&WD1/13.3)
Connection
Terminal
Jumper
Terminal
=S003+P015-X203 15 21 =S003+P017-F1 23 (=S003&WD1/9.3)
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P017-Q2 13 22 =S003+P015-X203 16 (=S003&WD1/9.3)
=S003+P018-X57
=S005+P013-K41 18 =S003+P013-X57 18 (=S005&WD1/12.6)
6 =S004&EQ1/1
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S003
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Main Hoist-1
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S003&TD1/7
Design Document No. - G71053- J5663 (EF-1) Page 7
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 7
1 2 3 4 5 6 7 8 9 10
Equipment list
Type No. Description Qty Supplier/Make Device Tag Cross Reference Remarks
5SX42167RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 16A ,Breaking Capacity 10 KA 1 Siemens =S004+P013-F1 (=S004&WD1/1.3)
5SX42047RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 04A ,Breaking Capacity 10 KA 1 Siemens =S004+P013-F2 (=S004&WD1/1.7)
MF42010A EMI Filter: Rated Voltage 230V AC (1 Phase), Rated Current 10A 1 EMI solutions =S004+P014-V1 (=S004&WD1/2.2)
DULUXSTAR T4 3U 20W-865 E27-HPF CFL,240V AC,18W (DULUXSTAR T4 3U 20W-865 E27-HPF) 1 Osram =S004+P014-H1 (=S004&WD1/2.3)
MF42010A EMI Filter: Rated Voltage 230V AC (1 Phase), Rated Current 10A 1 EMI solutions =S004+P013-V2 (=S004&WD1/2.4)
DULUXSTAR T4 3U 20W-865 E27-HPF CFL,240V AC,18W (DULUXSTAR T4 3U 20W-865 E27-HPF) 1 Osram =S004+P013-H3 (=S004&WD1/2.4)
DULUXSTAR T4 3U 20W-865 E27-HPF CFL,240V AC,18W (DULUXSTAR T4 3U 20W-865 E27-HPF) 1 Osram =S004+P013-H4 (=S004&WD1/2.5)
MF42010A EMI Filter: Rated Voltage 230V AC (1 Phase), Rated Current 10A 1 EMI solutions =S004+P012-V1 (=S004&WD1/2.6)
DULUXSTAR T4 3U 20W-865 E27-HPF CFL,240V AC,18W (DULUXSTAR T4 3U 20W-865 E27-HPF) 1 Osram =S004+P012-H1 (=S004&WD1/2.7)
3RV10211DA10 MPCB 3RV: Rated Voltage 415V,Rated current 3.2A,overload release 2.2 - 3.2A,s/c release 38A,Breaking Capacity 100kA 1 Siemens =S004+P013-Q2 (=S004&WD1/2.9)
3RN10221DW00 Monitoring Relays: Thermistor Motor Protection rated control voltage 24 ... 240 V AC/DC, for PTC thermistor 1 Siemens =S004+P013-B1 (=S004&WD1/3.5)
6SL33201TG388AA0 Sinamics S120 Single Motor Module in chassis format: Voltage 675-1035 V DC,Power 900kW,O/P Current 910A,Frame Size:JX 1 Siemens =S004+P012-G1 (=S004&WD1/4.3)
3KA84413UE00 Swicth Disconnector 3KA: Rated volatge 690V,Rated Current 1000A 1 Siemens =S004+P013-Q1 (=S004&WD1/4.3)
3KX35821YC Auxiliary Switch (1NO+1NC) for 3KT841/42/43 and 3KL841/42/43 and 3KA8431/44/45/46 1 Siemens =S004+P013-Q1 (=S004&WD1/4.3)
HOG10D-1024I+FSL 1
Pulse Encoder, 1024 Pulses per Revolution, hollow-shaft incremental encoder (Digital-Tacho) with mechanical centrifugal switch FSL.Enter the FSL rpm in rema HUBNER =S004+P013-G2 (=S004&WD1/5.2)
rks.
6SL30401MA000AA0 SINAMICS CONTROL UNIT CU320-2 DP WITH PROFIBUS INTERFACE WITHOUT COMPACT FLASH CARD 1 Siemens =S004+P012-A1 (=S004&WD1/6.2)
6SL30540ED001BA0 SINAMICS S120 COMPACTFLASH CARD W/O PERFORMANCE EXTENSION INCLUDING CERTIFICATE OF LICENCE V4.03 1 Siemens =S004+P012-A1 (=S004&WD1/6.2)
6ES79720BA410XA0 1
SIMATIC DP,BUS CONNECTOR FOR PROFIBUS UP TO 12 MBIT/S WITH TILTED OUTGOING CABLE, 15,8 X 54 X 39,5 MM (WXHXD), TERMINAT. RESIST. WITH Siemens =S004+P012-A1 (=S004&WD1/6.2)
ISOLAT. FUNCTION, WITHOUT PG SOCKET
6FX20021DC001AB0 Signal Cable, Pre assembled(Sinamics Drive CliQ), Length 1.0 m; 3 Siemens =S004+P012-A1 (=S004&WD1/6.2)
6FX80021AA011AE0 AOP Cable-RS232 4m plug-in cable ( AOP30 & CU320 ) 1 Siemens =S004+P012-OP1 (=S004&WD1/6.8)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =S004+P013-K15 (=S004&WD1/10.3)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S004+P013-K15 (=S004&WD1/10.3)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =S004+P013-K15 (=S004&WD1/10.3)
=S004+P013-K15 (=S004&WD1/10.3)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =S004+P013-K15 (=S004&WD1/10.3)
=S004+P013-K15 (=S004&WD1/10.3)
=S003&TD1/7 2
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Equipment List Sales Order No. - 3002447129 Current Project Status - As Commissioned = S004
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & EQ1
Function - Main Hoist-2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S004&EQ1/1
Design Document No. - G71053- J5663 (EF-1) Page 1
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 2
1 2 3 4 5 6 7 8 9 10
Equipment list
Type No. Description Qty Supplier/Make Device Tag Cross Reference Remarks
3TF69440CM7 Power Contactor: 3 Pole, Size 14, 820A AC3 upto 415V AC and 910A AC1 upto 690V AC, Auxiliary contacts 4NO+4NC, Coil Voltage: 220-240V AC 50/60Hz1 Siemens =S004+P013-K16 (=S004&WD1/10.5)
3SB14012WZ3 Wide band LED pilot light(Red) for AC 42 to 240V and DC 42 to 220V 1 Siemens =S004+P013-H1 (=S004&WD1/10.7)
3SB12002AB01 Selector Switch with P.F.R. 2 positions maintained (Black) 1 Siemens =S004+P012-Q1 (=S004&WD1/10.8)
3SB14000A Contact block rear connection for PB/SS (1NO+1NC) 2 Siemens =S004+P012-Q1 (=S004&WD1/10.8)
=S004+P012-Q1 (=S004&WD1/10.8)
1 &WD1/1
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Equipment List Sales Order No. - 3002447129 Current Project Status - As Commissioned = S004
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & EQ1
Function - Main Hoist-2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S004&EQ1/2
Design Document No. - G71053- J5663 (EF-1) Page 2
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 2
1 2 3 4 5 6 7 8 9 10
=S004+P013-X31 1 2
2 4 13 21 24
=S004+P013-F1
1NO+1NC
240 VAC Supply MCB 1 3 14 22 23
24 VDC Supply from Protective Panel.
(/8.3)
2.5 mm²
GRAY
=S004+P013-X51 1 2
2 4 13 21 24
=S004+P013-F2
2.5 mm² 04A
24 VDC Power Supply MCB 1 3 14 22 23
(/8.3)
=S004+P013-X33 1 2 3 4 5 6 7 8 9 10 =S004+P013-X34 1 2 3 4 5 6 7 8 9 10
2.5 mm²
/ -L240:1
(8.2) / -L240:2
(10.2) / -L240:3
/ -L240:4
(3.3) / S4-X33-5
(8.7) / -L240:6
/ -L240:7
/ -L240:8
/ -L240:9
/ -L240:10
/ -N240:1
(8.2) / -N240:2
(10.2) / -N240:3
(10.6) / -N240:4
/ -N240:5
(3.3) / -N240:6
/ -N240:7
/ -N240:8
/ -N240:9
/ -N240:10
240V AC Distribution bus
2.5 mm²
=S004+P013-X53 1 2 3 4 5 6 7 8 9 10 11 12 =S004+P013-X54 1 2 3 4 5 6 7 8 9 10 11 12
(4.7) / P24-1
(4.4) / -P24:2
(5.2) / -P24:3
(6.2) / -P24:4
(6.2) / -P24:5
(7.8) / -P24:6
(3.7) / X53-7
(7.3) / -P24:8
(11.3) / -P24:9
/ -P24:10
/ -P24:11
/ -P24:12
(4.6) / M24-1
(4.5) / -M24:2
(5.3) / -M24:3
(6.2) / -M24:4
(6.8) / -M24:5
(7.8) / -M24:6
(9.2) / -M24:7
(3.7) / X54.8
/ -M24:9
/ -M24:10
/ -M24:11
/ -M24:12
24V DC Distribution bus
&EQ1/2 2
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Power Distribution Sales Order No. - 3002447129 Current Project Status - As Commissioned = S004
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P013 & WD1
Function - Main Hoist-2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S004+P013&WD1/1
Design Document No. - G71053- J5663 (EF-1) Page 1
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 11
1 2 3 4 5 6 7 8 9 10
(=A001/5.6) / =A001-Y_MH2
(=A001/5.3) / =A001-R_MH2
=S004+P013-X16 1 2
6 mm²
6 mm²
DB:L 1 3 5 13 21
1 =S004+P013-Q2
(=A001/10.2) / =A001-L_5
2.2-3.2A
=S004+P013-X42 MH-2 fan supply 14 22
(/8.3)
I> I> I>
2 4 6
21 21 21
=S004+P014-S1 =S004+P013-S2 =S004+P012-S1
Door Limit Switches Door Limit Switch Door Limit Switch
22 22 22
CFL CFL CFL CFL
1.5 mm² 240V AC,18W 1.5 mm² 240V AC,18W 240V AC,18W 1.5 mm² 240V AC,18W
LI LO =S004+P014-H1 LI LO =S004+P013-H3 =S004+P013-H4 LI LO =S004+P012-H1
x1 x1 x1 x1
1.5 mm² 1.5 mm² 1.5 mm² 1.5 mm² 6 mm²
PE PE PE
L1
L2
DB:N
2
(4.6) / MH2_FAN_R
(4.6) / MH2_FAN_Y
(=A001/10.5) / =A001-N_5
=S004+P013-X42
1 3
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Panel Auxiliary Circuits Sales Order No. - 3002447129 Current Project Status - As Commissioned = S004
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P013 & WD1
Function - Main Hoist-2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S004+P013&WD1/2
Design Document No. - G71053- J5663 (EF-1) Page 2
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 11
1 2 3 4 5 6 7 8 9 10
-RESET_MPR1 / (8.6)
-RESET_MPR2 / (8.6)
X53-7 / (1.6)
(1.2) (1.5)
S4-X33-5 -N240:6
Alarm
H3 H2 Trip
13 Contact Contact
=S004+P013-K15
MH-2 Brake Cont. N N
(/10.3) 14 K1 H1 K2
2.5 SQ mm²
GRAY T/R
MPR_TRIP / (9.3)
=S004+P013-X251 1 2 3
X54.8 / (1.9)
=S004+P013-X37 1 2
D11
PTC TRIP
Supply To Brake Coil
PTC TRIP
PTC TRIP
2 4
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Field Auxillaries Sales Order No. - 3002447129 Current Project Status - As Commissioned = S004
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P013 & WD1
Function - Main Hoist-2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S004+P013&WD1/3
Design Document No. - G71053- J5663 (EF-1) Page 3
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 11
1 2 3 4 5 6 7 8 9 10
(2 x 50 x 10 Cu) Busbar
(=S002/10.3) / D_MH2
(=S002/10.2) / C_MH2
1 3 5
13 21
=S004+P013-Q1
1000A
MH2-Input Isolator 14 22
2 4 6
(/7.4)
=S004+P012-G1
900kW,910A
MH-2
DCP DCN DCPA DCNA DCPS DCNS
DC LINK
LED
SINAMICS S120 H200
P24V_1
AC
M1_1
(380-480V AC/
EP EP Temp Temp
NC
NC
NC
NC
500-690V AC)
M1 +24V - +
U1 V1 W1 PE1
1 2 3 4 5 6 L1 L2 1 2 3 4
-MH2_EP2 / (8.4)
-PE
1 3 5 -MH2_EP1 / (8.4)
2.5 SQ mm²
=S004+P013-K43 GRAY
820A 2 4 6
(/10.5)
(1.5) / -P24:2
(1.8) / -M24:2
(2.9) / -MH2_FAN_R
(2.9) / -MH2_FAN_Y
(1.8) / M24-1
(1.5) / P24-1
(=S005/4.3) / =S005-MH2_U1
From MH-STD
(=S005/4.3) / =S005-MH2_V1
(=S005/4.3) / =S005-MH2_W1
=S004+P013-X17 1 2 3 4
U1 V1 W1
=S004+P013-MH-2 M
Main Hoist
600KW at 690V
3~
744 rpm
PE
Rated current 642A
IP55
3 5
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - MH-2 Sales Order No. - 3002447129 Current Project Status - As Commissioned = S004
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P015 & WD1
Function - Main Hoist-2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S004+P015&WD1/4
Design Document No. - G71053- J5663 (EF-1) Page 4
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 11
1 2 3 4 5 6 7 8 9 10
=S004+P013-G2
1024 PPR
(+)
(-)
G
K1
K1-
K2
K2-
D11
SMC 30
(=S005/6.2) / MH2_ENC_K2- =S005-P5 / (=S005/6.5)
(=S005/6.2) / MH2_ENC_K2
(=S005/6.2) / MH2_ENC_K1- =S005-M5 / (=S005/6.5)
(=S005/6.2) / MH2_ENC_K1
/(5.3)
=S004+P013-A1
SMC30 -X521 1 2 3 4 5 6 7 8 -X531 1 2 3 4 5 6 7 8
MH-2
A
A*
B*
R*
CTRL
P_Enc 5/24V
-Temp
+Temp
Res.
Res.
Res.
Res.
M_Enc
Encoder conn. 2 for HTL/TTL Encoder conn. 2 for HTL/TTL
LED READY
M_Enc(M)
+24V M
M_Sense
P_Sense
Res.
Res.
Res.
Res
R*
A*
B*
R
A
B
+ + M M 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
(1.5) / -P24:3
(1.8) / -M24:3
(5.7)/
4 6
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - SMC30 Sales Order No. - 3002447129 Current Project Status - As Commissioned = S004
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P013 & WD1
Function - Main Hoist-2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S004+P013&WD1/5
Design Document No. - G71053- J5663 (EF-1) Page 5
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 11
1 2 3 4 5 6 7 8 9 10
=S003+P013-X204 1
=S004+P013-X204 1
=S004+P013-X204 2 2 =S003+P017-X204
(1.5) / -P24:5
43
=S003+P017-K4
(8.3) / OFF1_CHAIN1 Counter wt. LS 23 23
23 (=S003/12.5) 44
=S003+P017-K1 =S003+P015-K8 =S003+P015-K12
(8.3) / OFF1_CHAIN2 MH2_MPR_TRIP1 / (9.3)
Safety Brake Hoist(Step 1) Step 4
(8.3) / OFF2_CHAIN1 43 (=S003/16.4) 24 (=S003/16.8) 24 MH2_MPR_TRIP2 / (9.4)
Check Back 24
(=S003/12.2) =S003+P017-K6
(8.4) / OFF2_CHAIN2 23
End Limit switch
=S003+P015-K11
43(=S003/12.7) 44
13 Step 3
=S003+P017-K5 (=S003/16.7)
=S003+P017-K3 24 RESET1 / (8.5)
Pre Limit switch 23
Encoder Overspeed (=S003/12.6) 44 23 RESET2 / (8.5)
=S003+P015-K9
Switch 2 14 =S003+P015-K13
-M24:5 / (1.8)
(=S003/12.4) Lower (Step 1)
(=S003/16.5) 24 Step 5
=S004+P015-X55 13 (=S003/16.9) 24
=S005+P013-K2
13 D11 23
Stdby as =S003+P015-K10
MH-1 Selection 14 Step 2
(=S005/13.3) (=S003/16.6) 24
=S004+P015-X56
=S004+P017-X55 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14
15
=S004+P013-X52
=S004+P013-X55 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14
=S004+P012-OP1
AOP30 for MH
=S004+P012-A1
CU320-2 -X122 1 2 3 4 5 6 7 8 9 10 11 12 13 14 -X132 1 2 3 4 5 6 7 8 9 10 11 12 13 14
CU320-2_MH-2
DI 0
DI 1
DI 2
DI 3
DI 16
DI 17
M1
DI/DO 8
DI/DO 9
DI/DO 10
DI/DO 11
DI 4
DI 5
DI 6
DI 7
DI 20
DI 21
M2
DI/DO 12
DI/DO 13
DI/DO 14
DI/DO 15
M
SINAMICS G130
Advanced Operating Panel AOP30
+ + M M 2 3 5
-PE
(1.5) / -P24:4
(1.8) / -M24:4
5 7
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - CU 320 Sales Order No. - 3002447129 Current Project Status - As Commissioned = S004
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P013 & WD1
Function - Main Hoist-2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S004+P013&WD1/6
Design Document No. - G71053- J5663 (EF-1) Page 6
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 11
1 2 3 4 5 6 7 8 9 10
=S004+P013-X204 3 4
=S004+P017-X204
(1.6) / -P24:8
43
=S003+P017-K16
=S003-MH1_INV_READY3 / (=S003/10.6)
Position-3
MH_Counter Wt. Bypass 44 53 =S003-MH1_INV_READY4 / (=S003/10.6)
Int. Cont. =S005+P013-K45
83 =S003-MH1_INV_RUN3 / (=S003/11.3)
(=S003/13.5) Std as
=S005+P013-K42
OFF Selection 54 =S003-MH1_INV_RUN4 / (=S003/11.4)
(MH-1+MH-2) (=S005/13.10)
Selection 84 =S005-MH_STD_INV_READY3 / (=S005/12.4)
(=S005/13.6)
13 23 =S005-MH_STD_INV_READY4 / (=S005/12.4)
=S004+P013-Q1 =S004+P012-Q1
(8.6) / MH_BRAKE1_1 =S005-MH_STD_INV_RUN3 / (=S005/12.6)
1NO+1NC Position-1
(8.6) / MH_BRAKE1_2 MH2-Input Isolator 14 RUN/Maint. 24 =S005-MH_STD_INV_RUN4 / (=S005/12.6)
(/4.3) (/10.8)
13
=S005+P013-K44
31 (8.4) / MH_STD_ISO1
MH-2 Mode Selection
(=S005/13.8)
=S005+P013-K3
14 (8.5) / MH_STD_ISO2
-M24:6 / (1.9)
-P24:6 / (1.6)
Std. as
43 MH-2 Selection 32
=S003+P017-K14 (=S005/13.4)
Position-3
Safety Brake Reset 44
Int. Cont. MH2_O/P_CONT_1 / (8.7)
(=S003/13.4)
=S004+P017-X58 5 6
MH2_O/P_CONT_2 / (8.7)
=S004+P017-X57 4 5
10 10
=S004+P013-X57 1 2 3 4 5 6 7 8 9 =S004+P013-X58 1 2 3 4 5 6 7 8 9
=S004+P013-A2
TM15 -X520 1 2 3 4 5 6 7 8 9 10 -X521 1 2 3 4 5 6 7 8 9 10 -X524 + + M M
DRIVE-CLiQ
TM15 Module
L1+
DI/DO 0
DI/DO 1
DI/DO 2
DI/DO 3
DI/DO 4
DI/DO 5
DI/DO 6
DI/DO 7
M1
L2+
DI/DO 8
DI/DO 9
DI/DO 10
DI/DO 11
DI/DO 12
DI/DO 13
DI/DO 14
DI/DO 15
M2
+24V M
External source
24V DC
SINAMICS S120
Terminal Module TM15
-X522
L3+
DI/DO 16
DI/DO 17
DI/DO 18
DI/DO 19
DI/DO 20
DI/DO 21
DI/DO 22
DI/DO 23
M3
-PE
1 2 3 4 5 6 7 8 9 10
83 =S005+P013-K2
MH-2
ER/BR from Stdby as D11
Field 84
MH-1 Selection
(=S005/13.3)
(9.9) / OUT_CONT
(9.5) / MH2_INV_READY
(9.7) / MH2_INV_RUN
(9.3) / BRAKE_OPEN
(=S003/13.8) / =S003-OS_BYPASS_2
6 8
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - TM15 Sales Order No. - 3002447129 Current Project Status - As Commissioned = S004
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P013 & WD1
Function - Main Hoist-2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S004+P013&WD1/7
Design Document No. - G71053- J5663 (EF-1) Page 7
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 11
1 2 3 4 5 6 7 8 9 10
2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm²
(1.1) / -L240:2
=S004+P013-X39 5 (1.2)
L240:6
=S004+P013-X39 1
=S005-OUT_CONT2_3 / (=S005/11.8)
2.5 SQ mm²
=S005-OUT_CONT2_4 / (=S005/11.8) GRAY
2.5 mm²
43
2.5 mm² =S004+P013-K15
MH-2 Brake Cont.
(/10.3) 44
=S004+P013-K40
8-CH 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8
Relay Board
P1 O1 C1 P1 O1 C1 P2 O2 C2 P2 O2 C2 P3 O3 C3 P3 O3 C3 P4 O4 C4 P4 O4 C4 P5 O5 C5 P5 O5 C5 P6 O6 C6 P6 O6 C6 P7 O7 C7 P7 O7 C7 P8 O8 C8 P8 O8 C8
1 1 1 2 2 2 1 1 1 2 2 2 1 1 1 2 2 2 1 1 1 2 2 2 1 1 1 2 2 2 1 1 1 2 2 2 1 1 1 2 2 2 1 1 1 2 2 2
2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm²
(6.2) / -OFF1_CHAIN1
(6.2) / -OFF1_CHAIN2
(6.2) / -OFF2_CHAIN1
(6.2) / -OFF2_CHAIN2
(4.7) / MH2_EP1
(4.7) / MH2_EP2
(7.5) / MH_STD_ISO1
(7.5) / MH_STD_ISO2
(6.8) / RESET1
(6.8) / RESET2
(3.7) / RESET_MPR1
(3.7) / RESET_MPR2
(7.3) / MH_BRAKE1_1
(7.3) / MH_BRAKE1_2
(=S005/11.5) / MH2_STD_BRAKE1
(=S005/11.5) / MH2_STD_BRAKE2
(7.5) / MH2_O/P_CONT_1
(7.5) / MH2_O/P_CONT_2
(=S005/9.2) / MH2_O/P_CONT_3
(=S005/9.2) / MH2_O/P_CONT_4
OFF 1 Chain Common OFF 2 Reset Command MH-2 Brake MH-2
Chain Open f/b Contactor f/b
7 9
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Relay Board Sales Order No. - 3002447129 Current Project Status - As Commissioned = S004
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P013 & WD1
Function - Main Hoist-2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S004+P013&WD1/8
Design Document No. - G71053- J5663 (EF-1) Page 8
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 11
1 2 3 4 5 6 7 8 9 10
MH2_INV_READY / (7.4)
MH2_INV_RUN / (7.4)
-BRAKE_OPEN / (7.4)
OUT_CONT / (7.3)
MPR_TRIP / (3.8)
2.5 mm²
(1.9) / -M24:7
=S004+P013-K41
8-CH
Relay Board 1+ 1- 2+ 2- 3+ 3- 4+ 4- 5+ 5- 6+ 6- 7+ 7- 8+ 8-
P1 O1 C1 P2 O2 C2 P3 O3 C3 P4 O4 C4 P5 O5 C5 P6 O6 C6 P7 O7 C7 P8 O8 C8
=S004+P013-X57 15 17
2.5 mm² 2.5 mm² 2.5 mm²
(10.3) / MH2_BO1
(10.3) / MH2_BO2
(6.8) / MH2_MPR_TRIP1
(6.8) / MH2_MPR_TRIP2
(=S005/9.5) / MH_STD_MPR_TRIP1
(=S005/9.5) / MH_STD_MPR_TRIP2
(=S005/9.7) / MH2_INV_READY1
(=S005/9.7) / MH2_INV_READY2
(=S003/8.7) / MH2_INV_READY3
(=S003/8.7) / MH2_INV_READY4
(=S005/9.7) / MH2_INV_RUN1
(=S005/9.7) / MH2_INV_RUN2
(=S003/8.7) / MH2_INV_RUN3
(=S003/8.7) / MH2_INV_RUN4
(10.5) / OUT_CONT_1
(10.5) / OUT_CONT_2
Brake Open MPR trip MPR trip MH2_Ready MH2_Ready MH2_Run MH2_Run
Command f/b to MH-1 f/b to MH-STD f/b to Mh_STD f/b to MH1 f/b to MH_STD f/b to MH1
8 10
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Relay Board Sales Order No. - 3002447129 Current Project Status - As Commissioned = S004
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P013 & WD1
Function - Main Hoist-2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S004+P013&WD1/9
Design Document No. - G71053- J5663 (EF-1) Page 9
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 11
1 2 3 4 5 6 7 8 9 10
2.5 mm²
1 2
23 11 43 31
=S004+P012-Q1
2-way(Black)
OUT_CONT_1 / (9.9) RUN/Maint. 24 12 44 32
(/7.6)
(=S005/12.2) / =S005-MH_STD_BO3 MH2_BO1 / (9.3) OUT_CONT_2 / (9.9)
(=S005/12.2) / =S005-MH_STD_BO4 MH2_BO2 / (9.3)
2.5 mm²
2.5 mm²
(=S001/15.3) / =S001-DC_MH-2
2.5 mm²
2.5 mm²
=S004+P013-X39 9
2.5 SQ mm²
GRAY X1
=S004+P013-H1
Lamp_Red
DC LINK CHARGED X2
A1 A1
U U
=S004+P013-K15 =S004+P013-K43
240V AC A2 820A, 240V AC A2
MH-2 Brake Cont. MH-2 O/P Contactor
2.5 mm²
13 14 (/3.3) 1 3 5
21 22 (/4.3)
31 32
43 44 (/8.6) 2 4 6
53 54 (/11.5) 13 14 (/11.6)
61 62 21 22
71 72 31 32
83 84 43 44
53 54 (/8.7)
61 62
71 72
83 84
9 11
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Control Logic Sales Order No. - 3002447129 Current Project Status - As Commissioned = S004
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P013 & WD1
Function - Main Hoist-2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S004+P013&WD1/10
Design Document No. - G71053- J5663 (EF-1) Page 10
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 11
1 2 3 4 5 6 7 8 9 10
(1.6) / P24:9
53 13
=S004+P013-K15 =S004+P013-K43
MH-2 Brake Cont. MH-2 O/P Contactor
(/10.3) 54 (/10.5) 14
=S004+P013-X62 10 11
=S004+P015-X62 10 11
10 &TD1/1
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - To PLC Sales Order No. - 3002447129 Current Project Status - As Commissioned = S004
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P013 & WD1
Function - Main Hoist-2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S004+P013&WD1/11
Design Document No. - G71053- J5663 (EF-1) Page 11
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 11
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Connection
Connection
Terminal
Terminal
Jumper
Jumper
Terminal
Terminal
Target
Target
Point
Point
Function Text Target Terminal Strip Source Designation Cross Reference Function Text Target Terminal Strip Source Designation Cross Reference
=S004+P013-X16 =S004+P013-X34
=A001+P029-X31 4 1 =S004+P013-Q2 1 (=S004&WD1/2.9) 220V Neutral Terminal Strip 1 =S004+P013-F1 3 (=S004&WD1/1.4)
=S004+P013-K40 1 2 (=S004&WD1/1.4)
Connection
Terminal
Jumper
Terminal
Target
Point
=S004+P013-K15 A2 3 (=S004&WD1/1.4)
Function Text Target Terminal Strip Source Designation Cross Reference
=S004+P013-H1 X2 4 (=S004&WD1/1.4)
5 (=S004&WD1/1.4)
=S004+P013-X17
=S004+P013-X37 2 6 (=S004&WD1/1.5)
1 =S004+P013-K16 2 (=S004&WD1/4.3)
7 (=S004&WD1/1.5)
=S005+P013-K49 2
8 (=S004&WD1/1.5)
=A001+P029-X32 4 2 =S004+P013-Q2 5 (=S004&WD1/2.9)
9 (=S004&WD1/1.5)
2 =S004+P013-K16 4 (=S004&WD1/4.3)
10 (=S004&WD1/1.5)
=S005+P013-K49 4
Connection
3 =S004+P013-K16 6 (=S004&WD1/4.4)
Terminal
Jumper
Terminal
Target
Point
=S005+P013-K49 6 Function Text Target Terminal Strip Source Designation Cross Reference
=S004+P013-X37
Connection
Terminal
Jumper
Terminal
Target
Point
Mh- Brake Coil Supply 1 =S004+P013-K15 14 (=S004&WD1/3.3)
Function Text Target Terminal Strip Source Designation Cross Reference
2 =S004+P013-X34 6 (=S004&WD1/3.3)
Connection
=S004+P013-X31
Terminal
Jumper
Terminal
Target
Point
1 =S004+P013-F1 2 (=S004&WD1/1.3) Function Text Target Terminal Strip Source Designation Cross Reference
2 =S004+P013-F1 4 (=S004&WD1/1.3)
=S004+P013-X39
Connection
Terminal
Jumper
Terminal
Target
Point
Connection
8 (=S004&WD1/1.3)
Terminal
Jumper
Terminal
Target
Point
9 (=S004&WD1/1.3) Function Text Target Terminal Strip Source Designation Cross Reference
10 (=S004&WD1/1.3)
=S004+P013-X42
=A001+P028-X53 5 1 =S004+P014-S1 21 (=S004&WD1/2.2)
&WD1/11 2
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S004
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Main Hoist-2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S004&TD1/1
Design Document No. - G71053- J5663 (EF-1) Page 1
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 5
1 2 3 4 5 6 7 8 9 10
Terminal diagram
=S004+P013-B1 A1 7 (=S004&WD1/1.6)
Connection
Terminal
Jumper
Terminal
Target
Point
=S004+P013-X204 3 8 (=S004&WD1/1.6)
Function Text Target Terminal Strip Source Designation Cross Reference
=S004+P013-K15 53 9 (=S004&WD1/1.6)
10 (=S004&WD1/1.6)
=S004+P013-X42
11 (=S004&WD1/1.7)
=A001+P028-X54 5 2 =S004+P014-V1 NI (=S004&WD1/2.2)
12 (=S004&WD1/1.7)
Connection
Terminal
Jumper
Terminal
Target
Connection
Point
Terminal
Function Text Target Terminal Strip Source Designation Cross Reference
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S004+P013-X51
=S004+P013-X54
1 =S004+P013-F2 2 (=S004&WD1/1.7)
24V Negative Terminal Strip =S004+P012-G1-X41 1 1 =S004+P013-F2 3 (=S004&WD1/1.8)
2 =S004+P013-F2 4 (=S004&WD1/1.8)
=S004+P012-G1-X9 2 2 (=S004&WD1/1.8)
Connection
Terminal
Jumper
Terminal
=S004+P013-A1-X524 M 3 (=S004&WD1/1.8)
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S004+P012-A1-X124 M 4 (=S004&WD1/1.8)
=S004+P015-X56 14 5 (=S004&WD1/1.8)
=S004+P013-X52
=S004+P013-A2-X524 M 6 (=S004&WD1/1.9)
=S004+P012-A1-X132 1 1 =S004+P015-X56 1 (=S004&WD1/6.5)
=S004+P013-K41 1- 7 (=S004&WD1/1.9)
=S004+P012-A1-X132 2 2 =S004+P015-X56 2 (=S004&WD1/6.5)
=S004+P013-B1 A2 8 (=S004&WD1/1.9)
=S004+P012-A1-X132 3 3 =S004+P015-X56 3 (=S004&WD1/6.5)
9 (=S004&WD1/1.9)
=S004+P012-A1-X132 4 4 =S004+P015-X56 4 (=S004&WD1/6.6)
10 (=S004&WD1/1.9)
=S004+P012-A1-X132 5 5 =S004+P015-X56 5 (=S004&WD1/6.6)
11 (=S004&WD1/1.10)
=S004+P012-A1-X132 6 6 =S004+P015-X56 6 (=S004&WD1/6.6)
12 (=S004&WD1/1.10)
=S004+P012-A1-X132 7 7 =S004+P015-X56 7 (=S004&WD1/6.6)
Connection
Terminal
Jumper
Terminal
=S004+P012-A1-X132 8 8 =S004+P015-X56 8 (=S004&WD1/6.6)
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S004+P012-A1-X132 9 9 =S004+P015-X56 9 (=S004&WD1/6.7)
Jumper
Terminal
Point
1 3
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S004
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Main Hoist-2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S004&TD1/2
Design Document No. - G71053- J5663 (EF-1) Page 2
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 5
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Connection
Connection
Terminal
Terminal
Jumper
Jumper
Terminal
Terminal
Target
Target
Point
Point
Function Text Target Terminal Strip Source Designation Cross Reference Function Text Target Terminal Strip Source Designation Cross Reference
=S004+P013-X55 =S004+P013-X59
=S004+P012-A1-X122 14 14 =S004+P017-X55 14 (=S004&WD1/6.4) =S004+P013-A2-X520 1 1 =S004+P013-A2-X522 2 (=S004&WD1/7.3)
Connection
Terminal
Jumper
Terminal
Target
Point
3 =S004+P013-A2-X522 4 (=S004&WD1/7.3)
Function Text Target Terminal Strip Source Designation Cross Reference
=S004+P013-K41 4+ 4 =S004+P013-A2-X522 5 (=S004&WD1/7.4)
Connection
=S004+P013-A2-X520 10 9 =S004+P013-X58 9 (=S004&WD1/7.5)
Terminal
Jumper
Terminal
Target
Point
=+ 10 (=S004&WD1/7.5) Function Text Target Terminal Strip Source Designation Cross Reference
Connection
Terminal
Jumper
Terminal
Target
Point
=S004+P015-X62 11 11 =S004+P013-K16 14 (=S004&WD1/11.6)
Function Text Target Terminal Strip Source Designation Cross Reference
Connection
Terminal
Jumper
Terminal
Target
Point
=S004+P013-X58 Function Text Target Terminal Strip Source Designation Cross Reference
Connection
Terminal
Jumper
Terminal
Target
Point
=S004+P013-A2-X521 9 8 =S005+P013-K41 (=S004&WD1/7.7)
Function Text Target Terminal Strip Source Designation Cross Reference
=S004+P013-A2-X521 10 9 =S004+P013-X57 9 (=S004&WD1/7.7)
=S004+P013-A2-X524 M
=S004+P013-X251
=+ 10 (=S004&WD1/7.7)
Hoist Motor PTC thermistor =+ 1 =S004+P013-B1 1T1 (=S004&WD1/3.7)
=+ 2 =S004+P013-B1 T2 (=S004&WD1/3.7)
3 (=S004&WD1/3.7)
2 4
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S004
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Main Hoist-2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S004&TD1/3
Design Document No. - G71053- J5663 (EF-1) Page 3
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 5
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Connection
Connection
Terminal
Terminal
Jumper
Jumper
Terminal
Terminal
Target
Target
Point
Point
Function Text Target Terminal Strip Source Designation Cross Reference Function Text Target Terminal Strip Source Designation Cross Reference
=S004+P014-X58 =S004+P015-X62
=S004+P017-X58 5 5 =S003+P017-K41 (=S003&WD1/10.6) 10 =S004+P013-X62 10 (=S004&WD1/11.5)
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S004+P015-X53
=S003+P015-X204 13 13 =S003+P015-X53 12 (=S003&WD1/8.7) =S004+P017-X55
=S003+P015-X204 14 =S004+P013-X55 1 1 =S004+P013-K40 (=S004&WD1/6.2)
Connection
Terminal
Jumper
Terminal
Target
Point
=S004+P013-X55 3 3 =S003+P017-K1 24 (=S004&WD1/6.2)
Function Text Target Terminal Strip Source Designation Cross Reference
=S004+P013-X55 4 4 =S003+P017-K3 14 (=S004&WD1/6.3)
Connection
Terminal
Jumper
Terminal
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S004+P013-X55 10 10 =S003+P017-K5 44 (=S004&WD1/6.4)
=S004+P013-X55 11 11 (=S004&WD1/6.4)
=S004+P015-X56
=S004+P013-X55 12 12 =S003+P017-K6 44 (=S004&WD1/6.4)
=S004+P013-X52 1 1 =S003+P015-K8 24 (=S004&WD1/6.5)
=S004+P013-X55 13 13 =S004+P015-X55 13 (=S004&WD1/6.4)
=S004+P013-X52 2 2 =S003+P015-K9 24 (=S004&WD1/6.5)
=S004+P013-X55 14 14 =S004+P015-X56 7 (=S004&WD1/6.4)
=S004+P013-X52 3 3 =S003+P015-K10 24 (=S004&WD1/6.5)
15 (=S004&WD1/6.5)
=S004+P013-X52 4 4 =S003+P015-K11 24 (=S004&WD1/6.6)
Connection
Terminal
Jumper
Terminal
=S004+P013-X52 5 5 (=S004&WD1/6.6)
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S004+P013-X52 6 6 (=S004&WD1/6.6)
Connection
=S004+P013-X52 11 11 (=S004&WD1/6.7)
Terminal
Jumper
Terminal
Target
Point
=S004+P013-X52 12 12 =S004+P013-K40 (=S004&WD1/6.7) Function Text Target Terminal Strip Source Designation Cross Reference
3 5
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S004
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Main Hoist-2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S004&TD1/4
Design Document No. - G71053- J5663 (EF-1) Page 4
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 5
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S004+P017-X204
3 =S003+P017-K41 (=S003&WD1/10.6)
3 =S003+P017-K43 (=S003&WD1/11.3)
=S004+P013-X204 3 3 (=S004&WD1/7.3)
4 =S005&EQ1/1
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S004
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Main Hoist-2
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S004&TD1/5
Design Document No. - G71053- J5663 (EF-1) Page 5
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 5
1 2 3 4 5 6 7 8 9 10
Equipment list
Type No. Description Qty Supplier/Make Device Tag Cross Reference Remarks
5SX42167RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 16A ,Breaking Capacity 10 KA 1 Siemens =S005+P013-F1 (=S005&WD1/1.3)
5SX42047RC 2-Pole MCB 5SX: Rated voltage 415V AC, C Characteristics, Rated Current 04A ,Breaking Capacity 10 KA 1 Siemens =S005+P013-F2 (=S005&WD1/2.5)
3RV10211DA10 MPCB 3RV: Rated Voltage 415V,Rated current 3.2A,overload release 2.2 - 3.2A,s/c release 38A,Breaking Capacity 100kA 1 Siemens =S005+P013-Q2 (=S005&WD1/3.4)
6SL33201TG388AA0 Sinamics S120 Single Motor Module in chassis format: Voltage 675-1035 V DC,Power 900kW,O/P Current 910A,Frame Size:JX 1 Siemens =S005+P014-G2 (=S005&WD1/4.3)
3KA84413UE00 Swicth Disconnector 3KA: Rated volatge 690V,Rated Current 1000A 1 Siemens =S005+P015-Q1 (=S005&WD1/4.3)
3KX35821YC Auxiliary Switch (1NO+1NC) for 3KT841/42/43 and 3KL841/42/43 and 3KA8431/44/45/46 1 Siemens =S005+P015-Q1 (=S005&WD1/4.3)
6SL30401MA000AA0 SINAMICS CONTROL UNIT CU320-2 DP WITH PROFIBUS INTERFACE WITHOUT COMPACT FLASH CARD 1 Siemens =S005+P014-A2 (=S005&WD1/8.2)
6SL30540ED001BA0 SINAMICS S120 COMPACTFLASH CARD W/O PERFORMANCE EXTENSION INCLUDING CERTIFICATE OF LICENCE V4.03 1 Siemens =S005+P014-A2 (=S005&WD1/8.2)
6ES79720BA410XA0 1
SIMATIC DP,BUS CONNECTOR FOR PROFIBUS UP TO 12 MBIT/S WITH TILTED OUTGOING CABLE, 15,8 X 54 X 39,5 MM (WXHXD), TERMINAT. RESIST. WITH Siemens =S005+P014-A2 (=S005&WD1/8.2)
ISOLAT. FUNCTION, WITHOUT PG SOCKET
6FX20021DC001AB0 Signal Cable, Pre assembled(Sinamics Drive CliQ), Length 1.0 m; 1 Siemens =S005+P014-A2 (=S005&WD1/8.2)
6FX20021DC001AD0 Signal Cable, Pre assembled(Sinamics Drive CliQ), Length 3 m; 2 Siemens =S005+P014-A2 (=S005&WD1/8.2)
6FX80021AA011AE0 AOP Cable-RS232 4m plug-in cable ( AOP30 & CU320 ) 1 Siemens =S005+P014-OP1 (=S005&WD1/8.8)
RP24D082COMB5P 8-Channel Relay Board(Relay type- OMRON, Socket mountable),2-CO, Coil:24V DC 1 Boost/Equivalent =S005+P013-K41 (=S005&WD1/12.1)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =S005+P013-K1 (=S005&WD1/13.2)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S005+P013-K1 (=S005&WD1/13.2)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =S005+P013-K1 (=S005&WD1/13.2)
=S005+P013-K1 (=S005&WD1/13.2)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =S005+P013-K1 (=S005&WD1/13.2)
=S005+P013-K1 (=S005&WD1/13.2)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =S005+P013-K46 (=S005&WD1/13.3)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S005+P013-K46 (=S005&WD1/13.3)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =S005+P013-K46 (=S005&WD1/13.3)
=S005+P013-K46 (=S005&WD1/13.3)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =S005+P013-K46 (=S005&WD1/13.3)
=S005+P013-K46 (=S005&WD1/13.3)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =S005+P013-K2 (=S005&WD1/13.3)
=S004&TD1/5 2
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Equipment List Sales Order No. - 3002447129 Current Project Status - As Commissioned = S005
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & EQ1
Function - Main Hoist (Standby)
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S005&EQ1/1
Design Document No. - G71053- J5663 (EF-1) Page 1
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 3
1 2 3 4 5 6 7 8 9 10
Equipment list
Type No. Description Qty Supplier/Make Device Tag Cross Reference Remarks
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S005+P013-K2 (=S005&WD1/13.3)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =S005+P013-K2 (=S005&WD1/13.3)
=S005+P013-K2 (=S005&WD1/13.3)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =S005+P013-K2 (=S005&WD1/13.3)
=S005+P013-K2 (=S005&WD1/13.3)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =S005+P013-K3 (=S005&WD1/13.4)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S005+P013-K3 (=S005&WD1/13.4)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =S005+P013-K3 (=S005&WD1/13.4)
=S005+P013-K3 (=S005&WD1/13.4)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =S005+P013-K3 (=S005&WD1/13.4)
=S005+P013-K3 (=S005&WD1/13.4)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =S005+P013-K4 (=S005&WD1/13.5)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S005+P013-K4 (=S005&WD1/13.5)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =S005+P013-K4 (=S005&WD1/13.5)
=S005+P013-K4 (=S005&WD1/13.5)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =S005+P013-K4 (=S005&WD1/13.5)
=S005+P013-K4 (=S005&WD1/13.5)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =S005+P013-K42 (=S005&WD1/13.6)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S005+P013-K42 (=S005&WD1/13.6)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =S005+P013-K42 (=S005&WD1/13.6)
=S005+P013-K42 (=S005&WD1/13.6)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =S005+P013-K42 (=S005&WD1/13.6)
=S005+P013-K42 (=S005&WD1/13.6)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =S005+P013-K43 (=S005&WD1/13.7)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S005+P013-K43 (=S005&WD1/13.7)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =S005+P013-K43 (=S005&WD1/13.7)
=S005+P013-K43 (=S005&WD1/13.7)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =S005+P013-K43 (=S005&WD1/13.7)
=S005+P013-K43 (=S005&WD1/13.7)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =S005+P013-K44 (=S005&WD1/13.8)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S005+P013-K44 (=S005&WD1/13.8)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =S005+P013-K44 (=S005&WD1/13.8)
=S005+P013-K44 (=S005&WD1/13.8)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =S005+P013-K44 (=S005&WD1/13.8)
=S005+P013-K44 (=S005&WD1/13.8)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =S005+P013-K47 (=S005&WD1/13.9)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S005+P013-K47 (=S005&WD1/13.9)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =S005+P013-K47 (=S005&WD1/13.9)
=S005+P013-K47 (=S005&WD1/13.9)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =S005+P013-K47 (=S005&WD1/13.9)
1 3
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Equipment List Sales Order No. - 3002447129 Current Project Status - As Commissioned = S005
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & EQ1
Function - Main Hoist (Standby)
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S005&EQ1/2
Design Document No. - G71053- J5663 (EF-1) Page 2
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 3
1 2 3 4 5 6 7 8 9 10
Equipment list
Type No. Description Qty Supplier/Make Device Tag Cross Reference Remarks
=S005+P013-K47 (=S005&WD1/13.9)
3TH30220AU0 Auxiliary Contactor, 10A AC15, 2 NO+2 NC, Coil Voltage: 240V AC 1 Siemens =S005+P013-K45 (=S005&WD1/13.10)
3TX74023JY1 Surge suppressor (varistor) for 3TF30-35,3TH30 : Coil Voltage 127-240VAC/150-250VDC 1 Siemens =S005+P013-K45 (=S005&WD1/13.10)
3TX40102A Auxiliary contact blocks (1NO) for 3TF30 to 35 & 3TH30 2 Siemens =S005+P013-K45 (=S005&WD1/13.10)
=S005+P013-K45 (=S005&WD1/13.10)
3TX40012A Auxiliary contact blocks (1NC) for 3TF30 to 35 & 3TH30 2 Siemens =S005+P013-K45 (=S005&WD1/13.10)
=S005+P013-K45 (=S005&WD1/13.10)
3TF69440CM7 Power Contactor: 3 Pole, Size 14, 820A AC3 upto 415V AC and 910A AC1 upto 690V AC, Auxiliary contacts 4NO+4NC, Coil Voltage: 220-240V AC 50/60Hz1 Siemens =S005+P015-K48 (=S005&WD1/14.2)
3TF69440CM7 Power Contactor: 3 Pole, Size 14, 820A AC3 upto 415V AC and 910A AC1 upto 690V AC, Auxiliary contacts 4NO+4NC, Coil Voltage: 220-240V AC 50/60Hz1 Siemens =S005+P013-K49 (=S005&WD1/14.3)
3TF69440CM7 Power Contactor: 3 Pole, Size 14, 820A AC3 upto 415V AC and 910A AC1 upto 690V AC, Auxiliary contacts 4NO+4NC, Coil Voltage: 220-240V AC 50/60Hz1 Siemens =S005+P031-K50 (=S005&WD1/14.5)
3SB14012WZ3 Wide band LED pilot light(Red) for AC 42 to 240V and DC 42 to 220V 1 Siemens =S005+P013-H1 (=S005&WD1/14.7)
3SB12002AB01 Selector Switch with P.F.R. 2 positions maintained (Black) 1 Siemens =S005+P014-Q3 (=S005&WD1/14.9)
3SB14000A Contact block rear connection for PB/SS (1NO+1NC) 2 Siemens =S005+P014-Q3 (=S005&WD1/14.9)
=S005+P014-Q3 (=S005&WD1/14.9)
3SB12002DB01 Selector Switch with P.F.R. 3 positions maintained (Black) 1 Siemens =S005+P014-Q1 (=S005&WD1/14.9)
3SB14000A Contact block rear connection for PB/SS (1NO+1NC) 2 Siemens =S005+P014-Q1 (=S005&WD1/14.9)
=S005+P014-Q1 (=S005&WD1/14.9)
3SB19120AN Thrust pad for key & selector actuators (rotary actuators) to operate central contact block. 1 Siemens =S005+P014-Q1 (=S005&WD1/14.9)
2 &WD1/1
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Equipment List Sales Order No. - 3002447129 Current Project Status - As Commissioned = S005
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & EQ1
Function - Main Hoist (Standby)
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S005&EQ1/3
Design Document No. - G71053- J5663 (EF-1) Page 3
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 3
1 2 3 4 5 6 7 8 9 10
=S005+P013-X31 1 2
2 4 13 21 24
=S005+P013-F1
1NO+1NC
240 VAC Supply MCB 1 3 14 22 23
(/11.2)
2.5 mm²
2.5 mm²
=S005+P013-X33 1 2 3 4 5 6 7 8 9 10 =S005+P013-X34 1 2 3 4 5 6 7 8 9 10
/ -L240:1
(11.2) / -L240:2
(13.1) / -L240:3
(14.1) / -L240:4
/ -L240:5
/ -L240:6
/ -L240:7
/ -L240:8
/ -L240:9
/ -L240:10
/ -N240:1
(11.2) / -N240:2
(13.1) / -N240:3
(14.6) / -N240:4
(14.1) / -N240:5
/ -N240:6
/ -N240:7
/ -N240:8
/ -N240:9
/ -N240:10
&EQ1/3 2
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Power Distribution Sales Order No. - 3002447129 Current Project Status - As Commissioned = S005
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P013 & WD1
Function - Main Hoist (Standby)
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S005+P013&WD1/1
Design Document No. - G71053- J5663 (EF-1) Page 1
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
=S005+P013-X51 1 2
2 4 13 21 24
=S005+P013-F2
04A
24 VDC Power Supply MCB 1 3 14 22 23
(/11.2)
2.5 mm²
2.5 mm²
=S005+P013-X53 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 =S005+P013-X54 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
(4.6) / -P24:1
(4.5) / -P24:2
(5.3) / -P24:3
(8.2) / -P24:4
(8.1) / -P24:5
(9.8) / -P24:6
(6.3) / -P24:7
(9.3) / -P24:8
(9.2) / -P24:9
(10.7) / -P24:10
(10.2) / -P24:11
(15.2) / -P24:12
/ -P24:13
/ -P24:14
/ -P24:15
(10.2) / -P24:16
(7.3) / -P24:17
(4.6) / -M24:1
(4.5) / -M24:2
(5.3) / -M24:3
(8.2) / -M24:4
(8.8) / -M24:5
(9.8) / -M24:6
(12.1) / -M24:7
(6.3) / -M24:8
(7.3) / -M24:9
(10.7) / -M24:10
/ -M24:11
/ -M24:12
/ -M24:13
/ -M24:14
/ -M24:15
/ -M24:16
/ -M24:17
24V DC Distribution bus
1 3
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Power Distribution Sales Order No. - 3002447129 Current Project Status - As Commissioned = S005
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P013 & WD1
Function - Main Hoist (Standby)
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S005+P013&WD1/2
Design Document No. - G71053- J5663 (EF-1) Page 2
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
(=A001/5.7) / =A001-Y_MH_STD
(=A001/5.4) / =A001-R_MH_STD
=S005+P013-X16 1 2
6 mm²
6 mm²
1 3 5 13 21
=S005+P013-Q2
2.2-3.2A
MH-STD fan supply 14 22
(/11.2)
I> I> I>
2 4 6
6 mm²
6 mm²
(4.5) / MH_STD_FAN_R
(4.6) / MH_STD_FAN_Y
2 4
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Field Auxillaries Sales Order No. - 3002447129 Current Project Status - As Commissioned = S005
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P013 & WD1
Function - Main Hoist (Standby)
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S005+P013&WD1/3
Design Document No. - G71053- J5663 (EF-1) Page 3
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
(=S002/10.4) / D_MH_STD
(=S002/10.3) / C_MH_STD
1 3 5
13 21
=S005+P015-Q1
1000A
MH-STD 14 22
2 4 6
Input Isolator
(/9.6)
=S005+P014-G2
900kW,910A
MH-STDBY
DCP DCN DCPA DCNA DCPS DCNS
DC LINK
LED
SINAMICS S120 H200
P24V_1
AC
M1_1
(380-480V AC/
EP EP Temp Temp
NC
NC
NC
NC
500-690V AC)
M1 +24V - +
U1 V1 W1 PE1
1 2 3 4 5 6 L1 L2 1 2 3 4
-PE
-MH_STD_EP2 / (11.4)
-MH_STD_EP1 / (11.4)
1 3 5 1 3 5 1 3 5
(2.2) / -P24:2
(2.7) / -M24:2
(3.4) / -MH_STD_FAN_R
(3.5) / -MH_STD_FAN_Y
(2.7) / -M24:1
(2.2) / -P24:1
=S005+P015-K48 =S005+P013-K49 =S005+P031-K50
820A 2 4 6 820A 2 4 6 820A 2 4 6
(/14.2) (/14.3) (/14.5)
(=S003/5.2) / MH1_U1
(=S003/5.2) / MH1_V1
(=S003/5.2) / MH1_W1
(=S004/4.2) / MH2_U1
(=S004/4.2) / MH2_V1
(=S004/4.2) / MH2_W1
(=S006/4.2) / AH1_U1
(=S006/4.2) / AH1_V1
(=S006/4.2) / AH1_W1
To MH-1
To MH-2 To AH-1
3 5
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - MH-STDBY Sales Order No. - 3002447129 Current Project Status - As Commissioned = S005
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P013 & WD1
Function - Main Hoist (Standby)
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S005+P013&WD1/4
Design Document No. - G71053- J5663 (EF-1) Page 4
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
SMC 30
M4 / (=S003/6.5)
P4 / (=S003/6.5)
(=S003/6.2) / =S003-MH1_ENC_K2-
(=S003/6.2) / =S003-MH1_ENC_K2
D11
(=S003/6.2) / =S003-MH1_ENC_K1-
(=S003/6.2) / =S003-MH1_ENC_K1
M1 / (5.3)
=S005+P013-A1
SMC30 -X521 1 2 3 4 5 6 7 8 -X531 1 2 3 4 5 6 7 8
MH-1
A
A*
B*
R*
CTRL
P_Enc 5/24V
-Temp
+Temp
Res.
Res.
Res.
Res.
M_Enc
Encoder conn. 2 for HTL/TTL Encoder conn. 2 for HTL/TTL
LED READY
M_Enc(M)
+24V M
M_Sense
P_Sense
Res.
Res.
Res.
Res
R*
A*
B*
R
A
B
+ + M M 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
(2.3) / -P24:3
(2.7) / -M24:3
(5.7) / M1
4 6
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - SMC30 Sales Order No. - 3002447129 Current Project Status - As Commissioned = S005
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P013 & WD1
Function - Main Hoist (Standby)
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S005+P013&WD1/5
Design Document No. - G71053- J5663 (EF-1) Page 5
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
SMC 30
M5 / (=S004/5.5)
P5 / (=S004/5.5)
(=S004/5.2) / =S004-MH2_ENC_K2-
(=S004/5.2) / =S004-MH2_ENC_K2
D11
(=S004/5.2) / =S004-MH2_ENC_K1-
(=S004/5.2) / =S004-MH2_ENC_K1
/(6.3)
=S005+P013-A2
SMC30 -X521 1 2 3 4 5 6 7 8 -X531 1 2 3 4 5 6 7 8
MH-2
A
A*
B*
R*
CTRL
P_Enc 5/24V
-Temp
+Temp
Res.
Res.
Res.
Res.
M_Enc
Encoder conn. 2 for HTL/TTL Encoder conn. 2 for HTL/TTL
LED READY
M_Enc(M)
+24V M
M_Sense
P_Sense
Res.
Res.
Res.
Res
R*
A*
B*
R
A
B
+ + M M 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
(2.3) / -P24:7
(2.8) / -M24:8
(6.7)/
5 7
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - SMC30 Sales Order No. - 3002447129 Current Project Status - As Commissioned = S005
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P013 & WD1
Function - Main Hoist (Standby)
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S005+P013&WD1/6
Design Document No. - G71053- J5663 (EF-1) Page 6
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
SMC 30
M6 / (=S006/5.5)
P6 / (=S006/5.5)
(=S006/5.2) / =S006-AH1_ENC_K2-
(=S006/5.2) / =S006-AH1_ENC_K2
D11
(=S006/5.2) / =S006-AH1_ENC_K1-
(=S006/5.2) / =S006-AH1_ENC_K1
/(7.3)
=S005+P013-A3
SMC30 -X521 1 2 3 4 5 6 7 8 -X531 1 2 3 4 5 6 7 8
AH-1
A
A*
B*
R*
CTRL
P_Enc 5/24V
-Temp
+Temp
Res.
Res.
Res.
Res.
M_Enc
Encoder conn. 2 for HTL/TTL Encoder conn. 2 for HTL/TTL
LED READY
M_Enc(M)
+24V M
M_Sense
P_Sense
Res.
Res.
Res.
Res
R*
A*
B*
R
A
B
+ + M M 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
(2.5) / -P24:17
(2.8) / -M24:9
(7.7)/
6 8
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - SMC30 Sales Order No. - 3002447129 Current Project Status - As Commissioned = S005
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P013 & WD1
Function - Main Hoist (Standby)
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S005+P013&WD1/7
Design Document No. - G71053- J5663 (EF-1) Page 7
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
=S005+P015-X204 2
=S005+P013-X204 2
(2.3) / -P24:5
=S005+P013-X204 1 1 =S005+P017-X204
33 23 43
=S003+P017-K1 =S003+P017-K4 =S003+P015-K13
13
Safety Brake Counter wt. LS Step 5
(=S003/12.5) 53 =S003+P015-K11 (=S003/16.9)
Check Back 34 24 23 13 44
=S003+P015-K7 Step 3
(=S003/12.2) =S003+P017-K5 =S003+P015-K8 (=S003/16.7)
43 MH-Null Position 14 RESET1 / (11.4)
Pre Limit switch Hoist(Step 1)
=S003+P017-K2 (=S003/12.6)
(=S003/16.3) 54 (=S003/16.4)
24 14 RESET2 / (11.5)
Encoder Overspeed 43
Switch 1 44 23 13 =S005+P013-K2
(=S003/12.3) =S003+P017-K6 =S003+P015-K9 Stdby as D11
End Limit switch Lower (Step 1) MH-1 Selection 44
(=S003/12.7) 24 (/13.3)
(=S003/16.5) 14
OUT_CONT1_1 / (11.7) 13 43
(11.3) / OFF1_CHAIN1 =S003+P015-K10 =S003+P015-K12
OUT_CONT1_2 / (11.7) Step 2 43
(11.3) / OFF1_CHAIN2 Step 4
(=S003/16.6) 14 (=S003/16.8)
=S005+P013-K3
44
Std. as
MH-2 Selection 44
D11
(11.4) / OFF2_CHAIN1 (/13.4)
-M24:5 / (2.7)
(11.4) / OFF2_CHAIN2 OUT_CONT2_1 / (11.8)
OUT_CONT3_1 / (11.9)
OUT_CONT2_2 / (11.8)
OUT_CONT3_2 / (11.9)
=S005+P017-X55 4
=S005+P015-X56
9 10 12 13 =S005+P015-X56 1 2 3 4 9 10 12
=S005+P014-OP1
=S005+P013-X55 1 2 3 4 5 6 7 8 9 10 11 12 13 14 =S005+P013-X56
15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 AOP30
AOP30
=S005+P014-A2
CU320-2 -X122 1 2 3 4 5 6 7 8 9 10 11 12 13 14 -X132 1 2 3 4 5 6 7 8 9 10 11 12 13 14 SINAMICS G130
CU320-2_MH-STD
Advanced Operating Panel AOP30
DI 0
DI 1
DI 2
DI 3
DI 16
DI 17
M1
DI/DO 8
DI/DO 9
DI/DO 10
DI/DO 11
DI 4
DI 5
DI 6
DI 7
DI 20
DI 21
M2
DI/DO 12
DI/DO 13
DI/DO 14
DI/DO 15
M
-X524 24V DC -X540 serial interface
+ 1 2 3 4
Option Board
SINAMICS S120
Control Unit CU320-2
-X124 -X140
MP PE
+ + M M 2 3 5
-PE
(2.3) / -P24:4
(2.7) / -M24:4
7 9
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - CU 320 Sales Order No. - 3002447129 Current Project Status - As Commissioned = S005
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P012 & WD1
Function - Main Hoist (Standby)
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S005+P012&WD1/8
Design Document No. - G71053- J5663 (EF-1) Page 8
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
D11
=S005+P013-X204 3 4=S005+P017-X204
(2.4) / -P24:8
=S003-MH1_INV_READY1 / (=S003/10.5)
(=S003/10.4) =S005+P015-X204 4
53 =S003-MH1_INV_READY2 / (=S003/10.5)
=S003-MH_STD_MPR_TRIP1
=S003+P017-K16
=S003-MH1_INV_RUN1 / (=S003/11.2)
MH_Counter Wt. Bypass
(11.6) / MH1_BRAKE1_1 Int. Cont. 54 13 =S003-MH1_INV_RUN2 / (=S003/11.3)
(=S003/13.5)
=S003-MH_STD_MPR_TRIP2 =S005+P013-K46
(11.6) / MH1_BRAKE1_2 =S004-MH2_INV_READY1 / (=S004/9.5)
(=S003/10.4) =S005+P012-X1 Encoder
1
2 Overspeed
43 Switch 14 =S004-MH2_INV_READY2 / (=S004/9.5)
=S005+P013-K43 (/13.3)
13 =S004-MH2_INV_RUN1 / (=S004/9.7)
MH-1 Mode Selection
=S005+P013-K1 (/13.7)
=S005+P015-X58 3
44 =S004-MH2_INV_RUN2 / (=S004/9.7)
Encoder 1 Overspeed
(=S004/9.4)
Switch 14
(/13.2)
=S004-MH_STD_MPR_TRIP1
13 43
=S005+P013-K42 =S004-MH_STD_MPR_TRIP2 =S005+P013-K44
(MH-1+MH-2) (=S004/9.5) MH-2 Mode Selection
Selection 14 (/13.8) 44
-M24:6 / (2.8)
-P24:6 / (2.3)
(/13.6)
53 13 13
=S003+P017-K14 =S005+P013-K45 =S005+P015-Q1
Safety Brake Reset Std as 1NO+1NC
Int. Cont. 54 OFF Selection 14 MH-STD 14
(=S003/13.4) (/13.10)
Input Isolator
(/4.3) =S005+P017-X58
=S005+P017-X57 4 5 6 =S005+P015-X58 3 5 6
=S005+P013-X57 1 2 3 4 5 6 7 8 9 =S005+P013-X58 1 2 3 4 5 6 7 8 9
=S005+P013-A4
TM15 -X520 1 2 3 4 5 6 7 8 9 10 -X521 1 2 3 4 5 6 7 8 9 10 -X524 + + M M
TM-15 Module
L1+
DI/DO 0
DI/DO 1
DI/DO 2
DI/DO 3
DI/DO 4
DI/DO 5
DI/DO 6
DI/DO 7
M1
L2+
DI/DO 8
DI/DO 9
DI/DO 10
DI/DO 11
DI/DO 12
DI/DO 13
DI/DO 14
DI/DO 15
M2
+24V M
External source
24V DC
SINAMICS S120
Terminal Module TM15
-X522
L3+
DI/DO 16
DI/DO 17
DI/DO 18
DI/DO 19
DI/DO 20
DI/DO 21
DI/DO 22
DI/DO 23
M3
-PE
1 2 3 4 5 6 7 8 9 10
=S005+P013-X59 1 2 3 4 5 6 7 8 9
-PE
(12.6) / MH_STD_INV_RUN
(12.1) / MH1_BRAKE_OPEN
(12.2) / MH2_BRAKE_OPEN
=S003+P017-X204 8
(=S003/9.8) / =S003-MH1_O/P_CONT_4
(=S003/9.8) / =S003-MH1_O/P_CONT_3
(=S004/8.7) / =S004-MH2_O/P_CONT_4
(=S004/8.7) / =S004-MH2_O/P_CONT_3
=S005+P017-X204 7
8 =S005+P013-X204 7 10
Previous page (2.4) / -P24:9 Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - TM15 Sales Order No. - 3002447129 Current Project Status - As Commissioned = S005
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P012 & WD1
Function - Main Hoist (Standby)
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S005+P012&WD1/9
Design Document No. - G71053- J5663 (EF-1) Page 9
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
=S005+P013-X204
(2.4) / P24:11
5 5=S005+P018-X204
23 33
=S006+P018-K4 =S006+P031-K7
23
Counter wt. LS AH1-Null Position
(=S006/10.2) (=S006/11.3)
=S006+P031-K12
43 24 34
Step 4
=S006+P018-K45 (=S006/11.8)
23 23 24
Counter Wt
=S006+P018-K5 =S006+P031-K8
Bypass Int Contactor 44
(=S006/10.7) Pre Limit switch Hoist (Step 1)
(=S006/10.3) 24 (=S006/11.4) 24 =S006-AH1_INV_READY1 / (=S006/9.5)
13 23 =S006-AH1_INV_READY2 / (=S006/9.5)
=S005+P013-K4 =S006+P031-K9
23 =S006-AH1_INV_RUN1 / (=S006/9.5)
Std. Lower (Step 1)
(=S006/9.4) =S006+P018-K6 (=S006/11.5)
as AH-1 14 24 =S006-AH1_INV_RUN2 / (=S006/9.6)
=S006-MH_STD_MPR_TRIP1 End Limit switch
Selection (=S006/10.5)
(/13.5)
24
23
=S006-MH_STD_MPR_TRIP2 =S006+P031-K10
M24:10 / (2.8)
23 43
P24:10 / (2.4)
(=S006/9.4) Step 2
=S005+P014-Q3 =S005+P013-K47 (=S006/11.6) 24
Position-1 AH-1
RUN/Maint. 24 Mode Selection 44
(/14.9) (/13.9)
23
=S006+P031-K11
Step 3
(=S006/11.7) 24
=S005+P018-X60 2 5 6 7 8
=S005+P018-X61 1 2 3 4 5 6 7 8
=S005+P013-X60 1 2 3 4 5 6 7 8 9 =S005+P013-X61 1 2 3 4 5 6 7 8 9
=S005+P013-A5
TM15 -X520 1 2 3 4 5 6 7 8 9 10 -X521 1 2 3 4 5 6 7 8 9 10 -X524 + + M M
TM-15 Module
L1+
DI/DO 0
DI/DO 1
DI/DO 2
DI/DO 3
DI/DO 4
DI/DO 5
DI/DO 6
DI/DO 7
M1
L2+
DI/DO 8
DI/DO 9
DI/DO 10
DI/DO 11
DI/DO 12
DI/DO 13
DI/DO 14
DI/DO 15
M2
+24V M
External source
24V DC
SINAMICS S120
Terminal Module TM15
-X522
L3+
DI/DO 16
DI/DO 17
DI/DO 18
DI/DO 19
DI/DO 20
DI/DO 21
DI/DO 22
DI/DO 23
M3
-PE
1 2 3 4 5 6 7 8 9 10
-PE
=S005+P013-X62 1 2 3 4 5 6 7 8 9 10 11
D11
=S006+P018-X59 3 5
(=S003/13.8) / =S003-OS_BYPASS_3 23
(12.7) / MH_STD_MH1
(12.8) / MH_STD_MH2
(12.9) / MH_STD_AH1
=S006+P031-K13
(=S006/8.8) / =S006-AH1_O/P_CONT_4 Step 5 24
(=S006/11.9)
(=S006/8.8) / =S006-AH1_O/P_CONT_3
=S006+P018-X204 6
=S006+P013-X204 6
(2.5) / P24:16
9 11
(12.3) / AH1_BRAKE_OPEN
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - TM15 Sales Order No. - 3002447129 Current Project Status - As Commissioned = S005
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P012 & WD1
Function - Main Hoist (Standby)
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S005+P012&WD1/10
Design Document No. - G71053- J5663 (EF-1) Page 10
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
=S005+P013-X39 3 =S005+P013-X39 9
24
=S005+P013-F1
240 VAC Supply MCB
(/1.3) 23
=S005+P013-X39 5 (=S010/11.3)
=S010-RESET_MH-STD1
6 =S010-RESET_MH-STD2
(=S010/11.3)
24
=S005+P013-F2
24 VDC Power Supply MCB
(/2.5)
=S005+P013-X39 11 (=S003/9.7)
23
=S003-MH1_STD_BRAKE1
13 =S005+P013-X203 1
=S005+P013-Q2 2.5 mm² =S005+P013-X203 3
MH-STD fan supply
(/3.4) 14
=S005+P015-X203 1
=S005+P015-X203 3
2.5 mm²
21 21 21
2.5 mm² =S005+P015-K48 =S005+P013-K49 =S005+P031-K50
MH-1 MH-2 AH-1
(/14.2) 22 (/14.3) 22 (/14.5) 22
=S005+P013-X203 2 =S005+P013-X203 4
=S005+P013-K40
8-CH 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8
Relay Board
P1 O1 C1 P1 O1 C1 P2 O2 C2 P2 O2 C2 P3 O3 C3 P3 O3 C3 P4 O4 C4 P4 O4 C4 P5 O5 C5 P5 O5 C5 P6 O6 C6 P6 O6 C6 P7 O7 C7 P7 O7 C7 P8 O8 C8 P8 O8 C8
1 1 1 2 2 2 1 1 1 2 2 2 1 1 1 2 2 2 1 1 1 2 2 2 1 1 1 2 2 2 1 1 1 2 2 2 1 1 1 2 2 2 1 1 1 2 2 2
2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² =S005+P013-X203 9 10 13 14
2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm²
(8.2) / -OFF1_CHAIN1
(8.2) / -OFF1_CHAIN2
(8.2) / -OFF2_CHAIN1
(8.2) / -OFF2_CHAIN2
(4.7) / MH_STD_EP1
(4.7) / MH_STD_EP2
(8.8) / RESET1
(8.8) / RESET2
/ RESET_MPR1
/ RESET_MPR2
(9.3) / MH1_BRAKE1_1
(9.3) / MH1_BRAKE1_2
(8.3) / OUT_CONT1_1
(8.3) / OUT_CONT1_2
(=S003/9.4) / OUT_CONT1_3
(8.3) / OUT_CONT2_1
(8.3) / OUT_CONT2_2
(=S004/8.5) / OUT_CONT2_3
(=S004/8.5) / OUT_CONT2_4
(8.6) / OUT_CONT3_1
(8.6) / OUT_CONT3_2
(=S006/8.4) / OUT_CONT3_3
(=S006/8.4) / OUT_CONT3_4
(=S003/9.4) / OUT_CONT1_4
OFF 1 Chain OFF 2 Chain Reset Command Brake
Open f/b
10 12
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Relay Board Sales Order No. - 3002447129 Current Project Status - As Commissioned = S005
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P013 & WD1
Function - Main Hoist (Standby)
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S005+P013&WD1/11
Design Document No. - G71053- J5663 (EF-1) Page 11
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
MH_STD_INV_READY / (9.4)
AH1_BRAKE_OPEN / (10.2)
MH1_BRAKE_OPEN / (9.4)
MH2_BRAKE_OPEN / (9.4)
MH_STD_INV_RUN / (9.4)
MH_STD_MH1 / (10.3)
MH_STD_MH2 / (10.4)
MH_STD_AH1 / (10.4)
(2.8) / -M24:7
=S005+P013-K50 =S005+P013-K51
=S005+P013-K41 1-CH 1-CH
8-channel
Relay Board 1+ 1- 2+ 2- 3+ 3- 4+ 4- 5+ 5- 6+ 6- 7+ 7- 8+ 8- 1+ 1- 1+ 1-
P1 O1 C1 P2 O2 C2 P3 O3 C3 P4 O4 C4 P5 O5 C5 P6 O6 C6 P7 O7 C7 P8 O8 C8 P9 O9 C9 P10 O10 C10 P11 O11 C11 P12 O12 C12 P13 O13 C13 P14 O14 C14 P15 O15 C15 P16 O16 C16
P1 O1 C1 P1 O1 C1
=S005+P015-X203 5 6
=S003+P013-X35 7 =S003+P015-X204 13 =S003+P015-X204 14
=S005+P018-X203 5 6
(=S003/12.9) / MH_STD_BO2
(=S004/10.3) / MH_STD_BO3
(=S004/10.3) / MH_STD_BO4
(=S006/10.8) / MH_STD_BO5
(=S006/10.8) / MH_STD_BO6
(=S003/8.7) / MH_STD_INV_READY1
(=S003/8.7) / MH_STD_INV_READY2
(=S004/7.7) / MH_STD_INV_READY3
(=S004/7.7) / MH_STD_INV_READY4
(=S006/7.7) / MH_STD_INV_READY5
(=S006/7.7) / MH_STD_INV_READY6
(=S003/8.7) / MH_STD_INV_RUN1
(=S003/8.7) / MH_STD_INV_RUN2
(=S004/7.7) / MH_STD_INV_RUN3
(=S004/7.7) / MH_STD_INV_RUN4
(=S006/7.7) / MH_STD_INV_RUN5
(=S006/7.7) / MH_STD_INV_RUN6
(14.2) / MH_STD_MH1_1
(14.2) / MH_STD_MH1_2
(14.3) / MH_STD_MH2_1
(14.3) / MH_STD_MH2_2
(14.4) / MH_STD_AH1_1
(14.4) / MH_STD_AH1_2
Brake Open MH_STD_ReadyMH_STD_ReadyMH_STD_Ready MH_STD_Run MH_STD_Run MH_STD_Run MH_STD_Run MH_STD_Run MH_STD_Run
Command f/b to MH1 f/b to MH2 f/b to AH1 f/b to MH1 f/b to MH2 f/b to AH1 as_ MH1 as_ MH2 as_ AH1
11 13
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Relay Board Sales Order No. - 3002447129 Current Project Status - As Commissioned = S005
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P013 & WD1
Function - Main Hoist (Standby)
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S005+P013&WD1/12
Design Document No. - G71053- J5663 (EF-1) Page 12
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
=L001-MH1_SEL1 / (=L001/4.3)
=L001-MH1_SEL2 / (=L001/4.3)
2
=S005+P013-X203 15 =S005+P013-X35 17
=S003+P017-X203 15 =S003+P017-X203 17
=S005+P013-X35 3 From ACU
23 23 23 63 43 =L001-MH1+MH2_SEL1 / (=L001/4.5)
=S003+P017-K2 =S003+P017-K3 =S005+P014-Q1 =S005+P014-Q1 =S005+P014-Q1 =L001-MH1+MH2_SEL2 / (=L001/4.5)
Encoder Overspeed Encoder Overspeed Position-1 Position-3 Position-2 4
Switch 1 24 Switch 2 24 MH1-AH1-MH2 24 MH1-AH1-MH2 64 44
(=S003/12.3) (=S003/12.4) (/14.9)
MH1-AH1-MH2
(/14.9)
=S003+P013-X203 16 =S003+P017-X203 18
=S007+P017-X203 16 =S005+P013-X203 18
=S005+P013-X35 5 From ACU
=L001-MH2_SEL1 / (=L001/4.6)
=L001-MH2_SEL2 / (=L001/4.6)
6
A1 A1 A1 A1 A1 A1 A1 A1 A1 A1
U U U U U U U U U U
=S005+P013-K1 =S005+P013-K46 =S005+P013-K2 =S005+P013-K3 =S005+P013-K4 =S005+P013-K42 =S005+P013-K43 =S005+P013-K44 =S005+P013-K47 =S005+P013-K45
240V AC A2 240V AC A2 240V AC A2 240V AC A2 240V AC A2 240V AC A2 240V AC A2 240V AC A2 240V AC A2 240V AC A2
Encoder 1 Overspeed Encoder 2 Overspeed Stdby as Std. as Std. (MH-1+MH-2) MH-1 Mode Selection MH-2 Mode Selection AH-1 Std as
Switch Switch MH-1 Selection MH-2 Selection as AH-1 Selection Mode Selection OFF Selection
Selection
13 14 (/9.3) 13 14 (/9.6) 13 14 (=S004/6.3) 13 14 (=S003/7.2) 13 14 (/10.3) 13 14 (/9.3) 13 14 (=S003/8.4) 13 14 (=S004/7.3) 13 14 (=S006/7.3) 13 14 (/9.4)
21 22 21 22 21 22 21 22 21 22 21 22 21 22 21 22 21 22 21 22
31 32 31 32 31 32 (=S003/8.6) 31 32 (=S004/7.4) 31 32 (=S006/7.5) 31 32 31 32 31 32 31 32 31 32
43 44 43 44 43 44 (/8.6) 43 44 (/8.7) 43 44 43 44 (=S003/8.3) 43 44 (/9.5) 43 44 (/9.6) 43 44 (/10.3) 43 44 (=S003/9.7)
61 62 61 62 61 62 61 62 61 62 61 62 61 62 61 62 61 62 61 62
71 72 71 72 71 72 71 72 71 72 71 72 71 72 71 72 71 72 71 72
83 84 83 84 83 84 (=S004/7.4) 83 84 (=S003/8.5) 83 84 83 84 (=S004/7.3) 83 84 83 84 83 84 83 84 (=S006/8.7)
12 14
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Control Logic Sales Order No. - 3002447129 Current Project Status - As Commissioned = S005
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P013 & WD1
Function - Main Hoist (Standby)
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S005+P013&WD1/13
Design Document No. - G71053- J5663 (EF-1) Page 13
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
1 2 3
23 11 31 43 43 63
=S005+P014-Q1
3-way
MH1-AH1-MH2 24 12 32 44 44 64
(/13.3)
(/13.5)
(/13.4)
2.5 mm²
(=S001/15.3) / =S001-DC_MH_STD
=S005+P013-X203 =S005+P013-X203
23
D11 17
=S005+P015-X203 15 =S005+P015-X203 17
=S005+P013-X39 13
X1
=S005+P013-H1
Lamp_Red
DC LINK CHARGED X2
A1 A1 A1
U U U 1 2
23 11 43 31
=S005+P015-K48 =S005+P013-K49 =S005+P031-K50 =S005+P014-Q3
820A, 240V AC 820A, 240V AC 820A, 240V AC 2-way(Black)
A2 A2 A2 24 12 44 32
MH-1 MH-2 AH-1 RUN/Maint.
(/10.3)
=S005+P015-X203 16 =S005+P015-X203 18
2.5 mm²
(1.5) / -N240:4
=S005+P013-X203 24 =S005+P013-X203 18
(1.5) / N240:5
2.5 mm² D11 2.5 mm² 2.5 mm²
1 3 5 1 3 5 1 3 5
(/4.1) (/4.3) (/4.4)
2 4 6 2 4 6 2 4 6
13 14 (/15.8) 13 14 (/15.9) 13 14 (/15.9)
(2.4) / P24:12
=S005+P013-X204 26
=S005+P015-X204 26
53 53 53 53 53 53 13 13 13
=S005+P013-K2 =S005+P013-K3 =S005+P013-K42 =S005+P013-K4 =S005+P013-K44 =S005+P013-K47 =S005+P015-K48 =S005+P013-K49 =S005+P031-K50
Stdby as Std. as (MH-1+MH-2) Std. MH-2 Mode Selection AH-1 MH-1 MH-2 AH-1
MH-1 Selection 54 MH-2 Selection 54 Selection 54 as AH-1 54 (/13.8) 54 Mode Selection 54 (/14.2) 14 (/14.3) 14 (/14.5) 14
(/13.3) (/13.4) (/13.6) Selection (/13.9)
(/13.5)
=S005+P013-X63 1 2 3 4 5 6 7 8 9
STDBY AS MH-1 SELECTION STDBY AS MH-2 SELECTION MH-1+MH-2 STDBY AS AH-1 SELECTION MH-2 MODE SELECTION AH-1 MODE SELECTION MH-1 MH-2 AH-1
(=C001/24.2) (=C001/24.3) (=C001/24.4) (=C001/24.5) (=C001/34.3) (=C001/34.4) (=C001/34.5) (=C001/34.6) (=C001/34.7)
14 &TD1/1
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - To PLC Sales Order No. - 3002447129 Current Project Status - As Commissioned = S005
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + P013 & WD1
Function - Main Hoist (Standby)
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S005+P013&WD1/15
Design Document No. - G71053- J5663 (EF-1) Page 15
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 15
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Connection
Connection
Terminal
Terminal
Jumper
Jumper
Terminal
Terminal
Target
Target
Point
Point
Function Text Target Terminal Strip Source Designation Cross Reference Function Text Target Terminal Strip Source Designation Cross Reference
=S005+P012-X1 =S005+P013-X34
1 =S005+P013-K45 13 (=S005&WD1/9.5) 220V Neutral Terminal Strip 1 =S005+P013-F1 3 (=S005&WD1/1.4)
=S005+P013-K1 A2 3 (=S005&WD1/1.5)
Connection
Terminal
Jumper
Terminal
Target
Point
=S005+P013-H1 X2 4 (=S005&WD1/1.5)
Function Text Target Terminal Strip Source Designation Cross Reference
=S005+P013-X203 24 5 (=S005&WD1/1.5)
6 (=S005&WD1/1.5)
=S005+P013-X16
7 (=S005&WD1/1.5)
=A001+P029-X31 5 1 =S005+P013-Q2 1 (=S005&WD1/3.4)
8 (=S005&WD1/1.5)
Connection
Terminal
Jumper
Terminal
9 (=S005&WD1/1.6)
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
10 (=S005&WD1/1.6)
Connection
Terminal
Jumper
Terminal
=S005+P013-X17
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=A001+P029-X32 5 2 =S005+P013-Q2 5 (=S005&WD1/3.5)
Connection
Terminal
Jumper
Terminal
=S005+P013-X35
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
MH1+MH2 Selection =S005+P014-Q1 43 1 =L001+RS001-X36 11 (=S005&WD1/13.6)
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference MH-2 Mode selection =S005+P013-K45 A1 7 =L001+RS001-X36 17 (=S005&WD1/13.9)
=S005+P013-F1 24 2 (=S005&WD1/1.2)
Connection
Terminal
Jumper
Terminal
Target
Point
=S005+P013-X203 15 3 (=S005&WD1/1.2)
Function Text Target Terminal Strip Source Designation Cross Reference
=S005+P013-K41 4 (=S005&WD1/1.2)
5 (=S005&WD1/1.3)
=S005+P013-X39
6 (=S005&WD1/1.3)
=S005+P013-F1 24 3 =S001+P003-X37 5 (=S005&WD1/11.4)
7 (=S005&WD1/1.3)
=S005+P013-K40 2 4 =S001+P003-X37 6 (=S005&WD1/11.4)
8 (=S005&WD1/1.3)
5 =S010+P020-X37 5 (=S005&WD1/11.4)
9 (=S005&WD1/1.3)
=S005+P013-K40 3 6 =S010+P020-X37 6 (=S005&WD1/11.4)
10 (=S005&WD1/1.3)
9 =S004+P013-K40 (=S005&WD1/11.5)
&WD1/15 2
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S005
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Main Hoist (Standby)
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S005&TD1/1
Design Document No. - G71053- J5663 (EF-1) Page 1
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 7
1 2 3 4 5 6 7 8 9 10
Terminal diagram
=S005+P013-A1-X524 M 3 (=S005&WD1/2.7)
Connection
Terminal
Jumper
Terminal
Target
Point
=S005+P014-A2-X124 M 4 (=S005&WD1/2.7)
Function Text Target Terminal Strip Source Designation Cross Reference
=S005+P013-X56 14 5 (=S005&WD1/2.7)
=S005+P013-A4-X524 M 6 (=S005&WD1/2.8)
=S005+P013-X39
=S005+P013-K41 1- 7 (=S005&WD1/2.8)
=S005+P013-K40 5 12 =S003+P017-X594 12 (=S005&WD1/11.6)
=S005+P013-A2-X524 M 8 (=S005&WD1/2.8)
DC Link Charged =S001+P003-X35 2 13 =S005+P013-H1 X1 (=S005&WD1/14.7)
=S005+P013-A3-X524 M 9 (=S005&WD1/2.8)
Connection
Terminal
Jumper
Terminal
=S005+P013-A5-X524 M 10 (=S005&WD1/2.8)
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
11 (=S005&WD1/2.9)
12 (=S005&WD1/2.9)
=S005+P013-X51
13 (=S005&WD1/2.9)
1 =S005+P013-F2 2 (=S005&WD1/2.5)
14 (=S005&WD1/2.9)
2 =S005+P013-F2 4 (=S005&WD1/2.5)
15 (=S005&WD1/2.9)
Connection
16 (=S005&WD1/2.9)
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference 17 (=S005&WD1/2.10)
Connection
Terminal
Jumper
Terminal
Target
Point
=S005+P013-X53 Function Text Target Terminal Strip Source Designation Cross Reference
24V Positive Terminal Strip =S005+P013-K40 1 =S005+P013-F2 1 (=S005&WD1/2.2)
=S005+P014-G2-X9 1 2 (=S005&WD1/2.2)
=S005+P013-X55
=S005+P013-A1-X524 + 3 (=S005&WD1/2.3)
=S005+P014-A2-X122 1 1 =S005+P013-K40 (=S005&WD1/8.2)
=S005+P014-A2-X124 + 4 (=S005&WD1/2.3)
=S005+P014-A2-X122 2 2 =S005+P013-K40 (=S005&WD1/8.2)
=S005+P013-K40 5 (=S005&WD1/2.3)
=S005+P014-A2-X122 3 3 =S003+P017-K1 34 (=S005&WD1/8.2)
=S005+P013-A4-X524 + 6 (=S005&WD1/2.3)
=S005+P014-A2-X122 4 4 =S005+P017-X55 4 (=S005&WD1/8.3)
=S005+P013-A2-X524 + 7 (=S005&WD1/2.3)
=S005+P014-A2-X122 5 5 =S005+P013-K40 (=S005&WD1/8.3)
=S005+P013-K40 8 (=S005&WD1/2.4)
=S005+P014-A2-X122 6 6 =S005+P013-K40 (=S005&WD1/8.3)
=S005+P013-X204 7 9 (=S005&WD1/2.4)
=S005+P014-A2-X122 7 7 (=S005&WD1/8.3)
=S005+P013-A5-X524 + 10 (=S005&WD1/2.4)
=S005+P014-A2-X122 8 8 (=S005&WD1/8.3)
=S005+P013-K4 13 11 (=S005&WD1/2.4)
=S005+P014-A2-X122 9 9 =S005+P017-X55 9 (=S005&WD1/8.3)
=S005+P013-K2 53 12 (=S005&WD1/2.4)
=S005+P014-A2-X122 10 10 =S005+P017-X55 10 (=S005&WD1/8.4)
13 (=S005&WD1/2.5)
=S005+P014-A2-X122 11 11 (=S005&WD1/8.4)
14 (=S005&WD1/2.5)
=S005+P014-A2-X122 12 12 =S005+P017-X55 12 (=S005&WD1/8.4)
15 (=S005&WD1/2.5)
=S005+P014-A2-X122 13 13 =S005+P015-X56 13 (=S005&WD1/8.4)
=S006+P013-X204 6 16 (=S005&WD1/2.5)
=S005+P014-A2-X122 14 14 =S005+P013-X56 7 (=S005&WD1/8.4)
=S005+P013-A3-X524 + 17 (=S005&WD1/2.5)
15 (=S005&WD1/8.5)
Connection
Terminal
Connection
Jumper
Terminal
Terminal
Target
Jumper
Terminal
Point
Target
Function Text Target Terminal Strip Source Designation Cross Reference
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S005+P013-X54
=S005+P013-X56
24V Negative Terminal Strip =S005+P014-G2-X41 1 1 =S005+P013-F2 3 (=S005&WD1/2.7)
=S005+P014-A2-X132 1 1 =S005+P015-X56 1 (=S005&WD1/8.5)
=S005+P014-G2-X9 2 2 (=S005&WD1/2.7)
1 3
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S005
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Main Hoist (Standby)
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S005&TD1/2
Design Document No. - G71053- J5663 (EF-1) Page 2
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 7
1 2 3 4 5 6 7 8 9 10
Terminal diagram
=S005+P013-A4-X521 6 5 =S005+P017-X58 5 (=S005&WD1/9.6)
Connection
Terminal
Jumper
Terminal
Target
Point
=S005+P013-A4-X521 7 6 =S005+P015-X58 6 (=S005&WD1/9.6)
Function Text Target Terminal Strip Source Designation Cross Reference
=S005+P013-A4-X521 8 7 =S004+P013-K41 (=S005&WD1/9.7)
Connection
=S005+P014-A2-X132 4 4 =S005+P015-X56 4 (=S005&WD1/8.6)
Terminal
Jumper
Terminal
Target
Point
=S005+P014-A2-X132 5 5 =S005+P013-K40 (=S005&WD1/8.6) Function Text Target Terminal Strip Source Designation Cross Reference
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S005+P013-X57
=S005+P013-A4-X520 2 1 =S005+P013-K40 (=S005&WD1/9.3) =S005+P013-X60
=S005+P013-A4-X520 3 2 =S005+P013-K1 14 (=S005&WD1/9.3) =S005+P013-A5-X520 2 1 =S005+P014-Q3 24 (=S005&WD1/10.3)
Connection
Terminal
Jumper
Terminal
Target
Point
=S005+P013-A4-X520 5 4 =S005+P017-X57 4 (=S005&WD1/9.4)
Function Text Target Terminal Strip Source Designation Cross Reference
=S005+P013-A4-X520 6 5 =S005+P017-X57 5 (=S005&WD1/9.4)
Connection
Terminal
Jumper
Terminal
=S005+P013-A4-X520 10 9 =S005+P013-X58 9 (=S005&WD1/9.5)
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
Connection
Terminal
Jumper
Terminal
Target
Point
2 4
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S005
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Main Hoist (Standby)
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S005&TD1/3
Design Document No. - G71053- J5663 (EF-1) Page 3
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 7
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Connection
Connection
Terminal
Terminal
Jumper
Jumper
Terminal
Terminal
Target
Target
Point
Point
Function Text Target Terminal Strip Source Designation Cross Reference Function Text Target Terminal Strip Source Designation Cross Reference
=S005+P013-X63 =S005+P013-X204
=C001+P015-X63 1 1 =S005+P013-K2 54 (=S005&WD1/15.2) =S005+P017-X204 1 1 (=S005&WD1/8.2)
6 (=S005&WD1/15.7) =S004+P013-K40
8 (=S005&WD1/15.8) =S005+P013-K49 13
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
Connection
Terminal
Jumper
Terminal
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S005+P014-X57
=S005+P013-X203 =S005+P017-X57 6 6 =S003+P017-K41 (=S003&WD1/10.4)
Connection
Terminal
Jumper
Terminal
Target
Point
=S005+P013-A3-X521 3 1 (=S006&WD1/5.2)
Function Text Target Terminal Strip Source Designation Cross Reference
=S005+P015-X203 2 2 (=S005&WD1/11.7)
2 =S006+P018-A1-X521 1 (=S006&WD1/5.2)
=S005+P014-X58
=S005+P015-X203 3 3 (=S005&WD1/11.9)
5 =S003+P017-K41 (=S003&WD1/10.5)
=S005+P015-X203 4 4 =S005+P031-K50 22 (=S005&WD1/11.9)
Connection
Terminal
Jumper
Terminal
=S003+P013-X594 9 9 =S005+P013-K40 (=S005&WD1/11.7)
Target
Point
Function Text Target Terminal Strip Source Designation Cross Reference
=S003+P017-X203 10 10 (=S003&WD1/9.4)
10 =S005+P013-K40 (=S005&WD1/11.8)
=S005+P014-X60
13 (=S005&WD1/11.9)
=S005+P013-A5-X520 3 2 =S005+P018-X60 2 (=S005&WD1/10.3)
=S006+P031-X203 13 13 =S005+P013-K40 (=S006&WD1/8.4)
=S005+P013-A5-X520 4 3 =S005+P013-K4 14 (=S005&WD1/10.3)
=S006+P013-X203 14 14 =S005+P013-K40 (=S005&WD1/11.9)
=S005+P013-A5-X520 5 4 =S005+P013-K47 44 (=S005&WD1/10.3)
=S005+P013-X33 3 15 =S003+P017-X203 15 (=S005&WD1/13.2)
=S005+P013-A5-X520 6 5 =S005+P018-X60 5 (=S005&WD1/10.3)
=S005+P013-X35 17
=S005+P013-A5-X520 7 6 =S006+P018-K4 24 (=S005&WD1/10.3)
=S005+P015-X203 17 17 =S005+P013-K50 (=S005&WD1/14.3)
=S005+P013-A5-X520 8 7 =S005+P018-X60 7 (=S005&WD1/10.4)
18 (=S005&WD1/13.3)
=S005+P013-A5-X520 9 8 =S005+P018-X60 8 (=S005&WD1/10.4)
=S005+P031-K50 A2 18 =S005+P015-X203 18 (=S005&WD1/14.3)
=S005+P013-A5-X520 10 9 =S005+P014-X61 9 (=S005&WD1/10.4)
Std. As OFF selectiomn =S003+P017-X203 19 19 =S005+P013-K45 43 (=S003&WD1/9.7)
3 5
Previous page Next page
D11 As Commissioned 25.05.18 Z003U8PM Creator IN216289 Client - HEC Ltd. Ranchi Details - Terminal diagram Sales Order No. - 3002447129 Current Project Status - As Commissioned = S005
C10 TFC Changes 01 15.05.12 incad391 Last Editor Z003XN1Y Client ref.Prj No. - -- E&C Order No. - J5663 (EF-1) Current Revision Issue - D11 + & TD1
Function - Main Hoist (Standby)
B09 Changes (Manufacturing) 26.03.12 in213825 Approver End Client - SAIL Bhilai Steel Plant / =S005&TD1/4
Design Document No. - G71053- J5663 (EF-1) Page 4
Consultant - MECON Limited Project - 300+80/25T Laddle Crane Client Ref. Dwg. No. -
Rev. Reason for Revision Date Name Date 07.05.19 Page 7
1 2 3 4 5 6 7 8 9 10
Terminal diagram
Connection
Connection
Terminal
Terminal
Jumper
Jumper
Terminal
Terminal
Target
Target
Point
Point
Function Text Target Terminal Strip Source Designation Cross Reference Function Text Target Terminal Strip Source Designation Cross Reference
=S005+P014-X61 =S005+P015-X58
=S005+P013-A5-X521 3 2 =S005+P018-X61 2 (=S005&WD1/10.5) =S005+P013-X58 3 3 =S005+P015-Q1 14 (=S005&WD1/9.6)
Connection
Terminal
Jumper
Terminal
Target
Point
=S005+P013-A5-X521 7 6 =S005+P018-X61 6 (=S005&WD1/10.6)
Function Text Target Terminal Strip Source Designation Cross Reference
=S005+P013-A5-X521 8 7 =S005+P018-X61 7 (=S005&WD1/10.6)
Connection
3 =S005+P013-X203 3 (=S005&WD1/11.9)
Terminal
Jumper
Terminal
Target
Point