0% found this document useful (0 votes)
77 views2 pages

Logistics Plan-Oriental

This document outlines the logistics plan for transporting 100 tons of electrolytic copper cathodes from the Democratic Republic of Congo to Shanghai, China. The copper will be loaded onto a vessel at the port of Dar es Salaam, Tanzania within 3-4 days of signing the contract. The vessel will then take 30 days to transport the copper to the port of Shanghai, China, so the total estimated time for delivery is 35 days. The commercial director looks forward to completing this deal with the buyer.

Uploaded by

Dr M R aggarwaal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
77 views2 pages

Logistics Plan-Oriental

This document outlines the logistics plan for transporting 100 tons of electrolytic copper cathodes from the Democratic Republic of Congo to Shanghai, China. The copper will be loaded onto a vessel at the port of Dar es Salaam, Tanzania within 3-4 days of signing the contract. The vessel will then take 30 days to transport the copper to the port of Shanghai, China, so the total estimated time for delivery is 35 days. The commercial director looks forward to completing this deal with the buyer.

Uploaded by

Dr M R aggarwaal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

60 ANNEXE ROUTE KIPUSHI, LUBUMBASHI,

KATANGA PROVINCE, RD CONGO.

MOB/WHATSAPP 1: +260 96 7081766


MOB/WHATSAPP 2: +243 974 922229
QUANTUM E-MAIL: [email protected]
WEBSITE;www.quantumcongo.com
CONGO MINERALS GROUP
SARL
REF: QCMG / CU/167 / 2020/ August 25, 2020
ATT: MR. YONG CHUL KIM
ORIENTAL ENERGY INTERNATIONAL LIMITED

COPPER CATHODES Cu 100 TONS LOGISTICS PLAN

COMMODITY: Electrolytic Copper Cathode Grade A 99.99%.

This is in regards to the Copper Cathodes contract with TRANSACTION CODE: QUANTUM/
ORIENTALENERGY /15/2020 as far as the trial order 100 MT is concerned, Supply Contract CIF
Port of SHANGHAI PORT, CHINA.
As per the contract and different communications via whatsapp, we assume your company will
be ready and able to implement the purchasing requirements effectively starting August 26,
2020
Please note the following logistics approximation of the 100 tons delivery;
1). General Description:

Commodity Electrolytic Copper Cathodes Grade A 99.99%


Origin: Congo
First Order 100 tons.
Loading Port DAR ES SALAAM PORT, TANZANIA.
Port of Destination: SHANGHAI PORT, CHINA.
Delivery: Immediately.

2). Logistics Plan:

 After the contract is signed and sealed, booking of the readily available vessel will be
made immediately.
 Seller’s logistics agent Talon Cargo Group (www.taloncargo.com) will commence
transportation of 100 tons from warehouse to the loading port. This takes 1 day via
trucks (distance of 24kms).
 Stuffing and loading of the 100 takes 1 day.
 So, in totality we are talking about 3 to 4 days for stuffing and loading and paperwork
until the 100 tons is put inside the vessel.
 From Loading Port DAR ES SALAAM, TANZANIA to destination Port of SHANGHAI, CHINA
the vessel takes 30 days at sea.
 So, in totality we are talking about 35 days until the 100 tons is at SHANGHAI PORT,
CHINA.

We look forward doing business with you. .

Regards,

Elvis BALENGELA
Commercial Director

QUANTUM CONGO MINERALS GROUP SARL


MOB/WHATSAPP 1: +260 96 7081766
E-MAIL: [email protected]

Cc: Mr. Munalula Moola


[email protected]
MOB/WHATSAPP 2: +243 974 922229

CC: Mr. Jamal Bawazir


Director-OPERATIONS.
Talon Cargo Group (www.taloncargo.com)

You might also like