Foundation Layout

1. This document provides general notes and guidelines for a proposed residential building foundation layout in Kallikuppam for Mr. Shiva. 2. It specifies dimensions in feet and inches, concrete cover requirements, materials to be used, and that the foundation is designed for a ground floor plus one additional floor. 3. Guidelines are provided for the removal of formwork, including minimum time periods before removal based on concrete strength and structural member.

Uploaded by

ahmad anas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
537 views1 page

Foundation Layout

1. This document provides general notes and guidelines for a proposed residential building foundation layout in Kallikuppam for Mr. Shiva. 2. It specifies dimensions in feet and inches, concrete cover requirements, materials to be used, and that the foundation is designed for a ground floor plus one additional floor. 3. Guidelines are provided for the removal of formwork, including minimum time periods before removal based on concrete strength and structural member.

Uploaded by

ahmad anas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

GENERAL NOTES:-

1. All dimensions in Feet &


Inches.
A B C D E F 2. Dimensions to be read, not
scaled.
3. Clear cover to the main
reinf. as follows
a) Col 25mm for 12mm bars &
40mm for >12mm
b) Footings 50mm
4. Use M25Conc & Fe500
unless specified otherwise.
5. Found. designed for GF+1
10 Flrs. only.
6. Footing CL to coincide with
Column CL.
7.SBC -15-T/Sq.m

Removal of
formwork(Shuttering)
9 1. Shuttering of any part of the
structure shall not be removed
until the concrete attains 70%
of the specified strength of
concrete at seventh day.

8
However the following
minimum period after final
pour) shall be allowed before
removal of shuttering as per IS
1489-1991 Part I & part II
A) Vertical side of shuttering
columns, Walls & beams - 24
Hours
i) At any cross section of the
member not more than 50%
of the Bars shall be lapped
ii) Laps shall be staggered with
a minimum centre to centre

7
distance of 1.3 times lap
lenght of the bar for Tension
& Compression members
iii) Lap lenght shall be 50
SC times the diameter of the bar

6 for Tension & Compression


members
iv) Laps in columns shall be

5 SC
provided at midheight of floor
and not at slab level
v) Laps in beams and columns
shall be provided at the point

4
of contraflexure.
vi) Welding of bars shall be
done as a stitch weld for 5
times diameter of bar and a gap
of 5 times higher diameter bar
and bar using arc welding and
special electrodes after
obtaining written approval
from the structural designer

STRUCTURAL ENGINEER
A. AHMAD ANAS PROPOSED RESIDENTIAL
M.TECH STRUCTURES BUILDING AT KALLIKUPPAM FOR FOUNDATION LAYOUT
+91-9941299565
[email protected]
Mr.Shiva