Saudi Aramco Test Report

This document is a pressure test report for an equipment test conducted by Saudi Aramco. It provides details of the test including the equipment identification number, description and location. It lists the test instruments used, parameters tested, and results. The test was witnessed and approved by Saudi Aramco and contractor representatives and found the equipment passed with no leaks or pressure loss observed.

Uploaded by

Pradeep
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
76 views2 pages

Saudi Aramco Test Report

This document is a pressure test report for an equipment test conducted by Saudi Aramco. It provides details of the test including the equipment identification number, description and location. It lists the test instruments used, parameters tested, and results. The test was witnessed and approved by Saudi Aramco and contractor representatives and found the equipment passed with no leaks or pressure loss observed.

Uploaded by

Pradeep
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

SAUDI ARAMCO ID/PID - 3/01/05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-March-2013

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Pressure Test Report SATR-A-2001 30-Apr-13


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION TEST SYSTEM No./Test Pack No. PLANT NO.

DRAWING NUMBER (P&ID/ISO) / REV. No. PRESSURE TEST DIAGRAM NATURE OF TEST WORK PERMIT REQD?

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME LOCATION OF TEST (PLANT NAME & NO.)

SAUDI ARAMCO TIP (SATIP) NUMBER SATIP Activity No. TEST IN ACCORDANCE WITH: a) Procedure No. b) Supporting SAIC No.

System Description: Test Details (Type):


Test/Service Fluid: MAOP: Sys Mat'l Type: Limiting Factor:
Flushing Cleaning Method Used: Accepted: Rejected:
Lay-Up Method: None: Ambient: Wet: Dry: Other :

Pressure Gages/Recorder Temp Gage/Recorder Relief Valve


Test Instruments
PG- PG- PG- PG- PR- TG- TR- RV #
Serial No/Tag No.
Make
Range
Certificate No.
Date Calibrated
Set Pressure
Re-Calibration Due
Date
ITEM Description of Test Parameters
Actual Pass Fail Remarks
No. (Complete Applicable Data Entry Prior to Test)
Test Medium Type/Quality (Indicate method of treatment if req'd in
1 Remarks, i.e., Fluid type, ph, SRB count, O2 Scavenger, etc).

2 SystemTemperature at test:
Test Pressure: Service Test/Others:________
3 Strength Test: ___________ Valve Body: ______________
Tightness Test: ___________ Valve Seat: ______________

4 Preliminary Test Conducted at __________Psig

Area of interest (Indicate flange joints, weld joints, threaded, socket,


5
body)
6 Method of leak detection (direct visual/remote)
Test Duration : a. 30 minutes min for Plant Piping
7 b. 2 hrs. Pipeline strength test/ ______ Tightness Test
c. Others_____________
REPAIRS DURING TEST:

TEST RESULTS: Test Accepted. No leak or loss in pressure observed. State reasons in
Rejected Remarks Section.
AFFIX ANY TEST TAPE TO THIS REPORT (TEST EVIDENCE)

REMARKS:

Contractor / Third-Party Saudi Aramco


Construction Representative PMT Representative
Test is ready for inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Title, Department, Name, Initials and
Company, Initials and Date: Date:

QC Inspector PID Representative


Witnessed Test Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and
Name, Initials and Date:
Date:

QC Supervisor Proponent and Others (Optional)

Page 1 of 2
SAUDI ARAMCO ID/PID - 3/01/05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-March-2013

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Pressure Test Report SATR-A-2001 30-Apr-13


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION TEST SYSTEM No./Test Pack No. PLANT NO.

DRAWING NUMBER (P&ID/ISO) / REV. No. PRESSURE TEST DIAGRAM NATURE OF TEST WORK PERMIT REQD?

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME LOCATION OF TEST (PLANT NAME & NO.)

SAUDI ARAMCO TIP (SATIP) NUMBER SATIP Activity No. TEST IN ACCORDANCE WITH: a) Procedure No. b) Supporting SAIC No.

System Description: Test Details (Type):


Quality Record Approved: Name, T&I Witnessed QC Record Reviewed Work Verified
Name, Sign and Date: Organization,
Initials and Date:

Page 2 of 2

You might also like