0% found this document useful (0 votes)
842 views1 page

Design Verification Plan and Report: Copies Must Be Verified For Current Revision

This document is a Design Verification Plan and Report (DVP&R) that outlines testing procedures for verifying a system or component design meets its requirements. It lists tests by number, specification, method, acceptance criteria, planned timing, and space to record actual results. The DVP&R requires authorized signatures to verify sample representation and approval of test data and results.

Uploaded by

Jaskaran Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
842 views1 page

Design Verification Plan and Report: Copies Must Be Verified For Current Revision

This document is a Design Verification Plan and Report (DVP&R) that outlines testing procedures for verifying a system or component design meets its requirements. It lists tests by number, specification, method, acceptance criteria, planned timing, and space to record actual results. The DVP&R requires authorized signatures to verify sample representation and approval of test data and results.

Uploaded by

Jaskaran Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

DESIGN VERIFICATION PLAN AND REPORT Copies must be verified for current revision

DVP&R No: Rev: Date:


System Description: Supplier Name:

Subsystem Description: Supplier Code: Affected Program(s): Team:

Assembly Description: Part Number Rev Design Engineer Supplier Design Engineer (Key Contact)
Supplier
Address:
Name: Name:

City: Zip / Postal


Component Description: Part Number Rev Code:
Title: Title:

State: Country:
Email: Email:

Test Stage ED = Engineering Development Test, DV = Design Verification Test, PV = Production Verification Test, CCT = Continued Compliance Testing Phone: Phone:
Target Requirements. State required probability and confidence of meeting criteria, e.g. R90, C90 or all must pass.
Sample Level A = Prototype (No tooling), B = Prototype (Soft Tooled), C = Production Tooling (Not Process), D = Production Tooling & Process Cell: Cell:

Planned Product Testing Reporting of Results Planned Test Timing & Sample information Actual Timing & Sample Information
Compliance / Scheduled Timing Actual Timing
Test #

Regulatory / Specification / Test Name Method or Procedure Duration Acceptance Criteria Test Results / Findings Test Results Test Completed by Notes Test Target Requirement Test Location / Source of Sample Level Sample Size Report or Doc. Sample Level Sample ID Sample Size
SC/CC/KPC Pass / Fail Stage Verification Resp. Requirement or Batch # Number Tested
Start End Start End

Verification Report Authorization Design Engineer Review / Approval


I affirm that the samples used for verification testing are representative of our parts, and I authorize the use of this data.

Authorized Signature Date Authorized Signature Date

Title Time Title Time

Page 1 of 1

You might also like