0% found this document useful (0 votes)
403 views2 pages

Daily Report of Construction New

The report details the weather each day which did not impact work. It lists the manpower and equipment used including managers, laborers, and tools. Major activities for each block included masonry, carpentry, and concrete work. Materials received included cement, sand, steel, bricks and frames. The site was visited by representatives to discuss construction progress.

Uploaded by

SYED TANVEER
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
403 views2 pages

Daily Report of Construction New

The report details the weather each day which did not impact work. It lists the manpower and equipment used including managers, laborers, and tools. Major activities for each block included masonry, carpentry, and concrete work. Materials received included cement, sand, steel, bricks and frames. The site was visited by representatives to discuss construction progress.

Uploaded by

SYED TANVEER
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

DAILY REPORT OF CONSTRUCTION

I. REPORT DATE: ……… / …….. / ……….……. Project Title: 3 HOSTEL BLOCKS FOR WOMEN AT IIUI.

Monday Tuesday Wednesday Thursday Friday Saturday Sunday


II. REPORT DAY:

III. WEATHER
CONDITIONS: Sunny Sunny/Cloudy Cloudy Rain/Clear Rain

No Rain all day (No Effect) :_________ , Rain: (Time: _____________ to _______________) ,

IV. MANPOWER AND EQUIPMENT


MANPOWER EQUIPMENT
Project Manager Mason Mixer Machine

Site/Planning Engineer Carpenter Concrete Vibrator

Quantity Surveyor Scaffolder Water Pump

Project Accountant Ironworker Compactor

Site Surveyor Electrician Welding Plant

Civil Supervisor/Foreman Plumber Water Bowzer

Electrical Supervisor/Foreman Painter Floor Grinder

Mechanical Supervisor/Foreman Welder Excavator

Office Boy/Cook Floor Grinder/Polisher Generator

Store Keeper Stone Cutter Level Machine/Theodolite


General Attendant/ Security
TOTAL SKILLED (A) Scaffolding Joints (Nos)
Guard
Lab Technician/Attendant Un-Skilled Labor (B) Scaffolding Pipes (Rft)

Site Purchaser TOTAL SKILLED & Shuttering Plates (Sft)

Driver UN-SKILLED (A+B) Wood Runners (Nos)

V. MAJOR ACTIVITIES PERFORMED


BLOCK NO.1

1.

2.

3.

4.

5.

6.

BLOCK NO.2

1.

2.

3.

4.

5.

6.

BLOCK NO.3

1.

2.

3.

4.

5.

6.

VI. MATERIAL RECEIVED

Page 1 of 2
Description of Material Unit Quantity Received

1. Cement BAGS

2. Sand CFT

3. Crush ½” pure CFT

4. Crush ½” down CFT

5. Bricks NOS.

6. Steel Grade-60 M.Ton

7. Steel Grade-40 M.Ton

8. MS Door Frames Nos.

9. MS Window Frames Nos.

10. Lahori Gutka Tile Nos.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

VII. SITE VISITS


Name of Visitor Representing Items Discussed

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

CONTRACTOR’S REPRESENTATIVE CONSULTANT’S


REPRESENTATIVE
M/s Gulzari Associates M/s NESPAK (Pvt)
Limited
Islamabad. Islamabad.