Ijm Corporation Berhad: Hazard Identification and Risk Assessment Analysis

1) The document analyzes hazards and risks associated with ceiling work activities at the PJ8 Development Project. 2) It identifies hazards such as falls, cuts, and dust inhalation for tasks like installing ceiling frames and boards. 3) The analysis rates risks, lists legal requirements, and provides control measures and recommendations to mitigate hazards, including using personal protective equipment and fall protections, safe work procedures, and competent supervision of workers.

Uploaded by

haidil abd hamid
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
83 views

Ijm Corporation Berhad: Hazard Identification and Risk Assessment Analysis

1) The document analyzes hazards and risks associated with ceiling work activities at the PJ8 Development Project. 2) It identifies hazards such as falls, cuts, and dust inhalation for tasks like installing ceiling frames and boards. 3) The analysis rates risks, lists legal requirements, and provides control measures and recommendations to mitigate hazards, including using personal protective equipment and fall protections, safe work procedures, and competent supervision of workers.

Uploaded by

haidil abd hamid
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

IJM CORPORATION BERHAD

(104131-A)
HAZARD IDENTIFICATION AND RISK ASSESSMENT ANALYSIS

WORKPLACE : PJ8 Development Project


ACTIVITY : Ceiling Work (Block A,B,C & D)

SEQUENCE OF HAZARD GROUP & POTENTIAL LEGAL & OTHER RISK RATING CONTROL MEASURE/
JOB POTENTIAL HAZARD RISK REQUIREMENTS Prob. Sev. Total RECOMMENDATION
(P x S)

1) Cut and fix G.I a)Physical Fatality or serious FMA (BOWEC) 1986 3 2 6 1. All workers & must be inducted
body injury Part IV before commencing of work..
ceiling frame to wall -Fall of person
2. Close supervision on the activity.
and hang intermediate -Cut by sharp materials 3 1 3
3. The edges of working area must be
frame using G.I wire
fully barricaded.
to the slab soffit.
4. To provide proper working
platform (working platform must be
fully barricaded, secured, the plank
must be wide enough as per
scaffolding requirement and provide
with proper access).
5. All workers must use proper
personal PPE

2) Cut ceiling board a)Physical Fatality or serious FMA (BOWEC) 1986 3 2 6 1. All workers must be inducted

body injury. Part IV before commencing of work


and insert into ceiling -Fall of person
2. The Activity shall be carried out by
frame.
competent/experienced personal and

HSEF-HRC-001 Rev.2 PJ8/HIRARC/039-07


IJM CORPORATION BERHAD
(104131-A)
HAZARD IDENTIFICATION AND RISK ASSESSMENT ANALYSIS

-Cut by sharp materials supervised.


FMA(Mineral Dust) reg 3. To comply with the electrical
1 3 3
-Dust 1989 Safety procedure (All Electrical
equipment must be regularly
checked by competent person, live
electric cable must be hangover head
level).
4. All workers must use proper
P.P.E.

Activity carried out By: a)City Plaster Sdn Bhd Prepared By: 1. Faizal Riza (IJMC) Approved By:
2. Shaiful Izzuan(IJMC)
3. Norizal (IJMC)
4. Leong YT (IJMC) Name: Mr Beh Lai Seng
Location Of Activity Block A,B,C & D 5 .RickyChin Mun Hong Date: November 6, 2007

HSEF-HRC-001 Rev.2 PJ8/HIRARC/039-07