HVAC Commissioning Document - Ducting

This document summarizes the inspection of ducting for an HVAC system. Various parts of the ducting were checked, including connections, insulation, openings (OKA's), inspection hatches, and roof exhausts. Checks were performed to ensure connections were air tight, insulation was complete, openings could be accessed and functioned properly, and roof exhausts were water tight. Any issues found are noted. The document is to be sent back to the Global Technical Supervisor for future reference to assist in support of the HVAC system.

Uploaded by

CITACOM UTAMA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
157 views

HVAC Commissioning Document - Ducting

This document summarizes the inspection of ducting for an HVAC system. Various parts of the ducting were checked, including connections, insulation, openings (OKA's), inspection hatches, and roof exhausts. Checks were performed to ensure connections were air tight, insulation was complete, openings could be accessed and functioned properly, and roof exhausts were water tight. Any issues found are noted. The document is to be sent back to the Global Technical Supervisor for future reference to assist in support of the HVAC system.

Uploaded by

CITACOM UTAMA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

HVAC Commissioning Document – Ducting

Name Hatchery Country Contact Person

AHU/Rooms Commissioned by Date: dd/mm/yyyy

Part To check/measure N/A Data


Air Ducting Connections circular duct ⃞ Siliconed with white silicone OK ⃞

Connections rectangular ducts ⃞ Sealing strips OK ⃞

Are all connections air tight? ⃞ Check before insulating OK ⃞

Insulation ⃞ Check all seams OK ⃞

OKA’s Silicone around the sealing strip ⃞ OK ⃞

No screws are blocking the OKA's ⃞ OK ⃞

The OKA's can be opened easily by hand ⃞ OK ⃞

There is no debris on top of the OKA's ⃞ OK ⃞

The OKA's are functioning correctly during extraction ⃞ OK ⃞

Inspection Above and under ventilators ⃞ OK ⃞


hatches Above and under OKA's ⃞ OK ⃞

Before CVD ⃞ OK ⃞

Before Air Dampers ⃞ OK ⃞

Before DSLAM ⃞ OK ⃞

Roof Exhausts Remove the cover of the roof exhausts ⃞ OK ⃞

Water tight roof covers at exhausts ⃞ OK ⃞ Inform the customer if there is a water leak OK ⃞

GENERAL REMARKS: (everything not as request by Petersime specification, to do list by customer or Petersime etc.)

You are required to send the original form back to your Global Technical Supervisor for later reference. This will allow us to

identify the correct machine and give you our best support in the shortest possible time later during the running of the

machine.

HVAC Commissioning Document – Ducting