CS: Examination Form: 1.study Group?
CS: Examination Form: 1.study Group?
Required
1.Study group?
FAF-181
FAF-182
FI-181
SI-181
SI-182
2.SQA expenses can be diminished by:
not using software configuration management system;
excluding procedures & work instructions, templates, checklists, etc.;
excluding certification of employees for the key positions;
3.SQA corrective actions include:
identification & analysis of sources of irregularities;
collection of information on potential quality problems;
collection of information on quality non-conformities;
4.What the 'Software' term includes?
Application code & configuration files;
User / Installation / Maintenance Guides;
Application swimline model;
5.How many document templates & checklists are necessary for a medium-sized
software Project?
In accordance with Project's SQA request.
About 10 items.
Upon Customer request.
6.SQA preventive actions include:
collection of information on potential quality problems;
identification & analysis of departures from quality standards;
identification & analysis of sources of irregularities;
7.What Customer's requirement aspects includes the 'Software Quality' factor?
Minimal project price;
Good after-sales-service;
High application's consistency;
8.The corrective & preventive actions are elaborated based on analysis of:
Customer's software change requests, proposals suggested by the project staff members;
project progress reports, design review reports;
application test reviews, external quality audit reports;
9.What relationship is between software application's 'error', 'fault' and 'failure'?
An error in software cause application fault(s), which, in return, cause application failure(s).
An application failures due to the fault(s), generated by the programmer(s) error(s).
A fault in software can cause error(s), which cause application failure(s).
10.What does the 'Software Quality System (SQS)' means?
The procedures / processes how developers, QA engineers, project manager and Customer
manage application bugs.
The specialised software tools used by project team for task, bug tracking and code versioning.
The structure, responsibilities and organizational resources for implementation of quality
management.
11.Which software requirements refers to SQ 'Usability' factor?
The system, installed in the 120 branches, will not fail, on average, >10 mins / month during the
bank’s office hours;
Training a new employee will take no more than two days (16 training hrs);
A staff member should be able to handle at least 60 service calls a day;
12.How software application units & modules should be rated selecting them for
testing?
Upon the Customer suggestions;
Upon the probability of their failure;
Upon potential damages if their failure;
13.What the methodologies of reviewing documents you knows?
Expert reviews;
Formal design reviews;
Peer-to-peer reviews;
14.The classes of tests provided by black-box testing approach only are:
Data processing & calculations correctness tests;
Stress tests;
Software system security tests;
15.Usually SQA expenses include:
costs of software product bug fixing & costs of support;
costs of software product control & costs of failure of control;
costs of Software Development Plan review & costs of product integration testing;
16.'Software Verification' is checking if the project teams build …
... the product right.
…the product is in time.
… the right product.
17.Why SQA expenses in a software project should be estimated and controlled?
To evaluate economic damages of software failures & revise SQA budget;
To not exceed allocated SQA expenses;
To increase / decrease SQA activities;
18.What does the 'Software Quality Management (SQM)' means?
A multitude of actions provided to assure application quality.
QA reports and personnel assigned to assure application quality.
A part of the project management that determines and implements quality policy.
19.What are the software application testing objectives?
To demonstrate that the software-under-test is working properly;
To perform the required tests efficiently and effectively, within budgetary and scheduling
limitations;
To bring tested software to an acceptable level of quality;
20.What are the project benefits of SQA's document templates & checklists
usage?
It decrease the number of software errors in the application-under-development;
It ease communication between the Customer and the Project team;
It speeds up software application-under-development's testing process;
21.The bottom-up & top-down strategies of incremental software testing are
used in …
… white-box testing.
… gray-box testing.
… black-box testing.
Submit