System Formwor
System Formwor
▪ Formwork Assembly
▪ Simplicity – Pin and Wedge system
▪ Efficient – Quick Strip Prop Head
However since the proposed framing plans for typical floor is a beam slab structure, various system formworks were
found to be unsuitable as they are designed for flat slab structures.
Option of using self climbing formwork for Vertica structures was also explored. However due to beam slab
arrangement, the advantage of having self climbing formwork was not found.
The monolithic customised aluminium formwork is thus proposed which will allow complete vertical and horizontal
structures to be cast in one go.
The following slides depicts the advantage of MIVAN Monolithic system formwork.
MIVAN MODULAR ALUMINUM FORMWORK
The panels are held in position by a simple pin and wedge system that
passes through holes in the outside rib of each panel. The panels fit
precisely, simply and securely and require no bracing.
Buildings can be constructed quickly and easily by unskilled labour with
hammer being the only tool required. Once the panels have been
numbered, measuring is not necessary.
As the erection process is manually, tower cranes are not required. The
Fig.2 – Beam Assembly Details result is a typical 4 to 5 day cycle for floor–to–floor construction.
FORMWORK ASSEMBLY AND ERECTING
STRIKING OF PLATFORM
Striking of all forms can be done within 10-15 hours. The only tool
required for dismantling is hammer.
POSITIONING OF FORMWORK
Positioning of working platform bracket and securing nuts on tie
rod on inside the building.
REMOVAL OF KICKER
Positioning of working platform bracket and securing nuts on tie rod on
inside the building.
2. Prop Head for Soffit Beam: It forms the soffit beam. It is a V-shaped
head for easy dislodging of the formwork.
4 3 1
B. DECK COMPONENTS
1) Deck Panel: It forms the horizontal surface for casting of slabs. It is built for proper
safety of workers.
2) Deck Prop: It forms a V-shaped prop head. It supports the deck and bears the load
coming on the deck panel. 1
3) Prop Length: It is the length of the prop. It depends upon the length of the slab.
4) Deck Mid – Beam: It supports the middle portion of the beam. It holds the 2
concrete.
5) Soffit Length: It provides support to the edge of the deck panels at their perimeter
of the room.
6) Deck Beam Bar: It is the deck for the beam. This component supports the deck and
beam.
6 5 4
C. OTHER COMPONENTS
1) Internal Soffit Corner: It forms the vertical internal corner between the
walls and the beams, slabs, and the horizontal internal cornice
between the walls and the beam slabs and the beam soffit. 1
2) External Soffit Corner: It forms the external corner between the
components
3 4
WALL COMPONENTS
3) Kicker: It forms the wall face at the top of the panels and acts 1
as a ledge to support.
3
SOFTWARE APPLICATION TO FORMWORK DESIGN
The formwork is designed using the most economical assortment of panel sizes with the help of the state-of-the art
design software. The use of the software along with the experience and skill of the designers ensures an efficient
construction process by incorporating the optimum assembly procedures, economical panel selection and ultimately
minimizing capital and operational costs.
Using design software, the formwork is designed using the most economical assortment of panel sizes.
✓ Most efficient construction process incorporating the optimum assembly procedures.
✓ Economical panel section.
✓ Ultimately minimizing capital and operational cost.
SITE MANAGEMENT
The essence of the system is that it provides a production line approach in the construction industry. The laborers are
grouped together to form small teams to carry out various tasks within a certain time frame such as, reinforcement,
fabrication and erection, formwork erection, concreting etc.
Scheduling involves the design and development of the work cycle required to maximize efficiency in the field. The
establishment of a daily cycle of work, which when fully coordinated with different trades.
Optimum use of the labour force is made by ensuring that each trade has sufficient work on each working day.
The improved coordination and construction management enables the equipment to be used at optimum speed and
efficiency and speed of the output are outstanding. Thus a disciplined and systemized approach to construction is
achieved.
SPEED OF CONSTRUCTION
The system usually follows a four day cycle: -
Day 1: -The first activity consists of erection of vertical reinforcement bars and one side of the
vertical formwork for the entire floor or a part of one floor.
Day 2: -The second activity involves erection of the second side of the vertical formwork and
formwork for the floor
Day 3: - Fixing reinforcement bars for floor slabs and casting of walls and slabs.
Day 4: -Removal of vertical form work panels after 24hours, leaving the props in place for 7 days
and floor slab formwork in place for 2.5 days.
QUALITY ADVANTAGE OF MIVAN
The Advantages of this system are :-
o The MIVAN formwork is specifically designed to allow rapid construction of all types of architectural
layouts.
o Total system forms the complete concrete structure.
o Custom designed to suit project requirements.
o Unsurpassed construction speed.
o High quality finish.
o Cost effective.
o Panels can be reused up to 250 times.
o Erected using unskilled labor.
o Easy to handle.
o Aluminum does not rust like steel; therefore, the aluminium formwork can be reused hundreds of times.
o Formwork is made with an aluminium alloy, which has high tensile strength and is also very hard.
o Saving on overhead expenses due to speedy construction.
o Monolithic crack free structures.
o Doesn’t require timber or plywood for construction activities so, it saves the environment.
OTHER ADVANTAGE OF MIVAN
▪ Architectural changes not possible on the structure (but some walls can be of brick work or openings can be
entertained).
▪ The reinforcement will be congested in the lower floors up to 4th floor thus max. slump (200mm) is required, so
cement content will be increased or self compacting concrete to be used for structures
▪ Number of holes will be more in the vertical wall, outer wall which is in direct contact with the rain, hole should be
grouted by Non Shrink compound.
Link-01 Link-02
RAPIDCLIMB
Introduction
Rapidclimb equipment provides a crane lifted jump
formwork system providing safe, self contained
working levels for economical core construction and
multi-lift wall structures.
The platforms and formwork are moved by crane as a
single assembly from pour to pour.
A rack & pinion operation trolley enables fast and
controlled pull back of the shutters from the poured
wall by up to 700mm to enable cleaning of the form
face and steelfixing.
The trolley is safely secured with a wedge locking
system. All form types can be accommodated for
straight, curved or inclined walls and forms can be
adjusted readily in level and side to side by +/- 25mm
Suspended platforms are designed with hinged
connections so that components can be attached at
low level to reduce work at height. Also, suspended
uprights are offset to facilitate anchor removal.
Rapid climb System
Pouring Platform
Rapidclimb Turnbuckle
Wall
Rapidclimb Bracket Main Platform (constructed
Guardrail Post using Aluminium Beam and
GTX & Plywood or
Rapidclimb Frame Customers Scaffold Boards
Assembly
Wind Restraint
Suspension Tube
700mm max
Roll-back Rapidclimb
Trolley Jack
It consists of
• Sole plates
• Wedges
• Props
• Head tree
• Planks
• Batten
• Ledgers
FOUR WAY
HEAD
3
1
4
3.FOUR WAY 4.FOLDING
I HEAD TRIPOD
FLEX TABLE TABLE FORMWORK SYSTEM
4
3
HD COUPLER
BEAM SPAN 1525
6.BEAM SPAN 2230
5.TOWER SPINDLE WITH LEVER LOAD BEARING MEMBER FOR
NUT BEAM
TO ADJUST THE HEIGHT OF TOWER 7
7.SHORT PROP
8.LTS-WHEEL B
IT IS USED IN SLAB AND BEAM
FORMWORK FOR TRANSFERRING TO BE FIXED WITH 8
THE SLAB LOAD TO THE BEARING BOTTOM FRAME OF STAIR
TOWERS THROUGH STANDARD TOWER / HDT TO SHIFT ONE
WALERS PLACE TO ANOTHER PLACE
Peri form materials are available in
1. Plywood as well as in
2. Steel
Cup-lock
Wing Nut
Steel Waller
Steel
Tension
Rod
▪ Tripod is the main basic
component of the system.
Secondary Girder
Main Girder
GT-24 Girder
Main Props
Intermediate Props
Peri Sky Deck Alluminium Forms
Arrangement of Wall Wall Formwork
Panels Before Concreting
Joining of four
panels through Cup
- lock, Steel Rod,
and Steel Waller
Column Panel
Supports
Column Formwork
Beam Head
Cross Head
CT Prop
Locker
Tripod
Beam Formwork
Comparison of different kinds of Formworks used
with in Construction Industry
207
Type of
Advantages Dis-advantages
formwork
• Durable, light weight, economical, flexible for easy erection.
• It exhibits good thermal insulation so it can be used in cold • High labor cost.Usually varies from 30 to 40%
climates. ofvtotal cost of concrete slab per floor.
• Its reusability varies from 10 to 12 times. • High waste generation.5% of waste is produced for
Unique advantages of timber formwork: a single use of formwork.
Timber formwork • It can be built piece by piece so capable enough to form any • Erection and dismantling is to be done piece by
concrete shape as per architectural design. piece.
• This system is economical for small scale projects • Very highly skilled labor force is needed.
• with limited potential reuse. • Spans are limited as timber has low strength
• It has low initial cost and make up cost. compared to metal formworks.
• Good for restricted site conditions less storage area and use
of crane is difficult.
• Lighter in weight compared to steel formwork due to its low
density.
• Large section can be made because the strength of
aluminum in handling tension and compression is more than
that of steel.
• No changes can be made if ones fabricated.
Aluminum • It can be easily handled by unskilled labor.
• Initial cost is very high.
Formwork • Reusability is more. Varies from 100-250.
• Not economical for small and non-recitative
• In case of high magnitude constructions where need of rapid
works.
erection, this system creates
exceptionally fine quality finish and precise dimension
good enough to receive painting directly without plastering
in a very short time.
• Monolithic construction with few construction joints can be
easily made.
Type of
Advantages Dis-advantages
formwork
• Does not provide field fabrication by itself so
• Unique shapes and patterns can be designed with
design and planning must be carefully done.
• excellent finishing with less or no surfacetreatment.
• It is not suitable for heat applied curing of
• No size limits
Plastic concrete.
• More reuses making it highly economical
formwork • Strengthening material (fiber glass) is to be
• Light weight
used to increase stiffness in construction of
• Easy to strip and handle.
large and higher floor areas of multi storied
• No need of skilled labor.
buildings.
• Simple, fast, easily adaptable.
• High quality work with minimum maintains cost.
• It is a completely pre-engineered system where
MIVAN methodology is planned to its finniest details. • Pre- engineering is needed for
formwork • Early removal of formwork with air curing • planning and execution.
• components are made with aluminum so they are
light in weight number of reputations is very high it is
around 250-300.
• It is Australian based company that produces timber, • Preside planning is need before execution
DOKA form
aluminum, and steel forms which has a wide • Skilled labor is need to handle the form work
works
application in all fields of construction sector. system.
Type of
Advantages Dis-advantages
formwork
• Uses mostly in huge construction projects where
large number of repetitions of same shuttering is
possible.
• It is good for curved structures like columns,
chimneys, tanks. • Heavy to carry and handle.
Steel
• It is strong, durable in nature. • Not suitable for curved and new architectural
formwork
• Its reusability varies from 100 to 120. shapes.
• Instillation and dismantled with greater speed can be
achieved with results in higher savings in labor cost.
• Water absorption is very less, so formation of honey
combs can be minimized.
Factors Affecting Conventional Mivan Coffor Peri Doka
Initial Cost
Weight
Re-use
Maintenance cost
Scrap Value
Construction speed
Volume of Required
material
Seismic Resistance
Formwork Material
Pilferage
Formwork Material
Shrinkage
Possibility of Damage
Handling of Equipment 20
9
Factors Affecting Conventional Mivan Coffor Peri Doka
Finishing
Reinforcement
Requirement
Monolithic Structure
Allied Accessories
No of post concrete
procedures