CAO'S COMMENTS:
This report provides Council with some initial insight into the 2022 operating budget
which has been impacted by inflationary costs and pandemic related impacts to revenues.
"Own Source Revenue" has not fully recovered from the pandemic ($637 thousand).
In spite of these challenges, Administration has balanced the 2022 operating budget by
applying 5% or $1,295,034 from Peace River Agreement (PRA) revenue. It has also been
helpful that property assessment values have increased which has allowed the City to keep
the tax mill rate relatively flat, resulting in tax revenue increasing by $1,732,165. Based
on an average residential property of $323,796 the additional tax revenue generated would
be almost $103 per property.
Attached are variance analyses at a summary level and at a detailed level of the operating
budget. For further reference, 2019 actual results are included to show the most recent
pre
pre--pandemic year against the proposed 2022 budget. There remain additional, significant
unfavourable expense variances compared to prepre--pandemic 2019 actual results such as
RCMP costs ($1.7 million); Transit costs ($393 thousand) and insurance costs ($140
thousand).
Holding the line on the expenses the City can control will be required for a number of
years, combined with anticipated increases in assessment values. If assessment values do
not increase from year to year, Council could also direct Administration to increase tax
revenue by a moderate 1%1%--2.50% for each of those future years to at least match inflation.
Council could also direct Administration to increase the current PRA contribution from 5%
to up to 10% but in doing so, the same level of contribution would have to occur year after
year until we can be in a position to reduce that level of reliance.
Over the next 5 years $175,402,895 is forecast to be spent on the Capital program.
KEY INFORMATION:
RELEVANT OBSERVATIONS:
It should be noted that in 2019, the City experienced a deficit of $360 thousand and that in
2020 there was a small surplus of $150 thousand. This highlights the fact that there is
really no fat in the City's operating budget. The results for 2021 will not be known until
April 2022 but may possibly show a modest operating surplus.
Goal No. 3 - Build and manage civic assets and human resources that support the
current and future needs of the community.
ESSENTIAL QUESTION:
1. With many other municipalities increasing their tax rate, would Council want to
have a modest tax rate increase of 1%
1%--2% and less reliance on PRA revenue?
2. If Council wants to reduce the tax revenue increase will it prefer to increase the
transfer of Peace River Agreement revenue to offset operating budget challenges?
3. What level of PRA contribution is recommended for the future, 2022 to 2026?
4. Is the intention to use PRA revenue on an annual basis and is there a willingness to
slowly reduce the City's reliance on PRA revenue for operational purposes in future
years?
UNINTENDED OUTCOMES:
DEPARTMENTS CONSULTED ON THIS REPORT to achieve the key results (pros and cons)
All departments
Attachments:
Preliminary 2022 Operating Budget Analysis (Summary)
Preliminary 2022 Operating Budget Analysis (Detailed)
Average Tax Revenue Increase per Property Class
Assessment Value Historical Perspective
Capital Project Listing with Descriptions 2022
Capital Projects 2022 - 2026
Operating and Capital Budget Presentation
RESPECTFULLY SUBMITTED:
David Joy, Chief Financial Officer
05 Nov 2021
Preliminary 2022 Operating Budget Analysis
2022 vs 2021
Pre-Pandemic Budgets
2019 Actuals 2021 Budget 2022 Budget Fav (Unfav)
Revenues
Actuarial Adjustments 620,004 661,706 762,575 100,869 15.24% Affected by LAS debt
Collection for other Governments 16,493,282 11,751,000 15,851,000 4,100,000 34.89% Offset by requisitions below
Government transfers 29,746,310 29,085,333 30,156,181 1,070,848 3.68% Casino $600k; Peace River Agreement $508k
Other Revenue from own Sources 10,007,437 8,513,089 9,283,483 770,394 9.05% Excluding Pool subsidy, favourable by $313k but $637k below pre-pandemic 2019
Payments/Grants in Lieu of Taxes 485,553 450,000 450,000 0 0.00%
Return on investment 2,023,975 1,256,000 768,500 (487,500) (38.81%) Lower reserves due to RCMP bldg project
Sale of Services 12,639,312 12,972,650 13,585,150 612,500 4.72% Increased rates for Water & Sewer
Services Provided to Other Governments 814,344 865,649 1,003,953 138,304 15.98% Increased to align with actuals
Taxes 31,644,308 32,261,325 34,643,730 2,382,405 7.38% Assessment values increased by 6.67%; LAS loan payments increased by 25%
Transfers In 613,900 2,695,474 1,148,353 (1,547,121) (57.40%) For 2021 we applied $1,012k from the Federal Restart Grant and $586k from Contingency reserves.
Total Revenues 105,088,425 100,512,226 107,652,925 7,140,699 7.10%
Expenses
Contracted and general services 15,654,886 16,500,767 17,183,495 (682,728) (4.14%) Transit $800k unfav; Internet $100k fav
Interest and Bank Charges 1,426,652 1,370,658 1,359,999 10,659 0.78%
Material, goods and supplies 3,809,887 4,334,601 4,993,790 (659,189) (15.21%) Pool repairs $514k; mobility hardware $94k; eqpmt $38k
Other Expenses 2,467,476 2,931,499 3,007,043 (75,544) (2.58%) Arts & Culture $33k; e-bill capability $18k; employee recognition $13k
Other tax requisitions 16,473,605 11,751,000 15,851,000 (4,100,000) (34.89%) Offset by collections above
Principal on Long Term Debt & Actuarial Adjustments 2,103,379 2,071,931 2,119,354 (47,423) (2.29%) added LAS borrowing in 2021 which came into affect for 2022
Salaries, wages and employee benefits 25,248,522 25,600,873 27,070,907 (1,470,034) (5.74%) Arts & Culture mgr; Economic Development coordinator; additional support for Health & Safety;
Transfers Out 36,019,770 33,890,817 33,968,737 (77,920) (0.23%) A function of grants received and transfers into reserves.
Utilities 2,224,542 2,060,080 2,098,600 (38,520) (1.87%)
Total Expenses 105,428,719 100,512,226 107,652,925 (7,140,699) (7.10%)
Net Total (340,294) - 0 0
Increase in Tax Revenue with Tax Rates Staying the Same $ 1,732,164.86
1-Residential 813,024
2-Utilities 8,232
4-Major Industries (52,230)
5-Light Industries (119,662)
6-Business/Other 1,075,370
8-Recreation/Non Profit 7,358
9-Farm 74
1,732,165
Average Property Values 2021 2022 2022 vs. 2021 2022 vs. 2016
Residential (from Prov of BC) $ 301,995 $ 323,796 7.22% (11.33%)
Utilities $ 150,662 $ 151,695 0.69% 45.79%
Major Industry $ 13,520,000 $ 12,589,500 (6.88%) 9.64%
Light Industry $ 1,062,654 $ 877,346 (17.44%) (18.64%)
Commercial $ 820,385 $ 878,195 7.05% (0.27%)
Non-Profit $ 464,714 $ 423,773 (8.81%) 200.82%
Farm $ 18,567 $ 16,800 (9.52%) (25.99%)
$ 16,338,977 $ 15,261,105 (6.60%) 8.43%
(2.26%) (6.60%)
Increase in Tax Revenue $ 1,732,164.86
1-Residential 813,024
2-Utilities 8,232
4-Major Industries (52,230)
5-Light Industries (119,662)
6-Business/Other 1,075,370
8-Recreation/Non Profit 7,358
9-Farm 74
1,732,165
Reduce the Tax Rate Further and Increase the Transfer from Peace River Agreement
Revenue
Would have to keep the same level of PRA contribution year after year.
NOT Recommended
Capital Project Program 2022
C1 - Roads & Sidewalks $22,605,000
C2 - Facilities $39,393,000
C3 - Water & Sewer $ 3,105,000
C4 - Equipment $ 6,113,781
C5 – Operating Projects $ 1,738,057
Total $72,954,838
Growth Projects
• C1 – 100th Street Rebuild
• C2 – New RCMP Detachment
• C2 – Trails Development Toboggan Hill
• C2 – Kin Park Upgrades
• C2 – Surerus Park Upgrades
How is the Capital Program Financed ?
Peace River Agreement 64,980,838 89.07%
Conditional - Provincial 909,000 1.25%
Sewer Capital Reserve 2,160,000 2.96%
Water Capital Reserve 3,130,000 4.29%
Debenture Proceeds 265,000 0.36%
Federal Gas Tax 1,150,000 1.58%
Development Cost Charges 360,000 0.49%
72,954,838 100.00%
$175,302,895 in Capital Projects over 5 Years
These are funds that will be used to pre-engineering of future projects. This is work that
2012-14 C1 Pre-Engineering for future projects must be completed the year prior to construction starts to allow for early tendering and Planning
ensure that cost estimates are correct and that no major changes need to be addressed
This is for overlay and hot asphalt patching of existing paved streets and intersection, this
2012-19 C1 Road Overlay - Major Maintenance work is required to ensure safe and efficient movement of traffic, both commercial, Maintenance
industrial and residential.
Camera and software upgrades. This is to add upgrades to the existing traffic control
boxes as well as UPS options. Includes cameras and integration of intersections, so that
the controllers communicate remotely for faster remediation of issues, traffic coordination
2012-23 C1 Traffic Signal Controller Upgrades and effective operations and maintenance. The UPS option will allow the lights to operate
Maintenance
during short power outages. (Current equipment is obsolete and no longer supported by
the vendor)
This project as an LAS project to upgrade the existing gravel road to a paved urban
Local Area Service
2016-60 C1 - LAS 81 Ave (89A St to 93 St) standard, which includes base reconstruction, storm sewer installation, concrete curb and
(LAS)
gutter, street lighting and asphalt.
Upgrade the existing gravel road to a paved urban standard, which includes base
reconstruction, storm sewer installation, concrete curb and gutter, sidewalk, street lighting
2016-74 C1 - 101 St (105 Ave to 108 Ave) and asphalt. In 2020 the storm sewer will be installed as part of a phased development for
New Initiative
the new RCMP building. 2022 - Completion of the project.
This is to upgrade this street with storm sewer, sidewalks, and improved street lighting.
2016-75 C1 - 112 Ave (103 St to 106 St) The base will be reconstructed, new curb and gutter, and asphalt. Reconstruction
The AC water main will also be replaced
This is to upgrade this street with storm sewer, sidewalks, and improved street lighting.
2016-82 C1 - 111 Ave Cul-de-sac (Peace River Rd to east end) The base will be reconstructed, new curb and gutter, and asphalt. Reconstruction
The AC water main will also be replaced
This is to upgrade this street with storm sewer, sidewalks, and improved street lighting.
2016-92 C1 - 82 St (100 Ave to 101 Ave) The base will be reconstructed, new curb and gutter, and asphalt. Reconstruction
This is in the east boundary extension area
Re-construct 100 Street from 96 Ave to 105 Ave. Replacing all water / sewer lines,
increase storm drainage, install wider sidewalks, additional lighting, traffic lights,
2018-41 C1 - 100 St Rebuild pedestrian crosswalks, park benches, planters, and trees with grates. Construction began in
Growth
2021 between 96 Ave and 98 Ave. 2022 construction will be from 98 Ave to 100 Ave.
Reconstruction of 109 Ave from 102 St to 106 St, with improved storm sewer and
2018-43 C1 - 109 Ave (102 St - 106 St) streetlighting, sidewalk, curb and gutter, base and asphalt surface. Reconstruction
AC water main will also be replaced
2021-32 C1 - Pedestrian Controlled Crosswalk 93 St - 94 Ave Construction of overhead pedestrian controlled flashing crosswalk signals Maintenance
Construction of a sidewalk along 84 St from 93 Ave to 100 Ave and improve the street
lighting - 2 year project.
2021-34 C1 - Sidewalks & Streetlighting 84 St (93 Ave - 100 Ave) 2022 - 93 Ave to 97 Ave
Reconstruction
2023 - 97 Ave to 100 Ave
Install a larger storm sewer on 93 ave between 102st and 100st. The existing storm line
2022-23 C1 - 93 Ave (102 - 100 St) has reached capacity and surcharges during large rain events. The project also includes Reconstruction
adding several streetlights and a road surface overlay.
Install three new bus shelters at locations throughout the City. Transit ridership will
continue to grow and providing protections from the elements may continue to encourage
2022-25 C1 - Bus Shelters and increase in ridership. Location of shelters will be at Canadian Tire, Subway, and
Equipment
100th/100th at Cultural Centre
As part of this subdivision the developer was to complete this portion of 108 St. Funds
2022-29 C1 - 108 St (114A Ave block) received from the developer as part of the subdivision process will be used to complete Reconstruction
this work. ($102,035.60 has been secured by the developer)
22,605,000
Relocate air handling units above council chambers. Continue with outside lighting
2012-49 C2 City Hall Reno's upgrade.
Facilities
2012-64 C2 North Peace Arena Replace three HVAC units. Replace five exhaust fans. Facilities
2022 - works will include a clean up of unpaved connector trails. Toboggan Hill
2012-82 C2 Trails Development (ALL) completion and CPTE- trees, benches, tree and shrub removal. Growth
Also additional lighting on existing trail-ways to be installed.
2022 - replace the Alaska Highway west sign and the 100 Street North entrance sign
2014-32 C2 Urban Tourism Sign Plan Additional signage will be added in several parks Facilities
Future plan - replace 100 Ave east sign
2022 - increased vandalism and criminal activity has created a requirement for additional
surveillance capacity in all of our public spaces. Playground upgrades are being completed
2015-14 C2 Parks Improvement: Existing Parks in Pickel Park in 2022. Park improvements of upgrading benches/ picnic tables, garbage
Reconstruction
can at various parks.
Complete the installation of a change room facilities for staff and install partitions for
2015-38 C2 Public Works Building Retrofit additional work stations.
Facilities
2022 - Update to maintenance garage, addition of ornamentation storage shed and a staff
2016-10 C2 Cemetery Upgrades washroom facility.
Facilities
2021 - the strategy for redeveloping these parks has matured. In 2021 in collaboration
with the completion of 96th street and trail construction we will do a full renovation on
Kin Park.
2016-17 C2 - Kin Park Upgrades Additions will include: washrooms, warming/gathering hut, multi-use trails, cross country Facilities
ski loop trials, skateboard/scooter trails, fitness circuit, batting cage, boarded rink (pickle
ball/hockey), family skating area, paved parking lot, bike track, picnic shelter, and food
truck parking.
This is for the new build of RCMP facility as per the Facilities Master Plan of 2014.
2016-20 C2 New RCMP FMP 2021 - 2023 Construction continuation (occupancy tentatively for 2023) Building
Funds will be possibly borrowed from the MFA in 2023
Develop a plan through Community Engagement, 100 street revitalization and user
groups to replace the exterior siding and windows. This would include class D estimates
for the 2023 budget year.
2016-31 C2 Cultural Centre Exterior Replacement 2023 - The windows are old and require replacing to be more efficient and the exterior
Facilities
siding needs to be replaced due to fading paint and damage. The plan would also align
with the new downtown revitalization plan.
2021-1 C2 - Parks and Grounds Building Funds will be used to incorporate the mechanics to work from this shop. Maintenance
2021- Implement Urban Forest Strategy with planting of civic, boulevard and park trees.
2021-3 C2 - Urban Forest Annual This will be an annual allocation.
Maintenance
Pave the lane between the Curling Rink and the Kids Arena Field House. Additional curb
2021-36 C2 - Lane Paving (Curling Rink / KAFH) and gutters will be added to help with drainage.
Maintenance
Due to the realignment of the roof in 2021 the roofing membrane has been stretched and
requires replacing. Replace another chiller due to age and with the continue with replacing
2022-3 C2 - NPA Roof Membrane Replacement the aging chillers. Conduct an engineering study for the Heat Recovery System on the ice
Facilities
plant condenser.
These improvements would include replacing another chiller, refinishing the wood beams
2022-8 C2-Pomeroy Sports Centre Improvements on exterior of the building and engineering study for the potential heat recovery from the Facilities
ice plant condenser and providing supplemental heat for the building.
Replace the existing DDC heating and cooling control system and start to replace the
floor coverings due to the heated flooring and type of floor covering is failing.
2022-9 C2- Firehall Improvements The existing exhaust system is not configured appropriately for the fire apparatus to be
Facilities
relocated within the apparatus bays.
The flooring throughout the main floor is showing its age. There are some areas that need
2022-11 C2 - Curling Club Flooring Replacement to be replaced. We would also be required to do a hazardous assessment on the existing Facilities
tile for asbestos and if present conduct an abatement to remove the old tile.
The plan would include main floor and upstairs. This will include new washrooms,
flooring throughout, small kitchen, accessible lift, new windows in the upstairs meeting
2022-13 C2- Kids Arena Field House Retrofit room, office addition upstairs, paint throughout and new front foyer and entry. This
Facilities
would also include a new fire alarm system.
2022-21 C2 - Toboggan Hill Park Parking Lot Paving This project is to add pavement, storm drainage and trees to the parking lot. Maintenance
39,393,000
These are funds that are designated for Water Main Looping and the installation of fire
hydrants in areas that are require a higher density of fire hydrants.
There has been a number of water mains installed over the last few years,there will be
2012-27 C3 - Water Main Looping and Fire Hydrant Installations further work completed on the installation of fire hydrants in areas that require a higher
New Initiative
density. There is also a component of AC watermain replacement in this work. For 2022,
we will continue along 100 Ave between 84 and 82 Street.
This is to rehabilitate 2 wells on alternate years. This restores the flow capacity of the
2012-29 C3 - High Lift Pump Station - Well Rehabilitation wells
Maintenance
2013-17 C3 - HLPS - Refurbish 500 HP Pump This is scheduled maintenance for the high lift pumps at the High Lift Pump Station. Maintenance
A gas tax -Capital Infrastructure - grant was applied for to improve treatment quality at
the South Lagoon, and build a truck filling facility that will allow users to haul treated
effluent away. A grant amount of $5,000,000 was approved, the remainder of the required
2015-51 C3 Resource Recovery Centre funds will come from sewer reserves
Sewer Uility
2019 - working on Phase 2; 2020 - delays in getting power delayed commissioning, the
project will be completed early in 2020
Slope Stability study to guide future infrastructure projects around the north and south
2018-48 C3 - Slope Stability lagoons and the outfall lines, plus the raw water transmission line and the High Lift Pump Planning
Station 2020 work will be to add additional support to the lagoons and overflow area.
2020-11 C3 - North Lagoon Berm Repairs This project would remediate sections of erosion along the North Lagoon holding cells. Maintenance
Identified in the Long Term Water Supply Study, a radial collector well system is the
preferred long term supply plan. This study will involve geophysical review and test
2020-26 C3 - Collector Well Study drilling to identify the feasibility of a radial collector at the existing well site.
Planning
2022 - Start Environmental Assessment process
The old outfall line from the North Lagoon has become exposed in Fish Creek and needs
2021-35 C3 Old North Lagoon Outfall Removal to be removed so as not to inhibit fish movements in the creek
Maintenance
This project is to purchase redundant equipment to keep the critical sewer PLC
2022-19 C3 PLC Upgrades Sewer infrastructure operating.
This project is to extend and connect the sanitary main form 112 ave to 115 ave along 93
2022-22 C3 93 Street Sanitary Extension st. The intent is to increase the capacity of the sewer mainlines during times of peak flows Sewer Uility
and to reduce potential mainline surcharging.
3,105,000
Replace 5 units as per our equipment fleet management schedule.
2012-2 C4 PW Pickup Trucks Add 3 additional units due to staffing increases
Equipment
Replacement of Engine 2 (Unit 19) - RFP out at the end of 2020 but the award of the
RFP will not be until 2021, carried 2020 funds over to 2021 for the 1st payment of the
replacement unit.
2013-36 C4 Fire Apparatus: LT Replacement - Engine 2 (Unit 19) The second payment will be expected in 2022 and delivery of this unit is expected in the Equipment
spring of 2022
This process requires an approximate 400 day build time for a fire apparatus - hence the
two year expense
This ice resurfacer will be an electric machine intended to reduce CO2 emissions an in the
building and will replace an existing machine
2020-6 C4 PSC Ice Resurfacer Will be using funds from the Green Inititiative Reserve for this purchase and should be
Equipment
included on the CARIP report. This machine was ordered but will not arrived until 2022
The Rubber Tracked excavator is used as the primary excavator for most excavations
2021-15 C4 PW Rubber Tracked Excavator within the City. The rubber tracks cause less damage to asphalt, concrete and landscaping.
Equipment
The CFSJ's current bulldozer will need significant repairs in the coming year. The
2021-16 C4 PW Bulldozer bulldozer was originally purchased to push snow at the public snow dump. Since the Equipment
bulldozer was acquired it has also been used to pile waste asphalt, concrete and dirt.
The forklift for the PSC has reached end of life. It requires constant maintenance and
2021-18 C4 PSC Forklift must be replaced.
Equipment
This low ground pressure mower is designed to cut grass in wet conditions. It is a four
wheel drive articulated unit equipped with summer and winter attachments.
2021-20 C4 GDS Cemetery Mower This project was changed in 2021 to purchasing 2x zero turn mowers for grass cutting
Equipment
including the cemetery.
The current trailers that are used by the mowing crews to transport the mowers and
2021-21 C4 GDS Landscape Trailer (2) trimmers have reached end of life and require replacement.
Equipment
This project is to replace the Utility Works Maintenance box truck. This truck houses
2021-26 C4 PW Utility Maintenance Equipment tools and a work area for operators on excavation sites.
Equipment
2022-1 C4 PSC Floor Scrubbers To replace 3 existing floor scrubbers for the PSC Equipment
2022-14 C4 PW Hydro Excavator with Rodder This project is to replace Unit 5 which has reached end of life. Equipment
This project is to supply water tanks with pumps that adapt to the hook lift configurations.
2022-15 C4 PW Hook Lift Water Tanks This would eliminate the need to purchase sole use water trucks and allow public works to Equipment
flush streets and water trees or irrigate simultaneously.
This project is to replace the aging Trackless sidewalk machine with a 275 Wille sidewalk
2022-16 C4 GDS Sidewalk Machine machine. This project includes the sidewalk machine and various brooms, blades, buckets Equipment
and blowers.
This porject is to purchase two (2) electric SUV's (ELV) for Community Services and
Bylaw. These units would be used to transport staff to various meetings, site visits and
2022-17 C4 CS Electric SUV (2) work locations. The initiative would act as a pilot and staff would monitor the
Equipment
effectiveness of the ELV's. These will be zero emissions vehicles.
This project would provide the Community Services Electrician a vehicle to hold tools
2022-18 C4 CS Service Van and small parts as well as a vehicle to travel to various facilities. The van will include Equipment
shelving and a secondary heater. To replace unit 83 - recreation van
This project is to purchase an electric lift to aid in the safe install/removal of glass from
2022-26 C4 PSC Electric Maintenance Vehicle the PSC hockey rinks.
Facilities
Upgrade of all mobile radios from an analog system to a digital capable radio system.
Mobile radios are hard mounted radios located in all of our fire apparatus, command unit
2022-27 C4 FD Mobile Radio Upgrade and duty vehicles. Included is the upgrade of the department pagers to digital capable
Equipment
pagers with a higher frequency range.
Dedicated Foam Trailer for Industrial Fires - Pull behind with a 300L Foam Concentrate
Tote. The trailer will have a monitor (deck) nozzle along with adapters to pull additional
2022-31 C4 FD Foam Trailer hand lines off. Water will be supplied by a fire apparatus and pumped through the foam
Equipment
manifold.
This project is to replace 4 zero turn mowers that are reaching end of life. These mowers
2022-33 C4 GDS Zero Turn Mowers are used in the maintenance of parks, sports fields, and cemeteries.
Equipment
6,113,781
The mission of the Resource Municipalities Coalition is to protect and enhance existing
resource municipalities and rural communities so that they continue to develop as
permanent, sustainable and vibrant communities providing a high quality of life for
existing and future residents. The Coalition supports the important role that the resource
2013-51 C5 - Northeast Resource Municipalities Coalition municipalities and rural communities play in supporting existing and future resource
Operating Project
development. As well resource municipalities and rural communities are economically
diversified and socially vibrant communities that will continue to develop and prosper in
the long term.
2022 - this project includes: the continuation of the brownfields strategy, replacement of
the trade show booth (slated for 2021 but did not happen), Downtown lot development
project funding, marketing of downtown properties, support for the Mayor's Standing
2015-45 C5 - Economic Development Initiatives Committee on Community Economic Recovery, implementation of the Social and
Planning
Economic Development Framework, funding for contract work related to economic
development, funding for economic development plan.
2022 - an annual allotment to cover the cost of surveys, environmental studies, legal fees
and other costs associated with the disposal or acquisition of lands. Funds may also be
used to implement the Downtown Action Plan by strategically releasing lands for
2017-12 C5 - Lands: acquisition and disposal development and to advance the City of Fort St. John's strategic objectives by acquiring
Planning
land for future use. Land acquisitions and disposition processes are guided by the Land
Acquisition and Disposition Framework.
The City's Official Community Plan (OCP) identifies Urban Development Areas (UDA)
that are earmarked for future development. Neighbourhood Plans more specifically locate
2018-2 C5 - Neighbourhood Plan Areas: Urban Development land uses and associated infrastructure, services and amenities to ensure applications to Growth
subdivide and develop lands are coordinated and consistent with the City's visions for
growth.
Develop a capital asset management plan and possibly implement a software program
once all records are updated and matching to our GIS system.
2018-50 C5 - Capital Asset Management Plan Completing the facilities asset management plan and incorporate the Asset Retirement
Operating Project
obligation requirements.
Fort St. John is a winter city. As part of a long term strategy to create a sustainable and
recruitable community, make full use of our city assets and revitalize our downtown, we
have developed a Winter City Micro project plan. These funds will be used to create
2018-51 C5 - Winter Cities Program winter city projects either on City owned properties or by assisting business or not for Planning
profits to implement aspects of the plan. The projects planned for 2020 will focus on
Mathews park with lighting, and a skating loop and working in the Downtown to
encourage winter lighting.
The Health and Safety (H&S) Master Plan identifies the need for a comprehensive review
of the City’s internal safety management systems. The H&S Master Plan will be used to
guide the City through further evaluation of current systems and assist in creating or
2020-3 C5 - Health & Safety Master Plan revising the City’s safety management systems and training programs, while fulfilling the Maintenance
City’s obligations under the Workers’ Compensation Act and other relevant legislation.
Funding will be used to complete projects identified in the H&S Master Plan and Project
Gantt Chart items
Budget for this project is to lose, amend, establish necessary ROW segments in specific
block sections along 100th Street for an 86-foot ROW road width. This includes survey
2020-20 C5 - 100th Street Rights-of-Way Segments and legal fees associated with this project. Requires budget over the next 2-3 years, 2020-
Planning
2023.
Completion of audit to include: Grounds Building, City Hall, Protective Services Building,
Pomeroy Sports Centre and Fire Hall No. 1 and include: structural, electrical, mechanical,
2020-28 C5 - Facilities Audit envelope, energy efficiency, external landscape and hardscape and Hazardous Material
Planning
Assessments. As wellfollowup audits on all previous facilities to assess work done.
Cost saving, efficiencies and consistency of data is expected under a multi-year contract
agreement with one company for acquiring ortho air photos and Lidar data over the next
2021-6 C5 - Air Photo and Lidar Contract 5 years. A Request for Proposals will be issued to find a suitable vendor to supply yearly
Growth
air photo and Lidar data every second year for a 5 year term.
To engage a consultant to complete a Community Wildfire Protection Plan for the City of
2021-8 C5 - FD Community Wildfire Protection Plan Fort St John.
Planning
Re-confire current office spaces between City Hall and beatton building and to devise a
2022-4 C5 Re-Configure Office spaces plan for future growth
Planning
This project would include staffing required to collect data and enter into the designated
2022-6 C5- FAC Preventative Maintenance Project software program. We currently have City works software and would hope to utilize the Facilities
existing software with an additional
This project will give the new Arts and Culture Manager the ability to develop a plan and
2022-7 C5- Arts and Culture Master Plan direction from the Community, user groups and City Council going forward into the Operating Project
future of Arts and Culture
2022-32 C5 - Bylaw Tech (x2) The hiring of two Bylaw Tech term positions from April 25, 2022 to September 3, 2022. Growth
1,738,057
72,954,838
Average Property Values 2014 2015 2016 2017 2018 2019 2020 2021 2022 2022 vs. 2021 2022 vs. 2016
Residential (from Prov of BC) $ 313,637 $ 349,073 $ 365,182 $ 348,839 $ 321,464 $ 312,840 $ 311,443 $ 301,995 $ 323,796 7.22% (11.33%)
Utilities $ 86,149 $ 90,140 $ 104,049 $ 109,248 $ 113,792 $ 130,538 $ 162,534 $ 150,662 $ 151,695 0.69% 45.79%
Major Industry $ 12,174,700 $ 11,455,367 $ 11,482,700 $ 11,013,700 $ 10,415,667 $ 10,091,667 $ 14,375,500 $ 13,520,000 $ 12,589,500 (6.88%) 9.64%
Light Industry $ 800,135 $ 961,883 $ 1,078,350 $ 997,394 $ 842,038 $ 880,295 $ 844,888 $ 1,062,654 $ 877,346 (17.44%) (18.64%)
Commercial $ 655,095 $ 776,642 $ 880,565 $ 844,228 $ 871,006 $ 858,380 $ 873,190 $ 820,385 $ 878,195 7.05% (0.27%)
Non-Profit $ 117,873 $ 74,488 $ 140,873 $ 91,529 $ 92,506 $ 119,292 $ 131,539 $ 464,714 $ 423,773 (8.81%) 200.82%
Farm $ 23,476 $ 22,699 $ 19,961 $ 20,980 $ 20,980 $ 17,068 $ 18,567 $ 16,800 (9.52%) (25.99%)
$ 14,147,589 $ 13,731,069 $ 14,074,418 $ 13,424,899 $ 12,677,453 $ 12,413,992 $ 16,716,162 $ 16,338,977 $ 15,261,105 (6.60%) 8.43%
(2.94%) 2.50% (4.61%) (5.57%) (2.08%) 34.66% (2.26%) (6.60%)
Avg Residential Tax Revenue 2014 2015 2016 2017 2018 2019 2020 2021 2022 2022 vs. 2021 2022 vs. 2016
Residential $ 1,686 $ 1,747 $ 1,780 $ 1,703 $ 1,646 $ 1,521 $ 1,714 $ 1,564 $ 1,677 $113 ($103)
Residential Tax Rates 5.1888 4.9608 4.7577 4.7577 4.8608 4.8608 5.5034 5.1797 5.1797 0.00% 8.87%
Heavy Industry - Louisiana Pacific OSB
2014 2015 2016 2017 2018 2019 2020 2021 2022 2022 vs. 2021 2022 vs. 2014
Major Industrial Assessment * $ 35,064,100 $ 34,366,100 $ 33,915,100 $ 33,041,100 $ 31,247,000 $ 30,275,000 $ 28,751,000 $ 27,040,000 $ 25,179,000 ($1,861,000) ($9,885,100)
Municipal Tax Revenue $ 1,009,636 $ 946,068 $ 895,430 $ 872,354 $ 842,853 $ 816,635 $ 775,527 $ 777,230 $ 723,738 ($53,492) ($285,898)
Major Industry Tax Rates 28.794 27.5291 26.4021 26.4021 26.9739 26.9739 26.9739 28.7437 28.7437 0.00% (0.17%)
* Louisiana-Pacific OSB, Canadian Forest Products
Division 2015 2016 2017 2018 2019 2020 2021 2022 2022 vs. 2021 2022 vs. 2015
NPLP 23.09 25.41 25.46 24.71 25.18 25.61 25.39 25.44 0.20% 10.18%
Sewer Utilities 5.56 5.65 5.38 6.38 8.01 6.81 6.81 7.71 13.22% 38.67%
Water Utilities 10.40 10.98 10.54 11.94 10.82 11.02 10.93 12.63 15.55% 21.44%
Total 39.05 42.04 41.38 43.03 44.01 43.44 43.13 45.78 6.14% 17.23%
Total FTEs 212.53 223.92 228.09 232.20 232.62 238.32 245.73 250.92 2.11% 18.06%
Z:\dept\3_gm_corporate\2-private\Budgets\2022\ 2022-01-14
Capital Projects Detail 2022-2026 Presentation 10:29 AM
C1 - Transportation, Roads, Sidewalks 2022 2023 2024 2025 2026
100 Street Rebuild X X
112 Avenue from 103 Street to 106 Street X
LAS 81 Avenue from 89A Street to 93 Street X
111 Avenue Cul-de-Sac from Peace River Road to East End X
93 Avenue (102 Street - 100 Street) X
82 Street (100 Avenue to 101 Avenue) X
101 Street (105 Avenue - 108 Avenue) X
Road Overlay - Major Maintenance X X X X X
Sidewalks and Streetlights 84 Street (83 Avenue-100 Avenue) X X
108 Street (114A Avenue block) X
Pedestrian Crosswalk 93 Street and 94 Avenue X
109 Avenue (102 Street to 104 Street) X X X
Pre-Engineering for future projects X X X X X
Traffic Signal Controller Upgrades X X X X X
Bus Shelters X
101 Avenue (104 Street to 108 Street) X X X
LAS 111 Avenue (98 Street to 100 Street) X
LAS 101 Avenue (79 Street to 86 Street) X X
102 Street (110 Avenue to 113 Avenue) X X
79 Avenue (90 Street to 93 Street) X X
LAS 73 Avenue (100 Street to East End) X
95 Avenue (95 Street to 96 Street) X X
Street Lights Conversion to LED X
LAS Beaver Road and 103 Street (Alaska Rd S - Cree Rd & 107 St.) X X
LAS 90 Street (77 Avenue to 81 Avenue) X X
98A Avenue (98 Street to 100 Street) X X
105 Avenue (106 Street to 108 Street) X X
LAS 98 Street (Alaska Road South to 85 Avenue) X X
105 Avenue (102 Street to 104 Street) X
93 Street (77 Avenue to 79 Avenue) X
104 Avenue (102 Street to 106 Street) X X
97 Avenue (100 Street to 102 Street) X X
LAS 105 Avenue (104 Street to West End CDC) X X
111 Avenue (100 Street to 102 Street) X X
90 Street (77 Avenue to 79 Avenue) X
89 Avenue (79A St to 86 Street) X X
103 Avenue (106 Street to 108 Street) X
100 Street (Cree Road to 85 Avenue) X
77 Avenue (90 Street to 93 Street) X
Total to be Spent on Roads = $78,160,000 22,605,000 14,645,000 13,365,000 16,360,000 11,185,000
Z:\dept\3_gm_corporate\2-private\Budgets\2022\ 2022-01-14
Capital Projects Detail 2022-2026 Presentation 10:29 AM
C2: Facilities, Buildings and Parks 2022 2023 2024 2025 2026
New RCMP Building X X
Kin Park Upgrades X X
Surerus Park Upgrades X X X
North Peace Arena X X
Toboggan Hill Park Parking Lot Paving X
Kids Arena Field House Retrofit X
North Peace Arena Roof Membrane Replacement X
Trails Development X X X X X
Pomeroy Sports Centre Upgrades X X X X
Lane Paving (Curling Rink / KAFH) X
Parks Improvement: Existing Parks X X X X X
Pomeroy Sports Centre Improvements X
Cemetery Upgrades X X
Fire Training Centre X
Urban Tourism Sign Plan X X
Visitor Centre Construction Project X X X X
Firehall Improvements X
Urban Forest Annual X X X X
Public Works Expansion X
City Hall Renovations X
Cultural Centre Exterior Replacement X X X X X
Curling Club Flooring Replacement X
Parks and Grounds Building X
Pre-Engineering for Future Projects X X X X
Pomeroy Sports Centre Acoustics X
Retrofit Old RCMP Building X X X
Matthew's Park Parking Lot Paving X
Total Spent on Facilities, Buildings and Parks = $72,548,000 39,393,000 19,060,000 10,735,000 2,460,000 900,000
Z:\dept\3_gm_corporate\2-private\Budgets\2022\ 2022-01-14
Capital Projects Detail 2022-2026 Presentation 10:29 AM
C4: Equipment, Vehicles, Machinery 2021 2022 2023 2024 2025
IT Infrastructure X X X X X
IT Software/Systems Development X X X X
Fire Apparatus: Long Term Replacement - Engine 2 X
Public Works Hydro Excavator with Rodder X
PW Bulldozer X
Office Technology - Replacements/Additions X X X X X
Public Works Pickup Trucks X X X X X
GDS Sidewalk Machine X
Ice Resurfacer X
Fire Department Mobile Radio Upgrade X
Public Works Rubber Tracked Excavator X
Public Works Utility Maintenance Equipment X
Public Works Hook Lift Water Tanks X
Community Services Electric SUV (2) X
Grounds Department Zero Turn Mowers X
Fire Department Foam Trailer X
Grounds Department Cemetery Mower X
Grounds Department Landscape Trailer X
Community Services Service Van X
Pomery Sports Centre Forklift X
Pomeroy Sports Centre Floor Scrubbers X
Pomeroy Sports Centre Electric Maintenance Vehicle X
Public Works Grader X
Total to be Spent = $12,091,781 6,113,781 2,563,000 1,164,000 1,531,000 720,000
Z:\dept\3_gm_corporate\2-private\Budgets\2022\ 2022-01-14
Capital Projects Detail 2022-2026 Presentation 10:29 AM
Z:\dept\3_gm_corporate\2-private\Budgets\2022\ 2022-01-14
Capital Projects Detail 2022-2026 Presentation 10:29 AM
Peace River Agreement 64,980,838 89.07%
Conditional - Provincial 909,000 1.25%
Sewer Capital Reserve 2,160,000 2.96%
Water Capital Reserve 3,130,000 4.29%
Debenture Proceeds 265,000 0.36%
Federal Gas Tax 1,150,000 1.58%
Development Cost Charges 360,000 0.49%
72,954,838 100.00%
Z:\dept\3_gm_corporate\2-private\Budgets\2022\ 2022-01-14
Capital Projects Detail 2022-2026 Presentation 10:29 AM