0% found this document useful (0 votes)
256 views

Copie de Start Up and Commissioning Checklist 1

This document is a checklist for starting up and commissioning a Caterpillar C4.4 genset. It contains sections to check the fuel system, lube system, alarms, starter and battery. Some specific items included are verifying the fuel tank level, priming the fuel filter, checking for fuel leaks, testing the jacket oil heater and lube oil pressures, verifying alarm functions, inspecting starter wiring, and confirming the batteries are properly installed and charged. The service engineer is to work through the checklist with the customer to start up and commission the genset according to factory standards.

Uploaded by

Amin Thabet
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
256 views

Copie de Start Up and Commissioning Checklist 1

This document is a checklist for starting up and commissioning a Caterpillar C4.4 genset. It contains sections to check the fuel system, lube system, alarms, starter and battery. Some specific items included are verifying the fuel tank level, priming the fuel filter, checking for fuel leaks, testing the jacket oil heater and lube oil pressures, verifying alarm functions, inspecting starter wiring, and confirming the batteries are properly installed and charged. The service engineer is to work through the checklist with the customer to start up and commission the genset according to factory standards.

Uploaded by

Amin Thabet
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

C4,4 Genset Startup &

Commissioning Checklist
Cover Sheet
Italicized Items relate to Tier IV Compliance

SERVICE REPRESENTATIVE:
Selling Dealer: PARENIN Service Request #:
Service Engineer: Atef chouchene
Selling Dealer Address: City:
State/Province/Country: Zip Code:
Date of Service:
Commissioning Date:
Service Dealer (if Different than
Selling Dlr):

Service Dealer Address: City

State/Province/Country: Zip Code:

LOCATION OF THE SYSTEM:

Customer Name: SCIN Project Name (if applicable): INTERCEPTEUR 27 METRES

Street Address: City:

State/Province/Country: Zip Code:


Main Contact Name: Telephone Number:
Alt. Contact Name: Telephone Number:

PRODUCT INFORMATION
Engine Serial #: Generator Set Serial #: L1K01702/ L1K01708/L1K01703/
Engine Arrangement #: Generator Serial #: L1K01701
Engine Model Group: Generator Arrangement #:
Type of installation: Generator Model #: C4.4

Rated Speed: 1500 RPM Voltage: 400 V

Low Idle: Frequency: 50 HZ

High Idle: Amperage:

Timing: Rating: 38 Ekw

Set Point Timing Verfified: Yes Yes No N/A Fuel Type: diesel
Delegated final assembly
Engine Derate: contract #:

Caterpillar: Confidential Green


#
ENVIROMENTAL CONDITIONS
Ambient Temperature: 25° C Elevation: Sea Level

Engine Room Temp: Relative Humidity:


Atmospheric Conditions:

STORAGE AND INSULATION


Visual Inspection Before
Generator Dried for 48 Hours Start-up -- Grease, Water,
Before Start-up (See Debris, (Foreign Material)
SEHS9124): Yes Yes No N/A Yes Yes No N/A
Drying Method:

INSTALLING ELECTRICIAN:

Company Name: EBE

Electrician Name: Telephone Number:

INSTALLATION AND LOAD

1 Neutral Grounding Systems Yes Yes No N/A 10 Unit connected in parallel Yes Yes No N/A

2 Enclosure Weather Tight No Yes No N/A 11 Load Diagram Created & Saved Yes Yes No N/A

3 Proper Ventilation Yes Yes No N/A 12 Full Load Data Created & Saved Yes Yes No N/A

4 Description of load Vesssel 27 mertes


5 Motor SKVA
6 Motor Total HP
7 UPS Manufacturer
8 UPS Model Number/Size
9 UPS Serial Number
COMMENTS AND RECOMMENDATIONS:

CUSTOMER AUTHORIZATION TO SERVICE/TEST:

Customer Rep. Signature: Date:

Service Engineer Signature: Date:

Was Customer Offered ESC? Yes No N/A If no, why not?

SITE SPECIFICATIONS:
Job delays and problems:

Caterpillar: Confidential Green


#
CUSTOMER ACCEPTANCE:

Start-up and commissioning is complete within factory standards.


Customer Rep. Signature: Date:

Service Engineer Signature: Date:

Caterpillar: Confidential Green


#
CATERPILLAR C4,4 GENSET START-UP & COMMISSIONING CHECKLIST

CAUTION! Only qualified personnel who have been trained to support the product should attempt to proceed
with startup.

Note: Service Engineer must communicate with customer to understand site requirements for Personal
Protective Equipment (PPE), Lockout and other safety procedures.
Start-up

1. Fuel System and Fuel Storage


1 Properly sized fuel lines Yes Yes No N/A 10 Foot valve installed & operational N/A Yes No N/A
2 Fuel transfer pump properly installed Yes Yes No N/A 11 Correct valve installed in the return Yes Yes No N/A
3 Tank fuel level is verified Yes Yes No N/A 12 Check for fuel leaks Yes Yes No N/A
4 Fuel tank mounting is level Yes Yes No N/A 13 Critical fuel level shutdown No Yes No N/A
5 Fuel filter primed Yes Yes No N/A 14 Proper operation of fuel tank alarms No Yes No N/A
6 Fuel filter not damaged Yes Yes No N/A 15 High fuel level gauge stops pump No Yes No N/A
7 Properly vented fuel tanks No Yes No N/A 16 Shutoff valves are operating properly No Yes No N/A
8 Fuel tank plugs properly installed Yes Yes No N/A 17 Solenoid valve operating properly Yes Yes No N/A
9 Off package fuel lines are proper material Yes Yes No N/A 18 ULSD sticker on all fuel filling points N/A Yes No N/A
Notes:
Pas de réniflard installé sur le tank / capteur niveau bas et haut tank non installé

2. Lube System
1 Jacket oil heater operational Yes Yes No N/A 6 Check pre-lube installation N/A Yes No N/A
2 Oil sample taken (SOS) No Yes No N/A 7 Check for leaks Yes Yes No N/A
3 Install crankcase breather hose if necessary; check Yes Yes No N/A 8 Oil pressures within specifications Yes Yes No N/A
for proper installation & routing
4 Pipes routed through front end of base Yes Yes No N/A 9 Oil meets specifications Yes Yes No N/A
5 Remove crankcase covers, plugs & tape Yes Yes No N/A 10 CAT DEO-ULS/ API CJ 4 oil sticker on all engine Yes Yes No N/A
lube filling points
Notes:
Analyse de huile sera effectué après commissioning

3. Alarm Verification
1 Low water level Yes Yes No N/A 12 Over crank Yes Yes No N/A
2 High water temperature Yes Yes No N/A 13 Battery charger Yes Yes No N/A
3 Low water temperature N/A Yes No N/A 14 Over AC Voltage Yes Yes No N/A
4 Low oil pressure Yes Yes No N/A 15 Under AC Voltage Yes Yes No N/A

Caterpillar: Confidential Green


#
5 Low oil level N/A Yes No N/A 16 Under Frequency Yes Yes No N/A
6 Low fuel level N/A Yes No N/A 17 High / low battery voltage Yes Yes No N/A
7 High fuel level N/A Yes No N/A 18 Reverse power real Yes Yes No N/A
8 Over speed Yes Yes No N/A 19 Reverse power reactive Yes Yes No N/A
9 E-Stop Yes Yes No N/A 20 Yes No N/A
10 Crank termination systems Yes Yes No N/A 21 Yes No N/A
11 Low DC Voltage Yes Yes No N/A
Notes:

4. Starter & Battery


1 Inspect starter wiring Yes Yes No N/A 9 Battery cables & racks properly installed Yes Yes No N/A
2 Starter operational check Yes Yes No N/A 10 Proper electrolyte level & proper specific gravity N/A Yes No N/A
3 Cycle crank timer Yes Yes No N/A 11 Proper system voltage Yes Yes No N/A
4 Check battery boosts / float controls Yes Yes No N/A 12 Trickle charger Yes No N/A
5 Battery charging alternator operational check Yes Yes No N/A 13 Confirm auto start Yes Yes No N/A
6 Batteries connected properly Yes Yes No N/A 14 Charging alternator guards in place & secure Yes Yes No N/A
7 Batteries isolated from floor Yes Yes No N/A 15 Charging alternator belts properly inspected and Yes Yes No N/A
adjusted
8 Batteries charged (deep cycle) before use Yes Yes No N/A
Notes:
Batterie à gel sans entretien

5. Cooling System (Jacket Water and SCAC Systems)


Note: Refer to Engine News article SEBD9844 for the process for filling the coolant system.
1 Check for leaks Yes Yes No N/A 10 High water temperature shutdown Yes Yes No N/A
2 Check coolant level Yes Yes No N/A 11 Expansion tank highest level Yes Yes No N/A
3 Check for damage & unusual noise Yes Yes No N/A 12 All guards & shrouds installed with proper Yes Yes No N/A
clearance
4 Filler cap & seal installed properly Yes Yes No N/A 13 Discharge air unobstructed Yes Yes No N/A
5 Check antifreeze (refer to A&I Guide) Yes Yes No N/A 14 Cooling fan control strategy documented and N/A Yes No N/A
verified
6 Isolation valves & drain valves installed Yes Yes No N/A 15 Customer controlled fan: record ATAAC outlet N/A Yes No N/A
temperature when fan fully on (50 C minimum)
7 Drain valves routed correctly Yes Yes No N/A 16 Customer controlled fan: record jacket water outlet N/A Yes No N/A
temp when fan fully on
8 Correct condition, alignment, and tension of fan Yes Yes No N/A 17 Verify sufficient cooling/air flow provisions per A&I Yes Yes No N/A
belts / pulleys guide
9 Auxiliary supply voltage to fans correct N/A Yes No N/A
Notes:

Caterpillar: Confidential Green


#
6. Mechanical
1 Package properly mounted Yes Yes No N/A 4 Over speed shut-down is correct Yes Yes No N/A
2 Package supports & vibration isolators installed Yes Yes No N/A 5 Over-crank shut-down is correct Yes Yes No N/A
3 Air shut-off is operational N/A Yes No N/A 6 Motorized dampers are operational N/A Yes No N/A
Notes:

7. Gen Syst - Electrical


1 Check AC & DC electrical Yes Yes No N/A 10 Over voltage protection Yes Yes No N/A
2 Check for loose wiring & secure Yes Yes No N/A 11 Over current protection Yes Yes No N/A
3 Verify phase sequence of wiring Yes Yes No N/A 12 Check diodes Yes Yes No N/A
4 Confirm stator RTD's are functional N/A Yes No N/A 13 Correct generator wiring configuration Yes Yes No N/A
5 Annunciators installed & wiring is complete N/A Yes No N/A 14 Complete generator alignment process Yes Yes No N/A
6 Electrical bonding of services is complete Yes Yes No N/A 15 Unit is properly grounded (REHS4634) Yes Yes No N/A
7 Interconnects complete & ready for load test Yes Yes No N/A 16 Adjust voltage Yes Yes No N/A
8 Connections completed to transfer switch N/A Yes No N/A 17 All covers are in position Yes Yes No N/A
9 Fuse & fuse ratings are verified Yes Yes No N/A 18 Adjust frequency Yes Yes No N/A
Notes:
La charge n'est pas équilibré sur les trois phases

8. Gen Syst - Control Panel


1 Secure all wires Yes Yes No N/A 9 Check generator system controls Yes Yes No N/A
2 Check all wire terminations for tightness Yes Yes No N/A 10 Verify settings (correct as needed) Yes Yes No N/A
3 Energize set & system controls Yes Yes No N/A 11 Check software & upload latest version Yes Yes No N/A
4 Verify operation of annunciator N/A Yes No N/A 12 Check condition / operation of meters Yes Yes No N/A
5 Check auto / manual stop operation Yes Yes No N/A 13 Remote emergency stop wired / functional Yes Yes No N/A
6 Check generator local controls Yes Yes No N/A 14 Calibrations are checked Yes Yes No N/A
7 Check generator remote controls Yes Yes No N/A 15 Select set parameters on system (ECM download) Yes Yes No N/A
8 Verify interconnect wiring Yes Yes No N/A
Notes:

Caterpillar: Confidential Green


#
9. Gen Syst - Circuit Breakers
1 Test any alarms / shunt trip Yes Yes No N/A 3 Verify against generator Volts / Amps Yes Yes No N/A
2 Check for tight connections Yes Yes No N/A 4 Set circuit breaker trip unit for site conditions Yes Yes No N/A
Notes:

10. Gen Syst - Voltage Regulators


1 All settings verified Yes Yes No N/A 4 Install latest software version N/A Yes No N/A
2 Check cross current compensation circuit Yes Yes No N/A 5 VR PID loop gains configured and recorded Yes Yes No N/A
3 Check voltage power factor regulation Yes Yes No N/A
Notes: