0% found this document useful (0 votes)
457 views2 pages

Commissioning Form - Crane Truck

This document is a commissioning inspection checklist for a crane truck. It contains 14 sections checking various parts and systems of the crane truck, including the cab/operator station, lamps/electrical accessories, steering/implement systems, engine, and other items. Any issues found during inspection are noted in the comment column. Upon completion, the commissioning team signs off that the crane truck has passed inspection and is approved for use.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
457 views2 pages

Commissioning Form - Crane Truck

This document is a commissioning inspection checklist for a crane truck. It contains 14 sections checking various parts and systems of the crane truck, including the cab/operator station, lamps/electrical accessories, steering/implement systems, engine, and other items. Any issues found during inspection are noted in the comment column. Upon completion, the commissioning team signs off that the crane truck has passed inspection and is approved for use.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

WEDASAFE MANAGEMENT SYSTEM WS-OHS-FM-040

COMMISSIONING INSPECTION CHECK LIST


CRANE TRUCK
Date of Commissioning : Brand :
Main Company : Unit Model :
Sub Contractor : Build Year :
Unit Number : SMU / ODOMETER :
Serial Number : Closed Date :
No ITEMS / DESCRIPTION GOOD FAIL N/A COMMENT
1.1 Call Sign on 4 Sides of Equipment/Nomor unit 4 posisi
2. REQUIREMENT of CABIN / OPERATOR’S STATION
2.1 Radio RIG /Radio RIG
2.2 Operator Seat and Seat Belt/Sabuk Pengaman Operator
2.3 ROPS / FOPS
2.4 Fire Extinguisher / APAR
2.5 Instrument Panel / Panel Instrumen
2.6 Horn / Klakson
2.7 Interior Cabin / Interior Kabin
2.8 Windshield / Kaca Kabin
2.9 Windshield Wiper and Washer / Air pembersih kaca & karet
wiper
2.10 Doors and Lock / Pintu dan Kunci
2.11 Air Conditioner
2.12 Fatigue Alarm / Alarm Fatigue
2.13 Speed Buzzer / Buzzer Kecepatan
3. LAMPS and ELECTRICAL ACCESSORIES
3.1 Head Lamps / Lampu Utama
3.2 Reverse Lamps / Lampu Mundur
3.3 Hazard and Sign Lamps / Lampu Sign dan Tanda Bahaya
3.4 Flash/ Rotary light
3.5 Stop Lamps / Lampu Stop
3.6 Fog Lamps (if equipped) / Lampu Kabut
3.7 Back Up / Reverse Alarm / Alarm Mundur
3.8 Lock Out and Tag Out Switch / LOTO Switch
3.9 Battery Isolation Switch / Switch battery
3.10 Emergency Shutdown Push Switch / Tombol Emergency STOP
3.11 Battery and Cable Connection/ Kondisi battery dan kabel
4. STEERING and IMPLEMENT SYSTEM
4.1 Tires and Rims / Roda dan Velg
4.2 Steering Wheel and Linkage/ Kemudi roda dan Tirod
4.3 Secondary / Emergency Steering System and Function
Sistem kemudi Emergency (jika tersedia)
4.4 Steering System and Hydraulic Lines / Sistem kemudi
4.5 Parking Brake System and Function/ Sistem Rem Parkir & Fungsi
4.6 Retarder Brake System and Function/ Sistem Rem Retarder
4.7 Emergency Brake System and Function /Sistem Rem Emergency
dan fungsi (jika tersedia)
4.8 Service Brake System and Function /Sistem rem service & fungsi
4.9 Implement and swing lock control and function
4.10 Jack
4.11 DRUM/Roda Sling, Sling
4.12 Hook
5. ENGINE and OTHERS
5.1 Engine Condition of Leakage / Kondisi kebocoran mesin
5.2 Hydraulic Cylinders and Lines Condition/ Kondisi cylinder
hidraulik dan pipa hidraulik
5.3 Ladder, Footstep / Tangga, pijakan kaki
5.4 Rear View Mirror/ Kaca Spion
5.5 Handrail and Handhold/ Pengangan tangan
5.6 Muffler Pipe Cap / Pipa Knalpot
5.7 Wheel chock 2x
5.8 Traffic cones 2x
Comments

COMMISSIONING TEAM:
Nama / Jabatan / Tanda Tangan / Rekomendasi / Recomendation
Name Position Sign

THIS PIECE OF EQUIPMENT HAS BEEN INSPECTED AND HAS NOW PASSED THE COMMISSIONING PROCESS

Operation Manager : ______________________ Signature: _____________________

Mine Technical Manager (KTT) : ______________________ Signature: _____________________

Re-commissioning required (Circle) YES / NO Date required (If applicable) ____________________