0% found this document useful (0 votes)
66 views

13 - Bill of Materials Format

The document provides a cost estimate for a proposed two-storey residential building with a carport. It includes line item estimates for earthworks, structural works including concrete and reinforced steel, roofing works, masonry, architectural elements, ceiling finishes, plumbing, and electrical. The total material cost for the project is estimated to be 74,004.84.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
66 views

13 - Bill of Materials Format

The document provides a cost estimate for a proposed two-storey residential building with a carport. It includes line item estimates for earthworks, structural works including concrete and reinforced steel, roofing works, masonry, architectural elements, ceiling finishes, plumbing, and electrical. The total material cost for the project is estimated to be 74,004.84.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Project : Proposed Two Storey Residential Building (Carport)

Location :
Owner :

Item No. Description Quantity Unit Unit Cost

A. EARTH WORKS
A.1 Excavation 4.62 cu.m.
A.2 Backfill/Compaction 1.69 cu.m.
A.3 Embankment 4.15 cu.m.

Subtotal (Earthworks)

B. STRUCTURAL WORKS
B.1 Concrete works
a. Slab 2.00 cu.m. 3,000.00
RMC (3000psi, G-1 @ 28Days)
b. Materials(columns and Beams 2.00
Cement 20.00 bags 213.00
Sand 1.00 cu.m. 200.00
Gravel 2.00 cu.m. 900.00

Subtotal

B.2 Reinforced Steel Bars


a. Materials
Reinforced Steel Bars
16mmdia x 6.00m 17.00 pcs 299.28
16mmdia x 7.50m 6.00 pcs 374.10
9mm dia x 6.00m 29.00 pcs 73.00

Subtotal

Subtotal (Structural Works)

C. ROOFING WORKS
C.1 Roof Framing Works 1.00 lot
a. Materials
2" x 4" C Purlins 7.00 pcs 518.00
2" x 6" C Purlins 1.00 pcs 630.00
.60mm x 45mm x 5m Metal battens 9.00 pcs 205.00
tekscrew 60.00 pcs. 0.75
Subtotal

C.2 Roofings & accessories


a. Materials(include insulation) 1.00 lot 19,500.00

Subtotal

Sub-Total (Roofing Works)

D. MASONRY
D.1 4" thk. CHB 17.48 sq.m.
a. Materials
4" thk. CHB 228.00 pcs 5.50
Cement 10.00 bags 213.00
Sand 0.50 cu.m. 200.00
RSB (9mm dia x 6.00) 10.00 pcs 73.00

Subtotal

D.3 Plastering 34.96 sq.m.


a. Materials
Cement 10.00 bags 213.00
Sand 1.00 cu.m. 200.00

Subtotal

Subtotal (Masonry Works)

E. ARCHITECTURAL
E.1 Pebble washout 27.56 sq.m.
a. Materials
Black Pebble #10 13.00 bags 80.00
Black Pebble #5 5.00 bags 80.00
Cement 15.00 bags 213.00
40 x 40 Non-Slip Tiles 49.00 pcs

Subtotal

E.2 Paver 6.50 sq.m.


a. Materials
4"x 8"paver 350.00 pcs. 9.00

Subtotal
E.3 Pre cast 5.00 l.m
a. Materials
4" pre cast 5.00 l.m 100.00
Cement 3.00 bag 213.00

Subtotal

Subtotal (Architectural)

F. CEILING FINISHES
F.1 Flexboard Ceiling - flat ceiling 27.72 sq.m.
a. Materials
Carrying Channel 10.00 pcs 81.00
Furring Channel 8.00 pcs 64.00
Wall Angle 9.00 pcs 23.00
Furring Clip 28.00 pcs 2.15
Blind Rivets 3/4" 0.50 boxes 95.00
Flexboard 6.0mm 12.00 pcs 460.00

Subtotal (Ceiling Finishes)

G. PLUMBING (DOWNSPOUT) 1.00 lot


a. Materials
3" dia PVC pipe 2.00 pcs. 375.20
3" PVC elbow 6.00 pcs. 34.30
Solvent Cement 0.50 can 1,295.00

Subtotal (Plumbing)

H. Electrical
a. Materials
4" Pinlight 4.00 sets 72.10
Wall Lamp w/ CFL 9watts 2.00 pcs. 600.00
9W CFL E27 230V Daylight 2.00 pcs. 66.46
Push Botton Switch 1.00 pcs. 288.00
Duplex Weatherproof Outlet w/ Cover 1.00 pc. 511.76

Subtotal (Electrical)

Grand Total
Matl.Cost

6,000.00

4,260.00
200.00
1,800.00

12,260.00

5,087.76
2,244.60
2,117.00

9,449.36

21,709.36

3,626.00
630.00
1,845.00
45.00
6,146.00

19,500.00

19,500.00

25,646.00

1,254.00
2,130.00
100.00
730.00

4,214.00

2,130.00
200.00

2,330.00

6,544.00

1,040.00
400.00
3,195.00

4,635.00

3,150.00

3,150.00
500.00
639.00

1,139.00

8,924.00

810.00
512.00
207.00
60.20
47.50
5,520.00

7,156.70

750.40
205.80
647.50

1,603.70

288.40
1,200.00
132.92
288.00
511.76

2,421.08

74,004.84