Sir Syed University of Engineering & Technology (SSUET)

The document contains details of 4 lab assignments for a simulation and modeling course. Lab 1 involves creating a basic process model in Arena and observing simulation results. Lab 2 adds replication, plotting of model characteristics, and sensitivity analysis. Lab 3 analyzes the decide module. Lab 4 examines the batch and assign modules in modeling an assembly line that packs bottles into boxes. The labs involve hands-on modeling, running simulations, and analyzing performance measures from the Arena reports.

Uploaded by

Madiha Tahir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
268 views62 pages

Sir Syed University of Engineering & Technology (SSUET)

The document contains details of 4 lab assignments for a simulation and modeling course. Lab 1 involves creating a basic process model in Arena and observing simulation results. Lab 2 adds replication, plotting of model characteristics, and sensitivity analysis. Lab 3 analyzes the decide module. Lab 4 examines the batch and assign modules in modeling an assembly line that packs bottles into boxes. The labs involve hands-on modeling, running simulations, and analyzing performance measures from the Arena reports.

Uploaded by

Madiha Tahir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 62

Simulation and Modeling (CE- SSUET/QR/114

Sir Syed University of Engineering &


Technology (SSUET)

Software Engineering Department

Course Name: Software Project


Management Semester: 7thC

ASSIGNMNET NO. 3

Course Teachers:
MISS FARAH
Submitted By:
Umme Farwa Leelani
2018-SE-123
Simulation and Modeling (CE- SSUET/QR/114

LAB NO:1
Create, Process, Dispose module
OBJECTIVE:
To create an Arena model using flow chat modules and observe the results of the simulation run.

LAB TASK:
observe the report and fill performance measurement table (PMT)
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114

LAB NO 2
Simulation and Modeling (CE- SSUET/QR/114

Replication & Plot


OBJECTIVE:
To define the replication in ARENA and plot different characteristics of entities queue and resources.

LAB TASK
 Plot at least one characteristic of queue, entities and resources.
 Make 5 replication of simulation run fill the PMT for each replication.
 Change Arrivals from 5 to 2.5 run the model for 5 replications and fill PMT.
 Change the length of model to 720min.inter arrival time back to 5 and fill the PMT.
 Suppose that machine need to be setup for 2 min before processing each part. Change the delay type
and run length to 1440 min and fill PMT.
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114

LAB NO :3
Decide Module

OBJECTIVE:
To analyze decide module and its types.

LAB TASK:

1. Create part machine that works on part to decide whether they are good or bad.
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114
Performance Measure Where to look In AREENA Result
reports
Total production Entity. Number out 50

Average delay in queue Queue. Waiting time-Average 0.04

Maximum delay in queue Queue. Waiting time- -7.95


Maximum value
Average time in system Entity. Total Time- Average 0.053

Maximum time in system Entity. Total Time – -7.93


Maximum value
Time-average num. of parts in Queue. Number Waiting- 2.72
queue Average
Maximum number of parts in Queue. Number Waiting-Max- -5.27
queue value
Machine utilization Resource Utilization 0.98

2. Decide if part is good, exit the system, and if part is bad decide further.
a) Change entity picture.
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114
Performance Measure Where to look In AREENA Result
reports
Total production Entity. Number out 50

Average delay in queue Queue. Waiting time-Average -49.95

Maximum delay in queue Queue. Waiting time- -7.95


Maximum value
Average time in system Entity. Total Time- Average -49.93

Maximum time in system Entity. Total Time – -7.93


Maximum value
Time-average num. of parts in Queue. Number Waiting- -47.27
queue Average
Maximum number of parts in Queue. Number Waiting-Max- -5.27
queue value
Machine utilization Resource Utilization 0.98

3. Decide to trash the part or not. If bad part is greater than 5 than trash and exit
otherwise back to machine.
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114

Performance Measure Where to look In AREENA Result


reports
Total production Entity. Number out 50

Average delay in queue Queue. Waiting time-Average -49.95

Maximum delay in queue Queue. Waiting time- -7.95


Maximum value
Average time in system Entity. Total Time- Average -49.93

Maximum time in system Entity. Total Time – -7.93


Maximum value
Time-average num. of parts in Queue. Number Waiting- -47.27
queue Average
Maximum number of parts in Queue. Number Waiting-Max- -5.27
queue value
Machine utilization Resource Utilization 0.98
Simulation and Modeling (CE- SSUET/QR/114
4. Make a model of Movie Rental system
Description: Customer enters the store and decide which type of movie they
would like to rent. After making this decision, they proceed to the appropriate part
of the store, and make their selections. After renting a movie, the customer is
faced with the decision of whether or not they would like to buy some popcorn. If
they decide to buy popcorn, they go to the popcorn cart and get it, then go to the
checkout line. If they decide not to get popcorn, they go directly to the checkout
line.
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114
Performance Measure Where to look In AREENA Result
reports
Total production Entity. Number out 150

Average delay in queue Queue. Waiting time-Average Not Generated report

Maximum delay in queue Queue. Waiting time- Not Generated report


Maximum value
Average time in system Entity. Total Time- Average Average Not Generated report

Maximum time in system Entity. Total Time – -1


Maximum value
Time-average num. of parts in Queue. Number Waiting- Not Generated report
queue Average
Maximum number of parts in Queue. Number Waiting-Max- Not Generated report
queue value
Machine utilization Resource Utilization Not Generated report
Simulation and Modeling (CE- SSUET/QR/114

LAB NO.4
Batch and Assign Module
Objective:
To analyze the Batch and Assign module
Lab task:
1. An assembly line creates a box for packing. Each box contains six bottle at a time. create the
scenario using batch module.
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114

Performance Measure Where to look In AREENA Result


reports
Total production Entity. Number out 200

Average delay in queue Queue. Waiting time-Average 0

Maximum delay in queue Queue. Waiting time- -37.01


Maximum value
Average time in system Entity. Total Time- Average 0

Maximum time in system Entity. Total Time – -37.01


Maximum value
Time-average num. of parts in Queue. Number Waiting- 0
queue Average
Maximum number of parts in Queue. Number Waiting-Max- -1.74
queue value
Machine utilization Resource Utilization No report generated
Simulation and Modeling (CE- SSUET/QR/114

2. Change the box size to same color/same picture of bottles.


Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114
Performance Measure Where to look In AREENA Result
reports
Total production Entity. Number out 200

Average delay in queue Queue. Waiting time-Average 0.01

Maximum delay in queue Queue. Waiting time- -98.69


Maximum value
Average time in system Entity. Total Time- Average 0.01

Maximum time in system Entity. Total Time – -98.69


Maximum value
Time-average num. of parts in Queue. Number Waiting- 0
queue Average
Maximum number of parts in Queue. Number Waiting-Max- -104.59
queue value
Machine utilization Resource Utilization No report generated

3. Change the box size to 16.


I have already changed the size to 16 in task # 2.
Simulation and Modeling (CE- SSUET/QR/114

LAB NO.5
Separate and Record
Module
Objective:

To analyze the Separate and Record module.

LAB TASK:
Design a scenario for the billing department.
Invoices arrive in the billing department to be billed to the customer. At random; some of the accounts
are audited by a supervisor. The others are billed normally. Some of the invoices are for commercial
accounts, which have special contracts as to how they should be billed. These accounts are handled in a
different area than the normal bills. Once they are ready to be printed, however, all print on the same
printer, and are mailed in the same way. After the bills go out the revenue and sales figure are reported to
accounting department. The Accounts receivable department also gets a copy of the bill for future AR
follow-up.
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114

LAB NO 6
Queue Variables
Objective:
Analyze Queue variables

Lab Task:

1. Movie theater system

Design Movie Theater in which customer arriving in the cinema house then assign a picture then will
check if the queue is greater than 10(limit of a queue) exit the ticket queue and go somewhere else.
After getting the ticket, check for refreshment. There are two canteens: satellite canteen and a main
canteen. People select refreshment from the available canteens otherwise they will leave the food queue.
Also record how many people leave the food queue and ticket queue so that theater administration takes
necessary actions for maintaining the theater After taking refreshment customer leaves the lobby and
enter the theater.
Simulation and Modeling (CE- SSUET/QR/114

LAB NO 7

Data module

objective:
To create an Arena model using Data modules and observe the results of the simulation run.

LAB TASKS:
 Set priority by using the two create module.
 Set priority by using the create, decide and the parts with respect to attribute by using assign
module.
 Repeat task 2 Set Name: Machine ,Type :Resource, Members: Add Machine 1,Machine 2
 Again go to process module delete Resource (go to type select Set ) Set name: Machine, Selection
Rule: Cyclical ,Save Attribute: Entity come in system save.
 Generate a model in which machine based on schedule .(Type: Based on Schedule, Capacity:
Machine , Sc.Name: Machine 1 schedule, Schedule Rule: Wait
Simulation and Modeling (CE- SSUET/QR/114

ENTITIY NUMBER IN QUEUE:

TIME IN QUEUE:

WAITITNG TIME:

RESOURCE UTILIZATION:
Simulation and Modeling (CE- SSUET/QR/114

LAB NO:8
Station and Route Module

Objective:
To analyze the Station and Route module.

Lab Task # 1:

a) Create a lab scenario in which 150 students are arrived for the test. All students take 2 mints apply
delay of 2 mints, between students to complete the test.
Simulation and Modeling (CE- SSUET/QR/114

b) Repeat scenario no 1 with delay distribution of max 5 and min 2 mins.

Lab Task # 2:

a) Create a bus stop scenario in which 5 persons come to bus stop every min. bus take delay of 25mins.
The capacity of bus is 20 (space). Use hold and signal module the wait the value is 1, write the queue time
and process time.

Model:
Simulation and Modeling (CE- SSUET/QR/114

Delay and signal:

Output:
Simulation and Modeling (CE- SSUET/QR/114

b) Hold type change wait to infinite and run the scenario

HOLD BLOCK:

OUTPUT:

c) Repeat the scenario with the replication of 5 and run 1000, write queue time and process time.

RUN STEUP:
Simulation and Modeling (CE- SSUET/QR/114

OUTPUT:
Simulation and Modeling (CE- SSUET/QR/114

Lab no :9

Hold and Signal Module

OBJECTIVE:
To analyze the Hold and Signal module.

LAB TASK:

1(a) Create a lab scenario in which 150 students are arrived for the test .All students take 2 mints apply
delay of 2 mints, between students to complete the test.
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114

(b) Repeat scenario no 1 with delay distribution of max 5 and min 2 mints.
Simulation and Modeling (CE- SSUET/QR/114
2a Create a bus stop scenario in which 5 person come to bus stop every min. bus take delay of
25mins. The capacity of bus is 20 (space).Use hold and signal module the wait the value is 1, write
the queue time and process time.
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114

2b) Hold type change wait to infinite and run the scenario

2c Repeat the scenario with the replication of 5 and run 1000, write queue time and process time.
Simulation and Modeling (CE- SSUET/QR/114

LAB NO 10:

Search, Pickup and Dropoff Module

Module Objective: To analyze the Search, Pickup and Drop-off module.


LAB TASK
Public bus Transportation System:
Design a model of public bus transportation simulates a bus that moves between
different points, picking up and dropping off passengers.

Delay and signal:


Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114

LAB 11
Seize and Release Module

OBJECTIVE: To analyze the Seize and Release module.


Lab Task: Design a model to seize and release the resource. Choose your own scenario.
Simulation and Modeling (CE- SSUET/QR/114

LAB NO.12
Gather and Disperse Module
Objective: To analyze the Gather and Disperse module.
Lab Task: Design a model to gather and disperse the resource in the Hospital management scenario.
Simulation and Modeling (CE- SSUET/QR/114
Simulation and Modeling (CE- SSUET/QR/114