0% found this document useful (0 votes)
913 views11 pages

Capstone Project Diary (22058) : DIPLOMA IN - Academic Year (2021 - 2022)

This document outlines guidelines and schedules for students to complete their capstone projects at the Marathwada Institute of Technology. It includes a table with the expected activities and timeline for project completion on a monthly basis from September to May. The document also includes sections for students to log their completed activities each month and reflect on weaknesses and remedial actions. Signatures from the project guide, coordinator, and department head are required each month to track project progress.

Uploaded by

Kill You
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
913 views11 pages

Capstone Project Diary (22058) : DIPLOMA IN - Academic Year (2021 - 2022)

This document outlines guidelines and schedules for students to complete their capstone projects at the Marathwada Institute of Technology. It includes a table with the expected activities and timeline for project completion on a monthly basis from September to May. The document also includes sections for students to log their completed activities each month and reflect on weaknesses and remedial actions. Signatures from the project guide, coordinator, and department head are required each month to track project progress.

Uploaded by

Kill You
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

G.S.

Mandal’s
MARATHWADA INSTITUTE OF TECHNOLOGY
(POLYTECHNIC), Aurangabad
MIT Campus, Beed Bypass Road, Aurangabad – 431 010. (M.S.); India.
Phone (Principal): (0240) 2375333, (Office): 2375303; Fax: (0240) 2376230,
E-mail: [email protected], Website: www.mit.asia, http://polyaurangabad.mit.asia
(Approved by AICTE New Delhi, DTE Mumbai & Affiliated to MSBTE Mumbai (MS)
DTE Code: 2224 MSBTE Code: 0066

CAPSTONE PROJECT DIARY (22058)


DIPLOMA IN _______________________________
Academic Year (2021 - 2022)

Sr.
Name of Student Roll No. Mobile No. Name of Guide
No.
1
2
3
4

Project Title: -_________________________________________________________________


______________________________________________________________________________

Project Group ID: - __________________

Name of Project Guide: -_____________________________________________________

Interdisciplinary Project Coordinator: - _________________________________________


1. Project Schedule
The project comprises of various tasks. Each group of student is expected to follow the following
activity schedule till completion of project.

GUIDELINES TO ALL FINAL YEAR STUENTS FOR PROJECT WORK COMPLETION


Sr.
ACTIVITY Sep Oct Nov Dec Jan Feb March April May
No.

1 Project group Formation √


Project Titles & 3 Abstracts Submission
2 along with the seminar on each abstract √
& Project & Project Guide Allotment
Preparing Project Plan & Literature
3 √
review
4 Preparing literature review report √

5 Preparing presentation √

6 First Internal Review √


Main Project Design & Testing,
7 Troubleshooting. Writing the Software if √
applicable
Experiment, Result analysis &
8 √
conclusion for second internal review.
Second Internal Review with Final
9 discussion & compilation of PROJECT √
IN ALL AESPECTS
Primary/ draft Copy of Project Report &
PPT as per Predefined Formats. Guides
10 √
Approval with Corrections if any and
prepare Final Copy of Project Report.
Final Internal Review with
11 Demonstration of working PROJECT √
READY IN ALL ASPECTS
Paper presentation and/or Project
12 √ √
Competition participation.
Project Report Submission as per
13 √
Submission Schedule
14 MSBTE External Project Examination √

1. Above action plan should be strictly followed by all Final year Students .The follow up from the
students should be taken by respective guides & guides should report to HOD.
2. The Project Work Book will be verified by HOD every month to check the status of work carried out.
2. Record of Activities Carried Out by Student (Logbook)
[You may also record here the points discussed/ to be discussed with your guide]

Month/ Activities Carried Out (September) Sign of


Date Project
Guide
1st Week

2nd Week

3rd Week

4th Week

Sr.
Name of Staff Remark Signature
No.
1 Project Coordinator:
2 HOD:
[You may also record here the points discussed/ to be discussed with your guide]

Month/ Activities Carried Out (October) Sign of


Date Project
Guide
1st Week

2nd Week

3rd Week

4th Week

Sr.
Name of Staff Remark Signature
No.
1 Project Coordinator:
2 HOD:
[You may also record here the points discussed/ to be discussed with your guide]

Month/ Activities Carried Out (November) Sign of


Date Project
Guide
1st Week

2nd Week

3rd Week

4th Week

Sr.
Name of Staff Remark Signature
No.
1 Project Coordinator:
2 HOD:
[You may also record here the points discussed/ to be discussed with your guide]

Month/ Activities Carried Out (December) Sign of


Date Project
Guide
1st Week

2nd Week

3rd Week

4th Week

Sr.
Name of Staff Remark Signature
No.
1 Project Coordinator:
2 HOD:
[You may also record here the points discussed/ to be discussed with your guide]

Month/ Activities Carried Out (January) Sign of


Date Project
Guide
1st Week

2nd Week

3rd Week

4th Week

Sr.
Name of Staff Remark Signature
No.
1 Project Coordinator:
2 HOD:
[You may also record here the points discussed/ to be discussed with your guide]

Month/ Activities Carried Out (February) Sign of


Date Project
Guide
1st Week

2nd Week

3rd Week

4th Week

Sr.
Name of Staff Remark Signature
No.
1 Project Coordinator:
2 HOD:
[You may also record here the points discussed/ to be discussed with your guide]

Month/ Activities Carried Out (March) Sign of


Date Project
Guide
1st Week

2nd Week

3rd Week

4th Week

Sr. Name of Staff Remark Signature


No.
1 Project Coordinator:
2 HOD:
3. Self learning and reflection (Portfolio – Chintan manan)
[You may also record here the weakness and their remedial action related to group work]

Sign of
Month/
Activities Carried Out (April) Project
Date
Guide
1st Week

2nd Week

3rd Week

4th Week

Sr.
Name of Staff Remark Signature
No.
1 Project Coordinator:
2 HOD:
[You may also record here the weakness and their remedial action related to group work]

Sign of
Month/
Activities Carried Out (May) Project
Date
Guide
1st Week

2nd Week

3rd Week

4th Week

Sr.
Name of Staff Remark Signature
No.
1 Project Coordinator:
2 HOD: