0% found this document useful (0 votes)
110 views

C102501 Sapcellpp SAP Details: - : PFA T-Codes For Your Reference - PP

The document provides SAP transaction codes related to production planning and materials management. It lists 11 transaction codes for tasks like routing and BOM display, planned order creation, picklist generation, production order release and confirmation, stock checking, and warehouse stock display. Production planning involves creating planned orders, converting them to production orders, releasing and confirming the orders. Materials management transactions allow viewing stock levels, BOM structures, and supplier details.

Uploaded by

vema reddy.R
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
110 views

C102501 Sapcellpp SAP Details: - : PFA T-Codes For Your Reference - PP

The document provides SAP transaction codes related to production planning and materials management. It lists 11 transaction codes for tasks like routing and BOM display, planned order creation, picklist generation, production order release and confirmation, stock checking, and warehouse stock display. Production planning involves creating planned orders, converting them to production orders, releasing and confirming the orders. Materials management transactions allow viewing stock levels, BOM structures, and supplier details.

Uploaded by

vema reddy.R
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

C102501; sapcellpp

SAP details: -
1) RM material stock report. /Particular material RM.
Ans : mmbe,
2) Material stock report. /Particular part
3) WIP stock report details Bom part wise /with child parts.
4) Quality clearance details./ particular part wise
5) Part details /SAP BOM/ Routing of BOM
6) Pending PO report. / particular pending po
7) DC details of Sub contractors
8) One Part issues/Received supplier details
9) Dispatch details report/ One Part dispatch details report.
PP production and planning
Md11-Planned order creation (nmd11)
/nmd04- convert planned order to production order
Zmb21-Picklist
PDF-shift+1
/Zco02- production order release
Zco11- order confirmation
Coois – copy production order no. and check the details.
PFA T-Codes for your reference -PP
SI NO T-CODE TRANSACTIONS

1 CA03 ROUTING

2 CS03 BOM

3 MD04 STOCK OVER VIEW

4 MD11 Planed order creation

5 ZMB21 PCKLIST GENERATON

6 ZCO02 PRODUCTION RELEASE

7 ZCO11 ORDER CONFIRMATION

8 MMBE STOCK CHECK

9 COOIS Production order


information

10 ZBOM Multilevel BOM explorer

Display Material

11 MM03

MB52 : Warehouse
12 stock display

You might also like