Bihar State Power Transmission Company Limited: Page 1 of 29
Bihar State Power Transmission Company Limited: Page 1 of 29
Code 1 Indicates place where testing is planned to be performed i.e. Inspection Code 2 Indicates who has to perform the tests i.e. Testing Agency
location
P Component Manufacturer itself W By Equipment manufacturer during raw material / bought out component inspection
Q Component Manufacturer and Equipment Manufacturer X By Contractor during product/process inspection
R Y By BSPTCL during product/process inspection
Component Manufacturer, Equipment Manufacturer and Contractor
S Equipment Manufacturer itself
Z By Contractor and/or BSPTCL during product/process inspection
T Equipment Manufacturer and Contractor
U Equipment Manufacturer, Contractor and BSPTCL
V Third Party itself
Code 5 Whether specific approval of sub-vendor / Component make is Code 6 Whether test records required to be submitted after final inspection for issuance of
envisaged? Dispatch Clearances / Instructions ?
E Envisaged Y Yes
N Not Envisaged N No
Page 1 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
Components/ Reference
Sr. Type of Quantum of Check / Acceptance Format of Applicable Codes
Operation & document Remarks
No. Check Sampling with basis Norms Record
Description of Test for Testing
1 2 3 4 5 6
1.1 Structural Steel E Structural Steel to be procured from
(Sections and Plates) BSPTCL approved Sources. For re-
rollers specific approval of BSPTCL is
to be ensured and Dispatch Instruction
for every lot at re-roller’s works.
1.1.1 Mechanical Properties
(a) Test For 2 - Samples for IS: 410 N/mm² BSPTCL A J S Z N
Ultimate cast/heat size up to 2062:2011 (Min.) REPORT
Tensile 100 MT Grade E250A
Strength BSPTCL
3 - Samples for cast Specn.
/heat size between
100-200 MT
IS:
4 - Samples for 2062:2011 490 N/mm²
cast/heat size over Grade E350A (Min)
200 MT
Page 2 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
Components/
Reference Applicable Codes
Sr. Operation & Type of Quantum of Check / Format of
document for Acceptance Norms Remarks
No. Description of Check Sampling with basis Record
Testing
Test
1 2 3 4 5 6
IS: 2062:2011 below 20 mm min
Grade E 350 A 350 N/mm²
& 20-40 mm
BSPTCL Specn. min 330 N/mm²
above 40 mm
min 320 N/mm²
(c) Percentage 2 - Samples for cast/heat size IS: 2062:2011 23% Min. BSPTCL A J S Z N
Elongation at up to 100 MT Grade E250 A REPORT
5.65√Area 3 - Samples for cast/heat size &
between 100-200 MT BSPTCL Specn.
4 - Samples for cast/heat size
over 200 MT as per
IS 2062:2011
IS: 2062:2011 22% min.
Grade E 350 A
BSPTCL Specn.
(d) Bend Test 1 Sample for 50 MT per IS: 2062:2011 Piece at room temp. BSPTCL A J S Z N
Section per cast or Part thereof Grade E250 A shall with stand REPORT
as per IS 2062-2011 BSPTCL Specn. bending through
180 degree to an
internal dia
Page 3 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
1.1.2 Chemical Chemical 2 - Samples for cast size up to 100 As per As per Chemistry BSPTCL A J S Z - N
Composition Analysis MT Chemistry enclosed for each REPORT / / /
3 - Samples for cast size between enclosed for source D L V
100-200 MT each source
4 - Samples for cast size over 200
MT as per IS 2062 :2006
Page 4 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
Components/
Reference Applicable Codes Remarks
Sr. Operation & Quantum of Check / Format of
Type of Check document for Acceptance Norms
No. Description of Sampling with basis Record
Testing
Test
1 2 3 4 5 6
1.1.4 Dimensional Measurement One sample IS 808/ BSPTCL A J S Z N
Inspection for 50 MT / IS 1730 / REPORT
Section or IS 1852 &
Part Thereof BSPTCL Specn.
Angle section
Page 5 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
e) Weight Tolerance Unit Weight Test One sample IS 1852 / i) Up to 3 mm thick (BSPTCL A J S Z N
For Angle Sections for 50 MT / IS 808 ±5% REPORT)
Section or ii) > 3 mm thick
Part Thereof + 5%, - 3 %
over weights specified
in IS 808
Plate
a) Weight Unit Weight Test One sample for IS 1852 / +5%, -2.5% over (BSPTCL B K * Z - Y *P/U as per
Tolerances 50 MT / Section or part IS 1730 weights specified in REPORT) BSPTCL approval
thereof IS 1730
Page 6 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
Quantum of Format
Components/ Operation Type of Reference document Applicable Codes
Sr. No. Check / Sampling Acceptance Norms of Remarks
& Description of Test Check for Testing
with basis Record
1 2 3 4 5 6
1.2 Zinc E
To be procured from
BSPTCL approved
sources or Imported LME
registered source
Chemical Composition Chemical One sample for IS 209/IS 13229 IS 209/IS 13229 TPL D L V W N
Analysis 100MT or Reports
Part thereof
Chemical Composition Chemical One sample of IS 209/IS 13229 Min Zinc purity 98.5% TPL D L V W N
Analysis molten zinc taken Reports
from bath per
quarter
Page 7 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
ANNEXURE – I
Chemical Composition
Note: For Blooms size 150x150 mm and above Al and Si shall be read as follows:
Page 8 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
Page 9 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
Element C18 HMn-HT (E350) C20 MMn-For MS (E250) C18 MMn-For MS (E250)
C 0.15- 0.20 0.17- 0.23 0.15- 0.21
Mn 1.20- 1.50 0.6-1.0 0.6-1.0
Si 0.15- 0.30 0.10- 0.40 0.10-0.40
P 0.03 max 0.040 max 0.040 max
S 0.03 max 0.040 max 0.040 max
Cr 0.07 max 0.07 max 0.07 max
Al 0.015 min 0.010 min 0.010 min
Ni 0.07 max 0.07 max 0.07 max
Cu 0.10 max 0.10 max 0.10 max
Mo 0.07 max 0.07 max 0.07 max
V 0.030 min - -
V+Nb+Ti ≤0.25 ≤0.25 ≤0.25
CE 0.45 max 0.42 max 0.42 max
Permissible variation in Jindal Chemistry in angles specified max or under min limits-
Page 10 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
Permissible variation in Adhunik Metaliks Chemistry in angles specified max or under min limits-
Page 11 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
Element C18 HMn-HT (E350) C20 HMn-HT (E350) C18 MMn MS (E250) C20 MMn- MS (E250)
C 0.15- 0.20 0.15- 0.20 0.15- 0.20 0.17- 0.23
Mn 1.20- 1.50 1.20-1.50 0.6-1.0 0.6-1.0
Si 0.15- 0.35 0.15- 0.35 0.15-0.35 0.15-0.35
P 0.035 max 0.035 max 0.035 max 0.035 max
S 0.035 max 0.035 max 0.035 max 0.035 max
V 0.030 min 0.030 min - -
Al 0.015 -0.035 0.015 -0.035 0.010-0.035 0.010-0.035
CE 0.38-0.42 max 0.38-0.42 max 0.41 max 0.41 max
Permissible variation in Jayaswal Neco Industries Ltd Chemistry in angles specified max or under min limits-
Page 12 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
C20 MMn-For MS
Element (%) C18 HMn-HT (E350) C20 HMn-HT (E350) C18 MMn-For MS (E250)
(E250)
C 0.15 - 0.20 0.17 - 0.20 0.15 - 0.20 0.17 - 0.21
Mn 1.20 - 1.50 1.20 - 1.50 0.60 -1.00 0.60 -1.00
Si 0.15 - 0.35 0.15 - 0.35 0.15 - 0.30 0.15 - 0.30
P 0.035 max 0.035 max 0.035 max 0.035 max
S 0.035 max 0.035 max 0.035 max 0.035 max
Cr 0.05 max 0.05 max 0.05 max 0.05 max
Al 0.020 min 0.020 min 0.025 max 0.025 max
Ni 0.05 max 0.05 max 0.05 max 0.05 max
Cu 0.05 max 0.05 max 0.05 max 0.05 max
Mo 0.05 max 0.05 max 0.05 max 0.05 max
V 0.030 min 0.030 min - -
Ti 0.010 max 0.010 max 0.010 max 0.010 max
V+Nb+Ti 0.15 max 0.15 max 0.15 max 0.15 max
CE 0.44 max 0.44 max 0.39 max 0.39 max
Page 13 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
Permissible variation in Visa Steel Limited in angles specified max or under min limits-
Element C18HMn-For HT (E350) C20 MMn-For MS (E250) C18 MMn for MS (E250)
C 0.15- 0.20 0.17- 0.23 0.15- 0.21
Mn 1.20- 1.50 0.6- 1.00 0.6- 1.00
Si 0.15- 0.30 0.10-0.40 0.10-0.40
P 0.03 max 0.04 max 0.04 max
S 0.03 max 0.04 max 0.04 max
Cr 0.07 max 0.07 max 0.07 max
Ni 0.10 max 0.07 max 0.07 max
Cu 0.10 max 0.10 max 0.10 max
Al 0.015 min 0.002 min 0.002 min
Mo 0.010 max 0.010 max 0.010 max
V 0.030 min - -
V+Nb+Ti ≤0.25 ≤0.25 ≤0.25
CE 0.45 max 0.42 max 0.42 max
Page 14 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
Page 15 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
I.Monnet Ispat & Energy Ltd: Chemistry of MS & HT billets including tolerance
Element C18HMn-For HT (E350) C20 MMn-For MS (E250) C18 MMn for MS (E250)
C 0.17- 0.21 0.18- 0.22 0.16- 0.20
Mn 1.20- 1.35 0.6- 0.8 0.6- 0.8
Si 0.15- 0.30 0.15-0.30 0.15-0.30
P 0.03 max 0.04 max 0.04 max
S 0.03 max 0.04 max 0.04 max
Cr 0.05 max 0.05 max 0.05 max
Ni 0.05 max 0.05 max 0.05 max
Cu 0.05 max 0.05 max 0.05 max
Mo 0.05 max 0.05 max 0.05 max
V 0.025 min - -
V+Nb+Ti ≤0.15 ≤0.15 ≤0.15
CE 0.45 max 0.42 max 0.42 max
Page 16 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
Page 17 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
B. In Process Inspection
Quantum of
Components/ Reference
Type of Check / Format of Applicable Codes
Sr. No. Operation & document for Acceptance Norms Remarks
Check Sampling with Record
Description of Test Testing
basis
1 2 3 4 5 6
2.0 INPROCESS
INSPECTION
Fabrication of Tower IS 802 Part II/
Parts IS 7215/
BSPTCL approved
Drwg., Shop
Sketches
(a) Straightening Visual 100%
(b) Cropping (Cutting) Dime- 1st Piece and Length Tolerance BSPTCL A J S Z - N
nsional every 50th Piece ± 2 mm REPORT
The cut surface
to be clean, reasonable square & free
from distortion
(c) Stamping Visual 1st Piece and Letter size as per -do- A J S Z - N
every 50th Piece BSPTCL Specn. /
TPL norms
Page 18 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
(d) Punching / Drilling Dime- 1st Piece and Holes for bolts shall be drilled -do- A J S Z - N
nsional every 50th Piece or punched with a jig but
drilled holes shall be preferred.
The punching may be adopted
for thickness up to 12 mm.
Tolerances regarding punch
holes should be as follows:
a)Holes must be perfectly
circular and no tolerances in
this respect are possible.
b)The maximum allowable
difference in diameter of the
holes on the two sides of plates
or angle is 0.8mm,i.e the
allowable taper in a punched
hole should not exceed 0.8mm
on diameter.
c)Holes must be square with
the plates or angles and have
their walls parallel.
Page 19 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
B. In Process Inspection
Components/ Quantum of
Reference document for Format of Applicable Codes
Sr. No. Operation & Type of Check Check / Sampling Acceptance Norms Remarks
Testing Record
Description of Test with basis
1 2 3 4 5 6
(e) Edge Security Dimensional 1st Piece and every IS 802 Part II/ -do- A J S Z - N
50th Piece IS 7215/
BSPTCL approved Drwg.,
Shop Sketches
(i) For 13.5 mm dia Sheared 20mm Min.
Hole Rolled 16mm Min.
(f) Drilling & Punching 1st Piece and Tolerance cumulative and -do- A J S Z - N
Hole To Hole every 50th Piece between consecutive hole
Distance shall be within
± 2 mm and ± 1mm
respectively
Page 20 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
B. In Process Inspection
Components/
Type of Quantum of Check / Reference document Format of Applicable Codes
Sr. No. Operation & Acceptance Norms Remarks
Check Sampling with basis for Testing Record
Description of Test
1 2 3 4 5 6
(h) Heel Cutting Dimensi- 1st Piece and every BSPTCL for members -do- A J S Z - N
onal 50th Piece Approved Drwgs./ > 12mm thick
Shop Sketches gas cutting to be adopted
followed
By grinding/Machine cutting.
Tolerance on heel cutting length
+10mm
(i) Bending 100% Pieces IS 802( Part II)/ (1) HT Sections / Plates -do- A J S Z - N
IS 7215/ BSPTCL All Sections & all plates to be
Approved Drawing / hot bent.
Shop Sketches
Page 21 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
B. In Process Inspection
Quantum of
Components/
Check / Acceptance Format of Applicable Codes
Sr. No. Operation & Type of Check Reference document for Testing Remarks
Sampling with Norms Record
Description of Test
basis
1 2 3 4 5 6
(j) Welding (a) WPS As per BSPTCL Technical -do- WPS approval
Approval specn./approved by BSPTCL
(Welding Drg./BSPTCL approved Welding
procedure procedure & Welder`s qualification
specification)
(b) PQR/WQR Dispatch
Approval A J U Y - N Instructions at
(Procedure black stage for
/Welder welded
qualification members
record)
Page 22 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
B. In Process Inspection
Quantum of Reference
Components/ Operation & Type of Acceptance Format of Applicable Codes
Sr. No. Check / Sampling document for Remarks
Description of Test Check Norms Record
with basis Testing
1 2 3 4 5 6
3.0 GALVANIZING
(Surface Preparation Procedure)
3.1 Degreasing Chemical One sample IS 2629 Manufacturer’s -do- A J S Z - N
daily plant standard/IS
3.2 Pickling Chemical One sample IS 2629 Manufacturer’s -do- A J S Z - N
daily plant standard/IS
Iron contents 100
to 120 gram/litre.
Max
3.3 Rinsing Chemical One sample IS 2629 Manufacturer’s -do- A J S Z - N
daily plant standard/IS
Page 23 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
B. In Process Inspection
Quantum of
Reference
Components/ Operation & Description of Type of Check / Format of Applicable Codes
Sr. No. document for Acceptance Norms Remarks
Test Check Sampling with Record
Testing
basis
1 2 3 4 5 6
3.4 Pre Fluxing Chemical One sample IS 2629 IS 2629 -do- A J S Z - N
daily
Page 24 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
B. In Process Inspection
Quantum of
Components/ Reference
Check / Format of Applicable Codes
Sr. No. Operation & Type of Check document for Acceptance Norms Remarks
Sampling Record
Description of Test Testing
with basis
1 2 3 4 5 6
4.0 Galvanizing
Checking
(a) Visual Checking Visual 100% IS 2629 Surface to be free from defects like bare / -do- A J S Z - N
black spots, (except when small and
suitable for patching) heavy ash & flux
inclusions, lumps, pimples, runs etc
(b) Thickness of Measurement 8 samples / IS 4759 The minimum average zinc coating for all -do- A J S Z - N *For marine
Zinc coating shift section shall be 87 microns for thickness ≥ mentioned
5 mm & 65 microns for thickness < 5mm in BPS,
and for plates ≥5mm=127
micron,
<5mm &
plate=87
micron
(c) Weight of Zinc Measurement 3 samples / IS 4759 / IS (a) For thickness below 5mm, but not less -do- A J S Z - N *For
coating shift 6745 then 2 mm and for plates- Average Mass of marine,
Coating -460gm/m² ≥5mm=900
(b) For thickness 5mm & above – Average gm/ m²,
Mass of Coating - 610 gm/m² <5mm &
plate=610
gm/ m²
(d) Uniformity Measurement 3 samples / IS 2633 Material to withstand -do- A J S Z - N
of Zinc coating shift 4 dips of one minute each without showing
signs of copper deposits
(e) Adhesion Tests of Pivoted 3 samples / IS 2629 No removal or lifting of coating in areas -do- A J S Z - N
Zinc coating Hammer Test shift between hammer impressions
Page 25 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
Quantum of
Sr. Components/ Operation Reference document for Format Applicable Codes
Type of Check Check / Sampling Acceptance Norms Remarks
No. & Description of Test Testing of Record
with basis
1 2 3 4 5 6
5.0 FINAL INSPECTION &
TESTING
(Inspection Engineer to
Check/ensure compliance
to notes/General
Requirements given on
Notes of MQP.
(a) VISUAL & One sample for Please refer Please refer Test A J U Z Y Dispatch
DIMENSIONAL Visual & Measurement Every 50 MT/ Sr. No 2(a) Sr. No 2(a) Report Instructions
INSPECTION section/Lot or part to 2(j) to 2(j)
For Fabrication (as per thereof & Cl. No. & Cl. No.
approved dwg.) & 4.3 (a) 4.3 (a)
Galvanizing
(b) MECHANICAL (i) UTS Test One sample for Please Refer (for test Please Refer (for Test A J U Z - Y Dispatch
PROPERTIES (ii) Yield Stress Test Every 50 MT/ values) Sr. No. test values) Sr. No. Report Instructions
(iii) Percentage section/Lot or part 1.1.1(a), (b) (c), (d) 1.1.1(a), (b) (c),
Elongation Test thereof (d)
(iv) Bend Test
Page 26 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
Page 27 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
(1) The manufacturer if purchasing the steel sections directly from the re-rollers, the BSPTCL approved re-roller MQP to be ensured.
(2) Nuts & Bolts and Step Bolts & Nuts & other bought out items to be procured from BSPTCL approved sources and inspection at sub-vendor’s works.
(3) Welding procedure and Welder’s performance qualification approval by BSPTCL is required in case welding is involved at any stage of fabrication/erection.
(4) All bent pieces shall be checked at the process of bending by a bend gauge made as per bend ratio/degree shown in the sketch of the item/mark no. On the stand one
piece is thoroughly checked with bend gauge and all other pieces are checked by comparison method and pieces are cleared for further process. If the holes are to be
made near the bend line the same shall be done after bending.
(5) The sample pieces consumed in a testing shall be replenished by the manufacturer at the time of dispatch. If the offered material meets the quality requirements, Dispatch
Instructions shall be issued for total quantity offered without deducting the weight of materials consumed in testing.
(6) BSPTCL Specification means BSPTCL Technical Specification, Approved Drawing, Approved Technical data sheet and LOA provisions applicable for the specific
contract.
(7) Grades of steel used and the standards to which they conform shall be as approved by BSPTCL Engineering for the specific contract and shall be indicated in
approved Drawings/ BOM/offer list at the time of inspection.
(8) Steel plates below 6 mm used for packing plates/Packing washers shall be as per BSPTCL specification/ approved drawings BSPTCL, Produced as per IS 1079 1994
(Grade-O) are also acceptable however if below 6 mm thickness plates are used as load bearing plates viz. gusset plates, Joint splices etc. same shall confirm to IS 2062
or equivalent standard.
(10) The manufacturer shall maintain proper co-relation of test certificate with respect to the material from raw material stage to finished material stage (whether procured
from main producer or BSPTCL approved re-rollers)
(11) The manufacturer shall strip off galvanizing of rejected material before re-galvanizing in case rejection is due to galvanizing defects.
(12) The manufacturer shall dispose off entire section rejected in physical testing by gas cutting or by machine cutting from any end of rejected mark number.
(13) In case of any contradiction between Technical Specification / Approved Drawing and MQP, the details mentioned in the Technical Specification / Approved Drawing
shall be final.
(14) The manufacturer should progressively align their Quality System and sub-vendors Quality System to the requirements of ISO 9000 series Quality Standards and in due
course of time should get their quality system certified to ISO 9001.
(15) The manufacturer to ensure that all measuring & testing equipments is having valid calibration certificate issued by NABL accredited testing agency only.
Page 28 of 29
BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
(16) Inspection of angle sections at black stage for galvanized tower structures/parts, irrespective of specific contract can be followed as detailed hereunder.
(a) The manufacturer may raise inspection call for angle section at black stage at re-roller`s work against any one of the ongoing Contract.
(b) The manufacturer may fabricate the raw material cleared Dispatch Instructions for a particular contractor, for any of your projects under execution. Your fabricator may do
so against specific instruction from you in this regard.
(c) The fabricator (i.e. you) will maintain a separate register indicating splitting and swapping of material between different Projects awarded to same contractor, which can be
reviewed by BSPTCL inspection engineer, separate register for each Contractor is to be maintained if the fabricator is executing jobs for different contractor.
(d) The fabricator as a contractor on whom BSPTCL has placed the contract, will only be allowed to split and swap materials in black stage only between your different
ongoing contracts with BSPTCL, without any obligation to BSPTCL.
(e) The final inspection after fabrication and galvanizing, however, will continue to be contract wise and Dispatch Instructions will be issued for each contract only.
(17) Pieces of light sections to be wire bundled & of heavy sections to be supplied loose. Stacking to have proper ventilation and kept inclined. Damage to galvanization coating
to be avoided while handling. The fabricator to ensure sequential supplies and other details as per BSPTCL Technical Specification
(18) Prior approval of BSPTCL is required to be taken for any activity or process that is out sourced.
(19) In case tower part to be used at sub zero temperature, we may carry out Impact testing at -20° C during final inspection in line with IS/ BSPTCL TS.
(20) All relevant IS standards shall be read along with the latest amendments.
(21) Dispatch of the inspected towers shall be done with each tower / panel wise bundling in order to ensure availability of
complete tower parts without missing of any member at site.