0% found this document useful (0 votes)
107 views19 pages

Scrum Test

The document provides feedback from a Scrum Open assessment taken on November 23, 2021. It includes the test taker's score of 33.3%, a duration of 16 minutes and 32 seconds, and dates started and finished. The feedback section lists questions answered correctly, partially correctly, and incorrectly. It then provides details of two questions answered incorrectly along with explanations.

Uploaded by

Azhar Ghani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
107 views19 pages

Scrum Test

The document provides feedback from a Scrum Open assessment taken on November 23, 2021. It includes the test taker's score of 33.3%, a duration of 16 minutes and 32 seconds, and dates started and finished. The feedback section lists questions answered correctly, partially correctly, and incorrectly. It then provides details of two questions answered incorrectly along with explanations.

Uploaded by

Azhar Ghani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 19

Finished. https://www.classmarker.

com/online-test/results/

Title: Scrum Open

Percentage: 33.3%

Duration: 00:16:32

Date started: Tue 23 Nov 2021 02:50

Date finished: Tue 23 Nov 2021 03:06

Feedback

Thank you for taking the Open assessment of Scrum. Please review The Scrum Guide on Scrum.org and take
this assessment again to improve your score.

Ken Schwaber

Correctly answered Incorrectly answered Missed correct option

All Questions 10 Correct 1 Partially Correct 19 Incorrect

Question 1 of 30

Who is on the Scrum Team?

(choose the best three answers)

Correct answer: B. C. D.
You chose: A.

This question displayed answers in random order during the test.

A. Project Manager.

B. The Product Owner.

C. Developers.

1 of 19 11/23/2021, 1:10 PM
Finished. https://www.classmarker.com/online-test/results/

D. The Scrum Master.

Feedback

The Scrum Team consists of the Scrum Master, the Product Owner and Developers. The Scrum Team is
a cohesive unit of professionals focused on one objective at a time, the Product Goal.

2 of 19 11/23/2021, 1:10 PM
Finished. https://www.classmarker.com/online-test/results/

Question 2 of 30

Which of the following are examples of a Scrum Team practicing Scrum poorly or not exhibiting
traits of a self-managing Scrum Team?

(choose the best three answers)

Correct answer: B. C. F.
You chose: A. B. D.

This question displayed answers in random order during the test.

A. The Developers create their own Sprint Backlog, reflecting all work that is required to meet
the Definition of Done.

B. Stakeholders attend the Daily Scrum to check on the Scrum Team’s progress.

C. The Developers are working within the boundaries of their organizations functional
description and nicely handing off work from analyst to developer to tester to integration.

D. The Developers are collaboratively selecting their own work during the Sprint.

E. The Developers have all the skills they need to create a valuable, useful Increment.

F. The Developers invite external stakeholders to the Sprint Planning to ask them how to turn
a Product Backlog item into an Increment via a complete and detailed Sprint Backlog.

Feedback

• The Daily Scrum is for the Developers. It should not be used by external stakeholders to
check progress.
• During Sprint Planning the Scrum Team should be crafting the Sprint Goal based on the set
of Product Backlog items selected for the Sprint. The Developers identify the necessary
work to meet the Sprint Goal.
• Scrum Team members do not have titles, and no sub-teams; such as testing, architecture, or
operations are recognized. Accountability belongs with the Scrum Team as a whole,
regardless of whether team members have specialized skills.

Question 3 of 30

Who is required to attend the Daily Scrum?

(choose the best answer)

3 of 19 11/23/2021, 1:10 PM
Finished. https://www.classmarker.com/online-test/results/

Correct answer: D.
You chose: C.

This question displayed answers in random order during the test.

A. The Scrum Team.

B. The Developers and Product Owner.

C. The Developers and Scrum Master.

D. The Developers.

E. The Scrum Master and Product Owner.

Feedback

Only the people doing the work described on the Sprint Backlog need to inspect and adapt at the Daily
Scrum. If the Product Owner or Scrum Master are actively working on items in the Sprint Backlog, they
participate as Developers, they will need to be at the Daily Scrum.

Question 4 of 30

True or False: The Scrum Team must choose at least one high priority process improvement
item, identified during the Sprint Retrospective, and place it in the Sprint Backlog.

Correct answer: B.
You chose: A.

A. True

B. False

Feedback

An earlier version of the Scrum Guide prescribed the practice of placing one improvement in the Sprint
Backlog. This was removed in the 2020 update to the Scrum Guide because it was felt to be too
prescriptive. However, if this practice provides value to you then you should adopt it. It is simply not
prescribed anymore, but can still be valuable.

Question 5 of 30

4 of 19 11/23/2021, 1:10 PM
Finished. https://www.classmarker.com/online-test/results/

True or False: The purpose of a Sprint is to produce a valuable and useful Increment of
working product.

Correct answer: A.
You chose: A.

A. True

B. False

Feedback

The heart of Scrum is a Sprint, a timebox of one month or less during which a done, useful, and valuable
working product Increment is created.

Question 6 of 30

Who has the final say on the order of the Product Backlog?

(choose the best answer)

Correct answer: D.
You chose: B.

This question displayed answers in random order during the test.

A. The CEO.

B. The Scrum Master.

C. The Stakeholders.

D. The Product Owner.

E. The Developers.

Feedback

The Product Owner is the sole person responsible for ordering the Product Backlog.

5 of 19 11/23/2021, 1:10 PM
Finished. https://www.classmarker.com/online-test/results/

Question 7 of 30

The timebox for the Sprint Review is:

(choose the best answer)

Correct answer: D.
You chose: A.

This question displayed answers in random order during the test.

A. 1 day.

B. 4 hours and longer as needed.

C. As long as needed.

D. 4 hours for a monthly Sprint. For shorter Sprints it is usually shorter.

E. 2 hours.

Feedback

Sprint Review is a maximum four-hour timeboxed event for one-month Sprints. For shorter Sprints, the
event is usually shorter.

Question 8 of 30

Which statement best describes a Product Owner's responsibility?

(choose the best answer)

Correct answer: C.
You chose: A.

This question displayed answers in random order during the test.

A. Managing the project and ensuring that the work meets the commitments to the
stakeholders.

B. Keep stakeholders from distracting the Developers.

C. Optimizing the value of the work the Scrum Team does.

6 of 19 11/23/2021, 1:10 PM
Finished. https://www.classmarker.com/online-test/results/

D. Directing the Developers.

Feedback

The Product Owner is accountable for maximizing the value of the product and the work of the Scrum
Team.

Question 9 of 30

What does it mean to say that an event has a timebox?

(choose the best answer)

Correct answer: D.
You chose: D.

This question displayed answers in random order during the test.

A. The event must take at least a minimum amount of time.

B. The event must happen at a set time.

C. The event must happen by a given time.

D. The event can take no more than a maximum amount of time.

Feedback

Timeboxed events are events that have a maximum duration.

Question 10 of 30

The CEO asks the Developers to add a "very important" item to a Sprint that is in progress.
What should the Developers do?

(choose the best answer)

Correct answer: D.
You chose: B.

7 of 19 11/23/2021, 1:10 PM
Finished. https://www.classmarker.com/online-test/results/

This question displayed answers in random order during the test.

A. Add the item to the current Sprint and drop an item of equal size.

B. Add the item to the current Sprint without any adjustments.

C. Add the item to the next Sprint.

D. Inform the other members of the Scrum Team so the team can decide what to do.

Feedback

The items selected for a Sprint have been selected as most valuable with the Product Owner. The items
serve the Sprint's goal. No changes should be made that endanger the Sprint Goal. No one external to
the Scrum Team can force changes on the Developers.

Question 11 of 30

True or False: When multiple Scrum Teams work together on the same product, each team
should maintain a separate Product Backlog.

Correct answer: B.
You chose: B.

A. True

B. False

Feedback

Products have one Product Backlog, regardless of how many Scrum Teams are used. Any other setup
makes it difficult for the Developers to determine what they should work on.

Question 12 of 30

True or False: It is mandatory that the product Increment be released to production at the end
of each Sprint.

Correct answer: B.
You chose: B.

8 of 19 11/23/2021, 1:10 PM
Finished. https://www.classmarker.com/online-test/results/

A. True

B. False

Feedback

The product Increment should be usable and releasable at the end of every Sprint, but it does not have
to be released.

Question 13 of 30

During a Sprint, a Developer determines that the Scrum Team will not be able to complete the
items in their forecast. Who should be present to review and adjust the Product Backlog items
selected?

(choose the best answer)

Correct answer: A.
You chose: D.

This question displayed answers in random order during the test.

A. The Product Owner and the Developers.

B. The Developers.

C. The Product Owner and all stakeholders.

D. The Scrum Master, the project manager, and the Developers

Feedback

During the Sprint, scope may be clarified and re-negotiated between the Product Owner and the
Developers as more is learned. It is important to be transparent when challenges arise since ultimately
the entire Scrum Team is accountable for creating a valuable, useful Increment.

Question 14 of 30

An organization has decided to adopt Scrum, but management wants to change the terminology
to fit with terminology already used. What will likely happen if this is done?

9 of 19 11/23/2021, 1:10 PM
Finished. https://www.classmarker.com/online-test/results/

(choose the best answer)

Correct answer: D.
You chose: B.

A. Without a new vocabulary as a reminder of the change, very little change may actually
happen.

B. The organization may not understand what has changed with Scrum and the benefits of
Scrum may be lost.

C. Management may feel less anxious.

D. All of the above.

Question 15 of 30

What is the role of Management in Scrum?

(choose the best answer)

Correct answer: C.
You chose: D.

This question displayed answers in random order during the test.

A. Identify and remove people that are not working hard enough.

B. Continually monitor staffing levels of the Scrum Team.

C. Support the Product Owner with insights and information into high value product and
system capabilities. Support the Scrum Master to cause organizational change that fosters
empiricism, self-management, bottom-up intelligence, and intelligent product delivery.

D. Monitor the progress of the Developers on the Scrum Team.

Feedback

Management has no active role in the actual product development through Scrum. However,
management external to the Scrum Team is relevant in setting the vision and strategy to guide the
overall direction of the organization.

Question 16 of 30

10 of 19 11/23/2021, 1:10 PM
Finished. https://www.classmarker.com/online-test/results/

Who is responsible for managing the progress of work during a Sprint?

(choose the best answer)

Correct answer: B.
You chose: D.

This question displayed answers in random order during the test.

A. The Product Owner.

B. The Developers.

C. The most junior member of the team.

D. The Scrum Master.

Feedback

The Developers use the Daily Scrum to inspect progress toward the Sprint Goal and to inspect how
progress is trending toward completing the work in the Sprint Backlog.

Question 17 of 30

Who should know the most about the progress toward a business objective or a release, and be
able to explain the alternatives most clearly?

(choose the best answer)

Correct answer: D.
You chose: D.

This question displayed answers in random order during the test.

A. The Project Manager

B. The Scrum Master

C. The Developers

D. The Product Owner

11 of 19 11/23/2021, 1:10 PM
Finished. https://www.classmarker.com/online-test/results/

Feedback

The Product Owner is the sole person responsible for ordering the Product Backlog. Their
responsibilities include making the Product Backlog visible, transparent, and clear to all.

Question 18 of 30

The three pillars of empiricism are:

(choose the best answer)

Correct answer: A.
You chose: B.

This question displayed answers in random order during the test.

A. Inspection, Transparency, Adaptation.

B. Planning, Inspection, Adaptation.

C. Respect For People, Kaizen, Eliminating Waste.

D. Planning, Demonstration, Retrospective.

E. Transparency, Eliminating Waste, Kaizen.

Feedback

Scrum is founded on empirical process control theory, or empiricism. Empiricism asserts that knowledge
comes from experience and making decisions based on what is known.
Three pillars uphold every implementation of empirical process control: transparency, inspection, and
adaptation.

Question 19 of 30

When does a Developer become the sole owner of an item or task on the Sprint Backlog?

(choose the best answer)

Correct answer: C.
You chose: B.

12 of 19 11/23/2021, 1:10 PM
Finished. https://www.classmarker.com/online-test/results/

This question displayed answers in random order during the test.

A. Whenever a team member can accommodate more work.

B. At the Sprint Planning event.

C. Never. All Sprint Backlog items are "owned" by the Developers on the Scrum Team.

D. During the Daily Scrum.

Feedback

The entire Scrum Team is accountable for creating a valuable, useful Increment every Sprint, and the set
of Product Backlog items selected for the Sprint are collectively owned by the Developers. No individual
Developer can claim ownership over an item as this would block communication and collaboration. The
Sprint Backlog is updated by the Developers throughout the Sprint as more is learned.

Question 20 of 30

Which statement best describes the Sprint Review?

(choose the best answer)

Correct answer: A.
You chose: A.

This question displayed answers in random order during the test.

A. It is when the Scrum Team and stakeholders inspect the outcome of a Sprint and figure out
what to do next.

B. It is a mechanism to control Developer activity during a Sprint.

C. It is a demo at the end of the Sprint for everyone in the organization to check on the work
done.

Feedback

Every event in Scrum, besides the Sprint, which is a container for the other events, is an opportunity to
Inspect and Adapt.

Question 21 of 30

13 of 19 11/23/2021, 1:10 PM
Finished. https://www.classmarker.com/online-test/results/

The timebox for the Sprint Planning event is?

(choose the best answer)

Correct answer: B.
You chose: C.

This question displayed answers in random order during the test.

A. Monthly.

B. 8 hours for a monthly Sprint. For shorter Sprints it is usually shorter.

C. Whenever it is done.

D. 4 hours.

Feedback

Sprint Planning is timeboxed to a maximum of eight hours for a one-month Sprint. For shorter Sprints,
the event is usually shorter.

Question 22 of 30

When does the next Sprint begin?

(choose the best answer)

Correct answer: B.
You chose: D.

This question displayed answers in random order during the test.

A. Next Monday.

B. Immediately after the conclusion of the previous Sprint.

C. Immediately following the next Sprint Planning.

D. When the Product Owner is ready.

Feedback

14 of 19 11/23/2021, 1:10 PM
Finished. https://www.classmarker.com/online-test/results/

A new Sprint starts immediately after the conclusion of the previous Sprint.

Question 23 of 30

When might a Sprint be abnormally cancelled?

(choose the best answer)

Correct answer: B.
You chose: B.

This question displayed answers in random order during the test.

A. When the Developers feel that the work is too hard.

B. When the Sprint Goal becomes obsolete.

C. When the sales department has an important new opportunity.

D. When it becomes clear that not everything will be finished by the end of the Sprint.

Feedback

A Sprint could be cancelled if the Sprint Goal becomes obsolete. Only the Product Owner has the
authority to cancel the Sprint.

Question 24 of 30

The Product Backlog is ordered by:

(choose the best answer)

Correct answer: D.
You chose: D.

This question displayed answers in random order during the test.

A. Size, where small items are at the top and large items are at the bottom.

B. Items are randomly arranged.

15 of 19 11/23/2021, 1:10 PM
Finished. https://www.classmarker.com/online-test/results/

C. Risk, where safer items are at the top, and riskier items are at the bottom.

D. Whatever is deemed most appropriate by the Product Owner.

E. Least valuable items at the top to most valuable at the bottom.

Feedback

The Product Owner is accountable for effective Product Backlog management. The Product Backlog is
an emergent, ordered list of what is needed to improve the product. It is the single source of work
undertaken by the Scrum Team.

Question 25 of 30

The Developers should have all the skills needed to:

(choose the best answer)

Correct answer: B.
You chose: C.

This question displayed answers in random order during the test.

A. Complete the project as estimated when the date and cost are committed to the Product
Owner.

B. Turn the Product Backlog items they select into an Increment of useful and valuable
product functionality.

C. Do all of the development work, except for specialized testing that requires additional tools
and environments.

Feedback

The Developers are a group of professionals who do the work of delivering an Increment of done product
at the end of each Sprint. As a team, Developers have all of the skills necessary to create a product
Increment.

Question 26 of 30

When many Scrum Teams are working on a single product, what best describes the Definition

16 of 19 11/23/2021, 1:10 PM
Finished. https://www.classmarker.com/online-test/results/

of Done?

(choose the best answer)

Correct answer: C.
You chose: C.

This question displayed answers in random order during the test.

A. It depends.

B. Each Scrum Team uses its own, but must make their definition clear to all other teams so
the differences are known.

C. All Scrum Teams must have a Definition of Done that makes their combined Increment
valuable and useful.

Feedback

The Increment must be valuable and useful. This means that when many Scrum Teams are working on a
single product, they are expected to adhere to a single Definition of Done for the Increment.

Question 27 of 30

Upon what type of process control is Scrum based?

(choose the best answer)

Correct answer: D.
You chose: B.

This question displayed answers in random order during the test.

A. Complex

B. Defined

C. Hybrid

D. Empirical

17 of 19 11/23/2021, 1:10 PM
Finished. https://www.classmarker.com/online-test/results/

Feedback

Scrum is founded on empirical process control theory, or empiricism. Empiricism asserts that knowledge
comes from experience and making decisions based on what is observed.

Question 28 of 30

Which two things should the Scrum Team do during the first Sprint?

(choose the best two answers)

Correct answer: A. C.
You chose: A. C.

This question displayed answers in random order during the test.

A. Develop and deliver at least one piece of functionality.

B. Develop a plan for the rest of the release.

C. Deliver an Increment of useful and valuable product.

D. Determine the complete architecture and infrastructure for the product.

E. Create the complete Product Backlog to be developed in subsequent Sprints.

Feedback

The heart of Scrum is a Sprint, which is one month or less during which a done, usable, valuable product
Increment is created. This applies to every Sprint.

Question 29 of 30

When does a Developer become accountable for the value of a Product Backlog item selected
for the Sprint?

(choose the best answer)

Correct answer: C.
You chose: B.

18 of 19 11/23/2021, 1:10 PM
Finished. https://www.classmarker.com/online-test/results/

This question displayed answers in random order during the test.

A. Whenever a team member can accommodate more work.

B. At the Sprint Planning Event.

C. Never. The entire Scrum Team is accountable for creating value every Sprint.

D. During the Daily Scrum.

Feedback

All members of the Scrum Team share in the accountability for creating value every Sprint.

Question 30 of 30

True or False: Scrum has a role called "project manager."

Correct answer: B.
You chose: A.

A. True

B. False

Feedback

A Scrum Team has a Scrum Master, a Product Owner and Developers. As a whole they have all controls
needed.

19 of 19 11/23/2021, 1:10 PM