Abstract of Cost KVA DG Set Chorit & 500 KW Bulashbar POWER HOUSE S/No Description of Items Qty Rate Unit Amount

1) The document provides an abstract of cost and detail estimate for maintenance work at various power houses including supply of materials like batteries, cables, transformers etc. 2) Key items include cleaning of radiators, supply of gum boots, LED bulbs, rubber gloves, plastic furniture, carpets, transformer repair works etc as detailed in the estimate. 3) The total estimated cost for the maintenance work at different locations is Rs. 463720/- according to the abstract of cost.

Uploaded by

Zahoor Rana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views

Abstract of Cost KVA DG Set Chorit & 500 KW Bulashbar POWER HOUSE S/No Description of Items Qty Rate Unit Amount

1) The document provides an abstract of cost and detail estimate for maintenance work at various power houses including supply of materials like batteries, cables, transformers etc. 2) Key items include cleaning of radiators, supply of gum boots, LED bulbs, rubber gloves, plastic furniture, carpets, transformer repair works etc as detailed in the estimate. 3) The total estimated cost for the maintenance work at different locations is Rs. 463720/- according to the abstract of cost.

Uploaded by

Zahoor Rana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

Abstract of Cost

Name of work: SUPPLY OF MAINTENANCE MATERIAL FOR 200 KVA RATTU 500 KVA Mirmalik 250
KVA DG Set Chorit & 500 KW Bulashbar POWER HOUSE
S/No Description of items Qty Rate Unit Amount
1 S/O 100 Ampere liquid Battery 01 No 15000 Each 15000/
2 Cleaning of Radiator DG Set Chorit 01 Job 25000 01 Job 25000/
3 S/O Gum Boot 12 Pairs 1400 P/Pair 16800/
4 S/F Wire 7/-29 01 Coil 8000 P/Coil 8000/
5 S/O Grease 08 Kg 1000 P/Kg 8000/
6 S/F of LED Bulb 06 Nos 300 Each 1800/
7 S/o Rubber Hand Gloves 03 Pairs 2500 P/Pair 7500/
8 S/O Plastic Chairs 06 Nos 2500 Each 15000/
9 S/O Plastic Table 01 No 3500 Each 3500/
10 S/Laying of Carpet 168 Sft 70 P/Sft 11760/
11 S/Laying of Under Lay Foam 168 Sft 20 P/Sft 3360/
12 S/F of Cooling Valve I/C Pipe 01 job 4000 P/Job 4000/
13 Replacement of Sluice Valve Gear I/C 01 job 40000 P/Job 40000/
operating Mechanism
14 S/F of Single Core Copper Cable 19/83 100 Mtr 1500 P/Mtr 150000/
15 S/O Polythene Sheet 100 Mtr 200 P/Mtr 20000/
16 S/F of D Set Complete Pakistani 04 set 30000 P/Set 120000/
17 Dismantling/Refixing of HT Pole 01 No 14000 Each 14000
G Total= 463720/
Detail Estimate
Name of work: SUPPLY OF MAINTENANCE MATERIAL FOR 200 KVA RATTU 500 KVA Mirmalik 250
KVA DG Set Chorit & 500 KW Bulashbar
S/No Description of items Detail Total
1 S/O 100 Ampere liquid Battery (1x1)=01 No 01 No
2 Cleaning of Radiator DG Set Chorit (1x1)=01 Job 01 Job
3 S/O Gum Boot (1+1+1+1+1+1+1+1+1+1+1+1)=12 Pairs 12 Pairs
4 S/F Wire 7/-29 (1x1)=01 Coil 01 Coil
5 S/O Grease (1+1+1+1+1+1+1+1)=08 Kg 08 Kg
6 S/F of LED Bulb (1+1+1+1+1+1)=06 Nos 06 Nos
7 S/o Rubber Hand Gloves (1+1+1)=03 Pairs 03 Pairs
8 S/O Plastic Chairs For Bulashbar Power House 06 Nos
(1+1+1+1+1+1)=06 Nos
9 S/O Plastic Table For Bulashbar Power House 01 No
(1x1)=01 No
10 S/Laying of Carpet For Bulashbar Power House 168 Sft
(12x14)=168 Sft
11 S/Laying of Under Lay Foam For Bulashbar Power House 168 Sft
(12x14)=168 Sft
12 S/F of Cooling Valve I/C Pipe (1x1)=01 Job 01 job
13 Replacement of Sluice Valve Gear I/C Rattu Power House 01 job
operating Mechanism (1x1)=01 Job
14 S/F of Single Core Copper Cable 19/83 Mir Malik Area 100 Mtr
3x100=300 Rft
1x28=28 Rft
Total=328 Rft or 100 Mtr
15 S/O Polythene Sheet For Rattu and Mirmalik Power House 100 Mtr
(1x1) =01 Roll
Each Roll Contains 100 Mtr
16 S/F of D Set Complete Pakistani At Phopon (1x1) =01 Set 04 set
At Dadojail (1x1) =01 Set
At Chamrot (1x1) =01 Set
At Goriyal (1x1) =01 Set
Total=04 Set
17 Dismantling/Refixing of HT Pole At Nasirabad 01 No
(1x1) =01 No
Abstract of Cost
Name of work: SUPPLY OF MAINTENANCE MATERIAL FOR 800 KVA GUDAI POWER HOUSE

S/No Description of items Qty Rate Unit Amount


1 S/O Dori 04 Kg 500 P/Kg 2000/
2 S/O Grease Caltex 15 Lbs 800 P/Lb 12000/
3 S/O LED Bulb 12 Watt 43 Nos 300 Each 12900/
4 S/F of Service Line 7/44 30 Mtr 200 P/Mtr 6000/
5 S/F of Single Copper Cable 19/83 22 Mtr 1500 P/Mtr 33000/
6 S/F of Shackle Insulator with D Iron Clamp Complete 06 Nos 500 Each 3000/
7 S/O attendance Register 01 No 200 Each 200/
8 S/O Complaint Register 01 No 300 Each 300/
9 S/F of Pipe and Tap 01 Job 500 P/Job 500/
10 Repair/Rewinding of 100 KVA Step Down
Transformer Kushinat
(i) H T Leg 01 Leg 52000 P/Leg 52000/
(ii) L T Leg 01 Leg 33800 P/Leg 33800/

Total= 152700/
Deduction
Deduction of unserviceable wire
(i) H T Leg 01 Leg =10 Kg @ Rs 350 P/Kg
=3500
(ii) L T Leg 01 Leg = 8 Kg @ Rs 300 P/Kg _6500
=3000
Tota l=6500
Total= 149200
Detail Estimate
Name of work: SUPPLY OF MAINTENANCE MATERIAL FOR 800 KVA GUDAI POWER HOUSE
S/No Description of items Detail Total
1 S/O Dori (1+1+1+1)=01 Kg 04 Kg
2 S/O Grease Caltex (1+1+1+1+1+1+1+1+1+1+1+1+1+1+1)= 15 Lbs 15 Lbs
3 S/O LED Bulb 12 Watt (1+1+1+1+1+1+1+1+1+1+1+1+1+1+1) = 15 Nos
(1+1+1+1+1+1+1+1+1+1+1+1+1+1+1) = 15 Nos
(1+1+1+1+1+1+1+1+1+1+1+1+1+) = 13 Nos
Total= 43 Nos 43 Nos
4 S/F of Service Line 7/44 (1x30)= 30 Mtrl 30 Mtr
5 S/F of Single Copper Cable 19/83 (1x22)= 22 Mtr 22 Mtr
6 S/F of Shackle Insulator with D Iron (1+1+1+1+1+1)=06 Nos 06 Nos
Clamp Complete
7 S/O attendance Register (1x1)=01 No 01 No
8 S/O Complaint Register (1x1)=01 No 01 No
9 S/F of Pipe and Tap (1x1)=01 Job 01 Job
10 Repair/Rewinding of 100 KVA Step Down
Transformer Kushinat
(iii) H T Leg (1x1) = 01 Leg 01 Leg
(iv) L T Leg (1x1) = 01 Leg 01 Leg