0% found this document useful (0 votes)
109 views

Modul A Network Systems - Actual

This document provides instructions for a network configuration project using Cisco Packet Tracer. It includes a topology diagram showing 4 routers and 3 switches. An addressing table provides the IP addresses and subnets for each interface. Instructions specify configuring IP addresses, creating 3 DHCP pools with options, configuring VLANs on switches, adding ports to a port channel, and configuring OSPF routing between the routers with specified parameters. The goal is to configure the network system for an ISP company based on the job requirements of a CCNA Routing & Switching certification.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
109 views

Modul A Network Systems - Actual

This document provides instructions for a network configuration project using Cisco Packet Tracer. It includes a topology diagram showing 4 routers and 3 switches. An addressing table provides the IP addresses and subnets for each interface. Instructions specify configuring IP addresses, creating 3 DHCP pools with options, configuring VLANs on switches, adding ports to a port channel, and configuring OSPF routing between the routers with specified parameters. The goal is to configure the network system for an ISP company based on the job requirements of a CCNA Routing & Switching certification.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

LOMBA KOMPETENSI SISWA

SEKOLAH MENENGAH KEJURUAN


TINGKAT PROVINSI JAWA BARAT
TAHUN TAHUN 2021

NASKAH SOAL
MODUL A NETWORK SYSTEMS (PACKET TRACER)

Bidang Lomba
IT NETWORK SYSTEMS
ADMINISTRATION

PEMERINTAH DAERAH PROVINSI JAWA BARAT


DINAS PENDIDIKAN
Jl. Dr. Radjiman No. 6 Telp. (022) 4264813 Fax. (022) 4264881
Wisselbord (022) 4264944, 4264957, 4264973
Bandung ( 40171 )
Introduction to Test Project

Contents
This Test Project proposal consists of the following documentation/files:
1. LKSJB2021_ModulA_Network Systems
2. LKSJB2021_ModulA_Network Systems-PT.pka

Introduction
You work for an ISP company that is just starting its business. You are asked to configure
the network system. Like the job vacancy you are applying for, the scope of work you
must do falls within the scope of CCNA Routing & Switching Essential.
Modul A – Network Systems (Cisco Packet Tracer)
Topology

Addressing Table
Device Interface IP Address / Prefix Default Gateway

GI0/0 10.167.17.130/30 -
RO1
GI0/1 10.167.17.142/30 -
GI0/0 10.167.17.129/30 -
RO2 GI0/1 10.167.17.133/30 -
GI0/2 172.20.200.1/28 -
GI0/0 10.167.17.137/30 -
RO3
GI0/1 10.167.17.134/30 -
GI0/0 10.167.17.138/30 -
GI0/1 10.167.17.141/30 -
GI0/2.51 192.168.50.1/26 -
RO4
GI0/2.52 192.168.50.65/26 -
GI0/2.53 192.168.50.129/27 -
GI0/2.99 192.168.99.1/29 -
SW3-2 VLAN 99 192.168.99.2/29 192.168.99.1
S1 VLAN 99 192.168.99.3/29 192.168.99.1
Device Interface IP Address / Prefix Default Gateway

S2 VLAN 99 192.168.99.4/29 192.168.99.1


PC1 Fa0 DHCP DHCP
PC2 Fa0 DHCP DHCP
PC3 Fa0 DHCP DHCP
PC4 Fa0 DHCP DHCP

Instructions
- Configure device using console cable
- Configure IP Address according to topology and addressing table
- Create DHCP pool including network, default gateway and dns server (172.20.200.2)
with name:
o Manager
o Engineer
o Support
- For pool manager and Engineer excluding First 10 IPs to be assigned in dhcp pool.
- Configure VLAN on SW3-2, S1 and S2
VLAN Name Interfaces

51 Manager S1 & S2: Fa0/1-6


52 Engineer S1 & S2: Fa0/7-12
53 Support S1 & S2: Fa0/13-18
99 Management -

- On S1 and S2, add ports Fa0/23 and Fa0/24 to port channel 3 with LACP mode Active.
- Configure OSPF on RO1, RO2, RO3 and RO4.
o Process ID: 100
o Area 0
o Routing updates are not sent into networks where they are not required.
- Configure the active access ports to allow a maximum of 3 MAC addresses to be learned
on the ports and violation restrict for S1 and S2

You might also like