Table 1 - Recommended Offsites Equipment Spacing: PIP PNE00003 Process Unit and Offsites Layout Guide June 2013

This document provides a table of recommended minimum spacing distances between process and offsite equipment and facilities. The table lists various types of equipment and recommended minimum distances between them. Notes below the table provide additional context for the spacing recommendations, including references to other standards and guidance that may impact spacing requirements. The goal is to support process unit and offsite layout design that considers safety factors.

Uploaded by

Ashraf
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
744 views1 page

Table 1 - Recommended Offsites Equipment Spacing: PIP PNE00003 Process Unit and Offsites Layout Guide June 2013

This document provides a table of recommended minimum spacing distances between process and offsite equipment and facilities. The table lists various types of equipment and recommended minimum distances between them. Notes below the table provide additional context for the spacing recommendations, including references to other standards and guidance that may impact spacing requirements. The goal is to support process unit and offsite layout design that considers safety factors.

Uploaded by

Ashraf
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PIP PNE00003 COMPLETE REVISION

Process Unit and Offsites Layout Guide June 2013

Table 1 - Recommended Offsites Equipment Spacing


ROW

BLOWDOWN FACILITIES (DRUMS,


PUMPS, STACKS)

A A FIRED BOILERS

BLDG HIGH OCCUPANCE


B 30 (100) A
(> 15 PERSONS) Notes:
BLDG LOW OCCUPANCY 1. This table does not account for vapor cloud explosions, customer safety and property
C A A A
(15 PERSONS OR LESS) protection, environmental or flare vent/stack dispersal requirements.
2. Distances are in meters (feet).
D A A A A BUILDINGS UTILITY
3. Distances are from PIP Member Company input.
4. "A" indicates that an engineering/ safety decision is required. For location of buildings,
E 30 (100) A A A A COOLING TOWER
refer to Section 9.1.
5. "B" Indicates refer to NFPA 30.
F 15 (50) 30 (100) A A 30 (100) A ELECTRICAL OVERHEAD POLE LINES
6. "C" Indicates refer to NFPA 58.
7. "D" Indicates refer to API 2510.
G 15 (50) 15 (50) A A 6 (20) 30 (100) A ELECTRICAL MAIN SUBSTATIONS 8. Greater spacing may be required if control or distribution center serves more than one
ELECTRICAL CONTROL AND
H 30 (100) 30 (100) A A 0 30 (100) A A
DISTRIBUTION CENTERS (SEE NOTE 8)

I 15 (50) 8 (25) A A 0 6 (20) A A A FIRE STATIONS, FIRE PUMPS

J 61 (200) 30 (100) A A 15 (50) 30 (100) 8 (25) 15 (50) A A FLARE STACKS

K A A A A A A A A A A A HIGHWAYS, ROADS & PUBLIC AREAS

L 61 (200) 30 (100) A A 15 (50) 30 (100) 6 (20) 0 0 15 (50) A A LOADING AND/OR UNLOADING RACKS

NATURAL GAS METERING STATIONS


M 30 (100) 61 (200) A A 46 (150) 30 (100) 15 (50) 30 (100) 15 (50) 61 (200) A 30 (100) A
(MAIN PLT)

N 15 (50) 30 (100) A A 30 (100) 30 (100) 8 (25) 30 (100) 30 (100) 30 (100) A 30 (100) 30 (100) 3 (10) PIPEWAYS (MAJOR)

O 6 (20) 6 (20) A A 6 (20) 8 (25) 0 6 (20) 0 6 (20) A 0 6 (20) 3 (10) A PUMPS (FLAMMABLE)

P 15 (50) 15 (50) A A 15 (50) 15 (50) 5 (15) 30 (100) 8 (25) 30 (100) A 30 (100) 30 (100) 15 (50) 5 (15) 1 (3) PUMPS (NONFLAMMABLE)

Q 8 (25) 2 (5) A A 0 A 5 (15) 5 (15) 5 (15) 0 A 5 (15) 5 (15) 3 (10) 0 1 (3) 1 (3) RAILROADS (MAIN LINES -R/W)

R 61 (200) 30 (100) A A 0 30 (100) 8 (25) 8 (25) 0 15 (50) A A 61 (200) 8 (25) 0 30 (100) 15 (50) N/A RAILROADS (SPURS-CENTER LINE)

S 15 (50) 8 (25) A A A 11 (35) A A A 15(50) A A A 8 (25) A 5 (15) A A A OIL-WATER SEPARATORS (API-CPI)

T 30 (100) 61 (200) A A 46 (150) 30 (100) 15 (50) 30 (100) 15 (50) 61 (200) A 30 (100) 30 (100) 30 (100) 6 (20) 3 (10) 5 (15) 30 (100) 30 (100) 8 (25) SEWER MAINS (FLAMMABLE)

U 8 (25) 15 (50) A A 6 (20) 6 (20) 6 (20) 6 (20) 6 (20) 6 (20) A 3 (10) 3 (10) 3 (10) A 3 (10) 3 (10) 3 (10) 3 (10) 3 (10) A PLANT ROADS (EDGE)

PROPERTY LINES (OTHER THAN ROADS &


V 5 (15) 5 (15) A A 5 (15) 8 (25) 1 (4) 5 (15) 5 (15) 12 (40) A A 6 (20) 5 (15) 1 (3) 3 (10) 3 (10) 3 (10) A 5 (15) A A
RAILROADS)
PRESSURE STORAGE VESSELS, 500,000
W 61 (200) 30 (100) A A 8 (25) 8 (25) 8 (25) 0 A 8 (25) A A 30 (100) 8 (25) 8 (25) 30 (100) 15 (50) N/A A 30 (100) 3 (10) A N/A
GAL OR LESS
SPHERES AND SPHEROIDS (OVER
X 61 (200) 61 (200) A A 46 (150) 15 (50) C, D 30 (100) 15 (50) 61 (200) A 61 (200) 30 (100) 30 (100) 8 (25) C, D 8 (25) 61 (200) 30 (100) 61 (200) 8 (25) A B, C, D B, C, D
500,000 GAL)

Y 61 (200) 91 (300) A A 76 (250) 30 (100) C, D 61 (200) 30 (100) 91 (300) A 91 (300) 30 (100) 30 (100) 15 (50) C, D 8 (25) 61 (200) 30 (100) 61 (200) 15 (50) A B, C, D B, C, D B, C, D NFPA CLASS III LIQUID STORAGE

ATMOSPHERIC, LOW & INTER VAPOR


Z B B A A B B 8 (25) B B 61 (200) A B B B B B B B A B A A B, C, D B, C, D B, C, D B, C, D
PRESS STORAGE)

AA 61 (200) 61 (200) A A 61 (200) 61 (200) 8 (25) 61 (200) A 76 (250) A 61 (200) 46 (150) A 3 (10) A A 61 (200) A 61 (200) A A B, C, D B, C, D B, C, D B, C, D B, C, D PROCESS UNITS

BB 30 (100) 30 (100) A A 15 (50) 15 (50) 3 (10) 30 (100) 15 (50) 61 (200) A 30 (100) 61 (200) 30 (100) 5 (15) A A 30 (100) A 61 (200) 6 (20) 5 (15) 30 (100) 61 (200) 61 (200) A 46 (150) 15 (50)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 COLUMN

Process Industry Practices Page 17 of 21