SL6000 Specification (60 Pages)
SL6000 Specification (60 Pages)
Model: SL6000
1
CONTENTS
Configuration ··················· 1
Specifications ···················· 3
HEAVY LIFT
Boom and Jib
Arrangements ················ 23
2
SPECIFICATIONS
Model:Hino diesel engine E13C-UV H1 and H2 drums for load hoist powered by a hydraulic vari-
Type:Water-cooled, direct fuel injection, with turbocharger able plunger motors, driven through planetary reducers.
Complies with US EPA Tier III. Brake: A spring-set, hydraulically released multiple-disc brake
Displacement: 12.913 liters is mounted on the hoist motor and operated through a counter-
Rated Power: 320 kW/2,000 min-1 balance valve.
Max. torque: 1,650 N•m/1,300 min-1 Drum lock: External ratchet for locking drum.
Cooling system: Liquid, recirculating bypass Drums:
Starter: 24 V/6 kW H1 and H2:
Radiator: Corrugated type core, thermostatically controlled 640 mm P.C.D. x 1,367.1 mm Lg. wide drum,
Air cleaner: Dry type with replaceable paper element grooved for 28 mm wire rope. Rope capacity is 830 m
Throttle: Twist grip type hand throttle, electrically actuated working length and 1,080 m storage length.
Fuel filter: Replaceable paper element Note: Rope lengths listed above denote drum capacity and may differ from
actual rope lengths supplied when machinery is shipped.
Batteries: Two 12V x 136Ah/5HR capacity batteries, parallel
Line speed: 110 ~ 3 m/min
connected.
Single line on the first layer
Fuel tank capacity: 600 liters
Rated line pull: 137 kN {14.0 tf}
Max. relief valve pressure: 31.9 MPa {325 kgf/cm2} Cab & Control
Reservoir capacity: 710 liters
Totally enclosed, full vision cab with safety glass, fully
Boom Hoisting System adjustable, high backed seat with a head-rest and armrests,
and intermittent wiper and window washer (roof and front win-
Powered by a hydraulic motor through a planetary reducer. dow).
Brake: A spring-set, hydraulically released multiple-disc brake Cab fittings:
is mounted on the boom hoist motor and operated through a Air conditioner, convenient compartment (for tool), cup holder,
counter-balance valve. ashtray, cigarette lighter, sun visor, roof blind, tinted glass, floor
Drum lock: External ratchet for locking drum. mat, foot-rest, shoe tray
Drum: Double drum, grooved for 28 mm dia. wire rope. Controls:
Line speed: Double line on first drum layer Five adjustable levers for all winches and swing controls
Hoisting/Lowering: 20~2 m/min x 2
Boom hoist reeving: 30 parts of 28 mm dia.high strength
wire rope
Boom backstops: Required for all boom lengths
3
Lower Structure Attachment
Steel-welded carbody with axles. Crawler assemblies are Boom and Jib:
designed with quick disconnect feature for individual removal Welded lattice construction using tubular, high-tensile steel
as a unit from axles. Crawler belt tension is maintained by chords with pin connections between sections.
hydraulic jack force on the track-adjusting bearing block. Boom and Jib Length
Crawler drive: Two independent hydraulic propel drive is built Min. Length Max. Length
into each crawler side frame. Each drive consists of a hydraulic (Min. Combination) (Max. Combination)
motor propelling a driving tumbler through a planetary gear
STANDARD
box. Hydraulic motor and gear box are built into the crawler
Crane Boom 24 m 108 m
side frame within the shoe width.
Luffing Jib 30 m + 24 m 60 m + 72 m
Crawler brakes: Spring-set, hydraulically released parking
brakes are built into each propel drive. HEAVY LIFT
Steering mechanism: A hydraulic propel system provides both Crane Boom 36 m 108 m
skid steering (driving one track only) and counter-rotating steer- Luffing Jib 36 m + 24 m 66 m + 72 m
ing (driving each track in opposite directions). SUPER HEAVY LIFT
Track rollers: Sealed track rollers. Crane Boom 36 m 126 m
Shoes (flat): 1,500 mm wide each crawler
Luffing Jib 36 m + 24 m 84 m + 84 m
Max. travel speed: 1.0/0.4 km/h
Max. gradeability: 20%
Weight
4
GENERAL DIMENSIONS
0
R8,30 1,500
m
.0
84-
0.0
:3
gth
Len
om
Bo
ne
Cra
470
Lift Enhancer
m
- 72.0
4.0
th: 2
Leng
g Jib
Luffin
m
gth: 30.0 - 60.0
Luffing Boom Len
Boom Angle
(66°- 86°
)
*1: 2,860
*2: 3,080
6
STANDARD
L 6.0 6.0 8T HU
30 (98)
L 12.0 8T HU
36 (118) L 6.0 12.0 8T LU
mark shows the guy line installing position when the fixed jib
72 (236) L 6.0 12.0 12.0 12.0 12.0 8T LU
is used.
indicates the most flexible combination of insert heavy duty L 6.0 6.0 12.0 12.0 12.0 12.0 8T LU
booms, which can be modified to form all shorter hevy duty 78 (256)
boom arrangements. L 12.0 12.0 12.0 12.0 12.0 8T LU
7
Luffing Boom Arrangements for Luffing
Boom
length m (ft) Boom arrangement
L 6.0 6.0 8T LU
30 (98)
L 12.0 8T LU
48 (157) JL
6.0 12.0 12.0
JU
60 (197) JL
6.0 12.0 12.0 12.0
JU
72 (236) JL
6.0 12.0 12.0 12.0 12.0
JU
8
STANDARD
WORKING RANGES
Heavy Duty Crane Boom
80
70
40˚
60
30˚
42 40
m
36
m
30 30
m
24
m
20
H *1: 2.86 m
*2: 3.08 m
10
10 20 30 40 50 60 70 80
9
Luffing Boom
80
84
m
78 70
m
72
m
66 40˚ 60
m
60
m
20
H *1: 2.86 m
*2: 3.08 m
10
10 20 30 40 50 60 70 80
10
STANDARD
WORKING RANGES
Long Boom
110
108
m
100
102 50˚
m
96
m
90
90
m
80
70
40˚
60
Height above ground (m)
50
30˚
40
30
20
H *1: 2.86 m
*2: 3.08 m
10
10 20 30 40 50 60 70 80
11
Luffing Jib
Boom Angle: 86°
140
73˚
130
60˚
120
45˚
72
110
m
66
73˚
m
60
m
30˚ 100
54
m
48
m
42
90
m
36
m
30
m
24
15˚ 80
m
72
m
70
66
m
60
m
54
60 m
m
48
60
m
42
m
36
15˚ 50
m
24
m
40
30 m
30
20
H *1: 2.86 m
*2: 3.08 m
10
10 20 30 40 50 60 70 80 90
12
STANDARD
WORKING RANGES
Luffing Jib
Boom Angle: 76°
140
130
63˚
60˚
120
45˚
110
72
m
66
m
60
100
63˚ m 30˚
54
m
48
m
90
42
m
36
m
30
80
m
15˚
24
m
72
70
m
66
m
60
m
54
m
48
60 m 60
m
42
m
36
15˚ 50
m
24
m
40
30 m
30
20
H *1: 2.86 m
*2: 3.08 m
10
10 20 30 40 50 60 70 80 90
13
Luffing Jib
Boom Angle: 66°
140
130
120
110
53˚
100
40˚
90
54 m
80
48 m
42 m
20˚
36 m
15˚
30 m
70
72
24 m
m
66
m
60
m
54
60
m
48
60 m
m
42
50
m
30
15˚
m
24
m
40
30
30 m
20
H *1: 2.86 m
*2: 3.08 m
10
10 20 30 40 50 60 70 80 90
14
CRANE BOOM SUPPLEMENTAL
DATA
1. Designed and rated to comply with EN13000. 16. (Main Boom Lifting with Auxiliary Sheave Frame)
The total load that can be lifted is weight of auxiliary sheave
2. Operating radius is the horizontal distance from centerline
frame, hook block(s), slings, and all other load handling
of rotation to a vertical line through the center of gravity of
accessories deducted from main boom ratings shown.
the load.
Deduction auxiliary sheave frame
3. Deduct weight of hook blocks, slings and all other load han- Heavy Duty Crane Standard Crane Long Crane
dling accessories from main boom ratings shown. 0.7 ton 0.7 ton 0.7 ton
4. Ratings shown are based on freely suspended loads and 17. (Auxiliary Sheave Lifting)
make no allowance for such factors as wind effect on lifted The total load that can be lifted is weight of auxiliary sheave
load, ground conditions, out-of-level operating speeds or frame, hook block(s), slings, and all other load handling
any other condition that could be detrimental to the safe accessories deducted from main boom ratings shown.
operation of this equipment. The operator, therefore, has Deduction auxiliary sheave frame
the responsibility to judge the existing conditions and Heavy Duty Crane Standard Crane Long Crane
reduce lifted load and operating speeds accordingly. 0.7 ton 0.7 ton 0.7 ton
5. Ratings are for operation on a firm and level surface, up to 18. Ratings shown, but it should not exceed 14.0 ton in case of
1 % gradient. one reeve, and it should not exceed 28.0 ton in case of two
reeve.
6. At radii and boom lengths where no ratings are shown on
chart, operation is not intended nor approved. 19. Auxiliary sheave ratings at any radius from center of rotation
are the same as crane ratings shown in table for main boom
7. Boom inserts, guy pipe and guy lines must be arranged as
when operated at the same radius. But maximum angle is
shown in the "OPERATOR'S MANUAL".
the same main boom maximum angle.
8. Boom hoist reeving is 30 part line.
20. Boom lengths for auxiliary sheave mounting show below.
HL/SHL boom hoist reeving is 18 part line.
STD HL SHL
9. Boom backstops are required for all boom lengths. Heavy Crane NONE NONE NONE
10. The boom should be erected over the front of the crawlers, STD HL SHL
not laterally. STD Crane 30 m ~ 84 m 36 m ~ 84 m 36 m ~ 84 m
11. Ratings inside of boxes are limited by strength of
STD HL SHL
materials.
Long Crane 90 m ~ 102 m 90 m ~ 108 m 90 m ~ 120 m
12. When erecting and lowering the boom length of 102 m or
over, the blocks for erection must be placed at the end of
the crawlers. (for STD MAST).
13. When erecting and lowering the boom length of 108 m, the
blocks for erection must be placed at the end of the
crawlers. (for HL MAST).
15
21. Maximum hoist load for number of reeving parts of line for
hoist rope.
Main Hoist Loads (Single Drum)
No. of Parts of Line 1 2 3 4 5
Maximum Loads (t) 14.0 28.0 42.0 56.0 70.0
No. of Parts of Line 6 7 8 9 10
Maximum Loads (t) 84.0 98.0 112.0 126.0 140.0
No. of Parts of Line 11 12 13 14 15
Maximum Loads (t) 152.0 164.0 174.0 184.0 192.0
No. of Parts of Line 16
Maximum Loads (t) 200.0
16
LUFFING JIB SUPPLEMENTAL DATA
1. Designed and rated to comply with EN13000. 11. Ratings inside of boxes are limited by strength of
materials.
2. Operating radius is the horizontal distance from centerline
of rotation to a vertical line through the center of gravity of 12. When erecting and lowering the boom length of 54 m or
the load. over, the blocks for erection must be placed at the end of
the crawlers. (for STD MAST).
3. Deduct weight of hook blocks, slings and all other load han-
dling accessories from luffing jib ratings shown. 13. The minimum rated load is 4.0 ton.
4. Ratings shown are based on freely suspended loads and 14. (Luffing Jib Rating Loads)
make no allowance for such factors as wind effect on lifted The total load that can be lifted is the value for weight of
load, ground conditions, out-of-level operating speeds or hook block, slings, and all other loads handling accessories
any other condition that could be detrimental to the safe deducted from luffing jib ratings shown.
operation of this equipment. The operator, therefore, has
15. (Luffing Jib Lifting with Auxiliary Sheave Frame)
the responsibility to judge the existing conditions and
The total load that can be lifted is the weight of hook block,
reduce lifted load and operating speeds accordingly.
slings, and all other loads handling accessories deducted
5. Ratings are for operation on a firm and level surface, up to from luffing jib ratings shown.
1 % gradient.
16. (Auxiliary Sheave Lifting)
6. At radii and boom lengths where no ratings are shown on The total load that can be lifted over an auxiliary sheave is
chart, operation is not intended nor approved. weight of hook block, slings, and all other loads handling
accessories deducted from luffing jib ratings shown, but it
7. Boom and jib inserts and guy lines must be arranged as
should not exceed 14.0 ton in case of one reeve.
shown in the "OPERATOR'S MANUAL".
It should not exceed 28.0 ton in case of two reeves.
8. Boom hoist reeving is 30 part line. Boom and jib combinations for auxiliary sheave mounting
HL/SHL boom hoist reeving is 18 part line. are all boom and jib combinations.
Jib hoist reeving is 18 part line. Auxiliary sheave ratings at any radius from center of rota-
9. Boom and jib backstops are required for all boom lengths. tion are the same as luffing ratings shown in table for jib
when operated at the same radius.
10. The boom should be erected over the front of crawlers, not But maximum angle is the same jib maximum angle.
laterally.
17
18. Maximum hoist load for number of reeving parts of line for 19. Lifting capacities listed apply only to the machine as origi-
hoist rope. nally manufactured and designed by KOBELCO CRANES
Jib Hook Loads (Single Drum) CO.,LTD. Modifications to this machine or use of equipment
No. of Parts of Line 1 2 3 4 5 other than that specified can reduce operating capacity.
Maximum Loads (t) 14.0 28.0 42.0 56.0 70.0
20. Designed and rated to comply with ASME Code B30.5.
No. of Parts of Line 6 7 8 9 10
Maximum Loads (t) 84.0 98.0 112.0 126.0 140.0 Operation of this equipment in excess of rated loads or
No. of Parts of Line 11 12 13 14 15 disregard of instruction voids the warranty.
Maximum Loads (t) 152.0 164.0 174.0 184.0 192.0
No. of Parts of Line 16
Maximum Loads (t) 200.0
Jib Hook (Double Drum)
No. of Parts of Line 8 12 16
Maximum Loads (t) 112.0 164.0 200.0
Auxiliary Sheave
No. of Parts of Line 1 2
Maximum Loads (t) 14.0 28.0
Follow the both (1) and (2) above at a same time for the luffing jib operation.
Otherwise luffing jib may tip over the backwards due to lack of weight on front side of boom.
Failure to observe this precaution may lead to the jib tipping backwards and resulted to machine collapsing.
SL6000 minimum hook block self-weight and minimum number of reeving parts of line on hook block
Boom Jib Length 24 m 30 m 36 m 42 m 48 m 54 m 60 m 66 m 72 m 78 m 84 m
Length (79 ft) (98 ft) (118 ft) (138 ft) (157 ft) (177 ft) (197 ft) (217 ft) (236 ft) (256 ft) (276 ft)
30 m Hook Block Self-Weight (kg) 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000
(98 ft) No. of Part Line 13 6 4 2 2 2 2 2 2 2 2
36 m Hook Block Self-Weight (kg) 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000
(118 ft) No. of Part Line 11 6 4 2 2 2 2 2 2 2 2
42 m Hook Block Self-Weight (kg) 7,050 7,050 3,100 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000
(138 ft) No. of Part Line 10 9 4 2 2 2 2 2 2 2 2
48 m Hook Block Self-Weight (kg) 7,050 7,050 3,100 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000
(157 ft) No. of Part Line 9 9 4 2 2 2 2 2 2 2 2
54 m Hook Block Self-Weight (kg) 7,050 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000 2,000
(177 ft) No. of Part Line 9 8 6 2 2 2 2 2 2 2 2
60 m Hook Block Self-Weight (kg) 7,050 7,050 7,050 3,100 2,000 2,000 2,000 2,000 2,000 2,000 2,000
(197 ft) No. of Part Line 8 7 7 3 2 2 2 2 2 2 2
66 m Hook Block Self-Weight (kg) 7,050 7,050 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000
(217 ft) No. of Part Line 7 7 6 2 2 2 2 2 2 2 2
72 m Hook Block Self-Weight (kg) 7,050 7,050 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000
(236 ft) No. of Part Line 7 6 6 2 2 2 2 2 2 2 2
78 m Hook Block Self-Weight (kg) 7,050 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000
(256 ft) No. of Part Line 6 5 2 2 2 2 2 2 2 2
84 m Hook Block Self-Weight (kg) 7,050 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000
(276 ft) No.of Part Line 5 5 3 2 2 2 2 2 2 2
Weight of KOBELCO genuine hook block.
200 t hook block 7,050 kg 70 t hook block 3,100 kg
120 t hook block 4,500 kg 40 t hook block 2,000 kg
18
STANDARD
LIFTING CAPACITIES
Heavy Duty Crane Boom Long Boom Lifting
Lifting Capacities Capacities
Unit: ton Unit: ton
Counterweight: 180.0 ton, Carbody weight: 50.0 ton Counterweight: 180.0 ton, Carbody weight: 50.0 ton
Boom Boom Boom Boom
Length Length Length Length
Working (m) 24.0 30.0 36.0 42.0 (m) Working Working (m) 90.0 96.0 102.0 108.0 (m) Working
Radius (m) Radius (m) Radius (m) Radius (m)
6.0 6.7 m/450.0 6.0 14.0 15.0 m/98.0 15.8 m/84.0 14.0
7.0 425.0 7.5 m/390.0 7.0 16.0 96.0 83.7 16.6 m/70.0 17.5m /60.0 16.0
8.0 375.0 365.0 8.3 m/340.0 8.0 18.0 93.0 81.1 68.5 58.8 18.0
9.0 330.0 325.0 322.0 9.2 m/311.7 9.0 20.0 90.0 78.5 66.3 55.1 20.0
10.0 294.0 292.0 290.0 280.1 10.0 22.0 81.1 76.0 64.2 51.4 22.0
12.0 233.3 232.8 232.1 225.0 12.0 24.0 72.6 70.8 62.1 48.4 24.0
14.0 192.0 191.5 190.7 187.0 14.0 26.0 64.9 64.2 60.0 45.4 26.0
16.0 158.7 158.8 158.9 158.6 16.0 28.0 58.4 58.3 57.3 42.9 28.0
18.0 133.3 133.3 133.4 133.1 18.0 30.0 52.9 52.8 51.3 40.4 30.0
20.0 114.4 114.4 114.3 114.0 20.0 34.0 44.1 43.3 42.1 36.7 34.0
22.0 97.4 97.3 97.2 97.1 22.0 38.0 37.0 35.8 35.1 33.2 38.0
24.0 87.0 86.9 86.4 24.0 42.0 31.0 30.2 29.7 28.6 42.0
26.0 78.5 78.3 77.8 26.0 46.0 26.0 25.4 24.9 22.6 46.0
28.0 70.7 70.4 69.8 28.0 50.0 21.8 21.3 20.8 17.3 50.0
30.0 28.6 m/68.5 63.7 63.1 30.0 54.0 18.1 17.6 17.1 12.7 54.0
34.0 33.8 m/53.5 52.4 34.0 58.0 14.8 14.4 14.0 8.7 58.0
38.0 44.4 38.0 62.0 12.0 11.6 11.1 60.0m /6.8 62.0
42.0 39.0 m/42.6 42.0 66.0 9.5 9.0 8.5 66.0
Reeves 36 36 28 24 Reeves 70.0 7.2 6.7 6.2 70.0
72.0 6.2 72.0
Note: Reeves 7 6 5 5 Reeves
Designed and rated to comply with EN13000 .
Ratings shown in are determined by the strength of the boom or Note:
other structural components. Designed and rated to comply with EN13000 .
Ratings shown in are determined by the strength of the boom or
other structural components.
Note:
Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.
19
Luffing Jib Lifting Capacity Unit: ton
Counterweight: 180.0 ton, Carbody weight: 50.0 ton
Boom length (m) 30.0 Boom length (m)
30.0 m Boom Length
Jib length (m) 24.0 42.0 54.0 66.0 72.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
14.0 184.0 14.0
15.0 173.5 15.0
16.0 160.5 16.0
17.0 151.0 17.0
18.0 141.6 18.0
20.0 125.3 111.6 20.0
22.0 112.2 107.1 22.0
24.0 100.1 93.7 97.9 85.2 24.0
26.0 89.8 84.2 89.3 85.2 26.0
28.0 81.3 76.2 80.9 78.9 67.3 28.0
Jib length (m) 24.0 42.0 54.0 66.0 72.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
15.0 167.8 15.0
16.0 157.0 16.0
17.0 148.2 17.0
18.0 139.4 18.0
20.0 124.3 111.0 20.0
22.0 111.3 103.7 22.0
24.0 99.8 95.0 84.7 24.0
26.0 89.6 82.5 87.6 82.7 26.0
28.0 81.1 74.7 80.7 76.6 66.8 28.0
30.0 73.8 68.1 73.6 71.3 66.8 59.7 30.0
Working Radius (m)
Working Radius (m)
LIFTING CAPACITIES
Luffing Jib Lifting Capacity Unit: ton
Counterweight: 180.0 ton, Carbody weight: 50.0 ton
Boom length (m) 42.0 Boom length (m)
42.0 m Boom Length
Jib length (m) 24.0 42.0 54.0 66.0 72.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
15.0 15.4 m/156.2 15.0
16.0 151.0 16.0
17.0 142.7 17.0
18.0 134.4 18.0
20.0 121.0 20.0
22.0 110.0 96.6 22.0
24.0 99.3 92.1 84.1 24.0
26.0 89.1 85.0 80.2 26.0
28.0 80.6 72.9 78.8 74.4 66.3 28.0
Jib length (m) 24.0 42.0 54.0 66.0 72.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
16.0 16.2 m/143.5 16.0
17.0 137.4 17.0
18.0 129.6 18.0
20.0 116.9 20.0
22.0 106.4 96.0 22.0
24.0 97.7 89.1 82.4 24.0
26.0 88.8 82.3 77.6 26.0
28.0 80.3 71.1 76.4 72.0 65.7 28.0
Working Radius (m)
Working Radius (m)
21
Luffing Jib Lifting Capacity Unit: ton
Counterweight: 180.0 ton, Carbody weight: 50.0 ton
Boom length (m) 54.0 Boom length (m)
54.0 m Boom Length
Jib length (m) 24.0 42.0 54.0 66.0 72.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
17.0 132.2 17.0
18.0 124.8 18.0
20.0 112.8 20.0
22.0 102.8 93.7 22.0
24.0 94.5 86.1 24.0
26.0 87.3 79.6 74.0 26.0
28.0 80.0 74.0 69.7 64.2 28.0
30.0 72.8 63.0 69.0 65.0 60.9 58.1 30.0
Jib length (m) 24.0 42.0 54.0 66.0 72.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
17.0 17.8 m/121.3 17.0
18.0 120.1 18.0
20.0 108.7 20.0
22.0 99.3 90.4 22.0
24.0 91.3 83.2 24.0
26.0 84.5 77.0 72.4 26.0
28.0 78.6 71.5 67.3 28.0
30.0 72.5 66.7 62.8 58.3 30.0
Working Radius (m)
Working Radius (m)
22
HEAVY LIFT
is used. 66 (217)
L 12.0 12.0 12.0 12.0 8T 1U
indicates the most flexible combination of insert heavy duty
booms, which can be modified to form all shorter heavy duty
72 (236) L 12.0 12.0 6.0 12.0 12.0 8T 1U
boom arrangements.
L 6.0 6.0 12.0 12.0 12.0 12.0 8T 1U
78 (256)
L 12.0 12.0 12.0 12.0 12.0 8T 1U
23
Luffing Boom Arrangements for Luffing
Boom Symbol Boom Length Remarks
length m (ft) Boom arrangement L 9.0 m (29.5 ft) Boom Base
8T 8.0 m (26.2 ft) Boom Top
36 (118) L 6.0 12.0 8T LU 6.0 6.0 m (19.7 ft) Insert Boom
12.0 12.0 m (39.4 ft) Insert Boom
L 6.0 12.0 12.0 8T LU
42 (138)
LU 1.0 m (3.3 ft)
L 12.0 12.0 8T LU
mark shows the guy line installing position when
the fixed jib is used.
48 (157) L 12.0 12.0 6.0 8T LU
indicates the most flexible combination of insert luffing booms,
which can be modified to form all shorter luffing boom
L 6.0 6.0 12.0 12.0 8T LU
arrangements.
54 (177)
L 12.0 12.0 12.0 8T LU
48 (157) JL
6.0 12.0 12.0
JU
60 (197) JL
6.0 12.0 12.0 12.0
JU
72 (236) JL
6.0 12.0 12.0 12.0 12.0
JU
HL MAST
UM
12.
0
WORKING RANGES
Heavy Duty Crane Boom
80
70
40˚
60
30˚
42 40
m
36
m
30
20
H *1: 2.86 m
*2: 3.08 m
10
10 20 30 40 50 60 70 80
25
Luffing Boom
80
84
m
78 70
m
72
m
40˚
66 60
m
60
m
54
m
50 Height above ground (m)
48
m 30˚
42 40
m
36
m
30
20
H *1: 2.86 m
*2: 3.08 m
10
10 20 30 40 50 60 70 80
26
HEAVY LIFT
WORKING RANGES
Long Boom
110
108
m
100
102
m 50˚
96
m
90
90
m
80
70
40˚
60
Height above ground (m)
50
30˚
40
30
20
H *1: 2.86 m
*2: 3.08 m
10
10 20 30 40 50 60 70 80
27
Luffing Jib
Boom Angle: 86°
150
73˚
140
60˚
130
45˚ 120
72
m
66
73˚ 110
m
60 30˚
m
54
m
48
100
m
42
m
36
m
30
90
15˚
m
24
m
72
80
m
66
m
60
m
54
70
m
66 m
48
m
42
m
36
60
m
30
m
15˚
24
m
50
40
36 m
30
20
H *1: 2.86 m
*2: 3.08 m
10
10 20 30 40 50 60 70 80 90
28
HEAVY LIFT
WORKING RANGES
Luffing Jib
Boom Angle: 76°
150
140
63˚
60˚
130
45˚ 120
72
m
110
66
m
60
63˚ 30˚
m
54
m 100
48
m
42
m
36
90
m
30
m
15˚
24
m
80
72
m
66
m
60
70
m
54
m
48
66 m
m
42
m
60
36
m
30
15˚
m
24
m
50
40
36 m
30
20
H *1: 2.86 m
*2: 3.08 m
10
10 20 30 40 50 60 70 80 90
29
Luffing Jib
Boom Angle: 66°
150
140
130
120
53˚
110
45˚
100
60
m
54
53˚ 30˚
m
48 90
m
42
m
36
m
30
80
m
24
15˚
72
m
m
66
70
m
60
m
54
m
48
66 m
m
60
42
m
36
15˚
m
24
50
m
40
36 m
30
20
H *1: 2.86 m
*2: 3.08 m
10
10 20 30 40 50 60 70 80 90
30
HEAVY LIFT
LIFTING CAPACITIES
Heavy Duty Crane Boom Long Boom Lifting
Lifting Capacities Capacities
Unit: ton Unit: ton
Counterweight: 180.0 ton, Carbody weight: 50.0 ton Counterweight: 180.0 ton, Carbody weight: 50.0 ton
HL Mast point radius: 11 m to 16 m HL Mast point radius: 11 m to 16 m
Boom Boom Boom Boom
Length Length Length Length
Working (m) 36.0 42.0 (m) Working Working (m) 90.0 96.0 102.0 108.0 (m) Working
Radius (m) Radius (m) Radius (m) Radius (m)
8.0 8.3 m/367.5 8.0 14.0 15.0 m/98.0 15.8 m/98.0 14.0
9.0 330.0 9.2 m/323.3 9.0 16.0 98.0 98.0 16.6 m/84.0 17.5 m /84.0 16.0
10.0 286.4 286.9 10.0 18.0 98.0 98.0 84.0 84.0 18.0
12.0 225.4 225.9 12.0 20.0 98.0 97.5 84.0 84.0 20.0
14.0 184.9 185.2 14.0 22.0 89.9 87.4 84.0 81.9 22.0
16.0 156.0 156.1 16.0 24.0 81.0 78.8 75.9 73.8 24.0
18.0 134.4 134.3 18.0 26.0 73.5 71.5 68.7 66.7 26.0
20.0 117.7 117.4 20.0 28.0 66.9 65.1 62.3 60.5 28.0
22.0 104.1 103.9 22.0 30.0 61.1 59.4 56.8 55.1 30.0
24.0 93.2 92.8 24.0 32.0 56.0 54.4 51.8 50.3 32.0
26.0 84.0 83.6 26.0 34.0 51.5 49.9 47.5 46.0 34.0
28.0 76.2 75.9 28.0 36.0 47.4 45.9 43.5 42.1 36.0
30.0 69.5 69.1 30.0 38.0 43.5 42.3 40.0 38.7 38.0
32.0 63.5 63.3 32.0 40.0 39.9 39.0 36.7 35.5 40.0
34.0 33.8 m/58.7 58.2 34.0 44.0 33.8 33.2 31.1 30.0 44.0
36.0 53.7 36.0 48.0 28.9 28.3 26.4 25.3 48.0
38.0 49.7 38.0 52.0 24.7 24.2 22.4 21.4 52.0
40.0 39.0 m/47.8 40.0 56.0 21.2 20.7 18.9 18.0 56.0
Reeves 28 24 Reeves 60.0 18.2 17.6 15.9 15.0 60.0
Note: 64.0 15.4 14.8 13.3 12.4 64.0
Designed and rated to comply with EN13000 . 68.0 13.0 12.4 10.9 10.0 68.0
Ratings shown in are determined by the strength of the boom or 72.0 10.8 10.2 8.9 8.0 72.0
other structural components. 76.0 8.9 8.3 7.0 6.2 76.0
80.0 80.1 m/7.2 6.7 80.0
Reeves 7 7 6 6 Reeves
Note:
Designed and rated to comply with EN13000 .
Ratings shown in are determined by the strength of the boom or
other structural components.
31
Luffing Boom Lifting Unit: ton
32
HEAVY LIFT
LIFTING CAPACITIES
Luffing Jib Lifting Capacity Unit: ton
Counterweight: 180.0 ton, Carbody weight: 50.0 ton
HL Mast point radius: 16 m
Boom length (m) 36.0 Boom length (m)
36.0 m Boom Length
Jib length (m) 24.0 42.0 54.0 66.0 72.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
14.0 14.4 m/200.0 14.0
15.0 193.2 15.0
16.0 181.9 16.0
17.0 170.3 17.0
18.0 159.4 18.0
20.0 141.1 132.7 20.0
22.0 126.4 120.5 22.0
24.0 114.4 110.2 101.5 24.0
26.0 103.2 96.0 101.4 96.5 26.0
28.0 93.9 87.3 92.1 89.3 76.0 28.0
Jib length (m) 24.0 42.0 54.0 66.0 72.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
15.0 15.4 m/181.6 15.0
16.0 175.9 16.0
17.0 166.1 17.0
18.0 156.3 18.0
20.0 140.0 20.0
22.0 125.4 116.7 22.0
24.0 113.5 106.9 94.1 24.0
26.0 102.7 98.4 93.1 26.0
28.0 93.4 85.4 91.2 86.7 74.9 28.0
30.0 85.5 78.2 83.8 80.6 73.6 61.0 30.0
Working Radius (m)
Working Radius (m)
33
Luffing Jib Lifting Capacity Unit: ton
Counterweight: 180.0 ton, Carbody weight: 50.0 ton
HL Mast point radius: 16 m
Boom length (m) 48.0 Boom length (m)
48.0 m Boom Length
Jib length (m) 24.0 42.0 54.0 66.0 72.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
16.0 16.2 m/167.4 16.0
17.0 160.1 17.0
18.0 150.8 18.0
20.0 135.8 20.0
22.0 123.4 113.0 22.0
24.0 112.6 103.6 90.2 24.0
26.0 102.2 95.5 88.0 26.0
28.0 92.9 83.4 88.4 84.1 67.3 28.0
30.0 85.0 76.3 82.3 78.3 66.0 58.4 30.0
34.0 65.0 70.9 68.5 62.9 56.3 34.0
Jib length (m) 24.0 42.0 54.0 66.0 72.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
17.0 154.3 17.0
18.0 145.5 18.0
20.0 131.2 20.0
22.0 119.3 109.3 22.0
24.0 109.4 100.2 24.0
26.0 101.0 92.5 80.7 26.0
28.0 92.4 85.7 78.2 63.1 28.0
30.0 84.5 74.3 79.8 75.6 61.8 55.1 30.0
34.0 63.2 69.9 66.5 58.7 52.9 34.0
Working Radius (m)
Working Radius (m)
34
HEAVY LIFT
LIFTING CAPACITIES
Luffing Jib Lifting Capacity Unit: ton
Counterweight: 180.0 ton, Carbody weight: 50.0 ton
HL Mast point radius: 16 m
Boom length (m) 60.0 Boom length (m)
60.0 m Boom Length
Jib length (m) 24.0 42.0 54.0 66.0 72.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
17.0 17.8 m/141.8 17.0
18.0 140.3 18.0
20.0 126.7 20.0
22.0 115.4 103.2 22.0
24.0 105.9 97.0 24.0
26.0 97.8 89.5 76.5 26.0
28.0 90.8 83.0 74.2 28.0
30.0 84.0 77.3 71.7 58.2 30.0
34.0 61.4 67.8 64.4 55.3 49.4 34.0
38.0 53.1 60.2 57.1 52.1 47.0 38.0
Jib length (m) 24.0 42.0 54.0 66.0 72.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
18.0 18.5 m/131.7 18.0
20.0 122.2 20.0
22.0 111.4 95.3 22.0
24.0 102.3 91.5 24.0
26.0 94.5 86.5 71.3 26.0
28.0 87.8 80.3 68.1 28.0
30.0 82.0 74.8 66.6 55.1 30.0
34.0 57.5 65.6 61.6 52.2 46.4 34.0
Working Radius (m)
Working Radius (m)
35
36
SUPER HEAVY LIFT
114 (374) L 12.0 12.0 6.0 12.0 12.0 12.0 8T 5.0 6.0 12.0
U
L 12.0 12.0 6.0 12.0 12.0 12.0 8T 5.0 6.0 6.0 12.0
U
120 (394)
L 12.0 12.0 6.0 12.0 12.0 12.0 8T 5.0 12.0 12.0
U
126 (413) L 12.0 12.0 6.0 12.0 12.0 12.0 8T 5.0 6.0 12.0 12.0
U
37
Luffing Boom Arrangements for Luffing
Boom Symbol Boom Length Remarks
length m (ft) Boom arrangement L 9.0 m (29.5 ft) Boom Base
8T 8.0 m (26.2 ft) Boom Top
36 (118) L 6.0 12.0 8T LU 6.0 6.0 m (19.7 ft) Insert Boom
12.0 12.0 m (39.4 ft) Insert Boom
L 6.0 12.0 6.0 8T LU
42 (138)
LU 1.0 m (3.3 ft)
L 12.0 12.0 8T LU
mark shows the guy line installing position when
the fixed jib is used.
48 (157) L 12.0 12.0 6.0 8T LU
indicates the most flexible combination of insert luffing booms,
which can be modified to form all shorter luffing boom
L 6.0 6.0 12.0 12.0 8T LU
arrangements.
54 (177)
L 12.0 12.0 12.0 8T LU
54 (177)
12.0 12.0 12.0
JL JU
12.
12
12
0
.0
.0
60 (197) JL
6.0 12.0 12.0 12.0
JU
ML
ML
ML
72 (236) JL
12.0 12.0 12.0 6.0 12.0
JU
16.0 m 13.0 m 11.0 m
12.0 12.0 12.0 6.0 6.0 12.0 52.5 ft 42.7 ft 36.3 ft
JL JU
78 (256) Symbol Mast Length Remarks
12.0 12.0 12.0 12.0 12.0
JL JU
ML 9.0 m (29.5 ft)
84 (276) JL
12.0 12.0 12.0 6.0 12.0 12.0
JU
12.0 12.0 m (39.4 ft)
UM 9.0 m (29.5 ft)
38
SUPER HEAVY LIFT
WORKING RANGES
Heavy Duty Crane Boom
80
70
40˚
60
30˚
42 40
m
36
m
30
20
H *1: 2.86 m
*2: 3.08 m
10
10 20 30 40 50 60 70 80
39
Luffing Boom
80
84
m
78 70
m
72
m 40˚
66 60
m
60
m
54
m 30˚
50 Height above ground (m)
48
m
42 40
m
36
m
30
20
H *1: 2.86 m
*2: 3.08 m
10
10 20 30 40 50 60 70 80
40
SUPER HEAVY LIFT
WORKING RANGES
Long Boom
126 120
m
120
m
110
114
m
108
m
100
102
m
96 40˚
m 90
90
m
80
70
30˚
60
50
40
30
20
H *1: 2.86 m
*2: 3.08 m
10
10 20 30 40 50 60 70 80 90 100 110
41
73˚ 170
Luffing Jib
60˚
Boom Angle: 86° 160
150
45˚
84
140
m
78
m
72
m
30˚ 130
66
m
60
m
54
73˚
m
120
48
m
42
m
36
15˚ 110
m
30
m
100
84
m
78
m
72
90
m
66
84 m
m
60
m
80
54
m
48
m
42
70
m
36
m
30
60
m
15˚
24
m
36 m 40
30
20
H *1: 2.86 m
*2: 3.08 m
10
10 20 30 40 50 60 70 80 90 100
42
SUPER HEAVY LIFT
WORKING RANGES
170
Luffing Jib
63˚
Boom Angle: 60˚
160
76°
150
45˚
140
84
m
78
m
72
130
m
30˚
66
m
60
m
120
54
m
48
m
63˚
42
m
110
36
15˚
m
30
m
84 100
m
78
90
m
72
m
66
84 m
m
80
60
m
54
m
48
70
m
42
m
36
m
60
30
15˚
m
24
50
40
36 m
30
20
H *1: 2.86 m
*2: 3.08 m
10
10 20 30 40 50 60 70 80 90 100 110
43
170
Luffing Jib
Boom Angle: 160
66°
150
53˚
140
45˚
130
84
m
78
120
m
72
30˚
m
66
m
60
110
m
54
m
53˚
48
m 100
42
m
36
15˚
m
30
m
90
84
m
78
80
m
72
m
66
78 m
m
60
70
m
54
m
48
m
42
60
m
15˚
36
m
30
50
24
m
40
36 m
30
20
H *1: 2.86 m
*2: 3.08 m
10
44
SUPER HEAVY LIFT
LIFTING CAPACITIES
Heavy Duty Crane Boom
Lifting Capacities
Unit: ton Unit: ton Unit: ton
Counterweight: 180.0 ton Counterweight: 180.0 ton Counterweight: 180.0 ton
Carbody weight: 50.0 ton Carbody weight: 50.0 ton Carbody weight: 50.0 ton
Palette weight: 250.0 ton x 11 m Palette weight: 250.0 ton x 13 m Palette weight: 250.0 ton x 16 m
Boom Boom Boom Boom Boom Boom
Length Length Length Length Length Length
Working (m) 36.0 42.0 (m) Working Working (m) 36.0 42.0 (m) Working Working (m) 36.0 42.0 (m) Working
Radius (m) Radius (m) Radius (m) Radius (m) Radius (m) Radius (m)
8.0 8.3 m/550.0 8.0 8.0 8.3 m/550.0 8.0 8.0 8.3 m/550.0 8.0
9.0 544.9 9.2 m/523.4 9.0 9.0 544.9 9.2 m/526.0 9.0 9.0 544.9 9.2 m/527.3 9.0
10.0 511.1 510.0 10.0 10.0 537.4 519.0 10.0 10.0 537.4 519.9 10.0
12.0 428.0 427.0 12.0 12.0 461.6 460.5 12.0 12.0 511.5 503.7 12.0
14.0 367.7 366.6 14.0 14.0 396.6 395.6 14.0 14.0 439.6 438.8 14.0
16.0 321.8 320.8 16.0 16.0 347.3 346.3 16.0 16.0 385.3 384.2 16.0
18.0 285.5 284.9 18.0 18.0 308.5 307.6 18.0 18.0 342.4 341.4 18.0
20.0 255.6 255.9 20.0 20.0 277.3 276.4 20.0 20.0 307.9 306.9 20.0
22.0 228.2 228.5 22.0 22.0 250.3 250.5 22.0 22.0 279.5 278.5 22.0
24.0 205.8 206.0 24.0 24.0 225.9 226.0 24.0 24.0 250.7 253.5 24.0
26.0 187.2 187.3 26.0 26.0 204.5 205.6 26.0 26.0 224.9 230.9 26.0
28.0 170.5 171.4 28.0 28.0 184.3 188.4 28.0 28.0 201.5 211.7 28.0
30.0 154.2 157.8 30.0 30.0 166.7 173.6 30.0 30.0 178.8 195.2 30.0
32.0 139.6 146.0 32.0 32.0 151.0 160.7 32.0 32.0 157.9 179.2 32.0
34.0 33.8 m/127.4 135.7 34.0 34.0 33.8 m/137.7 149.1 34.0 34.0 33.8 m/139.6 164.0 34.0
36.0 126.3 36.0 36.0 136.6 36.0 36.0 148.3 36.0
38.0 115.7 38.0 38.0 125.1 38.0 38.0 132.8 38.0
40.0 39.0 m/110.5 40.0 40.0 39.0 m/119.5 40.0 40.0 39.0 m/124.8 40.0
Reeves 44 44 Reeves Reeves 44 44 Reeves Reeves 44 44 Reeves
Note:
Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
45
Luffing Boom Lifting Unit: ton
46
SUPER HEAVY LIFT
Unit: ton
LIFTING CAPACITIES Counterweight: 180.0 ton, Carbody weight: 50.0 ton
Palette weight: 130.0 ton x 16 m
Luffing Jib Lifting Capacity
Boom length (m) 36.0 Boom length (m)
36.0 m Boom Length
Jib length (m) 24.0 42.0 54.0 66.0 78.0 84.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
14.0 14.4 m/200.0 14.0
15.0 193.2 15.0
16.0 181.9 16.0
17.0 175.5 17.0
18.0 169.5 18.0
20.0 163.4 139.6 20.0
22.0 158.1 133.8 22.0
24.0 155.5 126.8 101.5 24.0
26.0 145.9 154.6 120.7 99.3 26.0
28.0 129.4 149.5 115.5 97.1 76.0 28.0
30.0 98.3 143.8 111.2 94.4 74.1 30.0
34.0 125.2 104.4 105.8 88.2 72.1 54.8 48.4 34.0
Jib length (m) 24.0 42.0 54.0 66.0 78.0 84.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
15.0 15.4 m/190.6 15.0
16.0 187.1 16.0
17.0 181.8 17.0
18.0 177.2 18.0
20.0 169.7 20.0
22.0 164.4 127.7 22.0
24.0 158.2 122.6 94.1 24.0
26.0 146.3 117.2 93.1 26.0
28.0 132.6 153.0 111.8 90.6 74.9 28.0
30.0 108.4 141.7 106.2 87.7 73.6 30.0
34.0 123.3 95.3 81.5 70.4 52.0 46.2 34.0
38.0 109.0 102.9 85.2 102.4 75.1 66.7 50.2 44.9 38.0
Working Radius (m)
Working Radius (m)
42.0 92.1 76.4 94.5 68.8 84.5 62.8 48.1 43.3 42.0
46.0 67.6 85.3 62.9 83.4 58.9 72.9 45.8 41.6 46.0
50.0 77.5 72.6 57.5 75.7 54.9 72.9 43.1 39.7 50.0
54.0 70.9 66.4 52.6 69.1 51.1 66.9 41.1 49.7 37.2 41.6 54.0
58.0 61.1 47.2 63.5 59.2 47.5 61.3 38.8 47.9 34.7 39.8 58.0
62.0 56.5 58.7 54.6 43.2 54.9 52.2 36.5 44.9 32.5 37.1 62.0
66.0 51.6 50.6 38.7 49.0 48.2 34.3 42.3 30.4 34.7 66.0
70.0 47.1 33.5 43.9 44.7 32.2 39.9 42.8 28.6 32.6 70.0
74.0 44.0 39.4 41.6 30.3 37.7 39.8 26.9 30.6 33.1 74.0
78.0 35.3 38.9 28.5 35.7 37.0 25.3 28.8 32.1 78.0
82.0 36.4 24.7 32.6 34.6 21.5 27.2 30.3 82.0
86.0 29.5 32.3 17.6 25.7 28.6 86.0
90.0 26.5 30.3 24.3 27.1 90.0
94.0 28.4 23.1 25.7 94.0
98.0 24.4 98.0
102.0 23.3 102.0
Reeves 16 12 8 8 8 8 Reeves
Note: Designed and rated to comply with EN13000.
47 Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.
Unit: ton
Counterweight: 180.0 ton, Carbody weight: 50.0 ton
Luffing Jib Lifting Capacity Palette weight: 130.0 ton x 16 m
Boom length (m) 48.0 Boom length (m)
48.0 m Boom Length
Jib length (m) 24.0 42.0 54.0 66.0 78.0 84.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
16.0 16.2 m/190.8 16.0
17.0 186.6 17.0
18.0 181.8 18.0
20.0 174.2 20.0
22.0 165.1 119.4 22.0
24.0 152.8 114.7 90.2 24.0
26.0 141.6 109.7 88.0 26.0
28.0 131.6 150.5 104.5 85.4 67.3 28.0
30.0 117.7 139.4 99.4 82.7 66.0 30.0
34.0 121.3 89.4 76.9 62.9 49.7 44.1 34.0
38.0 107.2 80.1 104.0 70.8 59.5 47.9 42.8 38.0
42.0 89.4 71.9 92.8 64.9 88.9 55.8 45.8 41.3 42.0
46.0 80.8 64.9 83.7 59.3 81.8 52.0 43.6 39.6 46.0
50.0 76.1 70.2 54.3 74.2 48.4 70.5 41.3 37.6 50.0
54.0 69.6 64.2 49.7 67.8 44.6 65.5 39.0 50.9 36.0 54.0
58.0 59.1 45.8 62.3 57.1 41.7 60.0 36.7 49.0 34.1 39.0 58.0
62.0 54.7 57.5 52.7 38.8 55.3 34.5 45.9 32.3 37.5 62.0
66.0 53.4 48.8 36.1 51.1 46.3 32.4 43.1 30.5 35.1 66.0
70.0 45.4 33.8 45.9 43.0 30.4 40.6 28.7 32.9 70.0
74.0 42.4 41.2 40.0 28.6 38.4 38.1 27.0 31.0 74.0
78.0 36.9 37.3 26.9 36.3 35.4 24.7 29.1 32.2 78.0
82.0 34.9 24.6 33.7 33.0 20.1 27.5 31.3 82.0
86.0 32.7 30.5 30.8 16.1 26.0 29.5 86.0
90.0 27.5 28.9 24.6 27.9 90.0
94.0 27.1 23.3 26.2 94.0
98.0 25.4 24.6 98.0
102.0 23.1 102.0
Reeves 16 12 8 8 8 8 Reeves
Jib length (m) 24.0 42.0 54.0 66.0 78.0 84.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
17.0 191.0 17.0
18.0 179.8 18.0
20.0 167.2 20.0
22.0 155.0 110.4 22.0
24.0 143.6 105.9 24.0
26.0 133.0 101.2 80.7 26.0
28.0 123.6 96.3 78.2 63.1 28.0
30.0 115.5 136.7 91.5 75.6 61.8 30.0
34.0 118.9 82.1 69.9 58.7 46.9 42.0 34.0
38.0 105.1 73.5 101.8 64.2 55.2 45.1 40.6 38.0
42.0 86.4 65.9 90.9 58.7 51.6 42.9 39.0 42.0
Working Radius (m)
Working Radius (m)
46.0 78.0 59.4 81.9 53.6 79.9 48.0 40.7 37.3 46.0
50.0 74.4 48.9 72.5 44.5 67.1 38.4 35.4 50.0
54.0 68.1 61.8 44.8 66.2 41.2 63.9 36.1 50.6 33.6 54.0
58.0 62.7 56.8 41.2 60.9 38.2 58.5 33.9 49.9 31.7 40.0 58.0
62.0 52.5 56.2 50.5 35.4 53.9 31.7 46.9 29.9 38.4 62.0
66.0 48.7 52.1 46.7 32.9 49.8 29.7 44.0 28.1 35.9 66.0
70.0 43.4 30.7 46.3 40.9 27.8 41.4 26.5 33.6 70.0
74.0 40.5 42.3 38.1 26.1 39.1 36.1 24.9 31.6 74.0
78.0 37.9 37.9 35.5 24.5 37.0 33.5 23.3 29.7 32.6 78.0
82.0 33.2 23.0 34.9 31.2 18.6 28.0 30.3 82.0
86.0 31.1 31.5 29.2 14.6 26.5 28.3 86.0
90.0 29.1 28.5 27.3 25.0 26.4 90.0
94.0 25.5 23.7 24.7 94.0
98.0 24.0 19.2 23.1 98.0
102.0 22.5 21.7 102.0
106.0 20.3 106.0
Reeves 16 8 8 8 8 8 Reeves
Note: Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications. 48
SUPER HEAVY LIFT
Unit: ton
LIFTING CAPACITIES Counterweight: 180.0 ton, Carbody weight: 50.0 ton
Luffing Jib Lifting Capacity Palette weight: 130.0 ton x 16 m
Boom length (m) 60.0 Boom length (m)
60.0 m Boom Length
Jib length (m) 24.0 42.0 54.0 66.0 78.0 84.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
17.0 17.8 m/162.3 17.0
18.0 161.4 18.0
20.0 150.8 20.0
22.0 140.5 103.2 22.0
24.0 130.7 99.1 24.0
26.0 121.7 94.8 76.5 26.0
28.0 113.5 90.4 74.2 28.0
30.0 106.4 86.0 71.7 58.2 30.0
34.0 116.7 77.4 66.4 55.3 44.5 40.0 34.0
38.0 103.1 69.5 61.0 52.1 42.7 38.6 38.0
42.0 92.3 62.5 89.0 55.9 48.7 40.7 37.1 42.0
46.0 75.3 56.6 80.2 51.1 78.2 45.3 38.5 35.4 46.0
50.0 68.6 72.9 46.7 70.9 42.0 63.5 36.3 33.6 50.0
54.0 66.7 42.8 64.7 38.9 61.9 34.0 31.9 54.0
58.0 61.4 54.6 39.5 59.5 36.1 57.1 32.0 47.6 30.1 41.6 58.0
62.0 50.4 54.9 48.3 33.5 52.5 30.0 46.3 28.3 39.8 62.0
66.0 46.8 50.9 44.7 31.1 48.6 28.1 44.9 26.6 37.1 66.0
70.0 47.4 41.6 29.1 45.1 39.0 26.3 42.2 25.1 34.7 70.0
74.0 38.7 42.0 36.2 24.7 39.8 23.6 32.5 74.0
78.0 36.2 39.2 33.7 23.2 37.4 31.7 21.8 30.5 78.0
82.0 35.2 31.5 21.4 34.9 29.5 17.1 28.7 28.6 82.0
86.0 29.5 32.6 27.5 13.1 27.1 26.5 86.0
90.0 27.6 29.5 25.7 25.6 24.8 90.0
94.0 26.3 24.1 24.2 23.2 94.0
98.0 22.5 19.3 21.7 98.0
102.0 21.1 20.3 102.0
106.0 19.0 106.0
110.0 17.8 110.0
Reeves 12 8 8 8 8 8 Reeves
Jib length (m) 24.0 42.0 54.0 66.0 78.0 84.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
18.0 18.5 m/144.7 18.0
20.0 137.9 20.0
22.0 128.7 95.3 22.0
24.0 120.0 91.5 24.0
26.0 111.9 87.5 71.3 26.0
28.0 104.5 83.3 68.1 28.0
30.0 98.0 79.2 66.6 55.1 30.0
34.0 114.0 71.4 61.6 52.2 41.9 34.0
38.0 100.7 64.1 56.6 49.0 40.1 35.9 38.0
42.0 90.1 57.7 86.8 51.7 45.7 38.1 34.4 42.0
46.0 52.3 78.2 47.3 76.1 42.4 36.0 32.7 46.0
Working Radius (m)
Working Radius (m)
Jib length (m) 24.0 42.0 54.0 66.0 78.0 84.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
18.0 19.2 m/130.3 18.0
20.0 127.2 20.0
22.0 119.3 22.0
24.0 111.7 84.5 24.0
26.0 104.5 80.9 66.6 26.0
28.0 98.0 77.3 64.6 28.0
30.0 92.2 73.6 62.4 51.2 30.0
34.0 111.2 66.6 57.8 48.5 39.5 34.0
38.0 98.2 60.1 53.2 45.6 37.8 33.8 38.0
42.0 87.9 54.3 84.4 48.8 42.5 35.9 32.4 42.0
46.0 49.3 76.0 44.7 39.5 33.9 30.8 46.0
50.0 62.5 45.4 69.0 40.9 67.0 36.7 31.9 29.2 50.0
54.0 57.3 63.1 37.6 61.1 34.0 54.9 29.9 27.4 54.0
58.0 58.1 34.7 56.1 31.6 51.3 28.0 42.7 25.9 58.0
62.0 53.7 45.4 51.8 29.2 49.3 26.2 41.8 24.3 37.0 62.0
66.0 42.1 47.9 27.2 45.5 24.5 40.4 22.9 36.2 66.0
70.0 39.1 44.6 37.0 25.5 42.2 22.9 39.7 21.5 35.8 70.0
74.0 36.5 41.6 34.4 39.3 21.5 37.4 19.9 33.7 74.0
78.0 32.1 36.6 29.5 20.2 34.8 18.3 31.6 78.0
82.0 30.1 34.2 27.5 17.6 32.4 25.5 13.9 29.7 82.0
86.0 28.2 25.7 30.3 23.6 10.0 28.0 22.7 86.0
90.0 24.0 28.3 22.0 26.4 21.1 90.0
94.0 22.5 25.6 20.5 24.8 19.6 94.0
98.0 19.1 18.7 18.2 98.0
102.0 17.9 13.1 17.0 102.0
106.0 16.7 15.8 106.0
110.0 14.7 110.0
114.0 13.7 114.0
Reeves 12 8 8 8 8 8 Reeves
Jib length (m) 30.0 42.0 54.0 66.0 78.0 84.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
20.0 20.6 m/102.8 20.0
22.0 99.2 22.0
24.0 93.8 77.9 24.0
26.0 88.5 74.7 26.0
28.0 83.4 71.3 59.4 28.0
30.0 78.6 68.0 57.4 47.7 30.0
34.0 69.5 61.6 53.1 45.1 37.0 34.0
38.0 59.8 94.5 55.6 48.9 42.4 35.3 31.6 38.0
42.0 84.4 50.4 44.8 39.5 33.5 30.2 42.0
46.0 74.2 45.8 73.9 41.1 36.7 31.6 28.6 46.0
50.0 64.2 42.2 66.6 37.7 64.9 34.0 29.7 27.1 50.0
Working Radius (m)
Working Radius (m)
Unit: ton
LIFTING CAPACITIES Counterweight: 180.0 ton, Carbody weight: 50.0 ton
Luffing Jib Lifting Capacity Palette weight: 130.0 ton x 16 m
Boom length (m) 84.0 Boom length (m)
84.0 m Boom Length
Jib length (m) 30.0 42.0 54.0 66.0 72.0 78.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
20.0 21.4 m/92.8 20.0
22.0 90.8 22.0
24.0 83.7 75.6 24.0
26.0 77.4 72.6 26.0
28.0 71.7 69.5 55.5 28.0
30.0 66.6 65.9 53.7 30.0
34.0 57.6 58.8 49.9 40.9 38.2 34.0 34.0
38.0 49.6 51.9 46.0 38.4 36.2 32.5 38.0
42.0 73.6 45.9 42.3 35.9 34.1 30.8 42.0
51
52
TRANSPORTATION PLAN
Base Machine
Upper Structure
Attachments
53
54
PARTS AND ATTACHMENTS
Dimensions: mm Weight: kg
Base Machine 6 m Insert Boom Heavy Boom Top
With mast and lower translifter without upper/lower With 6 m guy line x 4 Weight: 4,910 kg
connecting devices. Weight: 3,760 kg
Weight: 64,000 kg Width: 3,000 mm
2,600
2,840
3,400
1,510
6,220 3,000 3,390
14,250
2,590
2,840
2,990
2,530
7,370 12,220 3,000
1,360
4,450
8 m Tapered Boom
With 8 m guy line x 2
Weight: 5,150 kg
Crawler
Weight: 40,000 kg Width: 1,500 mm
3,000
1,910
1,500
11,490
2,840
1,790
8,220
Weight: 29,280 kg
11,500
3,560
1,330
9,340 3,000
2,960
480
460
2,390
1,020
55
Dimensions: mm Weight: kg
10 m Jib Base 8 m Mast Base
Weight: 3,780 kg Weight: 13,700 kg
1,990
3,050
10,290 2,490
2,530
6 m Insert Jib
Weight: 1,470 kg
9,360
2,060
1,990
12 m Insert Mast
With guy line
6,140 2,490
Weight: 5,650 kg
2,990
12 m Insert Jib
Weight: 2,680 kg
2,340
2,060
1,990
9 m mast top
With guy line
8 m Jib Top Weight: 10,080 kg
Weight: 3,690 kg
2,860
2,490
1,990
2,340
8,670 2,620
10,850
Other Attachments
Attachments Weight Dimensions (L x W x H)
Hanger sheave 2,010 kg 2,760 mm x 2,130 mm x 760 mm
5 m insert boom for long boom 1,790 kg 5,180 mm x 2,490 mm x 2,230 mm
Rear strut base 1,990 kg 6,820 mm x 2,590 mm x 1,620 mm
Rear strut top 2,410 kg 7,060 mm x 1,530 mm x 1,390 mm
Front strut base 1,840 kg 7,460 mm x 1,640 mm x 1,330 mm
Front strut top 3,040 kg 8,080 mm x 1,530 mm x 2,090 mm
Auxiliary sheave 650 kg 2,380 mm x 1,130 mm x 910 mm
56
57
58
HYDRAULIC CRAWLER CRANE