SL6000 Specification (60 Pages)

The document provides specifications for a hydraulic crawler crane model SL6000, including its maximum lifting capacities, boom and jib lengths, power plant details, load hoist and swing systems, and upper structure configuration.

Uploaded by

Thành Sơn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
156 views

SL6000 Specification (60 Pages)

The document provides specifications for a hydraulic crawler crane model SL6000, including its maximum lifting capacities, boom and jib lengths, power plant details, load hoist and swing systems, and upper structure configuration.

Uploaded by

Thành Sơn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 60

HYDRAULIC CRAWLER CRANE

Model: SL6000

Max. Lifting Capacity: 550 ton x 8.3 m


Max. Crane Boom Length: 126 m
Max. Luffing Jib Combination: 84 m + 84 m
CONFIGURATION

STD Long Boom


Max. Lifting Capacity:
98 metric tons x 15 m
Max. Boom Length: 108 m

STD Luffing Boom HL Luffing Boom


Max. Lifting Capacity: Max. Lifting Capacity:
300 metric tons x 9.0 m 300 metric tons x 8.5 m
Max. Boom Length: 84 m Max. Boom Length: 84 m

STD Heavy Duty HL Heavy Duty


Crane Boom Crane Boom
Max. Lifting Capacity: Max. Lifting Capacity:
450 metric tons x 6.7 m 367.5 metric tons x 8.3 m
Max. Boom Length: 42 m Max. Boom Length: 42 m

1
CONTENTS
Configuration ··················· 1

Specifications ···················· 3

General Dimensions ········· 5

SHL Luffing Jib STANDARD


Max. Lifting Capacity: Boom and Jib
200 metric tons x 14.4 m Arrangements ················· 7
Max. Combination:
Working Ranges ·················· 9
84 m + 84 m
Crane Boom
Supplemental Data ············16
Luffing Jib
Supplemental Data ··········· 17
Heavy Duty Crane Boom
Lifting Capacities ················· 19
Luffing Boom
Lifting Capacities ················· 19
Long Boom
Lifting Capacities ················· 19
Luffing Jib
Lifting Capacities ················· 20

HEAVY LIFT
Boom and Jib
Arrangements ················ 23

Working Ranges ··············· 25


Heavy Duty Crane Boom
Lifting Capacities ················· 31
Long Boom
Lifting Capacities ················· 31
SHL Heavy Duty Luffing Boom
Crane Boom Lifting Capacities ················· 32
Max. Lifting Capacity: Luffing Jib
550 metric tons x 8.3 m Lifting Capacities ················· 33
Max. Boom Length: 42 m
SUPER HEAVY LIFT
Boom and Jib
Arrangements ················ 37

Working Ranges ················ 39


Heavy Duty Crane Boom
Lifting Capacities ················· 45
Long Boom
Lifting Capacities ················· 45
Luffing Boom
Lifting Capacities ················· 46
Luffing Jib
Lifting Capacities ················· 47

Transportation Plan ············ 53

Parts and Attachments ········ 55

2
SPECIFICATIONS

Power Plant Load Hoist System

Model:Hino diesel engine E13C-UV H1 and H2 drums for load hoist powered by a hydraulic vari-
Type:Water-cooled, direct fuel injection, with turbocharger able plunger motors, driven through planetary reducers.
Complies with US EPA Tier III. Brake: A spring-set, hydraulically released multiple-disc brake
Displacement: 12.913 liters is mounted on the hoist motor and operated through a counter-
Rated Power: 320 kW/2,000 min-1 balance valve.
Max. torque: 1,650 N•m/1,300 min-1 Drum lock: External ratchet for locking drum.
Cooling system: Liquid, recirculating bypass Drums:
Starter: 24 V/6 kW H1 and H2:
Radiator: Corrugated type core, thermostatically controlled 640 mm P.C.D. x 1,367.1 mm Lg. wide drum,
Air cleaner: Dry type with replaceable paper element grooved for 28 mm wire rope. Rope capacity is 830 m
Throttle: Twist grip type hand throttle, electrically actuated working length and 1,080 m storage length.
Fuel filter: Replaceable paper element Note: Rope lengths listed above denote drum capacity and may differ from
actual rope lengths supplied when machinery is shipped.
Batteries: Two 12V x 136Ah/5HR capacity batteries, parallel
Line speed: 110 ~ 3 m/min
connected.
Single line on the first layer
Fuel tank capacity: 600 liters
Rated line pull: 137 kN {14.0 tf}

Hydraulic System Swing System


Six variable displacement piston pumps are driven by heavy-
Swing unit is powered by hydraulic motor driving spur gears
duty pump drive. Two variable displacement pumps are used in
through planetary reducers (4 sets), the swing system provides
H1 (main hook hoist) and right hand side propel circuit. Two
360° rotation.
variable displacement pumps are used in H2 (auxiliary hook
Swing parking brakes: A spring-set, hydraulically released
hoist) and left hand side propel circuit. One of the other two
multiple-disc brake is mounted on swing motor.
pumps is used in W1 (boom), W2 (jib) or W3 (SHL mast) hoist
Swing circle: Triple-row roller bearing with an integral internal-
circuit, and the other is used in the swing circuit.
ly cut swing gear.
Control: Full-flow hydraulic control system for infinitely variable
Swing speed: 0.9 min-1 {rpm}
pressure to all winches, propel and swing.
Controls respond instantly to the touch, delivering smooth func-
tion operation.
Upper Structure
Cooling: Oil-to-air heat exchanger (plate-fin type)
Torsion-free precision machined upper frame. All components
Filtration: Full-flow and bypass type with replaceable element
are located clearly and service friendly. Engine with low noise
Electrical system: All wiring corded for easy servicing, individ-
level.
ual fused branch circuits.

Max. relief valve pressure: 31.9 MPa {325 kgf/cm2} Cab & Control
Reservoir capacity: 710 liters
Totally enclosed, full vision cab with safety glass, fully
Boom Hoisting System adjustable, high backed seat with a head-rest and armrests,
and intermittent wiper and window washer (roof and front win-
Powered by a hydraulic motor through a planetary reducer. dow).
Brake: A spring-set, hydraulically released multiple-disc brake Cab fittings:
is mounted on the boom hoist motor and operated through a Air conditioner, convenient compartment (for tool), cup holder,
counter-balance valve. ashtray, cigarette lighter, sun visor, roof blind, tinted glass, floor
Drum lock: External ratchet for locking drum. mat, foot-rest, shoe tray
Drum: Double drum, grooved for 28 mm dia. wire rope. Controls:
Line speed: Double line on first drum layer Five adjustable levers for all winches and swing controls
Hoisting/Lowering: 20~2 m/min x 2
Boom hoist reeving: 30 parts of 28 mm dia.high strength
wire rope
Boom backstops: Required for all boom lengths

3
Lower Structure Attachment

Steel-welded carbody with axles. Crawler assemblies are Boom and Jib:
designed with quick disconnect feature for individual removal Welded lattice construction using tubular, high-tensile steel
as a unit from axles. Crawler belt tension is maintained by chords with pin connections between sections.
hydraulic jack force on the track-adjusting bearing block. Boom and Jib Length
Crawler drive: Two independent hydraulic propel drive is built Min. Length Max. Length
into each crawler side frame. Each drive consists of a hydraulic (Min. Combination) (Max. Combination)
motor propelling a driving tumbler through a planetary gear
STANDARD
box. Hydraulic motor and gear box are built into the crawler
Crane Boom 24 m 108 m
side frame within the shoe width.
Luffing Jib 30 m + 24 m 60 m + 72 m
Crawler brakes: Spring-set, hydraulically released parking
brakes are built into each propel drive. HEAVY LIFT
Steering mechanism: A hydraulic propel system provides both Crane Boom 36 m 108 m
skid steering (driving one track only) and counter-rotating steer- Luffing Jib 36 m + 24 m 66 m + 72 m
ing (driving each track in opposite directions). SUPER HEAVY LIFT
Track rollers: Sealed track rollers. Crane Boom 36 m 126 m
Shoes (flat): 1,500 mm wide each crawler
Luffing Jib 36 m + 24 m 84 m + 84 m
Max. travel speed: 1.0/0.4 km/h
Max. gradeability: 20%

Weight

Including base machine, counterweights = 180 t, carbody


weights = 50 t, 24 m boom with heavy boom tip and 450 t hook
block. Not include quick connection devise and upper
translifter.

Weight: 424 metric ton


Ground pressure: 136 kPa {1.4 kgf/cm2}

Main Specifications (Model: SL6000)


Lift Enhancer STD HL SHL Hoist Winch (H1, H2)
HL Mast - 30 m 30 m Max. Line Speed 110 m/min (1st layer)
Additional Weight - - ~250 t Rated Line Pull (Single line) 137 kN {14.0 tf}
Heavy Duty Crane Boom Wire Rope Diameter 28 mm
450 t 367.5 t 550 t Wire Rope Length 830 m
Max. Lifting Capacity
6.7 m Working Speed
Length 24 ~ 42 m 36 ~ 42 m 36 ~ 42 m Swing 0.9 min-1 {rpm}
Crane Boom Travel 1.0/0.6 km/h
300 t 300 t 300 t Hydraulic System
Max. Lifting Capacity
9m Pumps 6 variable displacement
Length 30 ~ 84 m 36 ~ 84 m 36 ~ 84 m Max. Pressure 31.9 MPa {325 kgf/cm2}
Long Boom Hydraulic Tank Capacity 710 liters
Length 90 ~ 108 m 90 ~ 108 m 90 ~ 126 m Weight
Luffing Jib Working Weight* Approx. 424 t
Max. Lifting Capacity 184 t 200 t 200 t Ground Pressure* 136 kPa {1.4 kgf/cm2}
Max. Combination (Boom) 60 m 66 m 84 m Upper: 180 metric tons
Counterweight
(Jib) 72 m 72 m 84 m Lower: 50 metric tons
Luffing Angle 66˚ ~ 86˚ * Including base machine, counterweights =180 metric ton, carbody
Power Plant weights = 50 metric ton, 24 m boom with heavy boom tip and 450 metric ton
Model Hino E13C-UV hook block. Not include quick connection device and upper translifter.
Engine Output 320 kW/2,000 min-1 {rpm}
Fuel Tank Capacity 600 liters

4
GENERAL DIMENSIONS

Crane Boom Unit: mm


6,860

0
R8,30 1,500

m
.0
84-
0.0
:3
gth
Len
om
Bo
ne
Cra

10,250 2,000 9,900


*1: 2,860
*2: 3,080
*1: 1,950
*2: 2,170

470

1: Without upper/lower connecting device


2: With upper/lower connecting device

Lift Enhancer

SHL CRANE SHL LUFFING


5
Luffing Jib Unit: mm

m
- 72.0
4.0
th: 2
Leng
g Jib
Luffin
m
gth: 30.0 - 60.0
Luffing Boom Len

Boom Angle
(66°- 86°
)
*1: 2,860
*2: 3,080

1: Without upper/lower connecting device


2: With upper/lower connecting device

6
STANDARD

BOOM AND JIB ARRANGEMENTS


Heavy Duty Crane Luffing Boom Arrangements
Boom Arrangements for Crane
Boom Boom
length m (ft) Boom arrangement length m (ft) Boom arrangement

24 (79) L 6.0 8T HU L 6.0 6.0 8T LU


30 (98)
L 12.0 8T LU

L 6.0 6.0 8T HU
30 (98)
L 12.0 8T HU
36 (118) L 6.0 12.0 8T LU

L 6.0 6.0 12.0 8T LU


36 (118) L 6.0 12.0 8T HU
42 (138)
L 12.0 12.0 8T LU

L 6.0 6.0 12.0 8T HU


42 (138) 48 (157) L 6.0 12.0 12.0 8T LU
L 12.0 12.0 8T HU

L 6.0 6.0 12.0 12.0 8T LU


54 (177)
Symbol Boom Length Remarks L 12.0 12.0 12.0 8T LU

L 9.0 m (29.5 ft) Boom Base


8T 8.0 m (26.2 ft) Boom Top 60 (197) L 6.0 12.0 12.0 12.0 8T LU

6.0 6.0 m (19.7 ft) Insert Boom


L 6.0 6.0 12.0 12.0 12.0 8T LU
12.0 12.0 m (39.4 ft) Insert Boom 66 (217)
HU 1.0 m (3.3 ft) L 12.0 12.0 12.0 12.0 8T LU

mark shows the guy line installing position when the fixed jib
72 (236) L 6.0 12.0 12.0 12.0 12.0 8T LU
is used.
indicates the most flexible combination of insert heavy duty L 6.0 6.0 12.0 12.0 12.0 12.0 8T LU
booms, which can be modified to form all shorter hevy duty 78 (256)
boom arrangements. L 12.0 12.0 12.0 12.0 12.0 8T LU

84 (276) L 6.0 12.0 12.0 12.0 12.0 12.0 8T LU

mark shows the guy line


Symbol Boom Length Remarks
installing position when
L 9.0 m (29.5 ft) Boom Base the fixed jib is used.
8T 8.0 m (26.2 ft) Boom Top indicates the most flexible
6.0 6.0 m (19.7 ft) Insert Boom combination of insert luffing
12.0 12.0 m (39.4 ft) Insert Boom booms, which can be modified
to form all shorter luffing boom
LU 1.0 m (3.3 ft)
arrangements.

Long Boom Arrangements


Boom Symbol Boom Length Remarks
length m (ft) Boom arrangement L 9.0 m (29.5 ft) Boom Base
8T 8.0 m (26.2 ft) Boom Top
90 (295) L 6.0 12.0 12.0 12.0 12.0 8T 5.0 6.0
JU
6.0 6.0 m (19.7 ft) Insert Boom
12.0 12.0 m (39.4 ft) Insert Boom
L 6.0 12.0 12.0 12.0 12.0 8T 5.0 6.0 6.0
JU 5.0 5.0 m (16.4 ft) Luffing Insert Jib
96 (315)
L 6.0 12.0 12.0 12.0 12.0 8T 5.0 12.0
JU
6.0 6.0 m (19.7 ft) Luffing Insert Jib
12.0 12.0 m (39.4 ft) Luffing Insert Jib
L 6.0 6.0 12.0 12.0 12.0 12.0 8T 5.0 6.0 6.0
JU JU 8.0 m (26.2 ft)
L 12.0 12.0 12.0 12.0 12.0 8T 5.0 6.0 6.0
JU mark shows the guy line installing position when the fixed jib
102 (335)
L 6.0 6.0 12.0 12.0 12.0 12.0 8T 5.0 12.0 is used.
JU
indicates the most flexible combination of insert long booms,
L 12.0 12.0 12.0 12.0 12.0 8T 5.0 12.0
JU which can be modified to form all shorter long boom
arrangements.
L 6.0 6.0 12.0 12.0 12.0 12.0 8T 5.0 6.0 12.0
JU
108 (354)
L 12.0 12.0 12.0 12.0 12.0 8T 5.0 6.0 12.0
JU

7
Luffing Boom Arrangements for Luffing
Boom
length m (ft) Boom arrangement

L 6.0 6.0 8T LU
30 (98)
L 12.0 8T LU

36 (118) L 6.0 12.0 8T LU

L 6.0 6.0 12.0 8T LU


42 (138)
L 12.0 12.0 8T LU

48 (157) L 6.0 12.0 12.0 8T LU

L 6.0 6.0 12.0 12.0 8T LU


54 (177)
L 12.0 12.0 12.0 8T LU

60 (197) L 6.0 12.0 12.0 12.0 8T LU

mark shows the guy line


Symbol Boom Length Remarks
installing position when
L 9.0 m (29.5 ft) Boom Base the fixed jib is used.
8T 8.0 m (26.2 ft) Boom Top indicates the most flexible
6.0 6.0 m (19.7 ft) Insert Boom combination of insert luffing
12.0 12.0 m (39.4 ft) Insert Boom booms, which can be modified
to form all shorter luffing boom
LU 1.0 m (3.3 ft)
arrangements.

Luffing Jib Arrangements


Jib Symbol Jib Length Remarks
length ft (m) Jib arrangement JL 10.0 m (32.8 ft) Jib Base
6.0 6.0 m (19.7 ft) Luffing Insert Jib
24 (79) JL
6.0
JU 12.0 12.0 m (39.4 ft) Luffing Insert Jib
JU 8.0 m (26.2 ft)
6.0 6.0
JL JU
30 (98) mark shows the guy line installing position when the fixed jib
12.0
JL JU is used.
indicates the most flexible combination of insert luffing jibs,
36 (118) JL
6.0 12.0
JU which can be modified to form all shorter luffing jib
arrangements.
6.0 6.0 12.0
JL JU
42 (138)
12.0 12.0
JL JU

48 (157) JL
6.0 12.0 12.0
JU

6.0 6.0 12.0 12.0


JL JU
54 (177)
12.0 12.0 12.0
JL JU

60 (197) JL
6.0 12.0 12.0 12.0
JU

6.0 6.0 12.0 12.0 12.0


JL JU
66 (217)
12.0 12.0 12.0 12.0
JL JU

72 (236) JL
6.0 12.0 12.0 12.0 12.0
JU

8
STANDARD

WORKING RANGES
Heavy Duty Crane Boom

82˚ 80˚ 70˚ 60˚ 50˚


90

80

70

40˚
60

Height above ground (m)


50

30˚
42 40
m
36
m
30 30
m
24
m
20
H *1: 2.86 m
*2: 3.08 m

10

10 20 30 40 50 60 70 80

Radius from center of rotation (m)


2.0 m
Center of rotation

1: Without upper/lower connecting device


2: With upper/lower connecting device

9
Luffing Boom

82˚ 80˚ 70˚ 60˚ 50˚


90

80

84
m
78 70
m
72
m
66 40˚ 60
m
60
m

Height above ground (m)


54 50
m
48
m 30˚
42 40
m
36
m
30 30
m

20
H *1: 2.86 m
*2: 3.08 m

10

10 20 30 40 50 60 70 80

Radius from center of rotation (m)


2.0 m
Center of rotation

1: Without upper/lower connecting device


2: With upper/lower connecting device

10
STANDARD

WORKING RANGES
Long Boom

82˚ 80˚ 70˚ 60˚


120

110

108
m
100
102 50˚
m
96
m
90
90
m

80

70

40˚

60
Height above ground (m)

50

30˚

40

30

20
H *1: 2.86 m
*2: 3.08 m

10

10 20 30 40 50 60 70 80

Radius from center of rotation (m)


2.0 m
Center of rotation

1: Without upper/lower connecting device


2: With upper/lower connecting device

11
Luffing Jib
Boom Angle: 86°

140

73˚
130
60˚

120
45˚

72
110

m
66
73˚
m
60
m

30˚ 100
54
m
48
m
42

90
m
36
m
30
m
24

15˚ 80
m

72
m

70
66
m
60
m
54

60 m
m
48

60
m
42
m
36

Height above ground (m)


m
30

15˚ 50
m
24
m

40

30 m
30

20
H *1: 2.86 m
*2: 3.08 m

10

10 20 30 40 50 60 70 80 90

Radius from center of rotation (m)


2.0 m
Center of rotation

1: Without upper/lower connecting device


2: With upper/lower connecting device

12
STANDARD

WORKING RANGES
Luffing Jib
Boom Angle: 76°

140

130
63˚
60˚

120

45˚
110

72
m
66
m
60
100
63˚ m 30˚
54
m
48
m

90
42
m
36
m
30

80
m

15˚
24
m

72

70
m
66
m
60
m
54
m
48

60 m 60
m
42
m
36

Height above ground (m)


m
30

15˚ 50
m
24
m

40

30 m
30

20
H *1: 2.86 m
*2: 3.08 m

10

10 20 30 40 50 60 70 80 90

Radius from center of rotation (m)


2.0 m
Center of rotation

1: Without upper/lower connecting device


2: With upper/lower connecting device

13
Luffing Jib
Boom Angle: 66°

140

130

120

110

53˚
100

40˚
90
54 m

80
48 m
42 m

20˚
36 m

15˚
30 m

70
72
24 m

m
66
m
60
m
54

60
m
48

60 m
m
42

Height above ground (m)


m
36

50
m
30

15˚
m
24
m

40

30
30 m

20
H *1: 2.86 m
*2: 3.08 m

10

10 20 30 40 50 60 70 80 90

Radius from center of rotation (m)


2.0 m
Center of rotation

1: Without upper/lower connecting device


2: With upper/lower connecting device

14
CRANE BOOM SUPPLEMENTAL
DATA

1. Designed and rated to comply with EN13000. 16. (Main Boom Lifting with Auxiliary Sheave Frame)
The total load that can be lifted is weight of auxiliary sheave
2. Operating radius is the horizontal distance from centerline
frame, hook block(s), slings, and all other load handling
of rotation to a vertical line through the center of gravity of
accessories deducted from main boom ratings shown.
the load.
Deduction auxiliary sheave frame
3. Deduct weight of hook blocks, slings and all other load han- Heavy Duty Crane Standard Crane Long Crane
dling accessories from main boom ratings shown. 0.7 ton 0.7 ton 0.7 ton

4. Ratings shown are based on freely suspended loads and 17. (Auxiliary Sheave Lifting)
make no allowance for such factors as wind effect on lifted The total load that can be lifted is weight of auxiliary sheave
load, ground conditions, out-of-level operating speeds or frame, hook block(s), slings, and all other load handling
any other condition that could be detrimental to the safe accessories deducted from main boom ratings shown.
operation of this equipment. The operator, therefore, has Deduction auxiliary sheave frame
the responsibility to judge the existing conditions and Heavy Duty Crane Standard Crane Long Crane
reduce lifted load and operating speeds accordingly. 0.7 ton 0.7 ton 0.7 ton

5. Ratings are for operation on a firm and level surface, up to 18. Ratings shown, but it should not exceed 14.0 ton in case of
1 % gradient. one reeve, and it should not exceed 28.0 ton in case of two
reeve.
6. At radii and boom lengths where no ratings are shown on
chart, operation is not intended nor approved. 19. Auxiliary sheave ratings at any radius from center of rotation
are the same as crane ratings shown in table for main boom
7. Boom inserts, guy pipe and guy lines must be arranged as
when operated at the same radius. But maximum angle is
shown in the "OPERATOR'S MANUAL".
the same main boom maximum angle.
8. Boom hoist reeving is 30 part line.
20. Boom lengths for auxiliary sheave mounting show below.
HL/SHL boom hoist reeving is 18 part line.
STD HL SHL
9. Boom backstops are required for all boom lengths. Heavy Crane NONE NONE NONE

10. The boom should be erected over the front of the crawlers, STD HL SHL
not laterally. STD Crane 30 m ~ 84 m 36 m ~ 84 m 36 m ~ 84 m
11. Ratings inside of boxes are limited by strength of
STD HL SHL
materials.
Long Crane 90 m ~ 102 m 90 m ~ 108 m 90 m ~ 120 m
12. When erecting and lowering the boom length of 102 m or
over, the blocks for erection must be placed at the end of
the crawlers. (for STD MAST).

13. When erecting and lowering the boom length of 108 m, the
blocks for erection must be placed at the end of the
crawlers. (for HL MAST).

14. The minimum rated show below.


Minimum Rated Load
Heavy Duty Crane Standard Crane Long Crane
- 7.7 ton 6.2 ton

15. (Main Boom Lifting)


The total load that can be lifted is the value for weight of
hook block, slings, and all other load handling accessories
deducted from main boom rating shown.

15
21. Maximum hoist load for number of reeving parts of line for
hoist rope.
Main Hoist Loads (Single Drum)
No. of Parts of Line 1 2 3 4 5
Maximum Loads (t) 14.0 28.0 42.0 56.0 70.0
No. of Parts of Line 6 7 8 9 10
Maximum Loads (t) 84.0 98.0 112.0 126.0 140.0
No. of Parts of Line 11 12 13 14 15
Maximum Loads (t) 152.0 164.0 174.0 184.0 192.0
No. of Parts of Line 16
Maximum Loads (t) 200.0

Main Hoist Loads for Heavy Boom (Double Drum)


No. of Parts of Line 8 12 16 20 24 28
Maximum Loads (t) 112.0 164.0 220.0 280.0 336.0 370.0
No. of Parts of Line 36 44
Maximum Loads (t) 450.0 550.0

Main Hoist Loads for Standard Boom (Double Drum)


No. of Parts of Line 8 12 16 20 24
Maximum Loads (t) 112.0 164.0 220.0 280.0 300.0

Auxiliary Hoist Loads


No. of Parts of Line 1 2
Maximum Loads (tons) 14.0 28.0

22. Weight of hook block


Weight of hook block
300 ton 200 ton
Hook block 550/450 ton 120 ton
(with hanger sheave) (w/o hanger sheave)

Weight (t) 11.7 9.9 (*1) 7.1 (*2) 4.5

Weight of hook block


14 ton
Hook block 70 ton 40 ton
Ball hook
Weight (t) 3.1 2.0 0.9

*1: 6.82 ton: when hanger sheave is not equipped.


*2: To reeve 11 parts of line or over, the hanger sheave (2 ton) is required.

Operation of this equipment in excess of rated loads or


disregard of instruction voids the warranty.

16
LUFFING JIB SUPPLEMENTAL DATA

1. Designed and rated to comply with EN13000. 11. Ratings inside of boxes are limited by strength of
materials.
2. Operating radius is the horizontal distance from centerline
of rotation to a vertical line through the center of gravity of 12. When erecting and lowering the boom length of 54 m or
the load. over, the blocks for erection must be placed at the end of
the crawlers. (for STD MAST).
3. Deduct weight of hook blocks, slings and all other load han-
dling accessories from luffing jib ratings shown. 13. The minimum rated load is 4.0 ton.

4. Ratings shown are based on freely suspended loads and 14. (Luffing Jib Rating Loads)
make no allowance for such factors as wind effect on lifted The total load that can be lifted is the value for weight of
load, ground conditions, out-of-level operating speeds or hook block, slings, and all other loads handling accessories
any other condition that could be detrimental to the safe deducted from luffing jib ratings shown.
operation of this equipment. The operator, therefore, has
15. (Luffing Jib Lifting with Auxiliary Sheave Frame)
the responsibility to judge the existing conditions and
The total load that can be lifted is the weight of hook block,
reduce lifted load and operating speeds accordingly.
slings, and all other loads handling accessories deducted
5. Ratings are for operation on a firm and level surface, up to from luffing jib ratings shown.
1 % gradient.
16. (Auxiliary Sheave Lifting)
6. At radii and boom lengths where no ratings are shown on The total load that can be lifted over an auxiliary sheave is
chart, operation is not intended nor approved. weight of hook block, slings, and all other loads handling
accessories deducted from luffing jib ratings shown, but it
7. Boom and jib inserts and guy lines must be arranged as
should not exceed 14.0 ton in case of one reeve.
shown in the "OPERATOR'S MANUAL".
It should not exceed 28.0 ton in case of two reeves.
8. Boom hoist reeving is 30 part line. Boom and jib combinations for auxiliary sheave mounting
HL/SHL boom hoist reeving is 18 part line. are all boom and jib combinations.
Jib hoist reeving is 18 part line. Auxiliary sheave ratings at any radius from center of rota-
9. Boom and jib backstops are required for all boom lengths. tion are the same as luffing ratings shown in table for jib
when operated at the same radius.
10. The boom should be erected over the front of crawlers, not But maximum angle is the same jib maximum angle.
laterally.

17. Luffing boom and jib combinations.


Jib Length
24 m 30 m 36 m 42 m 48 m 54 m 60 m 66 m 72 m 78 m 84 m
(79 ft) (98 ft) (118 ft) (138 ft) (157 ft) (177 ft) (197 ft) (217 ft) (236 ft) (256 ft) (276 ft)
30 m (98 ft) ○* ○* ○* ○* ○* ○* ○* ○* ○* × ×
36 m (118 ft) ○ ○ ○ ○ ○ ○ ○ ○ ○ ○** ○**
42 m (138 ft) ○ ○ ○ ○ ○ ○ ○ ○ ○ ○** ○**
Boom Length

48 m (157 ft) ○ ○ ○ ○ ○ ○ ○ ○ ○ ○** ○**


54 m (177 ft) ○ ○ ○ ○ ○ ○ ○ ○ ○ ○** ○**
60 m (197 ft) ○ ○ ○ ○ ○ ○ ○ ○ ○ ○** ○**
66 m (217 ft) ○*** ○*** ○*** ○*** ○*** ○*** ○*** ○*** ○*** ○** ○**
72 m (236 ft) ○** ○** ○** ○** ○** ○** ○** ○** ○** ○** ○**
78 m (256 ft) × ○** ○** ○** ○** ○** ○** ○** ○** ○** ○**
84 m (276 ft) × ○** ○** ○** ○** ○** ○** ○** ○** ○** ○**
× : All luffing jib combinations which is not allowed.
○ : All luffing jib combinations which is allowed.
○* : Standard-luffing jib combinations which is allowed.
○** : Super heavy lift-Luffing jib combinations which is allowed.
○*** : Heavy lift and Super heavy lift-Luffing jib combinations which is allowed.

17
18. Maximum hoist load for number of reeving parts of line for 19. Lifting capacities listed apply only to the machine as origi-
hoist rope. nally manufactured and designed by KOBELCO CRANES
Jib Hook Loads (Single Drum) CO.,LTD. Modifications to this machine or use of equipment
No. of Parts of Line 1 2 3 4 5 other than that specified can reduce operating capacity.
Maximum Loads (t) 14.0 28.0 42.0 56.0 70.0
20. Designed and rated to comply with ASME Code B30.5.
No. of Parts of Line 6 7 8 9 10
Maximum Loads (t) 84.0 98.0 112.0 126.0 140.0 Operation of this equipment in excess of rated loads or
No. of Parts of Line 11 12 13 14 15 disregard of instruction voids the warranty.
Maximum Loads (t) 152.0 164.0 174.0 184.0 192.0
No. of Parts of Line 16
Maximum Loads (t) 200.0
Jib Hook (Double Drum)
No. of Parts of Line 8 12 16
Maximum Loads (t) 112.0 164.0 200.0

Auxiliary Sheave
No. of Parts of Line 1 2
Maximum Loads (t) 14.0 28.0

Weight of hook block


Hook 14 ton
200 ton 120 ton 70 ton 40 ton
block Ball Hook
Weight (t) 7.05 4.5 3.1 2.0 0.9

21. Hook block and number of reeving parts of line restriction


(1) The self-weight of luffing jib point hook block must be heavier than or equal to the table below.
(2) Total number of reeving parts of line on luffing jib point hook block must be larger than or equal
to the table below.
Danger! Luffing jib point
hook block

Follow the both (1) and (2) above at a same time for the luffing jib operation.
Otherwise luffing jib may tip over the backwards due to lack of weight on front side of boom.
Failure to observe this precaution may lead to the jib tipping backwards and resulted to machine collapsing.

SL6000 minimum hook block self-weight and minimum number of reeving parts of line on hook block
Boom Jib Length 24 m 30 m 36 m 42 m 48 m 54 m 60 m 66 m 72 m 78 m 84 m
Length (79 ft) (98 ft) (118 ft) (138 ft) (157 ft) (177 ft) (197 ft) (217 ft) (236 ft) (256 ft) (276 ft)
30 m Hook Block Self-Weight (kg) 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000
(98 ft) No. of Part Line 13 6 4 2 2 2 2 2 2 2 2
36 m Hook Block Self-Weight (kg) 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000
(118 ft) No. of Part Line 11 6 4 2 2 2 2 2 2 2 2
42 m Hook Block Self-Weight (kg) 7,050 7,050 3,100 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000
(138 ft) No. of Part Line 10 9 4 2 2 2 2 2 2 2 2
48 m Hook Block Self-Weight (kg) 7,050 7,050 3,100 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000
(157 ft) No. of Part Line 9 9 4 2 2 2 2 2 2 2 2
54 m Hook Block Self-Weight (kg) 7,050 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000 2,000
(177 ft) No. of Part Line 9 8 6 2 2 2 2 2 2 2 2
60 m Hook Block Self-Weight (kg) 7,050 7,050 7,050 3,100 2,000 2,000 2,000 2,000 2,000 2,000 2,000
(197 ft) No. of Part Line 8 7 7 3 2 2 2 2 2 2 2
66 m Hook Block Self-Weight (kg) 7,050 7,050 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000
(217 ft) No. of Part Line 7 7 6 2 2 2 2 2 2 2 2
72 m Hook Block Self-Weight (kg) 7,050 7,050 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000
(236 ft) No. of Part Line 7 6 6 2 2 2 2 2 2 2 2
78 m Hook Block Self-Weight (kg) 7,050 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000
(256 ft) No. of Part Line 6 5 2 2 2 2 2 2 2 2
84 m Hook Block Self-Weight (kg) 7,050 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000
(276 ft) No.of Part Line 5 5 3 2 2 2 2 2 2 2
Weight of KOBELCO genuine hook block.
200 t hook block 7,050 kg 70 t hook block 3,100 kg
120 t hook block 4,500 kg 40 t hook block 2,000 kg
18
STANDARD

LIFTING CAPACITIES
Heavy Duty Crane Boom Long Boom Lifting
Lifting Capacities Capacities
Unit: ton Unit: ton
Counterweight: 180.0 ton, Carbody weight: 50.0 ton Counterweight: 180.0 ton, Carbody weight: 50.0 ton
Boom Boom Boom Boom
Length Length Length Length
Working (m) 24.0 30.0 36.0 42.0 (m) Working Working (m) 90.0 96.0 102.0 108.0 (m) Working
Radius (m) Radius (m) Radius (m) Radius (m)
6.0 6.7 m/450.0 6.0 14.0 15.0 m/98.0 15.8 m/84.0 14.0
7.0 425.0 7.5 m/390.0 7.0 16.0 96.0 83.7 16.6 m/70.0 17.5m /60.0 16.0
8.0 375.0 365.0 8.3 m/340.0 8.0 18.0 93.0 81.1 68.5 58.8 18.0
9.0 330.0 325.0 322.0 9.2 m/311.7 9.0 20.0 90.0 78.5 66.3 55.1 20.0
10.0 294.0 292.0 290.0 280.1 10.0 22.0 81.1 76.0 64.2 51.4 22.0
12.0 233.3 232.8 232.1 225.0 12.0 24.0 72.6 70.8 62.1 48.4 24.0
14.0 192.0 191.5 190.7 187.0 14.0 26.0 64.9 64.2 60.0 45.4 26.0
16.0 158.7 158.8 158.9 158.6 16.0 28.0 58.4 58.3 57.3 42.9 28.0
18.0 133.3 133.3 133.4 133.1 18.0 30.0 52.9 52.8 51.3 40.4 30.0
20.0 114.4 114.4 114.3 114.0 20.0 34.0 44.1 43.3 42.1 36.7 34.0
22.0 97.4 97.3 97.2 97.1 22.0 38.0 37.0 35.8 35.1 33.2 38.0
24.0 87.0 86.9 86.4 24.0 42.0 31.0 30.2 29.7 28.6 42.0
26.0 78.5 78.3 77.8 26.0 46.0 26.0 25.4 24.9 22.6 46.0
28.0 70.7 70.4 69.8 28.0 50.0 21.8 21.3 20.8 17.3 50.0
30.0 28.6 m/68.5 63.7 63.1 30.0 54.0 18.1 17.6 17.1 12.7 54.0
34.0 33.8 m/53.5 52.4 34.0 58.0 14.8 14.4 14.0 8.7 58.0
38.0 44.4 38.0 62.0 12.0 11.6 11.1 60.0m /6.8 62.0
42.0 39.0 m/42.6 42.0 66.0 9.5 9.0 8.5 66.0
Reeves 36 36 28 24 Reeves 70.0 7.2 6.7 6.2 70.0
72.0 6.2 72.0
Note: Reeves 7 6 5 5 Reeves
Designed and rated to comply with EN13000 .
Ratings shown in are determined by the strength of the boom or Note:
other structural components. Designed and rated to comply with EN13000 .
Ratings shown in are determined by the strength of the boom or
other structural components.

Luffing Boom Lifting


Unit: ton
Capacities Counterweight: 180.0 ton, Carbody weight: 50.0 ton
Boom Boom
Length Length
Working (m) 30.0 36.0 42.0 48.0 54.0 60.0 66.0 72.0 78.0 84.0 (m) Working
Radius (m) Radius (m)
7.0 7.7 m/300.0 7.0
8.0 300.0 8.5 m/300.0 8.0
9.0 300.0 300.0 9.3 m/300.0 9.0
10.0 292.1 291.4 278.2 10.2 m/258.6 11.0 m/224.6 11.8 m/197.3 10.0
12.0 230.2 229.5 222.9 212.7 203.2 194.3 12.7 m/175.1 13.5 m/156.1 12.0
14.0 188.9 188.2 184.8 177.0 169.8 163.0 156.5 149.9 14.3 m/140.3 15.2 m/126.4 14.0
16.0 157.8 157.6 156.9 150.7 145.0 139.4 134.1 128.6 123.8 119.0 16.0
18.0 132.4 132.1 131.4 130.5 125.7 121.0 116.5 111.9 107.8 103.6 18.0
20.0 113.4 113.0 112.3 111.8 110.3 106.2 102.4 98.3 94.7 91.1 20.0
22.0 98.6 98.3 97.5 96.9 96.4 94.2 90.7 87.0 83.9 80.6 22.0
24.0 86.9 86.5 85.7 85.1 84.6 83.9 81.0 77.6 74.8 71.8 24.0
26.0 77.3 76.9 76.1 75.5 74.9 74.2 72.7 69.6 67.0 64.2 26.0
28.0 69.4 68.9 68.1 67.4 66.8 66.1 65.4 62.7 60.3 57.7 28.0
30.0 28.7 m/66.8 62.2 61.4 60.7 60.1 59.3 58.6 56.7 54.4 52.0 30.0
34.0 33.9 m/51.7 50.7 49.9 49.3 48.4 47.7 46.7 44.7 42.4 34.0
38.0 42.6 41.8 41.0 40.2 39.4 38.4 37.0 34.9 38.0
42.0 39.1 m/40.7 35.4 34.6 33.7 32.7 31.4 30.4 28.7 42.0
46.0 44.3 m/32.3 29.5 28.3 27.2 25.9 24.8 23.6 46.0
50.0 49.5 m/25.7 23.8 22.6 21.3 20.2 19.0 50.0
54.0 20.6 18.9 17.5 16.4 15.1 54.0
58.0 54.7 m/19.6 15.7 14.3 13.1 11.9 58.0
62.0 59.9 m/14.4 11.6 10.3 8.8 62.0
66.0 65.1 m/9.7 7.6 66.0
Reeves 24 24 24 20 20 16 16 12 12 12 Reeves

Note:
Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.

19
Luffing Jib Lifting Capacity Unit: ton
Counterweight: 180.0 ton, Carbody weight: 50.0 ton
Boom length (m) 30.0 Boom length (m)
30.0 m Boom Length

Jib length (m) 24.0 42.0 54.0 66.0 72.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
14.0 184.0 14.0
15.0 173.5 15.0
16.0 160.5 16.0
17.0 151.0 17.0
18.0 141.6 18.0
20.0 125.3 111.6 20.0
22.0 112.2 107.1 22.0
24.0 100.1 93.7 97.9 85.2 24.0
26.0 89.8 84.2 89.3 85.2 26.0
28.0 81.3 76.2 80.9 78.9 67.3 28.0

Working Radius (m)


Working Radius (m)

30.0 69.5 73.8 73.1 67.3 60.2 30.0


34.0 58.8 54.9 62.5 57.7 61.9 60.4 58.7 34.0
38.0 47.3 54.0 49.7 53.3 48.8 52.2 51.8 38.0
42.0 47.2 43.5 46.6 42.6 45.5 45.1 42.0
46.0 41.8 38.4 35.1 41.2 37.5 40.1 36.2 39.4 35.0 46.0
50.0 34.3 31.3 36.7 33.4 30.2 34.6 31.9 33.0 30.7 50.0
54.0 28.1 32.7 29.9 27.0 29.5 28.3 27.8 27.1 54.0
58.0 28.5 27.0 24.2 25.2 25.2 21.9 23.5 24.1 58.0
62.0 24.5 21.9 21.6 22.6 19.5 19.8 21.5 18.3 62.0
66.0 19.9 18.6 20.5 17.5 16.7 19.3 16.3 66.0
70.0 16.1 18.6 15.8 14.1 17.4 14.5 70.0
74.0 17.1 14.3 11.9 15.8 13.0 74.0
78.0 13.0 14.4 11.7 78.0
82.0 10.6 82.0
86.0 9.8 86.0
Reeves 16 8 8 8 8 Reeves

Boom length (m) 36.0 Boom length (m)


36.0 m Boom Length

Jib length (m) 24.0 42.0 54.0 66.0 72.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
15.0 167.8 15.0
16.0 157.0 16.0
17.0 148.2 17.0
18.0 139.4 18.0
20.0 124.3 111.0 20.0
22.0 111.3 103.7 22.0
24.0 99.8 95.0 84.7 24.0
26.0 89.6 82.5 87.6 82.7 26.0
28.0 81.1 74.7 80.7 76.6 66.8 28.0
30.0 73.8 68.1 73.6 71.3 66.8 59.7 30.0
Working Radius (m)
Working Radius (m)

34.0 57.6 62.4 56.4 61.5 58.7 57.0 34.0


38.0 45.4 53.8 48.6 53.0 51.9 50.3 38.0
42.0 39.6 47.1 42.5 46.3 41.4 45.2 44.9 42.0
46.0 41.7 37.5 33.5 40.9 36.4 39.8 34.8 39.2 46.0
50.0 33.4 29.8 36.5 32.4 34.4 30.5 32.8 29.4 50.0
54.0 26.7 32.4 29.0 25.1 29.2 27.0 27.5 25.8 54.0
58.0 24.0 28.1 26.1 22.4 24.9 24.0 23.1 22.9 58.0
62.0 23.7 20.1 21.2 21.5 17.7 19.4 20.3 62.0
66.0 18.1 18.1 19.4 15.8 16.3 18.2 14.5 66.0
70.0 16.3 15.5 17.5 14.1 13.6 16.3 12.8 70.0
74.0 16.0 12.7 11.3 14.7 11.4 74.0
78.0 11.3 13.4 10.1 78.0
82.0 10.1 11.4 9.1 82.0
86.0 8.2 86.0
Reeves 16 8 8 8 8 Reeves
Note: Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.
20
STANDARD

LIFTING CAPACITIES
Luffing Jib Lifting Capacity Unit: ton
Counterweight: 180.0 ton, Carbody weight: 50.0 ton
Boom length (m) 42.0 Boom length (m)
42.0 m Boom Length

Jib length (m) 24.0 42.0 54.0 66.0 72.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
15.0 15.4 m/156.2 15.0
16.0 151.0 16.0
17.0 142.7 17.0
18.0 134.4 18.0
20.0 121.0 20.0
22.0 110.0 96.6 22.0
24.0 99.3 92.1 84.1 24.0
26.0 89.1 85.0 80.2 26.0
28.0 80.6 72.9 78.8 74.4 66.3 28.0

Working Radius (m)


Working Radius (m)

30.0 73.4 66.4 73.4 69.2 65.1 59.2 30.0


34.0 56.2 62.2 60.7 57.0 55.3 34.0
38.0 48.3 43.1 53.7 47.4 52.7 50.4 48.9 38.0
42.0 37.6 47.0 41.4 46.0 40.1 44.9 43.5 42.0
46.0 41.6 36.5 40.6 35.2 39.5 33.2 38.7 46.0
50.0 32.5 27.8 36.2 31.3 34.0 29.1 32.4 27.9 50.0
54.0 29.2 24.8 32.0 27.9 28.8 25.6 27.1 24.5 54.0
58.0 22.2 27.7 25.0 20.1 24.4 22.7 22.7 21.6 58.0
62.0 19.9 22.6 17.9 20.8 20.3 15.8 19.0 19.1 62.0
66.0 20.6 16.0 17.6 18.2 13.9 15.8 17.0 12.6 66.0
70.0 14.3 15.0 16.4 12.3 13.1 15.1 11.0 70.0
74.0 12.9 14.9 10.8 10.8 13.6 9.6 74.0
78.0 13.6 9.5 12.3 8.4 78.0
82.0 8.4 11.2 7.4 82.0
86.0 6.6 86.0
90.0 5.7 90.0
Reeves 12 8 8 8 8 Reeves

Boom length (m) 48.0 Boom length (m)


48.0 m Boom Length

Jib length (m) 24.0 42.0 54.0 66.0 72.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
16.0 16.2 m/143.5 16.0
17.0 137.4 17.0
18.0 129.6 18.0
20.0 116.9 20.0
22.0 106.4 96.0 22.0
24.0 97.7 89.1 82.4 24.0
26.0 88.8 82.3 77.6 26.0
28.0 80.3 71.1 76.4 72.0 65.7 28.0
Working Radius (m)
Working Radius (m)

30.0 73.2 64.8 71.2 67.1 63.0 58.6 30.0


34.0 54.7 61.8 58.9 55.2 53.5 34.0
38.0 47.1 53.3 45.9 51.9 48.8 47.3 38.0
42.0 35.2 46.6 40.0 45.4 38.6 43.6 42.2 42.0
46.0 30.9 41.2 35.3 40.2 33.9 39.2 37.9 46.0
50.0 31.4 25.0 35.9 29.9 33.5 27.6 31.9 26.3 50.0
54.0 28.1 22.2 31.4 26.5 28.3 24.2 26.6 23.0 54.0
58.0 19.7 27.1 23.7 17.6 23.9 21.4 22.2 20.1 58.0
62.0 17.6 21.2 15.6 20.2 19.0 18.4 17.8 62.0
66.0 19.1 13.8 17.1 16.9 11.7 15.2 15.7 66.0
70.0 12.2 14.4 15.2 10.1 12.5 13.9 9.1 70.0
74.0 10.9 13.7 8.8 10.2 12.4 7.8 74.0
78.0 12.3 7.6 11.1 6.7 78.0
82.0 6.5 10.1 82.0
Reeves 12 8 8 8 8 Reeves
Note: Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.

21
Luffing Jib Lifting Capacity Unit: ton
Counterweight: 180.0 ton, Carbody weight: 50.0 ton
Boom length (m) 54.0 Boom length (m)
54.0 m Boom Length

Jib length (m) 24.0 42.0 54.0 66.0 72.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
17.0 132.2 17.0
18.0 124.8 18.0
20.0 112.8 20.0
22.0 102.8 93.7 22.0
24.0 94.5 86.1 24.0
26.0 87.3 79.6 74.0 26.0
28.0 80.0 74.0 69.7 64.2 28.0
30.0 72.8 63.0 69.0 65.0 60.9 58.1 30.0

Working Radius (m)


Working Radius (m)

34.0 53.2 60.6 57.0 53.4 51.7 34.0


38.0 45.7 52.9 43.8 50.6 47.2 45.8 38.0
42.0 32.1 46.2 38.5 45.2 42.2 40.8 42.0
46.0 28.1 40.9 33.8 39.9 31.9 37.9 36.6 46.0
50.0 29.9 35.5 28.0 32.7 25.9 31.2 50.0
54.0 26.7 19.5 30.7 24.8 27.6 22.7 25.9 21.5 54.0
58.0 23.9 17.2 26.4 22.1 23.2 19.9 21.5 18.7 58.0
62.0 15.2 19.7 13.1 19.6 17.6 17.8 16.4 62.0
66.0 13.6 17.7 11.5 16.5 15.6 14.6 14.4 66.0
70.0 10.0 13.8 13.9 11.9 12.7 70.0
74.0 8.8 12.4 9.6 11.2 74.0
78.0 7.7 11.0 9.9 78.0
82.0 8.9 82.0
86.0 8.0 86.0
Reeves 12 8 8 8 8 Reeves

Boom length (m) 60.0 Boom length (m)


60.0 m Boom Length

Jib length (m) 24.0 42.0 54.0 66.0 72.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
17.0 17.8 m/121.3 17.0
18.0 120.1 18.0
20.0 108.7 20.0
22.0 99.3 90.4 22.0
24.0 91.3 83.2 24.0
26.0 84.5 77.0 72.4 26.0
28.0 78.6 71.5 67.3 28.0
30.0 72.5 66.7 62.8 58.3 30.0
Working Radius (m)
Working Radius (m)

34.0 51.3 58.7 55.2 51.5 47.7 34.0


38.0 44.2 52.3 49.0 45.6 44.2 38.0
42.0 38.4 45.8 36.1 43.9 40.7 39.4 42.0
46.0 25.1 40.5 31.6 39.6 29.8 36.6 35.3 46.0
50.0 22.0 27.9 34.8 26.4 31.7 23.8 30.1 50.0
54.0 24.8 29.8 23.3 26.7 21.1 25.0 19.4 54.0
58.0 22.2 14.4 25.6 20.7 22.4 18.4 20.7 17.0 58.0
62.0 12.7 18.4 10.9 18.8 16.2 17.1 14.8 62.0
66.0 11.1 16.4 9.4 15.8 14.3 14.0 13.0 66.0
70.0 14.7 8.0 13.1 12.6 11.3 11.3 70.0
74.0 6.9 11.2 9.0 9.9 74.0
78.0 10.0 7.0 8.7 78.0
82.0 8.8 7.7 82.0
86.0 6.8 86.0
Reeves 12 8 8 8 8 Reeves
Note: Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.

22
HEAVY LIFT

BOOM AND JIB ARRANGEMENTS


Heavy Duty Crane Luffing Boom Arrangements
Boom Arrangements for Crane
Boom Boom
length m (ft) Boom arrangement length m (ft) Boom arrangement

36 (118) L 6.0 12.0 8T U 36 (118) L 6.0 12.0 8T 1U

L 6.0 12.0 6.0 8T U


L 6.0 12.0 6.0 8T 1U
42 (138) 42 (138)
L 12.0 12.0 8T U
L 12.0 12.0 8T 1U

48 (157) L 12.0 12.0 6.0 8T 1U


Symbol Boom Length Remarks
L 9.0 m (29.5 ft) Boom Base L 6.0 6.0 12.0 12.0 8T 1U
8T 8.0 m (26.2 ft) Boom Top 54 (177)
L 12.0 12.0 12.0 8T 1U
6.0 6.0 m (19.7 ft) Insert Boom
12.0 12.0 m (39.4 ft) Insert Boom
60 (197) L 12.0 12.0 6.0 12.0 8T 1U
U 1.0 m (3.3 ft)
mark shows the guy line installing position when the fixed jib L 6.0 6.0 12.0 12.0 12.0 8T 1U

is used. 66 (217)
L 12.0 12.0 12.0 12.0 8T 1U
indicates the most flexible combination of insert heavy duty
booms, which can be modified to form all shorter heavy duty
72 (236) L 12.0 12.0 6.0 12.0 12.0 8T 1U
boom arrangements.
L 6.0 6.0 12.0 12.0 12.0 12.0 8T 1U
78 (256)
L 12.0 12.0 12.0 12.0 12.0 8T 1U

84 (276) L 12.0 12.0 6.0 12.0 12.0 12.0 8T 1U

mark shows the guy line


Symbol Boom Length Remarks
installing position when
L 9.0 m (29.5 ft) Boom Base the fixed jib is used.
8T 8.0 m (26.2 ft) Boom Top indicates the most flexible
6.0 6.0 m (19.7 ft) Insert Boom combination of insert luffing
12.0 12.0 m (39.4 ft) Insert Boom booms, which can be modified
to form all shorter luffing boom
1U 1.0 m (3.3 ft)
arrangements.

Long Boom Arrangements


Boom Symbol Boom Length Remarks
length m (ft) Boom arrangement L 9.0 m (29.5 ft) Boom Base
8T 8.0 m (26.2 ft) Boom Top
90 (295) L 12.0 12.0 6.0 12.0 12.0 8T 5.0 6.0
U
6.0 6.0 m (19.7 ft) Insert Boom
12.0 12.0 m (39.4 ft) Insert Boom
L 12.0 12.0 6.0 12.0 12.0 8T 5.0 6.0 6.0
U 5.0 5.0 m (16.4 ft) Luffing Insert Jib
96 (315)
L 12.0 12.0 6.0 12.0 12.0 8T 5.0 12.0
U
6.0 6.0 m (19.7 ft) Luffing Insert Jib
12.0 12.0 m (39.4 ft) Luffing Insert Jib
L 6.0 6.0 12.0 12.0 12.0 12.0 8T 5.0 6.0 6.0
U
U 8.0 m (26.2 ft)
L 12.0 12.0 12.0 12.0 12.0 8T 5.0 6.0 6.0
U
mark shows the guy line installing position when the fixed jib
102 (335)
L 6.0 6.0 12.0 12.0 12.0 12.0 8T 5.0 12.0 is used.
U
indicates the most flexible combination of insert long booms,
L 12.0 12.0 12.0 12.0 12.0 8T 5.0 12.0
U which can be modified to form all shorter long boom
arrangements.
L 6.0 6.0 12.0 12.0 12.0 12.0 8T 5.0 6.0 12.0
U
108 (354)
L 12.0 12.0 12.0 12.0 12.0 8T 5.0 6.0 12.0
U

23
Luffing Boom Arrangements for Luffing
Boom Symbol Boom Length Remarks
length m (ft) Boom arrangement L 9.0 m (29.5 ft) Boom Base
8T 8.0 m (26.2 ft) Boom Top
36 (118) L 6.0 12.0 8T LU 6.0 6.0 m (19.7 ft) Insert Boom
12.0 12.0 m (39.4 ft) Insert Boom
L 6.0 12.0 12.0 8T LU
42 (138)
LU 1.0 m (3.3 ft)
L 12.0 12.0 8T LU
mark shows the guy line installing position when
the fixed jib is used.
48 (157) L 12.0 12.0 6.0 8T LU
indicates the most flexible combination of insert luffing booms,
which can be modified to form all shorter luffing boom
L 6.0 6.0 12.0 12.0 8T LU
arrangements.
54 (177)
L 12.0 12.0 12.0 8T LU

60 (197) L 12.0 12.0 6.0 12.0 8T LU

L 6.0 6.0 12.0 12.0 12.0 8T LU


66 (217)
L 12.0 12.0 12.0 12.0 8T LU

Luffing Jib Arrangements


Jib Symbol Jib Length Remarks
length m (ft) Jib arrangement JL 10.0 m (32.8 ft) Jib Base
6.0 6.0 m (19.7 ft) Luffing Insert Jib
24 (79) JL
6.0
JU
12.0 12.0 m (39.4 ft) Luffing Insert Jib
JU 8.0 m (26.2 ft)
6.0 6.0
JL JU
30 (98) mark shows the guy line installing position when the fixed jib
12.0
JL JU is used.
indicates the most flexible combination of insert luffing jibs,
36 (118) JL
6.0 12.0
JU which can be modified to form all shorter luffing jib
arrangements.
6.0 6.0 12.0
JL JU
42 (138)
12.0 12.0
JL JU

48 (157) JL
6.0 12.0 12.0
JU

6.0 6.0 12.0 12.0


JL JU
54 (177)
12.0 12.0 12.0
JL JU

60 (197) JL
6.0 12.0 12.0 12.0
JU

6.0 6.0 12.0 12.0 12.0


JL JU
66 (217)
12.0 12.0 12.0 12.0
JL JU

72 (236) JL
6.0 12.0 12.0 12.0 12.0
JU

HL MAST
UM
12.
0

Symbol Mast Length Remarks


ML

ML 9.0 m (29.5 ft)


12.0 12.0 m (39.4 ft)
UM 9.0 m (29.5 ft)
24
HEAVY LIFT

WORKING RANGES
Heavy Duty Crane Boom

82˚ 80˚ 70˚ 60˚ 50˚


90

80

70

40˚
60

Height above ground (m)


50

30˚
42 40
m
36
m
30

20
H *1: 2.86 m
*2: 3.08 m

10

10 20 30 40 50 60 70 80

Radius from center of rotation (m)


2.0 m
Center of rotation

1: Without upper/lower connecting device


2: With upper/lower connecting device

25
Luffing Boom

82˚ 80˚ 70˚ 60˚ 50˚


90

80

84
m
78 70
m
72
m
40˚
66 60
m
60
m
54
m
50 Height above ground (m)
48
m 30˚
42 40
m
36
m
30

20
H *1: 2.86 m
*2: 3.08 m

10

10 20 30 40 50 60 70 80

Radius from center of rotation (m)


2.0 m
Center of rotation

1: Without upper/lower connecting device


2: With upper/lower connecting device

26
HEAVY LIFT

WORKING RANGES
Long Boom

82˚ 80˚ 70˚ 60˚


120

110

108
m
100
102
m 50˚
96
m
90
90
m

80

70
40˚

60
Height above ground (m)

50

30˚
40

30

20
H *1: 2.86 m
*2: 3.08 m

10

10 20 30 40 50 60 70 80

Radius from center of rotation (m)


2.0 m
Center of rotation

1: Without upper/lower connecting device


2: With upper/lower connecting device

27
Luffing Jib
Boom Angle: 86°

150

73˚
140

60˚
130

45˚ 120

72
m
66
73˚ 110

m
60 30˚
m
54
m
48

100
m
42
m
36
m
30

90
15˚
m
24
m

72

80
m
66
m
60
m
54

70
m

66 m
48
m
42
m
36

60
m
30
m

15˚
24
m

Height above ground (m)

50

40
36 m

30

20
H *1: 2.86 m
*2: 3.08 m

10

10 20 30 40 50 60 70 80 90

Radius from center of rotation (m)


2.0 m
Center of rotation

1: Without upper/lower connecting device


2: With upper/lower connecting device

28
HEAVY LIFT

WORKING RANGES
Luffing Jib
Boom Angle: 76°
150

140

63˚
60˚
130

45˚ 120

72
m
110

66
m
60
63˚ 30˚

m
54
m 100
48
m
42
m
36

90
m
30
m

15˚
24
m

80
72
m
66
m
60

70
m
54
m
48

66 m
m
42
m

60
36
m
30

Height above ground (m)

15˚
m
24
m

50

40

36 m

30

20
H *1: 2.86 m
*2: 3.08 m

10

10 20 30 40 50 60 70 80 90

Radius from center of rotation (m)


2.0 m
Center of rotation

1: Without upper/lower connecting device


2: With upper/lower connecting device

29
Luffing Jib
Boom Angle: 66°
150

140

130

120

53˚
110
45˚

100

60
m
54
53˚ 30˚

m
48 90
m
42
m
36
m
30

80
m
24

15˚
72
m

m
66

70
m
60
m
54
m
48

66 m
m

60
42
m
36

Height above ground (m)


m
30

15˚
m
24

50
m

40

36 m
30

20
H *1: 2.86 m
*2: 3.08 m

10

10 20 30 40 50 60 70 80 90

Radius from center of rotation (m)


2.0 m
Center of rotation

1: Without upper/lower connecting device


2: With upper/lower connecting device

30
HEAVY LIFT

LIFTING CAPACITIES
Heavy Duty Crane Boom Long Boom Lifting
Lifting Capacities Capacities
Unit: ton Unit: ton
Counterweight: 180.0 ton, Carbody weight: 50.0 ton Counterweight: 180.0 ton, Carbody weight: 50.0 ton
HL Mast point radius: 11 m to 16 m HL Mast point radius: 11 m to 16 m
Boom Boom Boom Boom
Length Length Length Length
Working (m) 36.0 42.0 (m) Working Working (m) 90.0 96.0 102.0 108.0 (m) Working
Radius (m) Radius (m) Radius (m) Radius (m)
8.0 8.3 m/367.5 8.0 14.0 15.0 m/98.0 15.8 m/98.0 14.0
9.0 330.0 9.2 m/323.3 9.0 16.0 98.0 98.0 16.6 m/84.0 17.5 m /84.0 16.0
10.0 286.4 286.9 10.0 18.0 98.0 98.0 84.0 84.0 18.0
12.0 225.4 225.9 12.0 20.0 98.0 97.5 84.0 84.0 20.0
14.0 184.9 185.2 14.0 22.0 89.9 87.4 84.0 81.9 22.0
16.0 156.0 156.1 16.0 24.0 81.0 78.8 75.9 73.8 24.0
18.0 134.4 134.3 18.0 26.0 73.5 71.5 68.7 66.7 26.0
20.0 117.7 117.4 20.0 28.0 66.9 65.1 62.3 60.5 28.0
22.0 104.1 103.9 22.0 30.0 61.1 59.4 56.8 55.1 30.0
24.0 93.2 92.8 24.0 32.0 56.0 54.4 51.8 50.3 32.0
26.0 84.0 83.6 26.0 34.0 51.5 49.9 47.5 46.0 34.0
28.0 76.2 75.9 28.0 36.0 47.4 45.9 43.5 42.1 36.0
30.0 69.5 69.1 30.0 38.0 43.5 42.3 40.0 38.7 38.0
32.0 63.5 63.3 32.0 40.0 39.9 39.0 36.7 35.5 40.0
34.0 33.8 m/58.7 58.2 34.0 44.0 33.8 33.2 31.1 30.0 44.0
36.0 53.7 36.0 48.0 28.9 28.3 26.4 25.3 48.0
38.0 49.7 38.0 52.0 24.7 24.2 22.4 21.4 52.0
40.0 39.0 m/47.8 40.0 56.0 21.2 20.7 18.9 18.0 56.0
Reeves 28 24 Reeves 60.0 18.2 17.6 15.9 15.0 60.0
Note: 64.0 15.4 14.8 13.3 12.4 64.0
Designed and rated to comply with EN13000 . 68.0 13.0 12.4 10.9 10.0 68.0
Ratings shown in are determined by the strength of the boom or 72.0 10.8 10.2 8.9 8.0 72.0
other structural components. 76.0 8.9 8.3 7.0 6.2 76.0
80.0 80.1 m/7.2 6.7 80.0
Reeves 7 7 6 6 Reeves
Note:
Designed and rated to comply with EN13000 .
Ratings shown in are determined by the strength of the boom or
other structural components.

31
Luffing Boom Lifting Unit: ton

Capacities Counterweight: 180.0 ton, Carbody weight: 50.0 ton


HL Mast point radius: 11 m to 16 m
Boom Boom
Length Length
Working (m) 36.0 42.0 48.0 54.0 60.0 66.0 72.0 78.0 84.0 (m) Working
Radius (m) Radius (m)
8.0 8.5 m/300.0 8.0
9.0 300.0 9.3 m/300.0 9.0
10.0 286.5 287.1 10.2 m/280.5 11.0 m/252.1 11.8 m/225.4 10.0
12.0 224.9 225.3 225.0 224.6 221.9 12.7 m/199.7 13.5 m/178.2 12.0
14.0 184.0 184.2 183.8 183.3 183.0 178.8 171.2 14.3 m/160.6 15.2 m/145.2 14.0
16.0 154.8 154.9 154.6 153.9 153.4 152.7 147.4 142.2 137.0 16.0
18.0 132.9 132.9 132.6 132.0 131.4 129.7 128.5 124.1 119.7 18.0
20.0 116.0 115.9 115.5 114.8 114.3 113.5 112.6 109.5 105.6 20.0
22.0 102.4 102.2 101.9 101.2 100.6 99.8 98.9 97.3 93.8 22.0
24.0 91.3 91.1 90.7 90.1 89.6 88.6 87.7 87.1 84.0 24.0
26.0 82.0 81.8 81.4 80.8 80.3 79.3 78.3 77.6 75.5 26.0
28.0 74.2 74.0 73.5 72.9 72.4 71.5 70.4 69.7 68.2 28.0
30.0 67.5 67.2 66.8 66.1 65.7 64.8 63.8 63.0 61.8 30.0
32.0 61.6 61.4 60.9 60.3 59.8 58.9 58.0 57.1 56.1 32.0
34.0 33.9 m/56.6 56.3 55.8 55.1 54.7 53.8 52.8 52.0 51.1 34.0
36.0 51.7 51.3 50.6 50.2 49.3 48.3 47.4 46.4 36.0
38.0 47.7 47.3 46.6 46.1 45.3 44.3 43.6 42.6 38.0
40.0 39.1 m/45.6 43.6 43.0 42.5 41.7 40.7 40.0 39.0 40.0
42.0 40.4 39.7 39.3 38.4 37.5 36.7 35.6 42.0
44.0 37.4 36.8 36.3 35.5 34.5 33.7 32.7 44.0
46.0 44.3 m/37.0 34.1 33.7 32.8 31.8 31.0 30.0 46.0
48.0 31.6 31.2 30.4 29.3 28.5 27.3 48.0
50.0 49.5 m/29.9 29.0 28.1 27.1 26.1 24.9 50.0
52.0 26.9 26.0 25.0 23.9 22.6 52.0
54.0 25.0 24.1 23.0 21.8 20.6 54.0
56.0 54.7 m/24.3 22.4 21.2 20.0 18.7 56.0
58.0 20.7 19.5 18.3 16.9 58.0
60.0 59.9 m/19.2 18.0 16.7 15.3 60.0
62.0 16.6 15.3 13.9 62.0
64.0 15.4 14.0 12.5 64.0
66.0 65.1 m/14.8 12.8 11.2 66.0
68.0 11.7 10.0 68.0
70.0 10.6 8.8 70.0
72.0 70.3 m/10.5 7.7 72.0
Reeves 24 24 24 20 20 16 16 12 12 Reeves
Note:
Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.

32
HEAVY LIFT

LIFTING CAPACITIES
Luffing Jib Lifting Capacity Unit: ton
Counterweight: 180.0 ton, Carbody weight: 50.0 ton
HL Mast point radius: 16 m
Boom length (m) 36.0 Boom length (m)
36.0 m Boom Length

Jib length (m) 24.0 42.0 54.0 66.0 72.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
14.0 14.4 m/200.0 14.0
15.0 193.2 15.0
16.0 181.9 16.0
17.0 170.3 17.0
18.0 159.4 18.0
20.0 141.1 132.7 20.0
22.0 126.4 120.5 22.0
24.0 114.4 110.2 101.5 24.0
26.0 103.2 96.0 101.4 96.5 26.0
28.0 93.9 87.3 92.1 89.3 76.0 28.0

Working Radius (m)


Working Radius (m)

30.0 85.9 79.9 84.3 83.0 74.1 64.3 30.0


34.0 68.2 71.7 65.9 70.9 68.8 60.0 34.0
38.0 54.8 62.2 57.0 61.3 60.2 54.2 38.0
42.0 48.2 54.7 50.1 53.8 48.1 52.7 49.3 42.0
46.0 48.7 44.5 40.4 47.7 43.3 46.6 40.5 45.1 46.0
50.0 39.9 36.2 42.7 38.7 41.6 37.4 41.1 35.0 50.0
54.0 32.6 38.6 34.8 30.5 37.4 33.5 36.9 33.0 54.0
58.0 29.7 35.1 31.6 28.3 33.8 30.2 33.4 29.7 58.0
62.0 28.8 25.7 30.8 27.4 22.8 30.3 26.9 62.0
66.0 23.5 28.2 25.0 22.0 27.7 24.5 19.4 66.0
70.0 21.6 25.9 22.9 20.0 25.4 22.3 19.4 70.0
74.0 21.0 18.3 23.4 20.5 17.7 74.0
78.0 16.8 18.8 16.2 78.0
82.0 15.5 17.4 14.9 82.0
86.0 13.7 86.0
Reeves 16 12 8 8 8 Reeves

Boom length (m) 42.0 Boom length (m)


42.0 m Boom Length

Jib length (m) 24.0 42.0 54.0 66.0 72.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
15.0 15.4 m/181.6 15.0
16.0 175.9 16.0
17.0 166.1 17.0
18.0 156.3 18.0
20.0 140.0 20.0
22.0 125.4 116.7 22.0
24.0 113.5 106.9 94.1 24.0
26.0 102.7 98.4 93.1 26.0
28.0 93.4 85.4 91.2 86.7 74.9 28.0
30.0 85.5 78.2 83.8 80.6 73.6 61.0 30.0
Working Radius (m)
Working Radius (m)

34.0 66.6 71.3 70.4 66.9 58.9 34.0


38.0 57.8 52.5 61.8 55.5 60.9 59.1 54.0 38.0
42.0 46.1 54.3 48.7 53.4 46.7 52.3 48.9 42.0
46.0 48.4 43.2 47.4 42.1 46.3 39.1 45.0 46.0
50.0 38.7 34.1 42.4 37.6 41.3 36.2 40.8 33.7 50.0
54.0 35.0 30.9 38.3 33.8 37.1 32.4 36.7 32.0 54.0
58.0 28.0 34.8 30.6 25.7 33.5 29.2 33.1 28.7 58.0
62.0 25.6 27.8 24.1 30.5 26.5 20.9 30.0 26.0 62.0
66.0 25.5 22.0 27.9 24.1 20.5 27.4 23.6 17.4 66.0
70.0 20.2 25.7 22.0 18.6 25.1 21.5 17.4 70.0
74.0 18.6 20.2 17.0 23.1 19.7 16.3 74.0
78.0 18.7 15.5 18.0 14.8 78.0
82.0 14.3 16.6 13.5 82.0
86.0 12.3 86.0
90.0 11.2 90.0
Reeves 16 12 8 8 8 Reeves
Note: Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.

33
Luffing Jib Lifting Capacity Unit: ton
Counterweight: 180.0 ton, Carbody weight: 50.0 ton
HL Mast point radius: 16 m
Boom length (m) 48.0 Boom length (m)
48.0 m Boom Length

Jib length (m) 24.0 42.0 54.0 66.0 72.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
16.0 16.2 m/167.4 16.0
17.0 160.1 17.0
18.0 150.8 18.0
20.0 135.8 20.0
22.0 123.4 113.0 22.0
24.0 112.6 103.6 90.2 24.0
26.0 102.2 95.5 88.0 26.0
28.0 92.9 83.4 88.4 84.1 67.3 28.0
30.0 85.0 76.3 82.3 78.3 66.0 58.4 30.0
34.0 65.0 70.9 68.5 62.9 56.3 34.0

Working Radius (m)


Working Radius (m)

38.0 56.3 61.4 53.9 60.5 57.4 53.8 38.0


42.0 43.9 53.9 47.3 53.1 45.1 51.2 48.6 42.0
46.0 38.9 48.0 41.9 47.0 40.8 45.9 44.8 46.0
50.0 37.5 32.1 42.1 36.4 41.0 33.2 40.4 32.3 50.0
54.0 33.8 29.0 37.9 32.6 36.8 31.1 36.4 30.0 54.0
58.0 26.2 34.5 29.5 23.8 33.3 28.2 32.8 27.1 58.0
62.0 23.8 26.8 22.5 30.2 25.5 29.8 24.6 62.0
66.0 24.6 20.4 27.6 23.2 16.5 27.2 22.4 66.0
70.0 18.6 25.4 21.1 16.5 24.9 20.5 13.5 70.0
74.0 17.1 19.4 15.0 22.9 18.8 13.5 74.0
78.0 17.8 13.7 17.2 12.7 78.0
82.0 12.5 15.8 11.5 82.0
86.0 11.6 10.4 86.0
90.0 9.5 90.0
Reeves 16 12 8 8 8 Reeves

Boom length (m) 54.0 Boom length (m)


54.0 m Boom Length

Jib length (m) 24.0 42.0 54.0 66.0 72.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
17.0 154.3 17.0
18.0 145.5 18.0
20.0 131.2 20.0
22.0 119.3 109.3 22.0
24.0 109.4 100.2 24.0
26.0 101.0 92.5 80.7 26.0
28.0 92.4 85.7 78.2 63.1 28.0
30.0 84.5 74.3 79.8 75.6 61.8 55.1 30.0
34.0 63.2 69.9 66.5 58.7 52.9 34.0
Working Radius (m)
Working Radius (m)

38.0 54.7 60.9 51.7 58.9 55.2 50.3 38.0


42.0 41.4 53.5 45.8 52.6 49.6 47.5 42.0
46.0 36.7 47.6 40.5 46.7 38.2 44.6 43.4 46.0
50.0 36.2 41.7 34.8 40.3 31.8 39.2 50.0
54.0 32.6 26.7 37.6 31.5 36.5 28.9 35.5 27.2 54.0
58.0 29.6 24.3 34.2 28.4 33.0 26.1 32.4 25.1 58.0
62.0 22.0 25.8 19.0 30.0 23.7 29.5 22.7 62.0
66.0 20.1 23.5 18.2 27.4 21.6 26.9 20.6 66.0
70.0 16.6 25.1 19.8 12.6 24.6 18.8 70.0
74.0 15.2 18.2 12.6 22.6 17.1 9.8 74.0
78.0 14.1 16.8 11.4 15.7 9.8 78.0
82.0 10.3 14.4 9.3 82.0
86.0 9.3 13.4 8.3 86.0
90.0 8.6 7.4 90.0
94.0 6.7 94.0
Reeves 12 8 8 8 8 Reeves
Note: Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.

34
HEAVY LIFT

LIFTING CAPACITIES
Luffing Jib Lifting Capacity Unit: ton
Counterweight: 180.0 ton, Carbody weight: 50.0 ton
HL Mast point radius: 16 m
Boom length (m) 60.0 Boom length (m)
60.0 m Boom Length

Jib length (m) 24.0 42.0 54.0 66.0 72.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
17.0 17.8 m/141.8 17.0
18.0 140.3 18.0
20.0 126.7 20.0
22.0 115.4 103.2 22.0
24.0 105.9 97.0 24.0
26.0 97.8 89.5 76.5 26.0
28.0 90.8 83.0 74.2 28.0
30.0 84.0 77.3 71.7 58.2 30.0
34.0 61.4 67.8 64.4 55.3 49.4 34.0
38.0 53.1 60.2 57.1 52.1 47.0 38.0

Working Radius (m)


Working Radius (m)

42.0 46.6 53.1 43.2 51.0 48.1 44.3 42.0


46.0 34.5 47.1 38.7 46.0 36.1 43.2 41.6 46.0
50.0 30.7 34.9 41.3 32.5 39.0 29.7 37.9 50.0
54.0 31.3 37.2 29.3 35.4 26.7 34.4 25.7 54.0
58.0 28.4 21.7 33.8 26.6 32.3 24.1 31.3 23.1 58.0
62.0 19.7 24.3 16.8 29.6 21.8 28.6 20.8 62.0
66.0 18.0 22.4 15.6 27.1 19.8 26.3 18.8 66.0
70.0 20.6 14.1 24.8 18.0 10.5 24.2 17.0 70.0
74.0 12.8 16.5 10.3 22.4 15.5 74.0
78.0 11.7 15.1 9.1 20.6 14.1 78.0
82.0 14.1 8.1 12.9 82.0
86.0 7.2 11.9 86.0
90.0 6.5 90.0
Reeves 12 8 8 8 8 Reeves

Boom length (m) 66.0 Boom length (m)


66.0 m Boom Length

Jib length (m) 24.0 42.0 54.0 66.0 72.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
18.0 18.5 m/131.7 18.0
20.0 122.2 20.0
22.0 111.4 95.3 22.0
24.0 102.3 91.5 24.0
26.0 94.5 86.5 71.3 26.0
28.0 87.8 80.3 68.1 28.0
30.0 82.0 74.8 66.6 55.1 30.0
34.0 57.5 65.6 61.6 52.2 46.4 34.0
Working Radius (m)
Working Radius (m)

38.0 50.8 58.2 55.2 49.0 44.0 38.0


42.0 45.0 52.2 40.1 49.3 45.7 41.4 42.0
46.0 46.7 35.9 44.5 33.4 41.7 38.8 46.0
50.0 28.0 32.3 40.3 29.9 37.6 36.2 50.0
54.0 25.4 29.3 36.9 26.9 34.2 24.4 33.1 23.4 54.0
58.0 26.8 18.4 33.4 24.4 31.2 21.9 30.1 20.9 58.0
62.0 16.6 22.2 28.6 19.7 27.5 18.8 62.0
66.0 15.0 20.3 12.5 26.3 17.8 25.3 16.9 66.0
70.0 13.7 18.7 11.4 24.4 16.1 23.3 15.2 70.0
74.0 10.2 14.7 21.5 13.7 74.0
78.0 9.1 13.4 20.1 12.4 78.0
82.0 8.3 12.3 11.2 82.0
86.0 10.2 86.0
90.0 9.4 90.0
Reeves 12 8 8 8 8 Reeves
Note: Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.

35
36
SUPER HEAVY LIFT

BOOM AND JIB ARRANGEMENTS


Heavy Duty Crane Luffing Boom Arrangements for Crane
Boom Arrangements Boom
length m (ft) Boom arrangement
Boom
length m (ft) Boom arrangement
36 (118) L 6.0 12.0 8T 1U

36 (118) L 6.0 12.0 8T U


L 6.0 12.0 6.0 8T 1U
42 (138)
L 6.0 12.0 6.0 8T U
L 12.0 12.0 8T 1U
42 (138)
L 12.0 12.0 8T U

48 (157) L 12.0 12.0 6.0 8T 1U

L 6.0 6.0 12.0 12.0 8T 1U


Symbol Boom Length Remarks
54 (177)
L 9.0 m (29.5 ft) Boom Base L 12.0 12.0 12.0 8T 1U
8T 8.0 m (26.2 ft) Boom Top
6.0 6.0 m (19.7 ft) Insert Boom 60 (197) L 12.0 12.0 6.0 12.0 8T 1U

12.0 12.0 m (39.4 ft) Insert Boom


L 6.0 6.0 12.0 12.0 12.0 8T 1U
U 1.0 m (3.3 ft)
66 (217)
L 12.0 12.0 12.0 12.0 8T 1U
mark shows the guy line installing position when the fixed jib
is used.
indicates the most flexible combination of insert heavy duty 72 (236) L 12.0 12.0 6.0 12.0 12.0 8T 1U

booms, which can be modified to form all shorter heav duty


L 6.0 6.0 12.0 12.0 12.0 12.0 8T 1U
boom arrangements.
78 (256)
L 12.0 12.0 12.0 12.0 12.0 8T 1U

84 (276) L 12.0 12.0 6.0 12.0 12.0 12.0 8T 1U

mark shows the guy line


Symbol Boom Length Remarks
installing position when
L 9.0 m (29.5 ft) Boom Base the fixed jib is used.
8T 8.0 m (26.2 ft) Boom Top indicates the most flexible
6.0 6.0 m (19.7 ft) Insert Boom combination of insert luffing
12.0 12.0 m (39.4 ft) Insert Boom booms, which can be modified
to form all shorter luffing boom
1U 1.0 m (3.3 ft)
arrangements.
Long Boom Arrangements
Boom Symbol Boom Length Remarks
length m (ft) Boom arrangement L 9.0 m (29.5 ft) Boom Base
8T 8.0 m (26.2 ft) Boom Top
90 (295) L 12.0 12.0 6.0 12.0 12.0 8T 5.0 6.0
U
6.0 6.0 m (19.7 ft) Insert Boom
12.0 12.0 m (39.4 ft) Insert Boom
L 12.0 12.0 6.0 12.0 12.0 8T 5.0 6.0 6.0
U 5.0 5.0 m (16.4 ft) Luffing Insert Jib
96 (315)
L 12.0 12.0 6.0 12.0 12.0 8T 5.0 12.0
U
6.0 6.0 m (19.7 ft) Luffing Insert Jib
12.0 12.0 m (39.4 ft) Luffing Insert Jib
L 6.0 6.0 12.0 12.0 12.0 12.0 8T 5.0 6.0 6.0
U
U 8.0 m (26.2 ft)
L 12.0 12.0 12.0 12.0 12.0 8T 5.0 6.0 6.0
U
mark shows the guy line installing position when
102 (335)
L 6.0 6.0 12.0 12.0 12.0 12.0 8T 5.0 12.0 the fixed jib is used.
U
indicates the most flexible combination of insert
L 12.0 12.0 12.0 12.0 12.0 8T 5.0 12.0
U long booms, which can be modified to form all
shorter long boom arrangements.
L 6.0 6.0 12.0 12.0 12.0 12.0 8T 5.0 6.0 12.0
U
108 (354)
L 12.0 12.0 12.0 12.0 12.0 8T 5.0 6.0 12.0
U

114 (374) L 12.0 12.0 6.0 12.0 12.0 12.0 8T 5.0 6.0 12.0
U

L 12.0 12.0 6.0 12.0 12.0 12.0 8T 5.0 6.0 6.0 12.0
U
120 (394)
L 12.0 12.0 6.0 12.0 12.0 12.0 8T 5.0 12.0 12.0
U

126 (413) L 12.0 12.0 6.0 12.0 12.0 12.0 8T 5.0 6.0 12.0 12.0
U

37
Luffing Boom Arrangements for Luffing
Boom Symbol Boom Length Remarks
length m (ft) Boom arrangement L 9.0 m (29.5 ft) Boom Base
8T 8.0 m (26.2 ft) Boom Top
36 (118) L 6.0 12.0 8T LU 6.0 6.0 m (19.7 ft) Insert Boom
12.0 12.0 m (39.4 ft) Insert Boom
L 6.0 12.0 6.0 8T LU
42 (138)
LU 1.0 m (3.3 ft)
L 12.0 12.0 8T LU
mark shows the guy line installing position when
the fixed jib is used.
48 (157) L 12.0 12.0 6.0 8T LU
indicates the most flexible combination of insert luffing booms,
which can be modified to form all shorter luffing boom
L 6.0 6.0 12.0 12.0 8T LU
arrangements.
54 (177)
L 12.0 12.0 12.0 8T LU

60 (197) L 12.0 12.0 6.0 12.0 8T LU

L 6.0 6.0 12.0 12.0 12.0 8T LU


66 (217)
L 12.0 12.0 12.0 12.0 8T LU

72 (236) L 12.0 12.0 6.0 12.0 12.0 8T LU

L 6.0 6.0 12.0 12.0 12.0 12.0 8T LU


78 (256)
L 12.0 12.0 12.0 12.0 12.0 8T LU

84 (276) L 12.0 12.0 6.0 12.0 12.0 12.0 8T LU

Luffing Jib Arrangements


Jib Symbol Jib Length Remarks
length m (ft) Jib arrangement JL 10.0 m (32.8 ft) Jib Base
6.0 6.0 m (19.7 ft) Luffing Insert Jib
24 (79) JL
6.0
JU 12.0 12.0 m (39.4 ft) Luffing Insert Jib
JU 8.0 m (26.2 ft)
6.0 6.0
JL JU
30 (98) mark shows the guy line installing position when the fixed jib
12.0
JL JU
is used.
indicates the most flexible combination of insert luffing jibs,
36 (118) JL
6.0 12.0
JU which can be modified to form all shorter luffing jib
arrangements.
6.0 6.0 12.0
JL JU
42 (138)
JL
12.0 12.0
JU SHL MAST
48 (157) JL
6.0 12.0 12.0
JU
UM
UM

6.0 6.0 12.0 12.0


JL JU
UM

54 (177)
12.0 12.0 12.0
JL JU
12.
12
12

0
.0
.0

60 (197) JL
6.0 12.0 12.0 12.0
JU
ML
ML
ML

12.0 12.0 12.0 6.0 6.0


JL JU
66 (217)
12.0 12.0 12.0 12.0
JL JU

72 (236) JL
12.0 12.0 12.0 6.0 12.0
JU
16.0 m 13.0 m 11.0 m
12.0 12.0 12.0 6.0 6.0 12.0 52.5 ft 42.7 ft 36.3 ft
JL JU
78 (256) Symbol Mast Length Remarks
12.0 12.0 12.0 12.0 12.0
JL JU
ML 9.0 m (29.5 ft)
84 (276) JL
12.0 12.0 12.0 6.0 12.0 12.0
JU
12.0 12.0 m (39.4 ft)
UM 9.0 m (29.5 ft)

38
SUPER HEAVY LIFT

WORKING RANGES
Heavy Duty Crane Boom

82˚ 80˚ 70˚ 60˚ 50˚


90

80

70

40˚
60

Height above ground (m)


50

30˚
42 40
m
36
m
30

20
H *1: 2.86 m
*2: 3.08 m

10

10 20 30 40 50 60 70 80

Radius from center of rotation (m)


2.0 m
Center of rotation

1: Without upper/lower connecting device


2: With upper/lower connecting device

39
Luffing Boom

82˚ 80˚ 70˚ 60˚ 50˚


90

80

84
m
78 70
m
72
m 40˚
66 60
m
60
m
54
m 30˚
50 Height above ground (m)
48
m
42 40
m
36
m
30

20
H *1: 2.86 m
*2: 3.08 m

10

10 20 30 40 50 60 70 80

Radius from center of rotation (m)


2.0 m
Center of rotation

1: Without upper/lower connecting device


2: With upper/lower connecting device

40
SUPER HEAVY LIFT

WORKING RANGES
Long Boom

82˚ 80˚ 70˚ 60˚ 50˚


130

126 120
m
120
m
110
114
m
108
m
100
102
m
96 40˚
m 90
90
m

80

70

30˚
60

Height above ground (m)

50

40

30

20
H *1: 2.86 m
*2: 3.08 m

10

10 20 30 40 50 60 70 80 90 100 110

Radius from center of rotation (m)


2.0 m
Center of rotation

1: Without upper/lower connecting device


2: With upper/lower connecting device

41
73˚ 170

Luffing Jib
60˚
Boom Angle: 86° 160

150
45˚

84
140

m
78
m
72
m
30˚ 130

66
m
60
m
54
73˚

m
120
48
m
42
m
36

15˚ 110
m
30
m

100
84
m
78
m
72

90
m
66

84 m
m
60
m

80
54
m
48
m
42

70
m
36
m
30

60
m

15˚
24
m

Height above ground (m)


50

36 m 40

30

20
H *1: 2.86 m
*2: 3.08 m

10

10 20 30 40 50 60 70 80 90 100

Radius from center of rotation (m)


2.0 m
Center of rotation

1: Without upper/lower connecting device


2: With upper/lower connecting device

42
SUPER HEAVY LIFT

WORKING RANGES
170
Luffing Jib
63˚
Boom Angle: 60˚
160
76°
150

45˚

140

84
m
78
m
72
130

m
30˚

66
m
60
m
120

54
m
48
m
63˚
42
m

110
36

15˚
m
30
m

84 100
m
78

90
m
72
m
66

84 m
m

80
60
m
54
m
48

70
m
42
m
36
m

60
30

15˚
m
24

Height above ground (m)


m

50

40
36 m

30

20
H *1: 2.86 m
*2: 3.08 m

10

10 20 30 40 50 60 70 80 90 100 110

Radius from center of rotation (m)


2.0 m
Center of rotation

1: Without upper/lower connecting device


2: With upper/lower connecting device

43
170
Luffing Jib
Boom Angle: 160

66°
150

53˚
140

45˚

130

84
m
78
120

m
72
30˚

m
66
m
60
110

m
54
m
53˚
48
m 100
42
m
36

15˚
m
30
m

90
84
m
78

80
m
72
m
66

78 m
m
60

70
m
54
m
48
m
42

60
m

15˚
36
m
30

Height above ground (m)


m

50
24
m

40

36 m
30

20
H *1: 2.86 m
*2: 3.08 m

10

10 20 30 40 50 60 70 80 90 100 110 120

Radius from center of rotation (m)


2.0 m
Center of rotation

1: Without upper/lower connecting device


2: With upper/lower connecting device

44
SUPER HEAVY LIFT

LIFTING CAPACITIES
Heavy Duty Crane Boom
Lifting Capacities
Unit: ton Unit: ton Unit: ton
Counterweight: 180.0 ton Counterweight: 180.0 ton Counterweight: 180.0 ton
Carbody weight: 50.0 ton Carbody weight: 50.0 ton Carbody weight: 50.0 ton
Palette weight: 250.0 ton x 11 m Palette weight: 250.0 ton x 13 m Palette weight: 250.0 ton x 16 m
Boom Boom Boom Boom Boom Boom
Length Length Length Length Length Length
Working (m) 36.0 42.0 (m) Working Working (m) 36.0 42.0 (m) Working Working (m) 36.0 42.0 (m) Working
Radius (m) Radius (m) Radius (m) Radius (m) Radius (m) Radius (m)
8.0 8.3 m/550.0 8.0 8.0 8.3 m/550.0 8.0 8.0 8.3 m/550.0 8.0
9.0 544.9 9.2 m/523.4 9.0 9.0 544.9 9.2 m/526.0 9.0 9.0 544.9 9.2 m/527.3 9.0
10.0 511.1 510.0 10.0 10.0 537.4 519.0 10.0 10.0 537.4 519.9 10.0
12.0 428.0 427.0 12.0 12.0 461.6 460.5 12.0 12.0 511.5 503.7 12.0
14.0 367.7 366.6 14.0 14.0 396.6 395.6 14.0 14.0 439.6 438.8 14.0
16.0 321.8 320.8 16.0 16.0 347.3 346.3 16.0 16.0 385.3 384.2 16.0
18.0 285.5 284.9 18.0 18.0 308.5 307.6 18.0 18.0 342.4 341.4 18.0
20.0 255.6 255.9 20.0 20.0 277.3 276.4 20.0 20.0 307.9 306.9 20.0
22.0 228.2 228.5 22.0 22.0 250.3 250.5 22.0 22.0 279.5 278.5 22.0
24.0 205.8 206.0 24.0 24.0 225.9 226.0 24.0 24.0 250.7 253.5 24.0
26.0 187.2 187.3 26.0 26.0 204.5 205.6 26.0 26.0 224.9 230.9 26.0
28.0 170.5 171.4 28.0 28.0 184.3 188.4 28.0 28.0 201.5 211.7 28.0
30.0 154.2 157.8 30.0 30.0 166.7 173.6 30.0 30.0 178.8 195.2 30.0
32.0 139.6 146.0 32.0 32.0 151.0 160.7 32.0 32.0 157.9 179.2 32.0
34.0 33.8 m/127.4 135.7 34.0 34.0 33.8 m/137.7 149.1 34.0 34.0 33.8 m/139.6 164.0 34.0
36.0 126.3 36.0 36.0 136.6 36.0 36.0 148.3 36.0
38.0 115.7 38.0 38.0 125.1 38.0 38.0 132.8 38.0
40.0 39.0 m/110.5 40.0 40.0 39.0 m/119.5 40.0 40.0 39.0 m/124.8 40.0
Reeves 44 44 Reeves Reeves 44 44 Reeves Reeves 44 44 Reeves
Note:
Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.

Long Boom Lifting Unit: ton


Capacities Counterweight: 180.0 ton, Carbody weight: 50.0 ton
Palette weight: 250.0 ton x 11 m, 13 m, 16 m
Boom Boom
Length Length
Working (m) 90.0 96.0 102.0 108.0 114.0 120.0 126.0 (m) Working
Radius (m) Radius (m)
14.0 15.0 m/98.0 15.8 m/98.0 14.0
16.0 98.0 98.0 16.6 m/84.0 17.5 m /84.0 16.0
18.0 98.0 98.0 84.0 84.0 18.3 m /80.0 19.2 m /70.0 18.0
20.0 98.0 98.0 84.0 84.0 79.4 70.0 20.0 m /60.0 20.0
22.0 98.0 98.0 84.0 84.0 78.7 70.0 59.3 22.0
24.0 98.0 98.0 84.0 84.0 78.0 69.3 58.5 24.0
26.0 98.0 97.7 84.0 83.9 77.3 68.7 57.8 26.0
28.0 98.0 93.1 84.0 80.1 76.6 68.0 57.0 28.0
30.0 98.0 89.0 84.0 76.6 75.9 67.3 53.8 30.0
32.0 96.3 84.2 84.0 73.2 75.2 66.0 51.1 32.0
34.0 92.7 79.8 84.0 69.9 72.2 63.0 48.4 34.0
36.0 89.2 74.9 81.1 66.4 69.3 60.2 45.7 36.0
38.0 86.0 69.8 77.3 62.9 66.5 57.8 43.4 38.0
40.0 83.4 65.0 74.8 60.1 63.7 55.1 41.9 40.0
44.0 75.9 55.7 68.2 54.8 58.8 50.3 39.4 44.0
48.0 69.2 48.1 63.0 51.3 53.4 47.2 37.0 48.0
52.0 64.2 43.8 58.4 47.6 50.3 44.5 34.7 52.0
56.0 59.6 40.7 54.2 44.6 47.7 42.3 32.7 56.0
60.0 55.4 38.1 50.1 41.8 45.1 40.2 31.0 60.0
64.0 52.4 36.0 47.1 38.9 42.7 38.4 29.6 64.0
68.0 50.2 34.5 45.0 36.5 40.9 36.9 28.4 68.0
72.0 48.1 33.3 42.8 34.6 39.2 35.6 27.4 72.0
76.0 46.3 32.2 41.0 33.0 37.6 34.3 26.5 76.0
80.0 80.1 m/44.2 31.4 38.9 31.2 36.1 33.3 25.8 80.0
84.0 30.8 37.9 30.3 35.1 32.4 25.1 84.0
88.0 85.3 m/30.6 36.9 29.3 34.3 31.7 24.6 88.0
92.0 90.5 m/36.2 28.5 33.6 31.1 23.9 92.0
96.0 95.7 m/28.0 32.9 30.5 23.5 96.0
100.0 30.9 30.1 22.9 100.0
104.0 100.9 m/30.4 28.2 22.3 104.0 Note:
108.0 106.1 m/27.2 22.0 108.0 Designed and rated to comply with EN13000.
112.0 111.3 m/21.8 112.0 Ratings shown in are determined by the strength
Reeves 7 7 6 6 6 5 5 Reeves of the boom or other structural components.

45
Luffing Boom Lifting Unit: ton

Capacities Counterweight: 180.0 ton, Carbody weight: 50.0 ton


Palette weight: 250.0 ton x 13 m
Boom Boom
Length
36.0 42.0 48.0 54.0 60.0 Length
Working
(m) Palette weight Palette weight Palette weight Palette weight Palette weight (m)
Working
Radius (m) 11 m 13 m 16 m 11 m 13 m 16 m 11 m 13 m 16 m 11 m 13 m 16 m 11 m 13 m 16 m Radius (m)
8.0 8.5 m/300.0 8.5 m/300.0 8.5 m/300.0 8.0
9.0 300.0 300.0 300.0 9.3 m/300.0 9.3 m/300.0 9.3 m/300.0 9.0
10.0 300.0 300.0 300.0 300.0 300.0 300.0 10.2 m/300.0 10.2 m/300.0 10.2 m/300.0 11.0 m/280.0 11.0 m/280.0 11.0 m/280.0 11.8 m/280.0 11.8 m/280.0 11.8 m/280.0 10.0
12.0 300.0 300.0 300.0 300.0 300.0 300.0 300.0 300.0 300.0 280.0 280.0 280.0 280.0 280.0 280.0 12.0
14.0 300.0 300.0 300.0 300.0 300.0 300.0 300.0 300.0 300.0 280.0 280.0 280.0 280.0 280.0 280.0 14.0
16.0 300.0 300.0 300.0 300.0 300.0 300.0 300.0 300.0 300.0 280.0 280.0 280.0 280.0 280.0 280.0 16.0
18.0 283.9 300.0 300.0 282.9 300.0 300.0 281.9 300.0 300.0 280.0 280.0 280.0 279.7 280.0 280.0 18.0
20.0 253.4 275.4 300.0 253.8 274.4 300.0 252.9 273.4 300.0 251.7 272.2 280.0 250.7 271.3 280.0 20.0
22.0 226.0 248.1 277.5 226.3 248.3 276.6 226.3 247.7 275.6 225.8 246.5 274.4 225.6 245.6 273.5 22.0
24.0 203.6 223.7 248.9 203.8 223.8 251.3 203.7 223.6 251.0 203.2 223.1 250.2 203.0 222.7 249.7 24.0
26.0 185.0 202.5 223.0 185.1 203.4 228.6 184.9 203.2 228.3 184.4 202.6 227.5 184.1 202.2 227.1 26.0
28.0 168.6 182.3 199.8 169.2 186.2 209.5 169.0 185.9 209.1 168.4 185.2 208.3 168.1 184.8 207.8 28.0
30.0 152.2 164.7 177.0 155.6 171.4 193.0 155.4 171.1 192.6 154.8 170.4 191.9 154.4 170.0 191.3 30.0
32.0 137.6 149.0 156.1 143.8 158.5 177.2 143.6 158.2 178.4 142.9 157.5 177.6 142.5 157.1 177.0 32.0
34.0 33.9 m/124.8 33.9 m/135.1 33.9 m/136.8 133.5 147.1 161.9 133.2 147.0 165.9 132.6 146.3 165.1 132.1 145.8 164.5 34.0
36.0 124.2 134.5 146.4 124.1 137.1 154.9 123.4 136.3 154.1 123.0 135.8 153.5 36.0
38.0 113.6 123.0 130.7 116.0 128.2 145.1 115.3 127.5 144.3 114.8 127.0 143.7 38.0
40.0 39.1 m/107.9 39.1 m/116.9 39.1 m/122.1 108.7 120.3 134.3 108.0 119.6 135.5 107.5 119.1 134.9 40.0
42.0 102.1 112.4 123.2 101.4 112.4 127.6 101.0 112.0 127.0 42.0
44.0 95.5 103.6 111.0 95.5 106.0 120.4 95.0 105.5 119.9 44.0
46.0 44.3 m/94.2 44.3 m/102.2 44.3 m/109.1 90.1 100.1 113.1 89.6 99.6 113.4 46.0
48.0 85.2 94.7 104.6 84.7 94.3 107.4 48.0
50.0 49.5 m/81.7 49.5 m/89.7 49.5 m/97.3 80.2 89.4 102.0 50.0
52.0 76.0 84.8 96.9 52.0
54.0 72.1 80.6 90.0 54.0
56.0 54.7 m/70.8 54.7 m/79.2 54.7 m/87.2 56.0
Reeves 24 24 24 24 24 24 24 24 24 20 20 20 20 20 20 Reeves
Boom Boom
Length
66.0 72.0 78.0 84.0 Length
Working
(m) Palette weight Palette weight Palette weight Palette weight (m)
Working
Radius (m) 11 m 13 m 16 m 11 m 13 m 16 m 11 m 13 m 16 m 11 m 13 m 16 m Radius (m)
12.0 12.7 m/280.0 12.7 m/280.0 12.7 m/280.0 13.5 m/252.0 13.5 m/252.0 13.5 m/252.0 12.0
14.0 280.0 280.0 280.0 252.0 252.0 252.0 14.3 m/213.5 14.3 m/213.5 14.3 m/213.5 15.2 m/182.8 15.2 m/182.8 15.2 m/182.8 14.0
16.0 280.0 280.0 280.0 252.0 252.0 252.0 213.5 213.5 213.5 182.8 182.8 182.8 16.0
18.0 278.4 280.0 280.0 252.0 252.0 252.0 213.5 213.5 213.5 182.8 182.8 182.8 18.0
20.0 249.4 269.9 280.0 248.1 252.0 252.0 213.5 213.5 213.5 182.8 182.8 182.8 20.0
22.0 224.9 244.3 272.2 224.1 243.0 252.0 213.5 213.5 213.5 182.8 182.8 182.8 22.0
24.0 202.2 221.9 248.4 201.4 221.0 247.1 200.8 213.5 213.5 182.8 182.8 182.8 24.0
26.0 183.3 201.3 226.1 182.4 200.4 225.1 181.7 199.7 213.5 180.8 182.8 182.8 26.0
28.0 167.2 184.0 206.8 166.3 183.0 205.8 165.7 182.3 205.0 164.7 181.2 182.8 28.0
30.0 153.5 169.1 190.3 152.6 168.1 189.3 151.9 167.3 188.5 150.9 166.3 182.5 30.0
32.0 141.6 156.1 176.0 140.7 155.1 175.0 140.0 154.4 174.2 138.9 153.3 173.0 32.0
34.0 131.2 144.9 163.5 130.2 143.8 162.5 129.5 143.1 161.6 128.5 142.0 160.5 34.0
36.0 122.0 134.9 152.5 121.1 133.9 151.4 120.3 133.1 150.6 119.2 132.0 149.4 36.0
38.0 113.9 126.0 142.7 112.9 125.0 141.6 112.1 124.2 140.8 111.0 123.1 139.6 38.0
40.0 106.6 118.1 133.9 105.6 117.1 132.8 104.8 116.3 132.0 103.7 115.1 130.8 40.0
42.0 100.0 111.0 126.0 99.0 109.9 124.9 98.2 109.1 124.0 97.1 108.0 122.9 42.0
44.0 94.1 104.5 118.8 93.1 103.5 117.7 92.3 102.7 116.9 91.2 101.5 115.7 44.0
46.0 88.7 98.7 112.3 87.6 97.6 111.2 86.9 96.8 110.4 85.7 95.6 109.2 46.0
48.0 83.8 93.3 106.4 82.7 92.2 105.3 81.9 91.4 104.4 80.8 90.3 103.3 48.0
50.0 79.2 88.4 100.9 78.2 87.3 99.8 77.4 86.5 99.0 76.3 85.3 97.8 50.0
52.0 75.1 83.9 95.9 74.0 82.8 94.8 73.2 82.0 94.0 72.1 80.8 92.8 52.0
54.0 71.2 79.7 91.3 70.2 78.6 90.2 69.4 77.8 89.3 68.2 76.6 88.2 54.0
56.0 67.6 75.8 87.0 66.6 74.7 85.9 65.8 73.9 85.1 64.7 72.8 83.9 56.0
58.0 64.3 72.2 83.0 63.3 71.1 81.9 62.5 70.3 81.1 61.4 69.2 79.9 58.0
60.0 59.9 m/61.4 59.9 m/69.0 59.9 m/77.8 60.2 67.8 78.2 59.4 67.0 77.4 58.3 65.8 76.2 60.0
62.0 57.3 64.7 74.7 56.5 63.9 73.9 55.4 62.7 72.7 62.0
64.0 54.6 61.7 71.5 53.8 60.9 70.7 52.7 59.8 69.5 64.0
66.0 65.1 m/53.2 65.1 m/60.2 65.1 m/69.4 51.3 58.2 67.6 50.2 57.0 66.4 66.0
68.0 48.9 55.6 64.7 47.8 54.4 63.6 68.0
70.0 46.7 53.2 62.0 45.6 52.0 60.9 70.0
72.0 70.3 m/46.4 70.3 m/52.8 70.3 m/61.7 43.4 49.7 58.3 72.0
74.0 41.4 47.6 55.9 74.0
76.0 75.5 m/40.0 75.5 m/46.0 75.5 m/54.2 76.0
Reeves 20 20 20 20 20 20 16 16 16 16 16 16 Reeves
Note: Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.

46
SUPER HEAVY LIFT

Unit: ton
LIFTING CAPACITIES Counterweight: 180.0 ton, Carbody weight: 50.0 ton
Palette weight: 130.0 ton x 16 m
Luffing Jib Lifting Capacity
Boom length (m) 36.0 Boom length (m)
36.0 m Boom Length

Jib length (m) 24.0 42.0 54.0 66.0 78.0 84.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
14.0 14.4 m/200.0 14.0
15.0 193.2 15.0
16.0 181.9 16.0
17.0 175.5 17.0
18.0 169.5 18.0
20.0 163.4 139.6 20.0
22.0 158.1 133.8 22.0
24.0 155.5 126.8 101.5 24.0
26.0 145.9 154.6 120.7 99.3 26.0
28.0 129.4 149.5 115.5 97.1 76.0 28.0
30.0 98.3 143.8 111.2 94.4 74.1 30.0
34.0 125.2 104.4 105.8 88.2 72.1 54.8 48.4 34.0

Working Radius (m)


Working Radius (m)

38.0 105.7 89.9 101.8 81.9 69.5 53.1 47.2 38.0


42.0 94.6 78.0 95.6 75.6 78.9 65.6 51.2 45.8 42.0
46.0 64.8 86.7 82.3 69.4 78.9 61.7 68.8 49.0 42.7 46.0
50.0 78.8 74.8 63.7 76.1 58.1 68.8 46.6 52.0 39.7 50.0
54.0 68.4 56.8 70.4 66.5 53.9 67.7 44.6 50.0 37.0 39.9 54.0
58.0 63.0 45.3 64.7 61.1 48.0 59.8 42.2 46.8 34.5 38.3 58.0
62.0 58.5 56.4 42.9 53.2 53.3 39.7 44.0 32.3 35.9 62.0
66.0 52.3 38.4 47.6 50.0 37.4 41.4 30.3 33.6 66.0
70.0 48.7 32.1 42.7 46.4 35.1 39.1 39.0 28.5 31.6 70.0
74.0 38.3 43.2 31.6 37.0 39.0 26.8 29.7 31.9 74.0
78.0 40.4 28.5 34.9 38.6 25.3 28.1 31.0 78.0
82.0 37.5 23.5 31.5 36.0 22.8 26.5 29.3 82.0
86.0 28.5 33.7 19.1 25.1 27.7 86.0
90.0 30.8 23.8 26.3 90.0
94.0 27.8 22.6 24.9 94.0
98.0 23.8 98.0
Reeves 16 12 8 8 8 8 Reeves

Boom length (m) 42.0 Boom length (m)


42.0 m Boom Length

Jib length (m) 24.0 42.0 54.0 66.0 78.0 84.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
15.0 15.4 m/190.6 15.0
16.0 187.1 16.0
17.0 181.8 17.0
18.0 177.2 18.0
20.0 169.7 20.0
22.0 164.4 127.7 22.0
24.0 158.2 122.6 94.1 24.0
26.0 146.3 117.2 93.1 26.0
28.0 132.6 153.0 111.8 90.6 74.9 28.0
30.0 108.4 141.7 106.2 87.7 73.6 30.0
34.0 123.3 95.3 81.5 70.4 52.0 46.2 34.0
38.0 109.0 102.9 85.2 102.4 75.1 66.7 50.2 44.9 38.0
Working Radius (m)
Working Radius (m)

42.0 92.1 76.4 94.5 68.8 84.5 62.8 48.1 43.3 42.0
46.0 67.6 85.3 62.9 83.4 58.9 72.9 45.8 41.6 46.0
50.0 77.5 72.6 57.5 75.7 54.9 72.9 43.1 39.7 50.0
54.0 70.9 66.4 52.6 69.1 51.1 66.9 41.1 49.7 37.2 41.6 54.0
58.0 61.1 47.2 63.5 59.2 47.5 61.3 38.8 47.9 34.7 39.8 58.0
62.0 56.5 58.7 54.6 43.2 54.9 52.2 36.5 44.9 32.5 37.1 62.0
66.0 51.6 50.6 38.7 49.0 48.2 34.3 42.3 30.4 34.7 66.0
70.0 47.1 33.5 43.9 44.7 32.2 39.9 42.8 28.6 32.6 70.0
74.0 44.0 39.4 41.6 30.3 37.7 39.8 26.9 30.6 33.1 74.0
78.0 35.3 38.9 28.5 35.7 37.0 25.3 28.8 32.1 78.0
82.0 36.4 24.7 32.6 34.6 21.5 27.2 30.3 82.0
86.0 29.5 32.3 17.6 25.7 28.6 86.0
90.0 26.5 30.3 24.3 27.1 90.0
94.0 28.4 23.1 25.7 94.0
98.0 24.4 98.0
102.0 23.3 102.0
Reeves 16 12 8 8 8 8 Reeves
Note: Designed and rated to comply with EN13000.
47 Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.
Unit: ton
Counterweight: 180.0 ton, Carbody weight: 50.0 ton
Luffing Jib Lifting Capacity Palette weight: 130.0 ton x 16 m
Boom length (m) 48.0 Boom length (m)
48.0 m Boom Length

Jib length (m) 24.0 42.0 54.0 66.0 78.0 84.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
16.0 16.2 m/190.8 16.0
17.0 186.6 17.0
18.0 181.8 18.0
20.0 174.2 20.0
22.0 165.1 119.4 22.0
24.0 152.8 114.7 90.2 24.0
26.0 141.6 109.7 88.0 26.0
28.0 131.6 150.5 104.5 85.4 67.3 28.0
30.0 117.7 139.4 99.4 82.7 66.0 30.0
34.0 121.3 89.4 76.9 62.9 49.7 44.1 34.0
38.0 107.2 80.1 104.0 70.8 59.5 47.9 42.8 38.0

Working Radius (m)


Working Radius (m)

42.0 89.4 71.9 92.8 64.9 88.9 55.8 45.8 41.3 42.0
46.0 80.8 64.9 83.7 59.3 81.8 52.0 43.6 39.6 46.0
50.0 76.1 70.2 54.3 74.2 48.4 70.5 41.3 37.6 50.0
54.0 69.6 64.2 49.7 67.8 44.6 65.5 39.0 50.9 36.0 54.0
58.0 59.1 45.8 62.3 57.1 41.7 60.0 36.7 49.0 34.1 39.0 58.0
62.0 54.7 57.5 52.7 38.8 55.3 34.5 45.9 32.3 37.5 62.0
66.0 53.4 48.8 36.1 51.1 46.3 32.4 43.1 30.5 35.1 66.0
70.0 45.4 33.8 45.9 43.0 30.4 40.6 28.7 32.9 70.0
74.0 42.4 41.2 40.0 28.6 38.4 38.1 27.0 31.0 74.0
78.0 36.9 37.3 26.9 36.3 35.4 24.7 29.1 32.2 78.0
82.0 34.9 24.6 33.7 33.0 20.1 27.5 31.3 82.0
86.0 32.7 30.5 30.8 16.1 26.0 29.5 86.0
90.0 27.5 28.9 24.6 27.9 90.0
94.0 27.1 23.3 26.2 94.0
98.0 25.4 24.6 98.0
102.0 23.1 102.0
Reeves 16 12 8 8 8 8 Reeves

Boom length (m) 54.0 Boom length (m)


54.0 m Boom Length

Jib length (m) 24.0 42.0 54.0 66.0 78.0 84.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
17.0 191.0 17.0
18.0 179.8 18.0
20.0 167.2 20.0
22.0 155.0 110.4 22.0
24.0 143.6 105.9 24.0
26.0 133.0 101.2 80.7 26.0
28.0 123.6 96.3 78.2 63.1 28.0
30.0 115.5 136.7 91.5 75.6 61.8 30.0
34.0 118.9 82.1 69.9 58.7 46.9 42.0 34.0
38.0 105.1 73.5 101.8 64.2 55.2 45.1 40.6 38.0
42.0 86.4 65.9 90.9 58.7 51.6 42.9 39.0 42.0
Working Radius (m)
Working Radius (m)

46.0 78.0 59.4 81.9 53.6 79.9 48.0 40.7 37.3 46.0
50.0 74.4 48.9 72.5 44.5 67.1 38.4 35.4 50.0
54.0 68.1 61.8 44.8 66.2 41.2 63.9 36.1 50.6 33.6 54.0
58.0 62.7 56.8 41.2 60.9 38.2 58.5 33.9 49.9 31.7 40.0 58.0
62.0 52.5 56.2 50.5 35.4 53.9 31.7 46.9 29.9 38.4 62.0
66.0 48.7 52.1 46.7 32.9 49.8 29.7 44.0 28.1 35.9 66.0
70.0 43.4 30.7 46.3 40.9 27.8 41.4 26.5 33.6 70.0
74.0 40.5 42.3 38.1 26.1 39.1 36.1 24.9 31.6 74.0
78.0 37.9 37.9 35.5 24.5 37.0 33.5 23.3 29.7 32.6 78.0
82.0 33.2 23.0 34.9 31.2 18.6 28.0 30.3 82.0
86.0 31.1 31.5 29.2 14.6 26.5 28.3 86.0
90.0 29.1 28.5 27.3 25.0 26.4 90.0
94.0 25.5 23.7 24.7 94.0
98.0 24.0 19.2 23.1 98.0
102.0 22.5 21.7 102.0
106.0 20.3 106.0
Reeves 16 8 8 8 8 8 Reeves
Note: Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications. 48
SUPER HEAVY LIFT

Unit: ton
LIFTING CAPACITIES Counterweight: 180.0 ton, Carbody weight: 50.0 ton
Luffing Jib Lifting Capacity Palette weight: 130.0 ton x 16 m
Boom length (m) 60.0 Boom length (m)
60.0 m Boom Length

Jib length (m) 24.0 42.0 54.0 66.0 78.0 84.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
17.0 17.8 m/162.3 17.0
18.0 161.4 18.0
20.0 150.8 20.0
22.0 140.5 103.2 22.0
24.0 130.7 99.1 24.0
26.0 121.7 94.8 76.5 26.0
28.0 113.5 90.4 74.2 28.0
30.0 106.4 86.0 71.7 58.2 30.0
34.0 116.7 77.4 66.4 55.3 44.5 40.0 34.0
38.0 103.1 69.5 61.0 52.1 42.7 38.6 38.0
42.0 92.3 62.5 89.0 55.9 48.7 40.7 37.1 42.0
46.0 75.3 56.6 80.2 51.1 78.2 45.3 38.5 35.4 46.0

Working Radius (m)


Working Radius (m)

50.0 68.6 72.9 46.7 70.9 42.0 63.5 36.3 33.6 50.0
54.0 66.7 42.8 64.7 38.9 61.9 34.0 31.9 54.0
58.0 61.4 54.6 39.5 59.5 36.1 57.1 32.0 47.6 30.1 41.6 58.0
62.0 50.4 54.9 48.3 33.5 52.5 30.0 46.3 28.3 39.8 62.0
66.0 46.8 50.9 44.7 31.1 48.6 28.1 44.9 26.6 37.1 66.0
70.0 47.4 41.6 29.1 45.1 39.0 26.3 42.2 25.1 34.7 70.0
74.0 38.7 42.0 36.2 24.7 39.8 23.6 32.5 74.0
78.0 36.2 39.2 33.7 23.2 37.4 31.7 21.8 30.5 78.0
82.0 35.2 31.5 21.4 34.9 29.5 17.1 28.7 28.6 82.0
86.0 29.5 32.6 27.5 13.1 27.1 26.5 86.0
90.0 27.6 29.5 25.7 25.6 24.8 90.0
94.0 26.3 24.1 24.2 23.2 94.0
98.0 22.5 19.3 21.7 98.0
102.0 21.1 20.3 102.0
106.0 19.0 106.0
110.0 17.8 110.0
Reeves 12 8 8 8 8 8 Reeves

Boom length (m) 66.0 Boom length (m)


66.0 m Boom Length

Jib length (m) 24.0 42.0 54.0 66.0 78.0 84.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
18.0 18.5 m/144.7 18.0
20.0 137.9 20.0
22.0 128.7 95.3 22.0
24.0 120.0 91.5 24.0
26.0 111.9 87.5 71.3 26.0
28.0 104.5 83.3 68.1 28.0
30.0 98.0 79.2 66.6 55.1 30.0
34.0 114.0 71.4 61.6 52.2 41.9 34.0
38.0 100.7 64.1 56.6 49.0 40.1 35.9 38.0
42.0 90.1 57.7 86.8 51.7 45.7 38.1 34.4 42.0
46.0 52.3 78.2 47.3 76.1 42.4 36.0 32.7 46.0
Working Radius (m)
Working Radius (m)

50.0 65.6 71.0 43.2 69.0 39.3 33.8 31.0 50.0


54.0 60.2 64.9 39.6 63.0 36.4 59.1 31.7 29.3 54.0
58.0 59.8 52.0 36.5 57.8 33.7 55.4 29.7 45.1 27.5 58.0
62.0 48.0 53.4 31.2 51.0 27.7 44.0 25.9 39.1 62.0
66.0 44.5 49.5 42.4 29.1 47.1 25.9 42.5 24.3 37.6 66.0
70.0 41.4 46.0 39.3 27.1 43.7 24.2 41.7 22.8 35.1 70.0
74.0 36.6 40.6 34.1 22.7 38.8 21.4 32.9 74.0
78.0 34.2 37.9 31.7 21.4 36.1 20.1 30.9 78.0
82.0 32.1 35.5 29.6 19.6 33.7 27.5 15.6 29.1 82.0
86.0 27.6 31.5 25.6 11.6 27.5 24.7 86.0
90.0 25.9 29.5 23.9 8.3 25.9 23.0 90.0
94.0 24.3 26.2 22.3 24.5 21.4 94.0
98.0 20.9 19.1 20.0 98.0
102.0 19.5 18.7 102.0
106.0 18.3 17.4 106.0
110.0 16.3 110.0
Reeves 12 8 8 8 8 8 Reeves
Note: Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
49 Ratings enclosed in gray-color box in the table require double-drum specifications.
Unit: ton
Counterweight: 180.0 ton, Carbody weight: 50.0 ton
Luffing Jib Lifting Capacity Palette weight: 130.0 ton x 16 m
Boom length (m) 72.0 Boom length (m)
72.0 m Boom Length

Jib length (m) 24.0 42.0 54.0 66.0 78.0 84.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
18.0 19.2 m/130.3 18.0
20.0 127.2 20.0
22.0 119.3 22.0
24.0 111.7 84.5 24.0
26.0 104.5 80.9 66.6 26.0
28.0 98.0 77.3 64.6 28.0
30.0 92.2 73.6 62.4 51.2 30.0
34.0 111.2 66.6 57.8 48.5 39.5 34.0
38.0 98.2 60.1 53.2 45.6 37.8 33.8 38.0
42.0 87.9 54.3 84.4 48.8 42.5 35.9 32.4 42.0
46.0 49.3 76.0 44.7 39.5 33.9 30.8 46.0

Working Radius (m)


Working Radius (m)

50.0 62.5 45.4 69.0 40.9 67.0 36.7 31.9 29.2 50.0
54.0 57.3 63.1 37.6 61.1 34.0 54.9 29.9 27.4 54.0
58.0 58.1 34.7 56.1 31.6 51.3 28.0 42.7 25.9 58.0
62.0 53.7 45.4 51.8 29.2 49.3 26.2 41.8 24.3 37.0 62.0
66.0 42.1 47.9 27.2 45.5 24.5 40.4 22.9 36.2 66.0
70.0 39.1 44.6 37.0 25.5 42.2 22.9 39.7 21.5 35.8 70.0
74.0 36.5 41.6 34.4 39.3 21.5 37.4 19.9 33.7 74.0
78.0 32.1 36.6 29.5 20.2 34.8 18.3 31.6 78.0
82.0 30.1 34.2 27.5 17.6 32.4 25.5 13.9 29.7 82.0
86.0 28.2 25.7 30.3 23.6 10.0 28.0 22.7 86.0
90.0 24.0 28.3 22.0 26.4 21.1 90.0
94.0 22.5 25.6 20.5 24.8 19.6 94.0
98.0 19.1 18.7 18.2 98.0
102.0 17.9 13.1 17.0 102.0
106.0 16.7 15.8 106.0
110.0 14.7 110.0
114.0 13.7 114.0
Reeves 12 8 8 8 8 8 Reeves

Boom length (m) 78.0 Boom length (m)


78.0 m Boom Length

Jib length (m) 30.0 42.0 54.0 66.0 78.0 84.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
20.0 20.6 m/102.8 20.0
22.0 99.2 22.0
24.0 93.8 77.9 24.0
26.0 88.5 74.7 26.0
28.0 83.4 71.3 59.4 28.0
30.0 78.6 68.0 57.4 47.7 30.0
34.0 69.5 61.6 53.1 45.1 37.0 34.0
38.0 59.8 94.5 55.6 48.9 42.4 35.3 31.6 38.0
42.0 84.4 50.4 44.8 39.5 33.5 30.2 42.0
46.0 74.2 45.8 73.9 41.1 36.7 31.6 28.6 46.0
50.0 64.2 42.2 66.6 37.7 64.9 34.0 29.7 27.1 50.0
Working Radius (m)
Working Radius (m)

54.0 59.1 34.6 59.2 31.5 51.3 27.8 25.5 54.0


58.0 48.9 52.6 32.0 53.2 29.0 49.7 26.0 24.0 58.0
62.0 45.2 46.6 42.8 29.9 47.9 27.1 47.4 24.3 39.5 22.5 34.9 62.0
66.0 39.7 43.2 25.2 44.0 22.7 38.2 21.1 34.2 66.0
70.0 36.9 39.0 34.7 23.6 40.8 21.2 36.7 19.8 33.7 70.0
74.0 34.4 35.0 32.3 37.9 19.9 35.9 18.6 32.6 74.0
78.0 30.1 35.3 27.4 18.7 33.5 16.3 31.3 78.0
82.0 28.1 33.0 25.5 15.6 31.2 12.1 29.9 82.0
86.0 26.4 30.9 23.8 29.1 21.7 8.4 28.4 86.0
90.0 22.2 27.2 20.1 27.0 19.3 90.0
94.0 20.7 24.5 18.7 23.6 19.2 94.0
98.0 19.4 18.7 17.4 17.9 17.8 98.0
102.0 16.2 12.6 16.5 102.0
106.0 15.1 15.3 106.0
110.0 14.1 14.2 110.0
114.0 13.2 114.0
Reeves 8 8 8 8 8 8 Reeves
Note: Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications. 50
SUPER HEAVY LIFT

Unit: ton
LIFTING CAPACITIES Counterweight: 180.0 ton, Carbody weight: 50.0 ton
Luffing Jib Lifting Capacity Palette weight: 130.0 ton x 16 m
Boom length (m) 84.0 Boom length (m)
84.0 m Boom Length

Jib length (m) 30.0 42.0 54.0 66.0 72.0 78.0 Jib length (m)
Boom angle 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° Boom angle
20.0 21.4 m/92.8 20.0
22.0 90.8 22.0
24.0 83.7 75.6 24.0
26.0 77.4 72.6 26.0
28.0 71.7 69.5 55.5 28.0
30.0 66.6 65.9 53.7 30.0
34.0 57.6 58.8 49.9 40.9 38.2 34.0 34.0
38.0 49.6 51.9 46.0 38.4 36.2 32.5 38.0
42.0 73.6 45.9 42.3 35.9 34.1 30.8 42.0

Working Radius (m)


Working Radius (m)

46.0 63.6 40.7 64.0 38.9 33.4 31.9 29.0 46.0


50.0 55.1 35.8 56.3 35.7 55.5 31.0 29.8 27.3 50.0
54.0 47.2 49.8 32.9 49.4 28.8 27.8 25.5 54.0
58.0 44.2 29.5 44.2 26.7 45.2 25.9 42.0 23.9 58.0
62.0 39.2 26.2 39.7 24.8 43.2 24.1 40.5 22.4 36.3 62.0
66.0 35.7 23.2 40.9 22.5 39.1 20.9 35.3 66.0
70.0 32.1 21.7 38.4 21.0 37.2 19.6 33.9 70.0
74.0 28.8 20.5 36.0 19.8 35.2 18.4 33.1 74.0
78.0 33.5 18.7 33.0 17.3 31.6 78.0
82.0 29.6 30.6 13.5 29.8 82.0
86.0 25.6 27.1 27.8 86.0
90.0 23.7 24.8 90.0
94.0 20.0 21.8 94.0
98.0 17.7 98.0
Reeves 8 8 8 8 8 8 Reeves
Note: Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.

51
52
TRANSPORTATION PLAN

Base Machine

Base machine (1)


Weight 64,000 kg
Base machine with mast and Width 3.0 m
lower translifter Height 3.4 m
without upper/lower (Machine)
connecting devices. Length 14.25 m

Base machine (2)


Weight 51,500 kg
Base machine with lower Width 3.0 m
translifter without Height 3.4 m
upper/lower connecting devices (Machine)
and mast. Length 11.67 m

Upper Structure

Upper Structure (1)


Weight 45,300 kg
Upper structure with mast Width 3.0 m
and upper connecting Height 2.37 m
devices. (Machine)
Length 14.25 m

Upper Structure (2)


Weight 32,000 kg
Upper structure and upper Width 3.0 m
connecting devices Height 2.37 m
without mast. (Machine)
Length 11.67 m

Attachments

With Weight 29,300 kg


1 x 12 m insert boom Width 3.0 m
1 x 12 m insert jib Height 2.9 m
2 x counterweights (Boom)

Upper translifter: 2,400 kg


Lower translifter: 2,300 kg
Upper connecting device: 900 kg
Lower connecting device: 2,500 kg

53
54
PARTS AND ATTACHMENTS

Dimensions: mm Weight: kg
Base Machine 6 m Insert Boom Heavy Boom Top
With mast and lower translifter without upper/lower With 6 m guy line x 4 Weight: 4,910 kg
connecting devices. Weight: 3,760 kg
Weight: 64,000 kg Width: 3,000 mm

2,600
2,840
3,400

1,510
6,220 3,000 3,390
14,250

12 m Insert Boom Luffing Boom Top


Carbody With 12 m guy line x 4 Weight: 5,520 kg
With upper/lower connecting devices. Weight: 6,570 kg
Weight: 22,610 kg Width: 2,990 mm

2,590
2,840
2,990

2,530
7,370 12,220 3,000
1,360

4,450

8 m Tapered Boom
With 8 m guy line x 2
Weight: 5,150 kg
Crawler
Weight: 40,000 kg Width: 1,500 mm
3,000
1,910
1,500

11,490
2,840
1,790

8,220

Crane Mast (Standard) 9 m Boom Base


Weight: 12,460 kg With H1, H2 and W2 winches including ropes,
guide sheave, and boom backstop
2,440

Weight: 29,280 kg

11,500
3,560
1,330

9,340 3,000

Base Counterweight Counterweight Base Carbody Weight Base Pallet Weight


Weight: 20,000 kg Weight: 10,000 kg Weight: 5,400 kg Weight: 11,000 kg
2,450
2,450
2,470

2,960

6,860 1,900 7,300


670

480

460

2,390
1,020

55
Dimensions: mm Weight: kg
10 m Jib Base 8 m Mast Base
Weight: 3,780 kg Weight: 13,700 kg

1,990

3,050
10,290 2,490

2,530
6 m Insert Jib
Weight: 1,470 kg
9,360
2,060

1,990

12 m Insert Mast
With guy line
6,140 2,490
Weight: 5,650 kg

2,990
12 m Insert Jib
Weight: 2,680 kg

2,340
2,060

1,990

12,140 2,490 12,240

9 m mast top
With guy line
8 m Jib Top Weight: 10,080 kg
Weight: 3,690 kg

2,860
2,490
1,990

2,340

8,670 2,620
10,850

Other Attachments
Attachments Weight Dimensions (L x W x H)
Hanger sheave 2,010 kg 2,760 mm x 2,130 mm x 760 mm
5 m insert boom for long boom 1,790 kg 5,180 mm x 2,490 mm x 2,230 mm
Rear strut base 1,990 kg 6,820 mm x 2,590 mm x 1,620 mm
Rear strut top 2,410 kg 7,060 mm x 1,530 mm x 1,390 mm
Front strut base 1,840 kg 7,460 mm x 1,640 mm x 1,330 mm
Front strut top 3,040 kg 8,080 mm x 1,530 mm x 2,090 mm
Auxiliary sheave 650 kg 2,380 mm x 1,130 mm x 910 mm

Note: Estimated weights may vary ± 2%.

56
57
58
HYDRAULIC CRAWLER CRANE

Note: Standard equipment may vary depending on your areas or countries.


Due to our policy of continual product improvements all designs and specifications are subject to change without advance notice.
Copyright by KOBELCO CRANES CO., LTD. No part of this catalog may be reproduced in any manner without notice.

Inquiries To:
17-1, Higashigotanda 2-chome, Shinagawa-ku, Tokyo 141-8626 JAPAN
Tel: +81-3-5789-2130 Fax: +81-3-5789-3372

KOBELCO is the corporate mark used by Kobe Steel on a variety of products


and in the names of a number of Kobe Steel Group companies. Bulletin No. SL6000-2SPEC-EU2 081001IF Printed in Japan