Test Report For: CT Insulation Resistance Test

The document reports on insulation resistance testing of current transformers (CTs) in a 66kV GIS substation. It provides details of 4 CT cores to be tested, including their ratios and classes. It describes insulation resistance tests performed between primary-secondary, secondary-earth, and secondary-to-secondary. Test results are presented in tables. Additional tests using a CT analyzer are outlined, including winding resistance, turns ratio, excitation curve, polarity, and burden. Test criteria are listed for each test.

Uploaded by

Ahmed Fathy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
143 views

Test Report For: CT Insulation Resistance Test

The document reports on insulation resistance testing of current transformers (CTs) in a 66kV GIS substation. It provides details of 4 CT cores to be tested, including their ratios and classes. It describes insulation resistance tests performed between primary-secondary, secondary-earth, and secondary-to-secondary. Test results are presented in tables. Additional tests using a CT analyzer are outlined, including winding resistance, turns ratio, excitation curve, polarity, and burden. Test criteria are listed for each test.

Uploaded by

Ahmed Fathy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Main Contractor: Owner: Consultant: Project Name:

Toshka 3 (220/66/22 KV) GIS S/S


Date: Page:
SEP, 2021 1 of 6
Vendor: Document Number:
Sieyuan

Title.

CT INSULATION RESISTANCE TEST

Test Report

for

66 KV GIS CT TEST

Company MADKOUR WITNESSED BY (EETC)


Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 2 of 6
Vendor: Document Number:
Sieyuan

Title.

CT INSULATION RESISTANCE TEST

 CT DATA
Bay No.: D07 No. of cores: 4 Manufacturer: Sieyuan

Core 1 Ratio: 1000-2000/1 Class: 5P30


Core 2 Ratio: 1000-2000/1 Class: 5P30
Core 3 Ratio: 1000-2000/1 Class: CLX
Core 4 Ratio: 1000-2000/1 Class: 0.5M5

Insulation ResistanceTest:

Test procedure:
* APPLIED VOLTAGE 5 KV (PRIM – E).
* APPLIED VOLTAGE 2.5 KV (PRIM – SEC).
* APPLIED VOLTAGE 1 KV (SEC – E) and (SEC TO SEC).
The test done according to the FAT procedure and results referred to the FAT criteria

A) CORE IT SELF:

R S T
CORES
Pri -Sec Sec - E Pri -Sec Sec - E Pri -Sec Sec - E
CORE 1
CORE 2
CORE 3

Company MADKOUR WITNESSED BY (EETC)


Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 3 of 6
Vendor: Document Number:
Sieyuan

Title.

CT INSULATION RESISTANCE TEST

B) SEC TO SEC:

Phase
R S T
Core
CORE 1 -CORE 2
CORE 2 - CORE 3
CORE 3 - CORE 1

C) PRIM TO EARTH:

R -E S-E T-E

CT Analyzer Test:

Test Procedure:
Company MADKOUR WITNESSED BY (EETC)
Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 4 of 6
Vendor: Document Number:
Sieyuan

Title.

CT INSULATION RESISTANCE TEST

 The CT will be completely tested by CT analyzer.


 Connect the CT to the testing kit (primary and secondary)
 Choose the below mentioned tests.
 Winding resistance
 Turns ratio
 Excitation curve
 Polarity
 Burden
 Run the test and print the test report from the testing kit.

1.1.WINDING RESISTANCE:
Ambient temp: o
C

Primary Winding
Phase
at C
o
at 75 oC
N

Secondary Winding 1
Phase
at o
C at 75 oC
n
R75 = Rt (234.5 +75) / (234.5 + t)
Where,
t is ambient temp,
Rt is resistance at ambient temp
Criteria:

1.2.POLARITY TEST:
Phase N
Core 1S1 - 1S2
  

Company MADKOUR WITNESSED BY (EETC)


Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 5 of 6
Vendor: Document Number:
Sieyuan

Title.

CT INSULATION RESISTANCE TEST

1.3.RATIO TEST :

Core Primary current (A) Secondary current (A) Expected current % error
S1 – S2

Criteria:
2. SINGLE POINT EARTH TEST:

Core no Function T.b.no Single point earthing check

S1 – s2

3. CHECK SHORT & ISOLATED LINK FOR PROPER FUNCTION:

Core no Function Confirm test for short and isolated check


S1 – s2

4. MAG - CURVE:

Locatio
Function:       CT#  
n
Make:   Phase     Ratio  
V kp:   SL #     Class  

Company MADKOUR WITNESSED BY (EETC)


Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 6 of 6
Vendor: Document Number:
Sieyuan

Title.

CT INSULATION RESISTANCE TEST

I mag   SL #     Burden  
Earthed   SL #     R ct  

Ter.    

Sl.# V I mA  
1      
2      
V volts

3      
4      
5      
6      
7      
8     I mA
 
Vkp      
 
Criteria:

Company MADKOUR WITNESSED BY (EETC)