Webinar Series 1B Hutama Karya Masyhur Permasalahan Geoteknik Tanah
Webinar Series 1B Hutama Karya Masyhur Permasalahan Geoteknik Tanah
Content:
Topik “Tanah Expansif dan Kelongsoran”:
Perilaku Tanah Expansif Clay Shale,Berbagai Kasus Kelongsoran di 1. Characteristics of Clay Shale and Previous Slope Instability
Indonesia, dan Contoh Alternatif Penanggulangannya
Disiapkan oleh: 2. Case Study of Slope Instability in Cipularang Toll Road
M. Irsyam dan A. Himawan
*Anggota - Akademi Ilmu Pengetahuan Indonesia AIPI
*Ketua - Kelompok Keahlian Rekayasa Geoteknik ITB
3. Case Study of Slope Instability in Semarang-Ungaran Toll Road
*Ketua - Tim Pemutakhiran Peta Gempa Indonesia 2010 dan 2017
*Anggota - TABG DKI Jakarta dan KKJTJ PUPR
1 2
3 4
Sadisun, 2008
5 6
Fundamentals Characteristics: Exposure slaking characteristics Fundamentals Characteristics: Exposure slaking characteristics
7 8
Fundamentals Characteristics: Exposure slaking characteristics Fundamentals Characteristics: Exposure slaking characteristics
9 10
Sadisun, 2008
11 12
200
II
50
200
90
0 50 100 150
0
Normal Stress (kPa)
13 14
EURASIA PLATE
PHILIPINE PLATE
Including:
PASIFIC PLATE
Hydroelectric power of Peusangan, Aceh
Samarinda-Sangatta road
Samarinda-Balikpapan road
CPO industry compleks
Hydroelectric power
Jatigede Dam
Main road mining
Main road Sentul-Cianjur Hambalang sport center
AUSTRALIA PLATE
15 16
17 18
GOR
Tribun - Bagian ujung bangunan pondasi
- Terlihat pergerakan pada lereng borpile terekspos karena longsoran
- Bagian ujung bangunan - Rembesan tanah banyak dijumpai
terekspos pondasi, terdapat
retakan pada dinding diperkirakan
akibat pergerakan pondasi karena
longsoran
- Rembesan air banyak dijumpai
EPA
- Lereng terlihat masih
bergerak mencapai area
parkir
- Tanah vulkanik terekspos
- Rembesan air banyak
dijumpai
Gulat
- Building dan tanah
sekitar terlihat stabil
EPI
- Pondasi terekspos karena
longsoran
- Diperkirakan lereng masih
bergerak
PH & Badminton
- Lereng terlihat masih
bergerak, terdapat retakan
baru pada rigid pavement
area parkir
- Area longsoran tertutup
semak lebat
- Diperkirakan terdapat jalur
air yang ditutup timbunan
19 20
21 22
23 24
(Rahardjo, 2012)
• Longsor pada
timbunan diatas
Clayshale
• Mata air
(Rahardjo, 2012)
25 26
Hambalang Project
Content:
27 28
JAKARTA Cikampek
BANDUNG
Bandung Bandung
Within 1-3 years of operation, there are several locations of slope instability
occurred within tha Clay Shale of Djatiluhur formation
29 30
92+400 92+400
92+800
93+000
Detail Design: due to limited budget, it was then decided to use embankment
with additional treatment such as sufficient drainage, cutting
the clayshale until hard layer before placing fill material, and
installing inclinometers
96+000
96+600
96+800
97+500
98+000
31 32
92+400
33 34
35 36
93+000
37 38
LAPI ITB:
Azis Jayaputra, Masyhur Irsyam, Agus Himawan, Andi Kartawiria
39 40
41 42
ROW
ROW
ROW
9.10
4.31
ROW
3.17
2.95
150.00m
43 44
45 46
2. Blockage of subdrain
47 48
49 50
18.0m
SF>1.3
51 52
53 54
55 56
BH03
BH-3
BH-2
BM01
Landslide at km 92+800
X 768393
Y 9265520
BH01
Z 407.00
BH-1
Pem
57 58 uki
man
Mesjid DMJ
DMJ
LA
DA
NG
Subsequence Landslide
BH03
BH-3
BH-2
BH-1
Pem
59 60 uki
man
Mesjid DMJ
DMJ
For Distribution 15
Prof. Dr. Masyhur Irsyam (ITB) 27 Januari 2021
BH03
BH-3
92+800
12m
BH-2
BM01
X 768393
Y 9265520
BH01
Z 407.00
BH-1
Pem
61 62 uki
man
Mesjid DMJ
DMJ
LA
DA
NG
Persiapan
Estimated failure surface after adding bored piles Pelaksanaan
Bored Pile
Pemboran
63 64
Capping Beam
Capping
65 66
16 cm
27 cm
55 cm
9 cm 11 cm
67 68
Tuffa Breksi
Clay Shale
69 70
Pier P0
Pier P1
71 72
Pier P2
73 74
75 76
77 78
Perkuatan Pier P0
79 80
81 82
Content:
83 84
+540.367
+533.956
+525.760
+524.471
200 1
187
+522.799 2
10%
1
2 600
+518.685
400
+517.199 10%
+516.799
1
2 600
investigation data
+511.681 200
1
2 600
400
1
2 600
200
+499.999 10% +499.799
1
2 600
400
1
2 600
+38.846
200
+488.599 10%
DS-8
BH-2
1
2 600
400
+482.999 10%
+482.599
DS-8
1
2 600
200
DL = 465.00M
472.115
480.001 472.197
471.837
471.799
471.799
471.762
471.522
471.424
ELEVASI RENCANA
518.685
525.760
540.367
545.257
533.956
473.680
474.245
476.524
477.532
477.833
479.352
479.741
480.534
483.050
483.178
485.340
486.730
489.583
493.671
495.532
500.519
502.342
503.756
505.629
507.601
510.045
510.942
511.681
ELEVASI EXISTING
JARAK 4.18 13.35 7.73 0.79 5.46 0.68 4.80 2.47 6.99 3.99 3.67 2.71 4.20 7.27 2.80 8.44 2.79 2.25 3.37 2.48 3.39 3.51 6.16 9.48 15.07 14.32 14.42 13.42
JARAK MENERUS 50.45 46.27 32.92 25.19 24.40 18.94 18.25 13.45 10.98 3.99 0.00 3.67 6.38 10.58 17.85 20.65 29.08 31.87 34.12 37.49 39.97 43.36 46.87 53.03 62.51 77.57 91.89 106.31 119.73
STA. 19+250
10%
+37.993
10%
10%
2780 CL
1 +14.0362°
400 285 44 75 75 300 360 360 360 150 80 150 360 360 300 75 75 44 285 400
2
538 25 25 55
95 LAJUR BAWEN BAWEN SEMARANG SEMARANG
PENDAKIAN
10%
DS-5
4%
30
3%
30 30
3%
30
4%
DS-5
10%
Clayshale
DL = 465.00M
472.115
480.001 472.197
471.837
471.799
471.799
471.762
471.522
471.424
ELEVASI RENCANA
14.32 14.42
518.685
545.257
525.760
540.367
533.956
473.680
474.245
476.524
477.532
477.833
479.352
479.741
480.534
483.050
483.178
485.340
486.730
489.583
493.671
495.532
500.519
502.342
503.756
505.629
507.601
510.045
510.942
511.681
ELEVASI EXISTING
JARAK 4.18 13.35 7.73 0.79 5.46 0.68 4.80 2.47 6.99 3.99 3.67 2.71 4.20 7.27 2.80 8.44 2.79 2.25 3.37 2.48 3.39 3.51 6.16 9.48
JARAK MENERUS 50.45 46.27 32.92 25.19 24.40 18.94 18.25 13.45 10.98 3.99 0.00 3.67 6.38 10.58 17.85 20.65 29.08 31.87 34.12 37.49 39.97 43.36 46.87 53.03 62.51 77.57 91.89 106.31 119.73
STA. 19+250
85 86
900 Semarang-Bawen 02
39.397 [°]; 2.28529 [Å]; Calcite; Quartz; Lizardite-1\ITT\RG
23.020 [°]; 3.86032 [Å]; Calcite; Lizardite-1\ITT\RG
17.735 [°]; 4.99707 [Å]; Montmorillonite-15A
12.376 [°]; 7.14594 [Å]; Lizardite-1\ITT\RG
400
47.512 [°]; 1.91217 [Å]; Calcite
100
0
10 20 30 40 50
Position [°2Theta]
Himawan, 2010
87 88
77
72 19
74 230
76 19
235
A
75
19
80
240
H
79
2
78
19
69
3
245
4
90
71
68
6
19
70
9 89
11
15
250
8
Informasi longsor 1974
B
18
88
19
10
8
9
14
17
164 87
255
+96. 86
G
11
12
16
10
13
7
85
12
19
5 6 26
13
14
25
260
B
3
4 2 4
1
15
5
16
84
19
Rencana timbunan
6 13 24
7 12 59 83
8 11
82
265
17
18
BO JUML
RO W
10 14 19
58
K
23
22 81
9 57
RE
20
15 21
16
27 19
19
20
28
PILEAH 47
17 21
56
60
20 22
270
19 23 32
41
21
Ø1 TITIK
42
22
55
18 24 31
40
29
33 19
25
.50
30 31
34 43
26
D
29 35
30
47
23
, L=
39
24
28 36 33
32
45
46
275
27
BORE
37 45
J
48
38m
38 44 34
49
25
+536.25
26
+34.224 39 43 50
46 44 19
42 35 51 63 62
RO W
41 280
T.104
50
BORE
52 38
62
DPT
36
LOG
27
40
28
53 61 47
54
+519.41
60 51
64
48
49
55 59
37
8
65 63
19
Pas.
29
58 64
30
66
B
52
77 65 67
LOG
57 67 54 285
C
76
56 68 75 66
69 74
53
31
78
batu
I
2
32
70 73 79
A
19
F
72 80
33
88 290
82
34
87
SE
83 86
85 89
35
MAR
84
19
BORE
90
36
H
91 295
92 95
37
AN
94
38
93
Clay Shale
LOG
G
96
19
39
300
40
G
41
42
43
44
45
46
D
47
E
19
325
Silty Clay
+67m
Wheathered Tuff Breccia
Ultimate/ residual
shear strength
Tuff Breccia
30m
89 90
Tuffaceous breccia
91 92
77
72 19
74 230
76 19
235
A
75
19
H
79
2
78
19
69
3
245
4
90
71
68
6
19
70
9 89
11
15
250
B
18
88
19
10
8
9
14
17
164 87
255
+96. 86
G
11
12
16
10
13
7
85
12
19
5 6 26
13
14
25
260
B
3
4 2 4
1
15
5
16
84
6 13 24
19
7 12 59 83
8 11
82
265
17
18
BO JUML
10 14 19
58
K
23
22 81
9 57
RE
20
15 21
16
27 19
19
20
28
PILEAH 47
17 21
56
60
20 22
270
19 23 32
41
21
Ø1 TITIK
42
22
55
18 24 31
40
29
33 19
25
.50
30 31
34 43
26
D
29 35
30
47
23
, L=
39
24
28 36 33
32
45
46
275
27
BORE
37 45
J
48
38m
38 44 34
49
25
+536.25
26
+34.224 39 43 50
46 44 19
42 35 51 63 62
41 280
T.104
50
BORE
52 38
62
DPT
36
LOG
27
40
28
53 61 47
54
+519.41
60 51
64
48
49
55 59
37
8
65 63
19
Pas.
29
58 64
30
66
B
52
77 65 67
LOG
57 67 54 285
C
76
56 68 75 66
69 74
53
31
78
batu
I
2
32
70 73 79
A
19
F
72 80
71 81
33
88 290
82
34
87
SE
83 86
85 89
35
MAR
84
19
BORE
90
36
H
91 295
92 95
37
AN
94
38
93
LOG
G
96
19
39
300
40
G
41
42
43
44
45
46
D
47
E
19
325
Silty Clay
+67m
Wheathered Tuff Breccia
Tuff Breccia
30m
93 94
95 96
Bored Pile and Final Excavation Bored Pile and Final Excavation
97 98
99 100
101 102
103 104
Boulder Kepasiran
Himawan, 2010
105 106
Dengan terjadinya pergerakan bored pile, berarti bored pile telah menerima beban lateral
tanah dan mencegah kelongsoran besar. Tetapi, pergerakan bored pile sudah cukup besar
Himawan, 2010 dan caping beam retak2
107 108
BM-1
Hard layer
Himawan, 2010
109 110
111 112
113 114
115 116
PEKERJAAN PEMELIHARAAN JEMBATAN TOL SEMARANG - SOLO RUAS SEMARANG – BAWEN TAHUN 2019
Progres BPile :
(9/9) = 100%
Progres BPile Abt A2 : Pelaksanaan : 26/7/2019
Progres BPile Group A : (10/10) = 100% sd 6/8/2019
(40/40) = 100% Pelaksanaan : 14/10/19 Progres Pile Cape : 100 %
Pelaksanaan : 25/09/19 sd 31/10/19 Sd 30/10/19 Pelaksanaan : 06/10/19 sd
Progres Pile Cape : 90,5 % Progres Pile Cape : 100 % 10/10/19
Pelaksanaan : 20/11/19 Pelaksanaan : 20/11/19
sd 27/11/19 Sd 26/11/19
117 118
PEKERJAAN PEMELIHARAAN JEMBATAN TOL SEMARANG - SOLO RUAS SEMARANG - BAWEN TAHUN 2019 PEKERJAAN PEMELIHARAAN JEMBATAN TOL SEMARANG - SOLO RUAS SEMARANG – BAWEN TAHUN 2019
119 120
PEKERJAAN PEMELIHARAAN JEMBATAN TOL SEMARANG - SOLO RUAS SEMARANG – BAWEN TAHUN 2019 PEKERJAAN PEMELIHARAAN JEMBATAN TOL SEMARANG - SOLO RUAS SEMARANG – BAWEN TAHUN 2019
Pembesian Jacketing di Pilar P.1 = 3m Pengecoran Jacketing Beton kelas B-2 SCC P.2 A dan B Tahap 2 = 3,5m
121 122
PEKERJAAN PEMELIHARAAN JEMBATAN TOL SEMARANG - SOLO RUAS SEMARANG – BAWEN TAHUN 2019 PEKERJAAN PEMELIHARAAN JEMBATAN TOL SEMARANG - SOLO RUAS SEMARANG – BAWEN TAHUN 2019
123 124