Rate Analysis

This document provides cost estimates for various road maintenance activities, including: 1. Restoration of rain cuts using soil, gravel, and compaction, estimated at Rs. 72.60 per cubic meter. 2. Maintenance of earthen shoulders by filling or stripping soil and compacting, estimated at Rs. 9.68 per square meter for filling and Rs. 9.68 per square meter for stripping. 3. Repair of potholes in bituminous roads by removing material, filling with bituminous macadam, and applying tack coats, estimated at Rs. 1,600 per cubic meter.
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
165 views

Rate Analysis

This document provides cost estimates for various road maintenance activities, including: 1. Restoration of rain cuts using soil, gravel, and compaction, estimated at Rs. 72.60 per cubic meter. 2. Maintenance of earthen shoulders by filling or stripping soil and compacting, estimated at Rs. 9.68 per square meter for filling and Rs. 9.68 per square meter for stripping. 3. Repair of potholes in bituminous roads by removing material, filling with bituminous macadam, and applying tack coats, estimated at Rs. 1,600 per cubic meter.
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 213

1 Lead for E/W borrow area to site 100

2 Lead for E/W borrow area to site 1000


3 Lead for Sand from source to site. 132
4 Lead for Hand broken Aggregate from source to site 172
5 Lead for Crusher Aggregate from source to site 172
6 Lead for fly ash from source to site 200
7 Lead for Local sand from source to site in Katch Track 5
Chapter – 15

MAINTENANCE OF ROADS

Sr. Reference to Description Unit Quantity Rate Total


No. MORD (Rs.) Amount (Rs.)
Specifications

15.1 1900 Restoration of Rain Cuts

i) Restoration of rain cuts with soil,


moorum gravel or a mixture of
these, clearing the loose soil
benching for 300mm width laying
fresh material in layers not
exceeding 250 mm and compaction
with plate compactor or power
rammer to restore the original
alignment, level and slopes.

A. Manual Means

Unit = cum

Taking output = 10 cum

a) Labour

Mate day 0.24 0.00 0.00

Mazdoor ( Unskilled ) day 6.00 0.00 0.00

b) Machinery

Plate compactor hour 3.00 200.00 600.00

c) Materials

Compemsation for earth cum 7.50 0.00 0.00


taken from private land
d) Overhead charges @ 10.0% on (a+b+c) 60.00

e) Contractor's profit @ 10% on a+b+c+d 66.00

Cost for 10 cum = a+b+c+d+e 726.00

Rate per cum = a+b+c+d+e/10 72.60


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

15.2 1903 1. Maintenance of Earthen shoulder


(filling with fresh soil)

Making up loss of
material/irregularities on shoulders
to the design level by adding fresh
approved soil and compacting it
with appropriate equipment

Unit = sqm

Taking output = 100 sqm

Assuming average thickness of filling to be 150 mm

Quality of fresh material = 15 cum

a. Labour

Mate day 0.20 0.00 0.00

Mazdoor ( Unskilled ) day 5.00 0.00 0.00

b. Machinery

Hydraulic excavator 1 cum hour 0.25 0.00 0.00


bucket capacity @ 60 cum per
hour
Tipper 5.5 cum 10t capacity t/km 0.68 0.00 0.00

Add 10% cost of transportation 0.00


to cover cost of loading and
unloading
Plate compactor @ 25 sqm per h hour 4.00 200.00 800.00

c. Material

Compensation of earth cum 7.50 0.00 0.00

d. Overheads Charges @ 10.0% on a+b+c 80.00

e. Contractor's profit @ 10% on a+b+c+d 88.00

Cost for 100 sqm = a+b+c+d+e 968.00

Rate per sqm = (a+b+c+d+e)/100 9.68

Cost for 15 cum = 968.00

Rate per cum = Rate/15 64.53


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

15.2 1903 2. Maintenance of Earhen shoulder


(stripping of excess soil)

Stripping excess soil from the


shoulder surface to achieve the
approved level and compacting with
plate compactor

Unit = sqm

Taking output = 100 sqm

Assuming on depth of stripping as


75 mm

Quantity of earth cutting invlove =


7.5 cm
a. Labour

Mate day 0.10 0.00 0.00

Mazdoor ( Unskilled ) day 2.50 0.00 0.00

b. Machinery

Plate compactor hour 4.00 200.00 800.00

c. Overheads @ 10.0% on a+b 80.00

d. Contractor's profit @ 10% on a+b+c 88.00

Cost for 100 sqm = a+b+c+d 968.00

Rate per sqm = a+b+c+d/100 9.68


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

15.3 1904 Maintenace of bituminous surface road

i. Repair to pot holes by removal of


failed material, trimming the sides to
vertical and levelling the bottom,
cleaning the same filled with 75mm
B.M, applying bitumen emulsion
prime coat at the bottom and
bitumen emulsion tack coat on sides
and on bottom as per specifications
502 and 503.

Unit = cum

Taking output = 187.5x0.075 = 14.06 cum = (30.94 Tonne)

(5% area of one km)

a) Labour

Mate day 0.80 0.00 0.00

Mazdoor ( Unskilled ) day 20.00 0.00 0.00

b) Machinery

Jack hammer 25 kg with tractor hour 4.00 400.00 1,600.00

Compressor 210 cfm with tractor hour 2.00 0.00 0.00

Emulsion pressure distributor hour 4.00 0.00 0.00

Mixall 6/10 t capacity hour 4.00 0.00 0.00

Smooth wheeled roller 80-100 hour 4.00 0.00 0.00


kN capacity
c) Material

Primer with bitumen emulsion Tonne 0.17 0.00 0.00


@ 9 kg P/10 sqm 187.5x9 =
168.75 kg.
Tack coat with bitumen emulsion @ 3.0 kg p/ 10 sqm

Bottom = 187.5

Sides = 28.27 Tonne 0.06 0.00 0.00

Total = 215.77

Bitumen for BM @ 3.5% by Tonne 1.08 0.00 0.00


weigth of mix
= 30.94 x 3.5 / 100 = 1.082

Wt of mix (BM) 14.06 cum = (30.94 tonne)


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

Wt of Bitumen = 1.082

Wt of aggregate 30.94 -1.082 = 29.86

Taking density of aggregate 1.5 t per cum

Volume of aggregate 29.86 / 1.5 = 19.90 cum

Grading (II) (40 mm nominal size)

37.5 - 25 mm 15% cum 2.99 0.00 0.00

25 - 10 mm 45% cum 8.96 0.00 0.00

10 - 5 mm 25% cum 4.98 0.00 0.00

5 and below 15% cum 2.99 0.00 0.00

d) Overhead @ 10.0% on a+b+c 160.00

e) Contractor's profit @ 10% on a+b+c+d 176.00

Cost of 14.06 cum = a+b+c+d+e 1,936.00

Rate P/cum = a+b+c+d+e/14.06 137.70


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

15.3 1904 Maintenace of bituminous surface road

ii. Patch repair on already filled pot


holes with 75 mm BM with 20 mm
premix carpet and B type seal coat as
per MORD Specification 1904.2

Unit = sqm

Takign output = 200 sqm

a) Labour

Mate day 0.64 #NAME? Err:509

Mazdoor day 16.00 #NAME? #NAME?

b) Machinery

Mixall 6/10 tonne hour 2.00 Err:509 Err:509

Bitumen pressure distribution hour 2.00 Err:509 Err:509

Smooth wheeler roller 80-100 hour 4.00 Err:509 Err:509


kN
c) Material

Bitumen for pre-mix carpet @ tonne 0.29 0.00


14.60 kg P/10 sqm
200x14.60/10 =292 kg

Bitumen for tack coat @ 2 kg tonne 0.04 0.00


per 10 sqm 200 x 2 / 10 = 40 kg

Bitumen for seal coat @ 6.8 kg tonne 0.14 0.00


per 10 sqm
200 x 6.8 / 10 = 136 kg

Crushed stone chipping @ 0.27 cum 5.40 0.00


cum per 10 sqm
= 200 x 0.27 / 10 = 5.4 cum

Crushed sand passing 2.36 mm cum 1.20 0.00


sieve and retained on 180
mircon sieve @ 0.06 cum per 10
sqm

200 x 0.06 / 10 = 1.20 cum

d) Overhead @ 10.0% on a+b+c Err:509

e) Contractor profit @ 10% on a+b+c+d Err:509

Cost of 200 sqm = a+b+c+d+e Err:509


Rate P/sqm = a+b+c+d+e/200 Err:509
Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

15.3 1904.2 , 503 & Maintenace of bituminous surface road


508.1

iii. Repair to pot holes and removal of


loose material, trimming of sides,
cleaning of surface providing tack
coat, 20 mm thick pre-mix carpet
and seal coat type B as per drawing
and Technical Specification Clause
1904.2 , 503 & 508.1

Unit = sqm
Taking output = 200 sqm

a) Labour
Mate day 0.80 0.00 0.00
Mazdoor ( Unskilled ) day 20.00 0.00 0.00
b) Machinery

Air compressor 210 cfm with hour 2.00 0.00 0.00


tractor
Bitumen pressure distributor hour 2.00 0.00 0.00

Mixall 6/10t capacity hour 2.00 0.00 0.00

Smooth wheel roller 80-100 kn hour 4.00 0.00 0.00

c) Material

Bitumen for tack coat @ 3kg per tonne 0.06 0.00 0.00
10 sqm 200 x 3 / 10 = 60 kg

Bitumen for pre-mix carpet @ tonne 0.292 0.00 0.00


14.60 kg per 10 sqm = 200 x
14.6 / 10 = 292 kg
Bitumen for seal coat @ 6.8 kg tonne 0.136 0.00 0.00
per 10 sqm
= 200 x 6.8 / 10 = 136 kg

Crushed stone chipping @ 0.27 cum 5.40 0.00 0.00


cum per 10 sqm
= 200 x 0.27 / 10 = 5.4 cum

Crushed sand passing 2.36 mm cum 1.20 0.00 0.00


sieve and retained on 180
mixron sieve @ 0.06 cum per 10
sqm
200 x 0.06 / 10 = 1.20 cum
d) Overhead charges @ 10.0% on a+b+c 0.00
e) Contractor profit @10% on a+b+c+d 0.00
Cost for 200 sqm = a+b+c+d+e 0.00
Rate per sqm = a+b+c+d+e/200 0.00
Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

say 0.00
Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

15.3 1904 Maintenace of bituminous surface road

iv. Repair to pot holes and removal of


loose material, trimming of sides,
cleaning of surface by providing tack
coat with bitumen emulsion, 20 mm
thick pre-mix carpet using catonic
bitumen emulsion and B type seal
coat with bitumen emulsion

Unit = sqm

Taking output = 200 sqm

a) Labour
Mate day 0.64 #NAME? #NAME?
Mazdoor day 16.00 #NAME? #NAME?
b) Machinery
Concrete mixer 0.4 / 0.28 cum hour 2.50 0.00 0.00
capacity
Air compressor 210 CFM with hour 2.00 0.00 0.00
tractor
Emulsion pressur distributor hour 2.00 Err:509 Err:509

Smooth wheeled sleel roller 80- hour 4.00 Err:509 Err:509


100 kN capacity
c) Materials
Emulsion for tack coat @ 3 kg tonne 0.06 0.00
per 10 sqm
200 x 3 / 10 = 60 kg
Emulsion for premix carpet @ tonn 0.43 0.00
21.50 kg per 10 sqm
200 x 21.50 / 10 = 430 kg
Emulsion for seal coat @ 10 kg tonn 0.20 0.00
per 10 sqm
= 200 x 10 / 10 = 200 kg
Crushed stone aggregate @ 0.27 cum 5.40 0.00
cum per 10 sqm =
200 x 0.27 / 10 = 5.4 cum
Crushed sand passing 2.36 mm c 1.20 0.00
sieve and retained on 180
micron sieve @ 0.06 cum per 10
sqm =
200 x 0.06 / 10 = 1.20
d) Overhead charges @10.0% on a+b+c Err:509
e) Contractor profit @ 10% on a+b+c+d Err:509
Cost for 200 sqm = a+b+c+d+e Err:509
Rate per sqm = a+b+c+d+e/200 Err:509
Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

15.4 1906 Maintenace of WBM road.


Maintenance of WBM road including
filling up of pot holes , ruts and
rectifying corrugated surface ,
damaged edges and revelling as per
technical specification .

Unit = sqm
Taking output = 14.06 cum
a) Labour
Mate day 0.80 0.00 0.00
Mazdoor ( Unskilled ) day 20.00 0.00 0.00
b) Machinery
Air compressor 210 cfm with hour 2.00 550.00 1,100.00
tractor
Bitumen pressure distributor hour 2.00 550.00 1,100.00
Mixall 6/10t capacity hour 2.00 0.00 0.00
Smooth wheel roller 80-100 kn hour 4.00 0.00 0.00
c) Material
Bitumen for tack coat @ 3kg per tonne 0.06 0.00 0.00
10 sqm 200
Bitumen forx 3pre-mix
/ 10 = 60 kg @ tonne
carpet 0.292 0.00 0.00
14.60 kg for
Bitumen perseal
10 coat
sqm @ = 6.8
200kg x tonne 0.136 0.00 0.00
per 10 sqm
Crushed stone chipping @ 0.27 cum 5.40 0.00 0.00
cum per 10 sqm
Crushed sand passing 2.36 mm cum 1.20 0.00 0.00
d) sieve and charges
Overhead retained on 180
@ 10.0% on a+b+c 220.00
e) Contractor profit @10% on a+b+c+d 242.00
Cost for 200 sqm = a+b+c+d+e 2,662.00
Rate per sqm = a+b+c+d+e/200 13.31
say 13.00
Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

15.6 1907 Maintenance of Drains


The maintenance of drains include erosion,
repair, clearing, cleaning, reshaping,
regrading, deepening of side drains as
well as catch water drains as per MORD
specification 1907.

Unit - Per Metre

Taking output one Km = 1000 Metre

a) Labour

Mate day 0.32 0.00 0.00

Mazdoor ( Unskilled ) day 8.00 0.00 0.00

b) Overhead charge @ 10% on a 0.00

c) Contractors profit @ 10% on a+b 0.00

Cost for 1000 metre = a+b+c 0.00

Rate per Metre = a+b+c/1000 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

15.7 1900 (I) Maintenance of Culverts

Maintenance of Hume pipe Culvert


of Cleaning, by way Clearing,
Erosion, repair, repairs to cracks,
parapet wall and protection work as
per Technical Specification Clause
1908.

Unit = One No. Hume pipe (1000 mm dia)

Taking output One No.H.P. Culvert

a) Labour

Mate day 0.10 0.00 0.00

Mazdoor ( Unskilled ) day 1.00 0.00 0.00

Mason IInd Class day 1.40 0.00 0.00

b) Material

Cement, Sand, Brick, Boulder L.S 350.00


etc.
c) Overhead charges @ 10.0% on a+b 35.00

d) Contractor Profit @ 10% on a+b+c 38.50

Cost for one No. Hume pipe culvert = a+b+c+d 423.50

Rate per hume pipe Culvert = a+b+c+d 423.50


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

15.7 1908 (II) Maintenance of Culverts Slab type

Maintenance of Slab type Culverts


by way of clearing, Cleaning,
Erosion, repair, repairs to cracks,
parapet walls and Protection works

Unit = One No. Culvert (2 m span)

Taken out = one No. Slab Culvert

a) Labour

Mate day 0.20 0.00 0.00

Mazdoor ( Unskilled ) day 4.00 0.00 0.00

Mason IInd Class day 1.00 0.00 0.00

b) Material

Cement, Sand, Bricks, Stone L.S 350.00


Boulder etc.

c) Overhead charges @ 10.0% on a+b 35.00

d) Contractor Profit @ 10% on a+b+c 38.50

Cost for One No. Slab Culverts =a+b+c+d 423.50

Rate per Culvert = a+b+c+d 423.50


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

15.8 1909 Maintenance of Causeway

Maintenance of Causeway by way of


minor Surface repairs, replacing Guide
Posts, repair of flood gauges, removal of
debris, providing boulders and protection
work and painting per Technical
Specification Clause 1909.

Unit = One metre

Taking output = 50 metre causeway

a) Labour

Mate day 0.80 0.00 0.00

Mazdoor ( Unskilled ) day 1.60 0.00 0.00

Mason(Ist Class) / Painter ( Ist day 4.00 0.00 0.00


Class)
b) Material

Supply of cement, paint, sand, LS 350.00


aggregate, boulder etc.

c) Overhead charge @10.0% on a+b 35.00

d) Contractors profit @ 10% on a+b+c 38.50

Cost for 50 metre = a+b+c+d 423.50

Cost per metre = a+b+c+d/50 8.47


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

15.9 1910 Maintenance of Road Signs

Maintenance of road signs by way of


cleaning and repainting of mandatory /
requlatory / cautionary / informatory and
place identifications sign board as per
MORD specifications 1910 and IRC-67

Unit = 1 km

Taking output = one KM

All types of signs in one Km

a) Labour

Mate day 0.09 0.00 0.00

Mazdoor ( Unskilled ) day 2.00 0.00 0.00

Painter ( Ist Class) day 0.13 0.00 0.00

b) Material

Synthetic Enamel Paint, Engineering LS 300.00


grade tape, welding machine etc.

c) Overhead charges @ 10.0% on a+b 30.00

d) Contractor's profit @ 10% on a+b+c 33.00

Cost for one Km = a+b+c+d 363.00

Rate per metre = a+b+c+d/1000 0.36


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

15.12 1914 Cutting of branches of trees shrubs and


trimming of grass and weeds

(i) Cutting of branches of trees and


shrubs from the road way or with in
R.O.W as per MORD specifications
including disposal of wood and
leaves to suitable location

Unit = one tree

Taking output 10 trees of 900 m average girth

a) Labour

Mate day 0.12 0.00 0.00

Mazdoor (skilled) day 1.00 0.00 0.00

Mazdoor (unskilled) day 2.00 0.00 0.00

b) Overhead charges @ 10.0% on a 0.00

c) Contractor's profit @ 10% on a+b 0.00

Cost for 10 trees = a+b+c 0.00

Rate per tree = a+b+c/10 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

15.13 1914 Cutting of branches of trees shrubs and


trimming of grass and weeds

(ii) Cutting of shrubs from the road way


or with in R.O.W and disposal of
shrubs to suitable locations as per
MORD specifications.

Unit=Each

Taking output 100 nos shrubs

a) Labour

Mate day 0.08 #NAME? #NAME?

Mazdoor day 2.00 #NAME? #NAME?

b) Overhead charges @ 10.0% on a #NAME?

c) Contractors profit @ 10% on a+b #NAME?

Cost for 100 shurbs = a+b+c #NAME?

Rate per shurb = a+b+c/100 #NAME?


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

15.13 1914 Cutting of branches of trees shrubs and


trimming of grass and weeds

(iii) Trimming of grass and weeds from


the shoulders/berms and disposing
of the same to suitable locations as
per MORD specifications

Unit = sqm

Taking output = 1500 sqm

a) Labour

Mate day 0.40 0.00 0.00

Mazdoor ( Unskilled ) day 10.00 0.00 0.00

b) Overheads charges @ 10.0% on a 0.00

c) Contractor profits @ 10% on a+b 0.00

Cost for 1500 sqm = a+b+c 0.00

Rate per sqm = a+b+c/1500 0.00


Chapter – 14

PROTECTION WORKS

Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

14.1 1301 Providing and laying boulder apron for bed


protection with stone boulders weighing not
less than 40 kg each, laid dry complete as per
drawing and technical specification.

Unit = cum

a) Material

Stone cum 1.00 0.00 0.00

Stone spalls cum 0.20 0.00 0.00

b) Labour

Mate day 0.04 0.00 0.00

Mason day 0.35 0.00 0.00

Mazdoor day 0.75 0.00 0.00

c) Overheads @ 10% on (a+b) 0.00

d) Contractor’s profit @ 10% on (a+b+c) 0.00

Rate per cum = (a+b+c+d) 0.00


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

14.2 1301 Providing and laying of boulder apron laid in


wire crates with 4 mm dia GI wire conforming
to IS:280 and IS:4826 in 100 mm x 100 mm mesh
(woven diagonally) including 10 per cent extra
for laps and joints laid with stone boulders
weighing not less than 40 kg each

Unit = cum

Taking ouput = 3 m x 1.5 m x 1.25 m = 5.63 cum

a) Material

Stone cum 5.63 0.00 0.00

Stone spalls cum 1.13 0.00 0.00

GI wires 4 mm dia @ 32 kg/10 sqm kg 64.00 0.00 0.00

b) Labour

Mate day 0.18 0.00 0.00

Mazdoor (skilled) day 1.50 0.00 0.00

Mazdoor day 3.00 0.00 0.00

Add for labour for weaving the wire crates 0.00


@ 2 per cent of cost of GI wire

c) Overheads @10.0% on (a+b) 0.00

d) Contractor’s profit @ 10% on (a+b+c) 0.00

Cost for 5.63 cum = a+b+c+d 0.00

Rate per cum = a+b+c+d/5.63 0.00


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

14.5 1302 Providing and laying pitching on slopes laid


over prepared filter media as per drawing and
technical specification

I. Stone/Boulder

Unit = cum

a) Material

Stone weighing not less than 40 kg cum 1.00 0.00 0.00

Stone spalls of minimum 25 mm size cum 0.20 0.00 0.00

b) Labour

Mate day 0.04 0.00 0.00

Mason day 0.35 0.00 0.00

Mazdoor for laying stones, filling day 0.75 0.00 0.00


quarry spalls
c) Overheads @ 10% on (a+b) 0.00

d) Contractor’s profit @ 10% on (a+b+c) 0.00

Rate per cum = (a+b+c+d) 0.00


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

14.5 1302 Providing and laying pitching on slopes laid


over prepared filter media as per drawing and
technical specification

II. Cement concrete blocks of size 0.3 x 0.3 x


0.3 m cast in cement concrete of grade M-
15

a) Concrete grade M-15

(Rate as per item No. 11.7 II (i)/ II (ii) cum 1.00 Err:509 Err:509
except that the size of aggregate shall
be 20 mm & down

Add 2 per cent of cost to account for Err:509


surface reinforcement and filling of
granular material in recesses
between blocks

Rate per cum = (a) Err:509


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

14.6 1302 Providing and laying filter material


underneath pitching in slopes complete as per
drawing and technical specification

Unit = cum

a) Material

Graded stone aggregate of required size cum 1.20 0.00 0.00

b) Labour

Mate day 0.05 0.00 0.00

Mazdoor (skilled) day 0.25 0.00 0.00

Mazdoor day 1.02 0.00 0.00

c) Overheads @ 10.0% on (a+b) 0.00

d) Contractor’s profit @ 10% on (a+b+c) 0.00

Rate per cum = (a+b+c+d) 0.00


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

14.7 1303 Providing and laying flooring complete as per


drawing and technical specifications laid over
cement concrete bedding

I. Rubble stone laid in cement mortar 1:3

Unit = cum

a) i) Cement mortar (1:3) (For rate cum 0.33 0.00 0.00


refer to item 11.5 (i)

b) ii) Add for cement concrete cum 0.33 0.00 0.00


bedding (M-15) nominal mix)
(For rate refer to item 11.4 I (i)/ I
(ii)

* Quantity shall be adopted as per design.

Add 1 per cent of cost to account for 0.00


excavation for preparation of bed

c) Material
Stone cum 1.00 0.00 0.00

Stone spalls cum 0.20 0.00 0.00

d) Labour

Mate day 0.08 0.00 0.00

Mason day 0.50 0.00 0.00

Mazdoor (for laying stone, filling of day 1.50 0.00 0.00


quarry spalls)

c) Overheads @ 10% on (a+c+d) 0.00

d) Contractor’s profit @ 10% on (a+b+c) 0.00

Rate per cum = (a+b+c+d) 0.00


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

14.7 1303 Providing and laying flooring complete as per


drawing and technical specifications laid over
cement concrete bedding

II. Cement conrete blocks grade M-15

a) Concrete grade M-15 block cum 1.00 0.00 0.00


(Rate as per item No 11.4 (II) (ii)

Add for cement concrete bedding cum 0.33 0.00 0.00


Rate as per item 11.4 (II) (ii)

* Quantity shall be adopted as per design.

Add 1 per cent of cost to account for 0.00


excavation for preparation of bed.

c) Overheads @ 10% on (a+c+d) 0.00

d) Contractor’s profit @ 10% on (a+b+c) 0.00

Rate per cum = (a+b+c+d) 0.00


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

14.8 1303 Providing and laying of dry rubble flooring


complete as per drawings and technical
specification

Unit = cum

a) Material

Stone cum 1.00 0.00 0.00

Stone spalls cum 0.20 0.00 0.00

b) Labour

Mate day 0.10 0.00 0.00

Mason ( Ist Class ) day 0.50 0.00 0.00

Mazdoor ( Unskilled ) day 1.50 0.00 0.00

Add 1 per cent of (b) for trimming and preparation of base 0.00

c) Overheads @ 10.0% on (a+b) 0.00

d) Contractors profit @ 10% on (a+b+c) 0.00

Rate per cum = (a+b+c+d) 0.00


Chapter – 13

SUPERSTRUCTURE
13.3 1000 Supply, fitting and Placing HYSD bar
reinforcement ( Fe 415 ) in substucture
complete as per drawings and technical
specification.

Unit = t

a) Material

i) HYSD bar including 5 per cent for t 1.05 0.00 0.00


laps and wastage

ii) Binding wire t 8.00 0.00 0.00

b) Labour for cutting, bending, tying and


placing in position
Mate day 0.44 0.00 0.00

Blacksmith day 3.00 0.00 0.00

Mazdoor( Unskilled ) day 8.00 0.00 0.00

c) Overheads @ 10.0% on (c) 0.00

d) Contractor’s profit @ 10% on (b+c+d) 0.00

Rate per cum = (a+b+c+d+e) 0.00


13.3 1000 Supply, fitting and Placing HYSD bar
reinforcement ( Fe 415 ) in substucture
complete as per drawings and technical
specification.

Unit = t

a) Material

i) HYSD bar including 5 per cent for t 1.05 0.00 0.00


laps and wastage
ii) Binding wire t 8.00 0.00 0.00

b) Labour for cutting, bending, tying and


placing in position
Mate day 0.44 0.00 0.00

Blacksmith day 3.00 0.00 0.00

Mazdoor( Unskilled ) day 8.00 0.00 0.00

c) Overheads @ 10.0% on (c) 0.00

d) Contractor’s profit @ 10% on (b+c+d) 0.00

Rate per cum = (a+b+c+d+e) 0.00


Chapter – 12

SUBSTRUCTURE
12.2 613.3 & 1204 Pointing with cement mortar (1:3) on brickwork
as per technical specification

Unit = 10 sqm

Taking output = 10 sqm

a) Material

Cement mortar 1.3 (Rate as in item 11.5. I) cum 0.03 0.00 0.00

b) Labour

Mate day 0.04 0.00 0.00 L-17

Mason Ist Class day 0.50 0.00 0.00 L-16

Mazdoor ( Un skilled ) day 0.50 0.00 0.00 L-18

Bhisti day 0.20 0.00 0.00 L-02

c) Overheads @ 10.0% on (a+b) 0.00

d) Contractor’s profit @ 10% on (a+b+c) 0.00

Rate per 10 sqm (a+b+c+d) 0.00

Rate per sqm (a+b+c+d)/10 0.00


12.3 600 Plastering with cement mortar (1:4), 15 mm thick
on brickwork in substructure as per technical
specification Clauses 613.4 & 1204.

Unit = 10 sqm

Taking output = 10 sqm

a) Material

Cement mortar 1:4 (Rate as in item 11.5 II ) cum 0.240 0.00 0.00 M-081

b) Labour

Mate day 0.06 0.00 0.00 L-17

Mason Ist Class day 0.60 0.00 0.00 L-16

Mazdoor ( Un skilled ) day 0.60 0.00 0.00 L-18

Bhisti day 0.30 0.00 0.00 L-02

c) Overheads @ 10.0% on (a+b) 0.00

d) Contractor’s profit @ 10% on (a+b+c) 0.00

Rate per 10 sqm = (a+b+c+d) 0.00

Rate per 10 sqm = (a+b+c+d) 0.00


12.4 702, 704, 900, Stone masonry in cement mortar for
1202 & 1204 substructure complete as per drawing &
technical specification

I. Coursed rubble masonry (1st sort)

(i) In 1:3 cement mortar

Unit = cum

a) Material

Stone cum 1.10 0.00

Through and bond stone Nos. 7.00 0.00


(7 no x 0.24 x 0.24 m x 0.39 m =
0.16 cum)

Cement mortar (Rate as in item cum 0.30 0.00


11.5. I)

b) Labour

Mate day 0.14 #NAME? #NAME? L-17

Mason day 1.50 #NAME? #NAME? L-16

Mazdoor day 2.10 #NAME? #NAME? L-18

Bhisti day 0.08 #NAME? #NAME? L-02

Add for scaffolding @ 5 per cent #NAME?


of cost of material (a) and labour
(b)
c) Overheads @ 10.0% on (a+b) #NAME?

d) Contractor’s profit @ 10% on (a+b+c) #NAME?

Rate per cum = (a+b+c+d) #NAME?


12.4 702, 704, 900, Stone masonry in cement mortar for
1202 & 1204 substructure complete as per drawing &
technical specification

I. Coursed rubble masonry (1st sort)

(ii) In 1:4 cement mortar

Unit = cum

a) Material

Stone cum 1.10 0.00

Through and bond stone Nos. 7.00 0.00


(7 no x 0.24 x 0.24 m x 0.39 m =
0.16 cum)
Cement mortar (Rate as in item cum 0.30 0.00
11.5 II)

b) Labour

Mate day 0.14 #NAME? #NAME? L-17

Mason day 1.50 #NAME? #NAME? L-16

Mazdoor day 2.10 #NAME? #NAME? L-18

Bhisti day 0.08 #NAME? #NAME? L-02

Add for scaffolding @ 5 per cent #NAME?


of cost of material (a) and labour
(b)
c) Overheads @ 10.0% on (a+b) #NAME?

d) Contractor’s profit @ 10% on (a+b+c) #NAME?

Rate per cum = (a+b+c+d) #NAME?


12.4 702, 704, 900, Stone masonry in cement mortar for
1202 & 1204 substructure complete as per drawing &
technical specification

I. Coursed rubble masonry (1st sort)

(iii) In cement mortar (1:5)

Unit = cum

a) Material

Stone cum 0.60 0.00

Through and bond stone Nos. 7.00 0.00


(7 no x 0.24 x 0.24 m x 0.39 m =
0.16 cum)
Spalls/blasted rubbles cum 0.50 0.00

Cement mortar (Rate same as in cum 0.33 0.00


item 12.1 III)
b) Labour

Mate day 0.14 #NAME? #NAME? L-17

Mason day 1.30 #NAME? #NAME? L-16

Mazdoor day 2.00 #NAME? #NAME? L-18

Bhisti day 0.08 #NAME? #NAME? L-02

As for scaffolding @ 5% on (a+b) #NAME?

c) Overheads @ 10.0% on (a+b) #NAME?

d) Contractor’s profit @ 10% on (a+b+c) #NAME?

Rate per cum = (a+b+c+d) #NAME?


12.4 702, 704, 900, Stone masonry in cement mortar for
1202 & 1204 substructure complete as per drawing &
technical specification

I. Coursed rubble masonry (1st sort)

(iv) In cement lime mortar (1:0.5:4.5)

Unit = cum

a) Material

Stone cum 1.10 0.00

Through and bond stone Nos. 7.00 0.00


(7 no x 0.24 x 0.24 m x 0.39 m =
0.16 cum)

Cement lime mortar (Rate as in cum 0.30 0.00


item 11.5. III)
b) Labour

Mate day 0.14 #NAME? #NAME? L-17

Mason day 1.50 #NAME? #NAME? L-16

Mazdoor day 2.10 #NAME? #NAME? L-18

Bhisti day 0.08 #NAME? #NAME? L-02

Add for scaffolding @ 5% of (a) and (b) #NAME?

c) Overheads @ 10.0% on (a+b) #NAME?

d) Contractor’s profit @ 10% on (a+b+c) #NAME?

Rate per cum = (a+b+c+d) #NAME?


12.4 702, 704, 900, Stone masonry in cement mortar for
1202 & 1204 substructure complete as per drawing &
technical specification

II. Coursed rubble masonry (2nd sort)

(i) In cement mortar (1:3)

Unit = cum

a) Material

Stone cum 0.60 0.00

Through and bond stone Nos. 7.00 0.00


(7 no x 0.24 x 0.24 m x 0.39 m =
0.16 cum)
Spalls/blasted rubbles cum 0.50 0.00

Cement mortar (Rate as in item cum 0.33 0.00


11.5 I)
b) Labour

Mate day 0.14 #NAME? #NAME? L-17

Mason day 1.30 #NAME? #NAME? L-16

Mazdoor day 2.00 #NAME? #NAME? L-18

Bhisti day 0.08 #NAME? #NAME? L-02

Add for scaffolding @ 5 per cent #NAME?


of cost of material (a) and labour
(b)

c) Overheads @ 10.0% on (a+b) #NAME?

d) Contractor’s profit @ 10% on (a+b+c) #NAME?

Rate per cum = (a+b+c+d) #NAME?


12.4 702, 704, 900, Stone masonry in cement mortar for
1202 & 1204 substructure complete as per drawing &
technical specification

II. Coursed rubble masonry (2nd sort)

(ii) In 1:4 cement mortar

Unit = cum

a) Material

Stone cum 0.60 0.00

Through and bond stone Nos. 7.00 0.00


(7 no x 0.24 x 0.24 m x 0.39 m =
0.16 cum)
Spall/blasted rubble cum 0.50 0.00

Cement mortar (Rate same as in cum 0.33 0.00


item 11.5 II)

b) Labour

Mate day 0.14 #NAME? #NAME? L-17

Mason day 1.30 #NAME? #NAME? L-16

Mazdoor day 2.00 #NAME? #NAME? L-18

Bhisti day 0.08 #NAME? #NAME? L-02

Add for scaffolding @ 5 per cent #NAME?


of cost of material (a) and labour
(b)
c) Overheads @ 10.0% on (a+b) #NAME?

d) Contractor’s profit @ 10% on (a+b+c) #NAME?

Rate per cum = (a+b+c+d) #NAME?


12.4 702, 704, 900, Stone masonry in cement mortar for
1202 & 1204 substructure complete as per drawing &
technical specification

II. Coursed rubble masonry (2nd sort)

(iii) In cement mortar (1:5)

Unit = cum

a) Material

Stone cum 0.60 0.00

Through and bond stone Nos. 7.00 0.00


(7 no x 0.24 x 0.24 m x 0.39 m =
0.16 cum)

Spall/blasted rubble cum 0.50 0.00

Cement mortar (Rate same as in cum 0.33 0.00


item 12.1 III)
b) Labour

Mate day 0.14 #NAME? #NAME? L-17

Mason day 1.30 #NAME? #NAME? L-16

Mazdoor day 2.00 #NAME? #NAME? L-18

Bhisti day 0.08 #NAME? #NAME? L-02

Add for scaffolding @ 5 per cent on (a+b) #NAME?


12.4 702, 704, 900, Stone masonry in cement mortar for
1202 & 1204 substructure complete as per drawing &
technical specification

II. Coursed rubble masonry (2nd sort)

(iv) In cement lime mortar (1:0.5:4.5)

Unit = cum

a) Material

Stone cum 0.60 0.00

Through and bond stone Nos. 7.00 0.00


(7 no x 0.24 x 0.24 m x 0.39 m =
0.16 cum)

Spalls/blasted rubbles cum 0.50 0.00

Cement lime mortar (Rate as in cum 0.33 0.00


item 11.5 III)

b) Labour

Mate day 0.14 #NAME? #NAME? L-17

Mason day 1.30 #NAME? #NAME? L-16

Mazdoor day 2.00 #NAME? #NAME? L-18

Bhisti day 0.08 #NAME? #NAME? L-02

Add for scaffolding @ 5 per cent on (a+b) #NAME?

c) Overheads @ 10.0% on (a+b) #NAME?

d) Contractor’s profit @ 10% on (a+b+c) #NAME?

Rate per cum = (a+b+c+d) #NAME?


12.4 702, 704, 900, Stone masonry in cement mortar for
1202 & 1204 substructure complete as per drawing &
technical specification

III. Random rubble masonry

(i) In cement mortar (1:3)

Unit = cum

a) Material

Stone cum 1.00 0.00

Through and bond stone Nos. 7.00 0.00


(7 no x 0.24 x 0.24 m x 0.39 m =
0.16 cum)

Cement mortar (Rate as in item cum 0.33 0.00


11.5 I)
b) Labour

Mate day 0.12 #NAME? #NAME? L-17

Mason day 1.20 #NAME? #NAME? L-16

Mazdoor day 1.80 #NAME? #NAME? L-18

Bhisti day 0.08 #NAME? #NAME? L-02

Add for scaffolding @ 5 per cent #NAME?


of cost of material (a) and labour
(b)
c) Overheads @ 10.0% on (a+b) #NAME?

d) Contractor’s profit @ 10% on (a+b+c) #NAME?

Rate per cum = (a+b+c+d) #NAME?


12.4 702, 704, 900, Stone masonry in cement mortar for
1202 & 1204 substructure complete as per drawing &
technical specification

III. Random rubble masonry

(ii) In 1:4 cement mortar

Unit = cum

a) Material

Stone cum 1.00 0.00

Through and bond stone Nos. 7.00 0.00


(7 no x 0.24 x 0.24 m x 0.39 m =
0.16 cum)

Cement mortar (Rate same as in cum 0.33 0.00


item 11.5 II)

b) Labour

Mate day 0.12 #NAME? #NAME? L-17

Mason day 1.20 #NAME? #NAME? L-16

Mazdoor day 1.80 #NAME? #NAME? L-18

Bhisti day 0.08 #NAME? #NAME? L-02

Add for scaffolding @ 5 per cent #NAME?


of cost of material (a) and labour
(b)

c) Overheads @ 10.0% on (a+b) #NAME?

d) Contractor’s profit @ 10% on (a+b+c) #NAME?

Rate per cum = (a+b+c+d) #NAME?


12.4 702, 704, 900, Stone masonry in cement mortar for
1202 & 1204 substructure complete as per drawing &
technical specification

III. Random rubble masonry

(iii) In cement mortar (1:5)

Unit = cum

a) Material

Stone cum 1.00 0.00

Through and bond stone Nos. 7.00 0.00


(7 no x 0.24 x 0.24 m x 0.39 m =
0.16 cum)

Cement mortar (Rate same as in cum 0.33 0.00


item 12.1 III)

b) Labour

Mate day 0.12 #NAME? #NAME? L-17

Mason day 1.20 #NAME? #NAME? L-16

Mazdoor day 1.80 #NAME? #NAME? L-18

Bhisti day 0.08 #NAME? #NAME? L-02

Add for scaffolding @ 5 per cent on (a+b) #NAME?

c) Overheads @ 10.0% on (a+b) #NAME?

d) Contractor’s profit @ 10% on (a+b+c) #NAME?

Rate per cum = (a+b+c+d) #NAME?


12.4 702, 704, 900, Stone masonry in cement mortar for
1202 & 1204 substructure complete as per drawing &
technical specification

III. Random rubble masonry

(iv) In cement lime mortar (1:0.5:4.5)

Unit = cum

a) Material

Stone cum 1.00 0.00

Through and bond stone Nos. 7.00 0.00


(7 no x 0.24 x 0.24 m x 0.39 m =
0.16 cum)
Cement lime mortar (Rate as in cum 0.33 0.00
item 11.5 III)

b) Labour

Mate day 0.12 #NAME? #NAME? L-17

Mason day 1.20 #NAME? #NAME? L-16

Mazdoor day 1.80 #NAME? #NAME? L-18

Bhisti day 0.08 #NAME? #NAME? L-02

Add for scaffolding @ 5 per cent on (a+b) #NAME?

c) Overheads @ 10.0% on (a+b) #NAME?

d) Contractor’s profit @ 10% on (a+b+c) #NAME?

Rate per cum = (a+b+c+d) #NAME?


12.5 802, 804, 805, Providing concrete for plain/reinforced cement
806, 807, 900, concrete in substructure complete as per
1200 & 1204 drawings and technical specification

Unit = cum

I. P.C.C grade M-15 (1:2.5:5) (Nominal mix)


Same as item 11.7 II (i) upto 5 m height
except for formwork which shall be 10 per
cent instead of 4 per cent of cost of material,
labour and machinery
12.5 802, 804, 805, Providing concrete for plain/reinforced cement
806, 807, 900, concrete in substructure complete as per
1200 & 1204 drawings and technical specification

Unit = cum

II. P.C.C grade M-15 (1:2.5:5) (Hand mix)


Same as item 11.7 II (ii) up to 5 m height
except for formwork which shall be 10 per
cent in stead of 4 per cent of cost of material
& labour
12.5 802, 804, 805, Providing concrete for plain/reinforced cement
806, 807, 900, concrete in substructure complete as per
1200 & 1204 drawings and technical specification

Unit = cum

III. P.C.C grade M-20 (1:2:4) nominal mix

i) Same as item 11.7 III (i) upto 5 m


height except for formwork which
shall be 10 per cent instead of 4 per
cent of cost of material, labour and
machinery

ii) For height above 5 m upto 10 m same


as item 11.7 III with following
changes:

a. Add 2 per cent of cost of material,


labour and machinery to cater for
extra lift.

b. The provision of formwork shall


be 12 per cent instead of 4 per
cent of cost of material, labour
and machinery
12.5 802, 804, 805, Providing concrete for plain/reinforced cement
806, 807, 900, concrete in substructure complete as per
1200 & 1204 drawings and technical specification

Unit = cum

IV. P.C.C grade M-20 (1:2:4) (Hand mix)

i) Same as item 11.7 III (ii) upto 5 m


height except for formwork which
shall be 10 per cent instead of 4 per
cent of cost of material and labour

ii) Same III (ii) above


12.5 802, 804, 805, Providing concrete for plain/reinforced cement
806, 807, 900, concrete in substructure complete as per
1200 & 1204 drawings and technical specification

Unit = cum

V. R.C.C grade M-20 (1:2:4) (Nominal mix)

i) Same as item 11.7 IV upto 5 m height


except for formwork which shall be 10
per cent instead of 4 per cent of cost of
material, labour and machinery

ii) For height beyond 5 m upto 10 m


same as above except that 2 per cent of
cost excluding formwork is to be
added for extra lift. For cost of
formwork add 12 per cent of cost of
material, labour and machnery instead
of 4 per cent

iii) For height above 10 m same as above


with the following changes

a) Add 4 per cent of cost of material,


labour and machinery excluding
formwork to cater for extra lift.

b) The provision of formwork shall


be 15 per cent instead of 4 per
cent
12.5 802, 804, 805, Providing concrete for plain/reinforced cement
806, 807, 900, concrete in substructure complete as per
1200 & 1204 drawings and technical specification

Unit = cum

VI. R.C.C grade M-25

i) Same as item 11.7 (V) up to 5 m height


excluding formwork. For cost of
formwork, add 10 per cent of cost of
material, labour and machinery.
Instead of 3.75 per cent

ii) For height beyond 5 m upto 10 m


same as above except that 2 per cent of
cost excluding formwork is to be
added for extra lift. For cost of
formwork add 12 per cent of cost of
material, labour and machnery instead
of 4 per cent

iii) For height above 10 m, add 4 per cent


of cost as above excluding formwork
for extra lift. For cost of formwork,
add 15 per cent of cost of material,
labour and machinery.
12.6 1000 & 1202 Supplying, fitting and placing HYSD / TMT bar
reinforcement (Fe 415) in substructrue complete
as per drawings and technical specification

Unit = T

a) Material

HYSD / TMT bars including 5 per cent t 1.05 0.00 0.00


overlaps and wastage

Binding wire kg 6.00 0.00 0.00 M-069

b) Labour for cutting, bending, shifting to


site, tying, and placing in position

Mate day 0.34 0.00 0.00 L-17

Blacksmith day 2.00 0.00 0.00 L-03 **

Mazdoor day 6.50 0.00 0.00 L-18

c) Overheads @ 10.0% on (a+b) 0.00

d) Contractor’s profit @ 10% on (a+b+c) 0.00

Rate per T = (a+b+c+d) 0.00

Rate per Kilogram = Rate/1000 0.00


12.7 614, 709 & Providing weepholes in brick masonry/stone
1204.37 masonry, plain/reinforced concrete abutment,
wing wall, return wall with 100 mm dia AC pipe
extending through the full width of the
structures with slope of IV:20H towards
drawing face complete as per drawings and
technical specification

Unit = Nos

Taking output = 30 Nos

a) Material

AC pipe 100 mm dia i/c wastage @ 5 per m 31.50 #NAME? #NAME? M-049
cent. Average length of weep hole is taken
as one metre for the purpose of estimating

MS clamps Nos. 30.00 #NAME? #NAME? M-129

Collar for AC pipe (average) Nos. 10.00 #NAME? #NAME? M-083

Cement mortar 1:3 (For rate refer to item cum 0.05 #NAME? #NAME? M-081
11.5 I)

b) Labour

Mate day 0.03 #NAME? #NAME? L-17

Mason day 0.50 #NAME? #NAME? L-16

Mazdoor day 0.25 #NAME? #NAME? L-18

c) Overheads @ 10.0% on (a+b) #NAME?

d) Contractor’s profit @ 10% on (a+b+c) #NAME?

Cost for 30 Nos = a+b+c+d #NAME?

Rate per No= (a+b+c+d)/30 #NAME?


12.8 1204.3.8 Backfilling behind abutment, wing wall and
return wall complete as per drawings &
technical specification

Unit = cum

Taking output = 10 cum

I) Granular material

a) Material

Granular material cum 12.00 #NAME? #NAME? M-008

b) Labour

Mate day 0.28 #NAME? #NAME? L-17

Mazdoor day 10.00 #NAME? #NAME? L-18

Bhisti day 0.40 #NAME? #NAME? L-02

c) Overheads minor T&P @10.0% on (a+b) #NAME?

d) Contractor’s profit @ 10% on (a+b+c) #NAME?

Cost for 10 cum of granular backfill = a+b+c+d #NAME?

Rate per cum = (a+b+c+d)/10 #NAME?


12.8 1204.3.8 Backfilling behind abutment, wing wall and
return wall complete as per drawings &
technical specification

Unit = cum

Taking output = 10 cum

II) Sandy material

Unit = cum

Taking output = 10 cum

a) Material

Sand cum 12.00 #NAME? #NAME? M-166

b) Labour

Mate day 0.40 #NAME? #NAME? L-17

Mazdoor for filling, watering, day 10.00 #NAME? #NAME? L-18


ramming etc.

Bhisti day 0.40 #NAME? #NAME? L-02

c) Overheads minor T&P @ 10.0% on (a+b) #NAME?

d) Contractor’s profit @ 10% on (a+b+c) #NAME?

Cost for 10 cum of sand backfill = a+b+c+d #NAME?

Rate per cum = (a+b+c+d)/10 #NAME?


12.9 1204.3.8 Providing and laying filter media with granular
crushed aggregates as per specification to a
thickness of not less than 600 mm with smaller
size towards the soil and bigger size towards the
wall and providing over the entire surface
behind abutment, wing wall, return wall to the
full height, compacted to firm condition
complete as per drawing and technical
specification

Unit = cum

Taking output = 10 cum

a) Material

Filter media as per specification cum 12.00 0.00 0.00 M-004

b) Labour

Mate day 0.40 #NAME? #NAME? L-17

Mazdoor for filling, watering, ramming etc. day 9.00 #NAME? #NAME? L-18

Mazdoor (skilled) day 1.00 #NAME? #NAME? L-20

Bhisti day 0.50 #NAME? #NAME? L-02

c) Overheads minor T&P @ 10.0% on (a+b) #NAME?

d) Contractor’s profit @ 10% on (a+b+c) #NAME?

Cost for 10 cum of filter media = a+b+c+d #NAME?

Rate per cum = (a+b+c+d)/10 #NAME?


12.10 1207.1 Supplying, fitting and fixing in position true to
line and level elastomeric bearing conforming to
IRC:83 (Part-II) Section IX complete, including
all accessories as per drawings and technical
specification

Unit = cubic centimetre

Considering an elastomelic bearing of size 500 x


400 x 96 mm for this analysis,

Overall volume = 19200 cu.cm

Volume of 6 Nos 488x388x4 mm size reinforcing


steel plates = 4545 cu.cm.

Hence volume of elastomer = 14655 cu. cm.

a) Labour

Mate day 0.06 #NAME? #NAME? L-17

Mazdoor day 1.00 #NAME? #NAME? L-18

Mazdoor skilled day 0.50 #NAME? #NAME? L-20

b) Material

Elastomeric bearing assembly consisting of Nos. 1.00 #NAME? M-094


7 internal layers of elastomer bonded to 6
nos. internal reinforcing steel laminates by
the process of vulcanisation, complete with
all components as per drawing and
technical specification

Add for anchorage bolts if required and


consumables @ 1 per cent of (a+b)

c) Overheads @10.0% on (a+b) #NAME?

d) Contractor’s profit @ 10% on (a+b+c) #NAME?

Cost for 19200 cu.cm. of elastomeric bearing = a+b+c+d #NAME?

Rate per cu.cm of elastomeric bearing = (a+b+c+d)/19200 #NAME?


12.11 615, 710 & Providing PCC M-20 architectural coping on the
1204.3.11 top of wing wall, return wall etc. complete as
per drawing and technical specification

Unit = Running metre

Taking output = 1 metre

Assume wall thickness = 345 mm

Projection of the coping will be 25 mm wide on


both side of the wall = 345 + 50 = 395 mm

Quantity = 1 x 0.395 x 0.150 = 0.059

a) PCC M-20 Grade (1:2:4) Nominal Mix

As per Chapter No. 12.5 (iii) of Chapter 12. cum 0.059

Add 10 per cent extra of cost of (a) being


architectural coping

Cost of 1 metre = a 0.00

Rate per metre = a 0.00


12.12 1205.5.7 Providing pressure relief pipes 100 mm dia in
bottom slab of box cell on a filter media base of
0.5 m x 0.5 m

Unit = Nos

a) Material

AC pipe 100 mm dia i/c wastage of 5 per m 0.63 #NAME? #NAME? M-049
cent 600 mm long upto the bottom of
levelling course
Filter media base with stone aggregate 0.5 cum 0.25 0.00 0.00 M-004
m x 0.5 m area 1 m deep

b) Labour

Mate day 0.031 #NAME? #NAME? L-17

Mason day 0.016 #NAME? #NAME? L-16

Mazdoor day 0.80 #NAME? #NAME? L-18

c) Overheads @10.0% on (a+b) #NAME?

d) Contractor’s profit @ 10% on (a+b+c) #NAME?

Rate per No= (a+b+c+d) #NAME?


Chapter – 11

FOUNDATION

Sr. Reference to Description Unit Quantity Rate Total


No. MORD (Rs.) Amount (Rs.)
Specifications

11.1 305 Excavation for Structures

Earthwork in excavation for structures as per


drawing and technical specification including
setting out, construction of shoring and
bracing, removal of stumps and other
deleterious material, dressing of sides and
bottom and backfilling in trenches with
approved material.

I. Ordinary soil

(i) Upto 3 m depth

Unit = cum

Taking output = 10 cum

a) Labour

Mate day 0.32 0.00 0.00

Mazdoor day 8.00 0.00 0.00

b) Overheads @ 10.0% on (a) 0.00

c) Contracotr’s profit @ 10%(a+b) 0.00

Cost for 10 cum = a+b+c 0.00

Rate per cum = a+b+c/10 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

11.1 305 Excavation for Structures

Earthwork in excavation for structures as per


drawing and technical specification including
setting out, construction of shoring and
bracing, removal of stumps and other
deleterious material, dressing of sides and
bottom and backfilling in trenches with
approved material.

I. Ordinary soil

(ii) 3 m to 6 m depth

a) Labour

Mate day 0.38 0.00 0.00

Mazdoor day 9.50 0.00 0.00

b) Overheads @ 10.0% on (a) 0.00

c) Contractor’s profit @ 10% on (a+b) 0.00

Cost for 10 cum = a+b+c 0.00

Rate per cum = (a+b+c)/10 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

11.2 305 & 1203 Fillling in foundation trenches as per


drawing and technical specification

I. Sand filling

Unit = cum

a) Labour

Mate day 0.01 0.00 0.00

Mazdoor day 0.30 0.00 0.00

b) Material

Sand (assuming 20 per cent voids) cum 1.20 0.00 0.00

c) Overheads @ 10.0% on (a+b) 0.00

d) Contractor’s profit @ 10% on (a+b+c) 0.00

Rate per cum = (a+b+c+d) 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

11.4 802, 803, 1202 & Providing concrete for plain/reinforced


1203 concrete in open foundations complete as
per drawings and technical specification

I. P.C.C grade M-10

(i) Nominal mix 1:3:6

Unit = cum

a) Material

Cement t 0.250 0.00 0.00

Coarse sand cum 0.48 0.00 0.00

40 mm aggregate cum 0.576 0.00 0.00

20 mm aggregate cum 0.288 0.00 0.00

10 mm aggregate cum 0.10 0.00 0.00

b) Labour

Mate day 0.08 0.00 0.00

Mason day 0.10 0.00 0.00

Mazdoor day 1.63 0.00 0.00

Bhisti day 0.27 0.00 0.00

c) Machinery

Concrete mixer 0.4/0.28 cum hour 0.40 0.00 0.00


capacity
d) Formwork @ 4.0% on cost of 0.00
material, labour and
machinery (a+b+c)

e) Overheads @ 10.0% on (a+b+c+d) 0.00

f) Contractor’s profit @ 10% on (a+b+c+d+e) 0.00

Rate per cum = (a+b+c+d+e+f) 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

11.4 802, 803, 1202 & Providing concrete for plain/reinforced


1203 concrete in open foundations complete as
per drawings and technical specification

II. P.C.C grade M-15

(i) Nominal mix 1:2.5:5

Unit = cum

a) Material

Cement t 0.275 0.00 0.00

Coarse sand cum 0.480 0.00 0.00

40 mm aggregate cum 0.480 0.00 0.00

20 mm aggregate cum 0.240 0.00 0.00

10 mm aggregate cum 0.080 0.00 0.00

b) Labour

Mate day 0.08 0.00 0.00

Mason ( Ist class ) day 0.10 0.00 0.00

Mazdoor ( Unskilled ) day 1.63 0.00 0.00

Bhisti day 0.27 0.00 0.00

c) Machinery

Concrete mixer 0.4/0.28 cum hour 0.40 0.00 0.00


capacity
d) Formwork @ 4.0% on cost of 0.00
material, labour and
machinery (a+b+c)

e) Overheads @ 10.0% on (a+b+c+d) 0.00

f) Contractor’s profit @ 10% on (a+b+c+d+e) 0.00

Rate per cum = (a+b+c+d+e+f) 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

11.4 802, 803, 1202 & Providing concrete for plain/reinforced


1203 concrete in open foundations complete as
per drawings and technical specification

III. P.C.C grade M-20

(i) Nominal mix 1:2:4

Unit = cum

a) Material

Cement t 0.330 0.00 0.00

Coarse sand cum 0.450 0.00 0.00

40 mm aggregate cum 0.360 0.00 0.00

20 mm aggregate cum 0.360 0.00 0.00

10 mm aggregate cum 0.180 0.00 0.00

b) Labour

Mate day 0.08 0.00 0.00

Mason ( Ist class ) day 0.10 0.00 0.00

Mazdoor ( Unskilled ) day 1.63 0.00 0.00

Bhisti day 0.27 0.00 0.00

c) Machinery

Concrete mixer 0.4/0.28 cum hour 0.40 0.00 0.00


capacity
d) Formwork @ 4.0% on cost of 0.00
material, labour and
e) machinery (a+b+c)
Overheads @ 10.0% on (a+b+c+d) 0.00

f) Contractor’s profit @ 10% on (a+b+c+d+e) 0.00

Rate per cum = (a+b+c+d+e+f) 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

11.4 802, 803, 1202 & Providing concrete for plain/reinforced


1203 concrete in open foundations complete as
per drawings and technical specification

IV. R.C.C grade M-20

Unit = cum

a) Material

Cement t 0.350 0.00 0.00

Coarse sand cum 0.450 0.00 0.00

20 mm aggregate cum 0.540 0.00 0.00

10 mm aggregate cum 0.360 0.00 0.00

b) Labour

Mate day 0.08 0.00 0.00

Mason ( Ist class ) day 0.12 0.00 0.00

Mazdoor ( Unskilled ) day 1.73 0.00 0.00

Bhisti day 0.27 0.00 0.00

c) Machinery

Concrete mixer 0.4/0.28 cum hour 0.40 0.00 0.00


capacity
d) Formwork @ 4.0% on cost of 0.00
material, labour and
machinery (a+b+c)
e) Overheads @ 10.0% on (a+b+c+d) 0.00

f) Contractor’s profit @ 10% on (a+b+c+d+e) 0.00

Rate per cum = (a+b+c+d+e+f) 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

11.4 802, 803, 1202 & Providing concrete for plain/reinforced


1203 concrete in open foundations complete as
per drawings and technical specification

V. R.C.C grade M-25

Unit = cum

a) Material

Cement t 0.404 0.00 0.00

Coarse sand cum 0.450 0.00 0.00

20 mm aggregate cum 0.540 0.00 0.00

10 mm aggregate cum 0.360 0.00 0.00

b) Labour

Mate day 0.08 0.00 0.00

Mason ( Ist class ) day 0.12 0.00 0.00

Mazdoor ( Unskilled ) day 1.73 0.00 0.00

Bhisti day 0.27 0.00 0.00

c) Machinery

Concrete mixer 0.4/0.28 cum hour 0.40 0.00 0.00


capacity
d) Formwork @ 4.0% on cost of 0.00
material, labour and
e) machinery (a+b+c)
Overheads @ 10.0% on (a+b+c+d) 0.00

f) Contractor’s profit @ 10% on (a+b+c+d+e) 0.00

Rate per cum = (a+b+c+d+e+f) 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

11.5 600, 1202, 1203 Brick masonary work in cement mortar in


foundation complete excluding pointing
and plastering as per drawing and technical
specifications Clause 600, 1202 & 1203.

Unit = cum

I. Brick masonary in 1:3 cement mortar

a) Material

Brick Nos 500.000 0.00 0.00

Cement mortar 1:3 cum 0.24 0.00 0.00

b) Labour

Mate day 0.09 0.00 0.00

Mason ( Ist Class ) day 0.80 0.00 0.00

Mazdoor ( Unskilled ) day 1.60 0.00 0.00

Bhisti day 0.20 0.00 0.00

d) Overheads @ 10.0% on (a+b) 0.00

e) Contractor’s profit @ 10% on (a+b+c) 0.00

Rate per cum = (a+b+c+d) 0.00


*
Chapter–10

TRAFFIC SIGNS, MARKINGS AND OTHER ROAD APPURTENANCES

Sr. Reference to Description Unit Quantity Rate Total


No. MORD (Rs.) Amount (Rs.)
Specifications

10.1 1701 Printing New Letters and Figures of any Shade.


Printing new letter and figures of any shade
with synthetic enamel paint black or any
other approved colour to give an even
shade as per drawing and Technical
specification Clause 1701.

Details for 100 letters of 160 mm height, i.e.,


1.6
i) m.Hindi
Unit = per cm height per letter
Taking output = 40 sqm
a) Labour
Mate day 0.12 0.00 0.00
Painter Ist class day 2.00 0.00 0.00
Mazdoor ( Unskilled ) day 1.00 0.00 0.00
b) Material
Paint litre 0.70 0.00 0.00
c) Overheads @ 10.0% on (a+b) 0.00
d) Contractor’s profit @ 10% on (a+b+c) 0.00
Cost for 1600 cm = a+b+c+d 0.00
Rate per cm height per letter = (a+b+c+d)/1600 0.00
Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

10.1 1701 Printing New Letters and Figures of any Shade.


Printing new letter and figures of any shade
with synthetic enamel paint black or any
other approved colour to give an even
shade as per drawing and Technical
specification Clause 1701.

Details for 100 letters of 160 mm height, i.e.,


1.6 m.
ii) English and Roman
Unit = per cm height per letter
Taking output = 40 sqm
a) Labour
Mate day 0.07 0.00 0.00
Painter Ist class day 1.25 0.00 0.00
Mazdoor ( Unskilled ) day 0.50 0.00 0.00
b) Material
Paint litre 0.50 0.00 0.00
c) Overheads @ 10.0% on (a+b) 0.00
d) Contractor’s profit @ 10% on (a+b+c) 0.00
Cost for 1600 cm = a+b+c+d 0.00
Rate per cm height per letter = (a+b+c+d)/1600 0.00
Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

10.3(B) 1701 Providing and erecting direction and place


indentifications of semi reflective sign
boards as per IRC:67 made of 2 mm thick
M. S. Sheet duly stove enameled paint in
white colour in front and grey colour on
back with red reflective border of 70 mm
width and required message, letters, figures
with reflective engineering grade tape as
per MORD specifications of required shade
and colour. Supported and welded on 47
mm × 47 mm of 12 SWG Square tube of
3050 mm height duly strengthened by 25
mm × 5 mm M/s flat iron on edges on back
firmly fixed to the ground by means of
properly designed foundations with M-15
grade cement concrete 450 mm × 450 mm ×
600 mm, 600 mm below ground level as per
approved drawing and Technical
Specification Clause 1701

Unit = sqm
Taking output = 40 sqm

10.5 1700 Painting Two Coats on New Concrete Surfaces

Painting two coats including primer coat


after filling the surface with synthetic
enamel paint in all shades on new
plastered/ concrete surfaces as per drawing
and Technical specification
Unit = sqm

Taking output = 40 sqm

a) Labour
Mate day 0.20 0.00 0.00
Painter day 3.00 0.00 0.00
Mazdoor day 2.00 0.00 0.00
b) Material

Cement Primer as per specifications l 3.00 0.00 0.00


Paint conforming to requirement of l 6.00 0.00 0.00
Clause 1701.3.8
Add for scaffolding @ 1 per cent of
labour cost where required

c) Overheads @ 10.0% on (a+b) 0.00

d) Contractor’s profit @ 10% on (a+b+c) 0.00

Cost for 40 sqm = a+b+c+d 0.00

Rate per sqm = (a+b+c+d)/40 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

10.10 1700 Kilometre Stone

Reinforced cement concrete M-15 grade


kilometre stone/Local stone of standard
design as per IRC:8-1980, fixing in position
including painting and printing, etc

i) 5th kilometre stone (precast)

Unit = each

Taking output = 6 Nos.

a) M-15 grade of concrete cum 2.35 0.00 0.00


( As per item 12.5 )
b) Steel reinforcement @ 5 kg per kg 22.08 0.00 0.00
sqm ( As per item 12.6 )
c) Excavation in soil for foundation cum 1.68 0.00 0.00
( As per item 11.1 )
d) Painting two coats on concrete sqm 9.85 0.00 0.00
surface ( As per ite
10.5 )
e) Lettering on km post (average 30 per cm 1,800.00 0.00 0.00
letters of 10 cm height each) ( As per
per item 10.1 ) letter

Transportation and fixing

f) Labour

Mate day 0.26 0.00 0.00

Mason day 0.60 0.00 0.00

Mazdoor including day 6.00 0.00 0.00


loading/unloading
g) Machinery

50 HP Tractor with trolley hour 6.00 0.00 0.00

h) Overheads @ 10.0% on (f+g) 0.00

i) Contractor’s profit @ 10% on (f+g+h) 0.00

Cost for 6 Nos. 5th km stone = a+b+c+d+e+f+g+h+i 0.00

Rate for each 5th km stone = (a+b+c+d+e+f+g+h+i)/6 0.00

Say RS 0.00
Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

10.10 1700 Kilometre Stone

Reinforced cement concrete M-15 grade


kilometre stone/Local stone of standard
design as per IRC:8-1980, fixing in position
including painting and printing, etc

ii) Ordinary Kilometer stone (Precast)

Unit = each

Taking output = 14 Nos.

a) M-15 grade of concrete cum 3.77 0.00 0.00


( As per item 12.5 )
b) Steel reinforcement @ 5 kg per kg 26.32 0.00 0.00
sqm ( As per item 12.6 )
c) Excavation in soil for foundation cum 2.77 0.00 0.00
( As per item 11.1 )
d) Painting two coats on concrete sqm 11.41 0.00 0.00
surface ( As per ite
10.5 )
e) Lettering on km post (average 12 per cm 1,680.00 0.00 0.00
letters of 10 cm height each) ( As per
per item 10.1 ) letter

Transportation and fixing

f) Labour

Mate day 0.32 0.00 0.00

Mason day 1.00 0.00 0.00

Mazdoor day 7.00 0.00 0.00

g) Machinery

50 HP Tractor with trolley hour 6.00 0.00 0.00

h) Overheads @ 10.0% on (f+g) 0.00

i) Contractor’s profit @ 10% on (f+g+h) 0.00

Cost for 14 Nos. ordinary km 0.00


stone = a+b+c+d+e+f+g+h+i

Rate for each ordinary km stone = 0.00


(a+b+c+d+e+f+g+h+i)/14

Say RS 0.00
Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

10.10 1700 Kilometre Stone

Reinforced cement concrete M-15 grade


kilometre stone/Local stone of standard
design as per IRC:8-1980, fixing in position
including painting and printing, etc

iii) 200 m stone (precast)

Unit = each

Taking output = 33 Nos.

a) M-15 grade of concrete cum 1.58 0.00 0.00


( As per item 12.5 )
b) Steel reinforcement @ 5 kg per kg 66.00 0.00 0.00
sqm ( As per item 12.6 )
c) Excavation in soil for foundation cum 1.39 0.00 0.00
( As per item 11.1 )
d) Painting two coats on concrete sqm 6.27 0.00 0.00
surface ( As per ite
10.5 )
e) Lettering on km post (average 1 per cm 330.00 0.00 0.00
letter of 10 cm height each) ( As per
per item 10.1 ) letter

Transportation and fixing

f) Labour

Mate day 0.34 0.00 0.00

Mason day 1.50 0.00 0.00

Mazdoor day 7.00 0.00 0.00

g) Machinery

50 HP Tractor with trolley hour 6.00 0.00 0.00

h) Overheads @ 10.0% on (f+g) 0.00

i) Contractor’s profit @ 10% on (f+g+h) 0.00

Cost for 33 Nos. 200 m stone = a+b+c+d+e+f+g+h+i 0.00

Rate for each 200 m stone = (a+b+c+d+e+f+g+h+i)/33 0.00

Say RS 0.00
Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

10.11 1700 Boundary Pillar

Reinforced cement concrete M-15 grade


boundary pillars/local stone of standard
design as per IRC:25-1967, fixed in position
including finishing and lettering but
excluding painting.

Unit = each

Taking output = 57 Nos.

a) M-15 grade of concrete ( As cum 1.25 0.00 0.00


per item 12.5 )
b) Steel reinforcement ( As kg 79.80 0.00 0.00
per item 12.6 )
c) Excavation in soil for foundation ( As cum 10.72 0.00 0.00
per item 11.1 )
d) Lettering each 10 cm ) per 2,280.00 0.00 0.00
( As per item 10.1 ) letter
per cm
high
Transportation and fixing

e) Labour

Mate day 0.57 0.00 0.00

Mazdoor day 14.25 0.00 0.00

f) Machinery

Tractor with trolley hour 6.00 0.00 0.00

g) Material

Stone spall cum 11.97 0.00 0.00

h) Overheads @ 10.0% on (e+f+g) 0.00

i) Contractor’s profit @ 10% on (e+f+g+h) 0.00

Cost for 57 Nos. boundary pillar = a+b+c+d+e+f+g+h+i 0.00

Rate for each boundary pillar = (a+b+c+d+e+f+g+h+i)/57 0.00

Say RS 0.00
Chapter – 9

PIPE CULVERTS

Sr. Reference to Description Unit Quantity Rate Total


No. MORD (Rs.) Amount (Rs.)
Specifications

9.3 1100 Providing and laying Reinforced Cement


Concrete Pipe NP3 as per design in Single
Row

Providing and laying reinforced cement


concrete pipe NP3 for culverts on first class
bedding of granular material in single row
including fixing collar with cement mortar 1:2
but excluding excavation, protection works,
backfilling, concrete and masonry works in
head walls and parapets.

Unit = m

Taking output = 7.5 m

(3 pipes of 2.5 m length each)

(A) 1200 mm dia

a) Labour

Mate day 0.14 0.00 0.00

Mason day 0.50 0.00 0.00

Mazdoor day 3.00 0.00 0.00

b) Material

Sand at site cum 0.05 0.00 0.00

Cement at site t 0.07 0.00 0.00

RCC pipe NP3 pipe including m 7.50 0.00 0.00


collar at site

c) Overheads @ 10.0% on (a+b) 0.00

d) Contractor’s profit @ 10% (a+b+c) 0.00

Cost for 7.5 m = a+b+c+d 0.00

Rate per m = (a+b+c+d)/7.5 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

9.3 1100 Providing and laying Reinforced Cement


Concrete Pipe NP3 as per design in Single
Row

Providing and laying reinforced cement


concrete pipe NP3 for culverts on first class
bedding of granular material in single row
including fixing collar with cement mortar 1:2
but excluding excavation, protection works,
backfilling, concrete and masonry works in
head walls and parapets.

Unit = m

Taking output = 7.5 m

(3 pipes of 2.5 m length each)

(B) 1000 mm dia

a) Labour

Mate day 0.09 0.00 0.00

Mason day 0.25 0.00 0.00

Mazdoor day 2.00 0.00 0.00

b) Material

Sand at site cum 0.04 0.00 0.00

Cement at site t 0.03 0.00 0.00

RCC pipe NP3 concrete pipe m 7.50 0.00 0.00


including collar at site

c) Overheads @ 10.0% (a+b) 0.00

d) Contractor’s profit @ 10% (a+b+c) 0.00

Cost for 7.5 m = a+b+c+d 0.00

Rate per m = (a+b+c+d)/7.5 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

9.5 1100 Providing and laying Reinforced Cement


Concrete Pipe NP3 as per design in Double
Row
Providing and laying reinforced cement
concrete pipe NP3 for culverts on first class
bedding of granular material in double row
including fixing collar with cement mortar 1:2
but excluding excavation, protection works,
backfilling, concrete and masonry works in
head walls and parapets as per Clause 1106.

Unit = m

Taking output = 7.5 m

(6 pipes of 2.5 m length each)

(B) 1000 mm dia

a) Labour

Mate day 0.22 0.00 0.00

Mason Ist class day 0.60 0.00 0.00

Mazdoor day 4.80 0.00 0.00

b) Material

Sand at site cum 0.080 0.00 0.00

Cement at site t 0.060 0.00 0.00

RCC pipe NP3 concrete pipe m 15.00 0.00 0.00


including collar at site
c) Overheads @ 10.0% (a+b) 0.00

d) Contractor’s profit @ 10% (a+b+c) 0.00

Cost for 7.5 m = a+b+c+d 0.00

Rate per m = (a+b+c+d)/7.5 0.00


Chapter – 8

HILL ROADS

Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.1 200 Site Clearance

As per Chapter 2
Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.2 1600 Setting Out

Unit = 1km

The analysis of rate per km shall account of the following:

(i) Construction of permanent benchmark 1


No., TBM 20 Nos. in 1 km

(ii) Construction of reference pillars (burjee)


at 25 m on both sides in 1 km as per Fig.
1600.2 and @ 8.33 m interval on curves

(iii) Construction of back pillars as per Fig. 1600.1.

(iv) Construction of job pillars as per Fig. 1600.1.

(v) (1) Construction of reference pillers as per figure 1600.2

(I) Excavation for structure


earthwork in excavation
fundation as drawing and
technical specifications.

As per item No.11.1 of Chapter cum 0.012


11

(II) Stone masonry work in cement


mortar in foundation complete
as per drawing and technical
specifications

As per item No.11.6 of chapter cum 0.012


11
(III) Plaster with cement mortar 1:4
as technical specifications

As per item No.12.3 of chapter sqm 0.04


12
(2) Construction of back piller as per figure No. 1600.1

Earthwork for structure

(I) Earthwork in excavation for


foundation as per drawing and
technical specification

As per item No. 11.1 of chapter cum 0.036


11
Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

(II) Stone masonary work in


cement mortar in foundation
complete as per drawing and
technical specification

As per itme No. 11.6 chapter 11 cum 0.036

(III) Plaster with cement sand


mortar 1:4 as per technical
specifications

As per item 12.3 of chapter 12 sqm 0.45

(3) Construction of Job pillers as per figure No. 1600.1

(I) Earth work for structure earth


work in excavation for
foundation as per drawing and
technical specification

As per item No. 11.1 of chapter cum 0.096

(II) Stone masonary work in


cement sand mortar in
foundation complete as per
drawing and technical
specification

As per item No. 11.6 of chapter cum 0.096


11

(III) Plaster with cement sand


mortar 1:4 as per drawing and
technical specification

As per Item No.12.3 of chapter sqm 0.96


12
(vi) The marking of centre line, setting out,
curves, recording of levels, etc. by the
surveyor will be incidental to work and
no extra payment shall be made for the
same.
Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.3 1600 / 300 Earthwork in Hill Road

(i) Excavation in Hilly Areas in Soil by manual means.

Excavation in soil in Hilly Area by


manual means including cutting and
trimming of side slopes and disposing of
excavated earth with all lifts and lead
upto 20 m.

Unit = cum

Taking output = 120 cum

a) Labour

Mate day 2.40 #NAME? #NAME? L-17

Mazdoor day 60.00 #NAME? #NAME? L-18

b) Overheads @ 10.0% on (a) #NAME?

c) Contractor’s profit @ 10% on (a+b) #NAME?

Cost for 120 cum = (a+b+c) #NAME?

Rate per cum = (a+b+c)/120 #NAME?


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.3 1600 / 300 Earthwork in Hill Road

(ii) Excavation in Hilly Areas in Soil by mechanical means.

Excavation in soil in Hilly Area by


mechanical means including cutting and
trimming of side slopes and disposing of
excavated earth with all lifts and lead
upto 1000 m.

Unit = cum

Taking output = 260 cum

a) Labour

Mate day 0.24 #NAME? #NAME? L-17

Mazdoor for trimming slopes and day 6.00 #NAME? #NAME? L-18
helping in excavation, etc.

b) Machinery

Dozer D-50 (90 HP) @ 43.28 cum per hour 6.00 0.00 0.00 PM-007
hour

Front end loader hour 6.00 Err:509 Err:509 PM-011

Tipper 5.5 cum capacity, 4 trips per hour 12.00 Err:509 Err:509 PM-035
hour

c) Overheads @ 10.0% on (a+b) Err:509

d) Contractor’s profit @ 10% on (a+b+c) Err:509

Cost for 260 cum = a+b+c+d Err:509

Rate per cum = (a+b+c+d)/260 Err:509


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.4 1600 / 300 (i) Excavation in Hilly Area in Ordinary


Rock by manual means

Excavation in ordinary rock using


manual means including loading in a
truck and carrying of excavated material
to embankment site with in all lifts and
leads upto 20 m jumper work.

Unit = cum

Taking output = 120 cum

a) Labour

Mate day 5.28 #NAME? #NAME? L-17

Mazdoor day 132.00 #NAME? #NAME? L-18

b) Overheads @ 10.0% on (a) #NAME?

c) Contractor’s profit @ 10% on (a+b) #NAME?

Cost for 120 cum = a+b+c #NAME?

Rate per cum = (a+b+c)/120 #NAME?


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.4 1600 / 300 (ii) Excavation in Hilly Areas in Ordinary


Rock by mechanical means not
requiring blasting

Excavation in hilly area in ordinary rock


not requiring blasting by mechanical
means including cutting and trimming of
slopes and disposal of cut material with
all lift and lead upto 1000 m

Unit = cum

Taking output = 170 cum

a) Labour

Mate day 0.32 #NAME? #NAME? L-17

Mazdoor day 8.00 #NAME? #NAME? L-18

b) Machinery

Dozer D-50 (90 HP) @ 28.32 cum per hour 6.00 0.00 0.00 PM-007
hour

Front end loader hour 7.00 Err:509 Err:509 PM-011

Tipper 5.5 cum capacity, 4 trips per hour 7.00 Err:509 Err:509 PM-035
hour

c) Overheads @ 10.0% on (a+b) Err:509

d) Contractor’s profit @ 10% on (a+b+c) Err:509

Cost for 170 cum = a+b+c+d Err:509

Rate per cum = (a+b+c+d)/170 Err:509


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.5 1600 / 300 Excavation in Hilly Areas in Hard Rock requiring blasting

Excavation in hilly areas in hard rock requiring


blasting, by mechanical means including
trimming of slopes and disposal of cut material
with all lift and lead upto 1000 m.

Unit = cum

Taking output = 170 cum

a) Labour

Mate day 0.49 #NAME? #NAME? L-17

Mazdoor day 10.00 #NAME? #NAME? L-18

Driller day 2.00 #NAME? #NAME? L-11

Blaster day 0.25 #NAME? #NAME? L-05

b) Machinery

Dozer D-50 (90 HP) @ 28.32 cum per hour hour 6.00 0.00 0.00 PM-007

Air compressor 250 cfm with two jack hour 5.00 0.00 0.00 PM-001
hammer @ 20 cum per hour

Front end loader hour 7.00 Err:509 Err:509 PM-011

Tipper 5.5 cum capacity, 4 trips per hour hour 7.00 Err:509 Err:509 PM-035

c) Materials

Gelatine 80 per cent kg 35.00 #NAME? #NAME? M-107

Electric detonators @ 1 detonator for 2 nos 140.00 #NAME? #NAME? M-095


Gelatine sticks of 125 gms each

d) Overheads @ 10.0% on (a+b+c) #NAME?

e) Contractor’s profit @ 10% on (a+b+c+d) #NAME?

Cost for 170 cum = a+b+c+d+e #NAME?

Rate per cum = (a+b+c+d+e)/170 #NAME?


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.6 1600 / 600 / 700 Retaining Walls / Breast Walls

Construction of retaining walls/breast walls in


cement mortor with 1:5 as per drawing and
technical specifications.

Unit = cum

(i) Earthwork for structures

As per item No.11.1(i to iv) of Chapter 11 cum


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.6 1600 / 600 / 700 Retaining Walls / Breast Walls

Construction of retaining walls/breast walls in


cement mortor with 1:5 as per drawing and
technical specifications.

Unit = cum

(ii) Plain cement concrete M-10 grade

As per item No.11.4 of Chapter 11 cum


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.6 1600 / 600 / 700 Retaining Walls / Breast Walls

Construction of retaining walls/breast walls in


cement mortor with 1:5 as per drawing and
technical specifications.

Unit = cum

(iii) Stone masonry in cement mortor 1:5

As per item No. 12.4 (iii) of Chapter 12 cum


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.6 1600 / 600 / 700 Retaining Walls / Breast Walls

Construction of retaining walls/breast walls in


cement mortor with 1:5 as per drawing and
technical specifications.

Unit = cum

(iv) Pointing with cement mortor 1:3

As per item No.12.2 of Chapter 12 cum


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.6 1600 / 600 / 700 Retaining Walls / Breast Walls

Construction of retaining walls/breast walls in


cement mortor with 1:5 as per drawing and
technical specifications.

Unit = cum

(v) Providing P.C.C. M-20 architectural


coping on top of retaining wall/breast
wall

As per item No.12.12 of Chapter 12 cum


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.6 1600 / 600 / 700 Retaining Walls / Breast Walls

Construction of retaining walls/breast walls in


cement mortor with 1:5 as per drawing and
technical specifications.

Unit = cum

(vi) Back filling behind retaining wall/breast wall

As per item No. 12.9 of Chapter 12 cum


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.6 1600 / 600 / 700 Retaining Walls / Breast Walls

Construction of retaining walls/breast walls in


cement mortor with 1:5 as per drawing and
technical specifications.

Unit = cum
Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

Drainage

8.7 1600/700 Construction of hill side drain in accordance


/300/800 with the requirement of specifications true to
lines and grades. Dimesions and other
particulars as per drawing or directed by the
Engineer.

Unit = 1 m

(i) Earthwork in excavation for structures


as per drawing and technical
specification

As per item No.11.1 of Chapter 11 cum


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.7 1600/700 Construction of hill side drain in accordance


/300/800 with the requirement of specifications true to
lines and grades. Dimesions and other
particulars as per drawing or directed by the
Engineer.

Unit = 1 m

(ii) Plain cement concrete M-10 grade

As per item No.11.4 of Chapter 11 cum


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.7 1600/700 Construction of hill side drain in accordance


/300/800 with the requirement of specifications true to
lines and grades. Dimesions and other
particulars as per drawing or directed by the
Engineer.

Unit = 1 m

(iii) Stone masonry in cement mortor 1:5

As per item No.12.4 of Chapter 12 cum


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.7 1600/700 Construction of hill side drain in accordance


/300/800 with the requirement of specifications true to
lines and grades. Dimesions and other
particulars as per drawing or directed by the
Engineer.

Unit = 1 m

(iv) Plain cement concrete M-15 grade

As per item No.11.7 of Chapter 11 cum


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.7 1600/700 Construction of hill side drain in accordance


/300/800 with the requirement of specifications true to
lines and grades. Dimesions and other
particulars as per drawing or directed by the
Engineer.

Unit = 1 m

(v) Cement plaster 9 mm thick 1:3 on stone masonry

As per item No.12.3 of Chapter 12 cum


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.7 1600/700 Construction of hill side drain in accordance


/300/800 with the requirement of specifications true to
lines and grades. Dimesions and other
particulars as per drawing or directed by the
Engineer.

Unit = 1 m

(vi) Providing P.C.C. M-20 architectural


coping on top of wall

As per item No.12.11 of Chapter 12 cum


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.8 1600/300/ Construction of catch water/intercepting drain


700/800 in random rubble masonry in 1:5 cement sand
mortor true to the specified lines grades levels
and dimensions as per the requirement of the
specifications

Unit = 1 m

(i) Earthwork in excavation for structures


as per drawing and technical
specification
As per item No.11.1 of Chapter 11 cum
Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.8 1600/300/ Construction of catch water/intercepting drain


700/800 in random rubble masonry in 1:5 cement sand
mortor true to the specified lines grades levels
and dimensions as per the requirement of the
specifications

Unit = 1 m

(ii) Plain cement concrete M-10 grade

As per item No.11.4 of Chapter 11 cum


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.8 1600/300/ Construction of catch water/intercepting drain


700/800 in random rubble masonry in 1:5 cement sand
mortor true to the specified lines grades levels
and dimensions as per the requirement of the
specifications

Unit = 1 m

(iii) Stone masonry in cement mortor 1:5

As per item No.12.4 of Chapter 12 cum


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.8 1600/300/ Construction of catch water/intercepting drain


700/800 in random rubble masonry in 1:5 cement sand
mortor true to the specified lines grades levels
and dimensions as per the requirement of the
specifications

Unit = 1 m

(iv) Plain cement concrete M-15 grade

As per item No.11.7 of Chapter 11 cum


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.8 1600/300/ Construction of catch water/intercepting drain


700/800 in random rubble masonry in 1:5 cement sand
mortor true to the specified lines grades levels
and dimensions as per the requirement of the
specifications

Unit = 1 m

(v) Cement plaster 9 mm thick 1:3 on stone masonry

As per item No. 12.3 of Chapter 12 cum


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.8 1600/300/ Construction of catch water/intercepting drain


700/800 in random rubble masonry in 1:5 cement sand
mortor true to the specified lines grades levels
and dimensions as per the requirement of the
specifications

Unit = 1 m

(vi) Providing P.C.C. M-20 architectural


coping on top of wall

As per item No.12.11 of Chapter 12 sqm


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.9 1600/300 Scupper

Construction of scupper with dry stone


masonry as per drawing and technical
specifications

Unit = 1 m

Taking output = 6 m

(i) Earthwork in excavation for structures


as per drawing and technical
specification

Quantity for 6 m formation width of hill


side rock cutting and foundation

(a) As per plate No. 7.27 of Rural Road cum 115.00 0.00
Manual
Rate as per item No.11.1(i to iv) of Chapter 11

Rate per m = a/6 0.00


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.9 1600/300 Scupper

Construction of scupper with dry stone


masonry as per drawing and technical
specifications

Unit = 1 m

Taking output = 6 m

(ii) Random rubble dry stone masonry

Quantity for 6 m formation width cum 38.00 0.00

a) Labour

Mate day 3.80 #NAME? #NAME? L-17

Mason day 38.00 #NAME? #NAME? L-16

Mazdoor day 57.00 #NAME? #NAME? L-18

b) Materials

Stone cum 38.00 0.00

Bond stone nos 266.00 0.00

c) Overheads @ 10.0% on (a+b) #NAME?

d) Contractor’s profit @ 10% on (a+b+c) #NAME?

Cost for 6 m = a+b+c+d #NAME?

Rate per m = (a+b+c+d)/6 #NAME?


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.9 1600/300 Scupper

Construction of scupper with dry stone


masonry as per drawing and technical
specifications

Unit = 1 m

Taking output = 6 m

(iii) Random course rubble stone masonry dry in corbelling

Quantity for 6 m formation width cum 9.00 0.00

a) Labour

Mate day 0.72 #NAME? #NAME? L-17

Mason 2nd class day 6.00 #NAME? #NAME? L-15

Mazdoor day 12.00 #NAME? #NAME? L-18

b) Materials

Corbelling Stones size 30 cm x 15 nos 1,335.00 0.00


cm x 15 cm including wastage

c) Overheads @ 10.0% on (a+b) #NAME?

d) Contractor’s profit @ 10% on (a+b+c) #NAME?

Cost for 6 m = a+b+c+d #NAME?

Rate per m = (a+b+c+d)/6 #NAME?


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.9 1600/300 Scupper

Construction of scupper with dry stone


masonry as per drawing and technical
specifications

Unit = 1 m

Taking output = 6 m

(iv) Stone filling in foundation trenches as


per drawing and technical specification

Quantity for 6 m formation width cum 10.00 0.00

a) Labour

Mate day 0.12 #NAME? #NAME? L-17

Mazdoor day 3.00 #NAME? #NAME? L-18

b) Materials

Loose stone cum 12.00 0.00

c) Overheads @ 10.0% on (a+b) #NAME?

d) Contractor’s profit @ 10% on (a+b+c) #NAME?

Cost for 6 m = a+b+c+d #NAME?

Rate per m = (a+b+c+d)/6 #NAME?


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.10 1400/1700/ 800 Construction of RCC guide posts of 20 cm dia


M-15 grade cast-in-situ with 20 mm nominal
size aggregate, true to line and grade,
tolerance of vertical RCC posts not to exceed 1
in 500

(i) RCC M-15 grade

Unit = cum

As per item No. 11.7 of Chapter 11

(ii) HYSD steel bars

Unit = t

As per item No. 12.6 of Chapter 12

(iii) Painting two coats including prime coat


on new concrete surface

Unit = sqm

As per item No.10.5 of Chapter 10


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.11 1600 Providing edge stones on valley side of


formation as per drawing or as ordered by the
Engineer

Unit = 1 m

Taking Output = 45 m (100 no of edge stone of


size 450 mm x 300 mm x 100 mm)

a) Labour

Labour for fixing edge stone

Mate day 0.18 #NAME? #NAME? L-17

Mazdoor day 3.00 #NAME? #NAME? L-18

Mason 2nd class day 1.50 #NAME? #NAME? L-15

b) Materials

Locally available stones of size 450 nos 100.00 0.00


mmx300 mmx100 mm
c) Painting two coats including priming
coat on new concrete/stone surfaces

45 x 0.500 = 22.50

As per item No.10.5 of Chapter 10 sqm 22.50 0.00

d) Overheads @ 10.0% on (a+b+c) #NAME?

e) Contractor’s profit @ 10% on (a+b+c+d) #NAME?

Cost for 45 m = a+b+c+d+e #NAME?

Rate per m = (a+b+c+d+e)/45 #NAME?


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.12 1600/300 Turfing with Sods

Furnishing and laying of the live sods of


perennial turf forming grass on embankment
slope, verges or other locations shown on the
drawing or as directed by the Engineer
including preparation of ground, fetching of
sods and watering.

Unit = sqm

Taking output = 100 sqm

a) Labour

Mate day 0.12 #NAME? #NAME? L-17

Mazdoor for preparation of ground and day 3.00 #NAME? #NAME? L-18
fetching of sods

b) Machinery

Water tanker including watering for 3 hour 2.00 Err:509 Err:509 PM-044
months

Tractor-trolley hour 1.00 Err:509 Err:509 PM-036

c) Materials

Farmyard manure @ 0.18 cum per 100 cum 0.18 0.00


sqm at site of work
Cost of water kl 12.00 #NAME? #NAME? M-200

d) Overheads @ 10.0% on (a+b+c) #NAME?

e) Contractor’s profit @ 10% on (a+b+c+d) #NAME?

Cost for 100 sqm = a+b+c+d+e #NAME?

Rate per sqm = (a+b+c+d+e)/100 #NAME?


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

8.13 1600/300 Seeding and Mulching

Preparation of seed bed on previously laid top


soil, furnishing and placing of seeds, fertilizer,
multching material, applying bituminous
emulsion at the rate of 0.23 l per sqm and
laying and fixing jute netting, including
watering for 3 months all as per Clause 310.

Unit = sqm

Taking output = 240 sqm

a) Labour

Mate day 0.60 #NAME? #NAME? L-17

Mazdoor day 15.00 #NAME? #NAME? L-18

b) Machinery

Water tanker 6 kl capacity including hour 13.00 Err:509 Err:509 PM-043


watering for 3 months (for one hour per
week)
Tractor-trolley hour 2.40 Err:509 Err:509 PM-036

c) Materials

Seeds kg 3.60 #NAME? #NAME? M-169

Sludge/Farm yard manure @ 0.18 cum cum 0.43 #NAME? #NAME? M-174
per 100 sqm

Bitumen Emulsion l 55.20 #NAME? #NAME? M-075

Jute netting, open weave, 2.5 cm square sqm 264.00 #NAME? #NAME? M-126
opening

Cost of water for 3 months kl 84.00 #NAME? #NAME? M-200

d) Overheads @ 10.0% on (a+b+c) #NAME?

e) Contractor’s profit @ 10% on (a+b+c+d) #NAME?

Cost for 240 sqm = a+b+c+d+e #NAME?

Rate per sqm = (a+b+c+d+e)/240 #NAME?


Chapter – 7

CAUSEWAY AND SUBMERSIBLE BRIDGES

Reference to Total
Sr. Rate
MORD Description Unit Quantity Amount
No. (Rs.)
Specifications (Rs.)

7.1 300 Excavation for Structures

Earthwork in excavation for foundation of structures as per


drawings and technical specifications, includding setting out,
construction of shoring and bracing, removal of stumps and other
deleterious matter, dressing of sides and bottom and backfilling
with approved material.

Ordinary soil upto 3 m depth

Unit = cum

As per item No.11.1 of Chapter 11

PCC 1:3:6 in Foundation (M-10 Grade)


Reference to Total
Sr. Rate
MORD Description Unit Quantity Amount
No. (Rs.)
Specifications (Rs.)

7.2 800 Plain cement concrete 1:3:6 nominal mix in foundation with
crushed stone aggregate 40 mm nominal size mechanically
mixed, placed in foundation and compacted by vibration
including curing for 14-days.

Unit = cum

As per item No.11.7 of Chapter 11


Reference to Total
Sr. Rate
MORD Description Unit Quantity Amount
No. (Rs.)
Specifications (Rs.)

7.3 600 (i) Brick Masonry Work in Cement Mortar 1:4 in Foundation
complete excluding Pointing and Plastering, as per
Drawing and Technical Specifications

(A) Brick Masonry in 1:4 cement mortar

Unit = cum

As per item No.11.5 (ii) of Chapter 11

(B) Brick Masonry in cement lime mortar (1:0.5:4.5)

Unit = cum

As per item No.11.5 (iii) of Chapter 11

OR
Reference to Total
Sr. Rate
MORD Description Unit Quantity Amount
No. (Rs.)
Specifications (Rs.)

7.3 702, 704, (ii) Stone masonry work in cement mortar in foundation
1202 & 1203 complete as per drawing and technical specification

(A) In 1:4 cement mortar

Unit = cum

As per item No.11.6 (ii) of Chapter 11

(B) In cement lime mortar (1:0.5:4.5)

Unit = cum

As per item No.11.6 (iii) of Chapter 11


Reference to Total
Sr. Rate
MORD Description Unit Quantity Amount
No. (Rs.)
Specifications (Rs.)

7.4 1500 Cement Concrete Pavement

Construction of un-reinforced, dowel jointed, plain cement


concrete pavement over a prepared sub-base with 43 grade
cement M-30 (Grade), coarse and fine aggregate conforming to
IS:383, maximum size of coarse aggregate not exceeding 25 mm,
mixed in a concrete mixer of not less than 0.2 cum capacity using
approved mix design, laid in fixed formwork (Iron channel,
Wedges, Iron plates, including levelling the formwork as per
drawing), spreading the concrete with shovels rakes, compacted
and finished in continuous operation including provision of
contraction, expansion, construction joints, applying primer
sealant, debonding strips, dowel bar, admixtures as approved,
curing compound finishing to lines and grade as per drawing.

Unit = cum

As per Item No.6.5 of Chapter 6


Reference to Total
Sr. Rate
MORD Description Unit Quantity Amount
No. (Rs.)
Specifications (Rs.)

7.5 800 Plain Cement Concrete in Open Foundation Complete as per


Drawing and Technical Specifications. P.C.C. Grade M-15 base
course for C.C. Pavement

Unit = cum

As per item No.11.7 (ii) of Chapter 11


Reference to Total
Sr. Rate
MORD Description Unit Quantity Amount
No. (Rs.)
Specifications (Rs.)

7.6 800 / 1700 Construction of RCC guide post of 25 cm dia M-15 grade cast-
in-situ with 20 mm nominal size aggregate, true to line and
grade, tolerance of vertical RCC post not to exceed 1 in 500,
centre spacing between vertical post not to exceed 2000 mm,
including two coats of painting.

(i) RCC M-15 grade

Unit = cum

As per item No.12.5 of Chapter No.12


Reference to Total
Sr. Rate
MORD Description Unit Quantity Amount
No. (Rs.)
Specifications (Rs.)

7.6 800 / 1700 Construction of RCC guide post of 25 cm dia M-15 grade cast-
in-situ with 20 mm nominal size aggregate, true to line and
grade, tolerance of vertical RCC post not to exceed 1 in 500,
centre spacing between vertical post not to exceed 2000 mm,
including two coats of painting.

(ii) HYSD Steel Bars

Unit = t

As per item No.12.6 of Chapter 12


Reference to Total
Sr. Rate
MORD Description Unit Quantity Amount
No. (Rs.)
Specifications (Rs.)

7.6 800 / 1700 Construction of RCC guide post of 25 cm dia M-15 grade cast-
in-situ with 20 mm nominal size aggregate, true to line and
grade, tolerance of vertical RCC post not to exceed 1 in 500,
centre spacing between vertical post not to exceed 2000 mm,
including two coats of painting.

(iii) Painting Two Coats including Prime Coat on New


Concrete Surfaces

Unit = sqm

As per item No.10.5 of Chapter 10


Reference to Total
Sr. Rate
MORD Description Unit Quantity Amount
No. (Rs.)
Specifications (Rs.)

7.7 1100 Laying Reinforced Cement Concrete Pipe NP3 / NP4 as


specified in design on First Class Bedding in Single Row

Unit = m

As per item No. 9.1 of Chapter 9


Reference to Total
Sr. Rate
MORD Description Unit Quantity Amount
No. (Rs.)
Specifications (Rs.)

7.8 300 Back Filling with Sand in Foundation Trenches as per Drawing
& Technical Specifications

Unit = cum

As per item No.11.2 of Chapter 11


Chapter – 6

CEMENT CONCRETE PAVEMENT

Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

6.4 1500 Cement Concrete Pavement

Construction of un-reinforced, dowel jointed


at expansion and construction joint only, plain
cement concrete pavement over a prepared
sub base, with 43 grade cement M-30 (Grade),
coarse and fine aggregates conforming to
IS:383, maximum size of coarse aggregate not
exceeding 25 mm, mixed in a concrete mixer of
not less than 0.2 cum capacity and appropriate
weigh batcher using approved mix design,
laid in approved fixed side formwork (steel
channel, laying and fixing of 125 nicron thick
polythene film, wedges, steel plates including
levelling the formwork as per drawing),
spreading the concrete with shovels, rakes,
compacted using needle, screed and plate
vibrators and finished in continuous operation
including provision of contraction, expansion,
construction joints, applying debonding strips,
primer, sealant, dowel bars, near approaches
to bridge/culvert and construction joints,
admixtures as approved, curing of concrete
slabs for 14-days, finishing to lines and grade
as per drawing and Technical Specification
Clause 1501.

Unit = cum

Taking output = 75 cum (172.50 t)

(100 x 3.75 x 0.200)

a) Labour

Mate day 7.00 0.00 0.00

Mason 1st class day 5.00 0.00 0.00

Mason 2nd class day 5.00 0.00 0.00

Mazdoor ( unskilled) day 129.00 0.00 0.00

Mazdoor ( Skilled ) day 6.00 0.00 0.00

Surveyor . day 2.00 0.00 0.00

Mazdoor ( Semi skilled ) day 6.00 0.00 0.00

Bhisti day 14.00 0.00 0.00

Blacksmith for cutting of dowel bars day 1.00 0.00 0.00


including removal of burrs, fabrications
& fixing of dowel bars.
Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

b) Machinery

(i) Concrete mixer 0.2 cum capacity (6 hour 36.00 0.00 0.00
mixers) with weigh batcher and
suitable capacity calibrated water
tank

(ii) Needle vibrator hour 9.00 150.00 1,350.00

Screed vibrator hour 9.00 150.00 1,350.00

(iii) Plate vibrator hour 9.00 150.00 1,350.00

Concrete joint cutting machine for hour 4.00 150.00 600.00


initial & final cuts

Water tanker 6 kl capacity hour 5.00 0.00 0.00

Air Compressor (1 hour initial + 1 hour 2.00 0.00 0.00


hour final)

c) Material

(i) Crushed stone coarse aggregates, cum 67.50 0.00 0.00


grading will be as per Clause
1501.2.4.1 (Table 1500-1) @ 0.90
cum/cum of concrete conforming
to Clause 600.4.4 of Specifications.

(ii) Sand as per IS:383 and conforming cum 33.75 0.00 0.00
to Clause 1500.2.4.2 @ 0.45
cum/cum of concrete.

(iii) Cement 43 grade @ 310 kg/cum of t 26.25 0.00 0.00


concrete.

(iv) 125 micron polythene sheet sqm 412.50 0.00 0.00

(v) 25 mm dia mild steel bars of grade tonne 0.1176 0.00 0.00
S 240. 500 mm long 20 Nos. at
culvert/bridge slab and at
construction joint including 5 per
cent wastage.

Bitumen primer @ 200 ml per joint tonne 0.005 0.00 0.00


for 23 joints

Bituminous sealant 800 ml per joint m 19.00 0.00 0.00


for 23 joints

Jute rope 10 mm dia including 5 m 90.00 0.00 0.00


per cent wastage

3.75 m (length) x 10 mm (width) x 5 No. 90.00 0.00 0.00


mm (thick) debonding strips cut-
out of rubber filler board, or similar
material including 5 per cent
wastage
Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

Tight fitting polythene sheathing, l 483.00 0.00 0.00


covering 2/3rd dowel bars (20x23)
including 5 per cent wastage.

Plasticizer 0.5 per cent by weight of l 122.00 0.00 0.00


cement curing compound (if used)
@ 3 sqm per litre

curing compound litre 131.25 0.00 0.00


Water for curing KL 18.00 0.00 0.00

Joint filler board 20mm thick as per sqm 3.00 0.00 0.00
IS:1838
( 4x3.75x0.20 = 3 sqm )

d) Formwork @ 3% of (a+b+c) 139.50

e) Overheads @ 10.0% on (a+b+c+d) 478.95

f) Contractor’s profit @ 10% on (a+b+c+d+e) 526.85

Cost for 75 cum = a+b+c+d+e+f 5,795.30

Rate per cum = (a+b+c+d+e+f)/75 77.27

Say Rs 77.30
Chapter – 5

BASES AND SURFACE COURSES (BITUMINOUS)

Sr. Reference to Description Unit Quantity Rate Total


No. MORD (Rs.) Amount (Rs.)
Specifications

5.1 502 Prime Coat

(i) Low porosity

Providing and applying primer coat


with bitumen emulsion on prepared
surface of granular base including
cleaning of road surface and spraying
primer at the rate of 0.70 kg/sqm using
mechanical means.

Unit = sqm

Taking output = 1750 sqm

a)  Labour

Mate day 0.04 0.00 0.00

Mazdoor day 1.00 0.00 0.00

b)  Machinery

Hydraulic broom @ 1250 sqm per hour 1.40 0.00 0.00


hour
Air compressor 250 cfm hour 1.40 0.00 0.00

Bitumen emulsion distributor @ hour 1.00 0.00 0.00


1750 sqm per hour
Water tanker 6 kl capacity 1 trip hour 0.50 0.00 0.00
per hour

c)  Material

Bitumen emulsion @ 0.85 kg per t 1.48 0.00 0.00


sqm

Water kl 3.00 0.00 0.00

d) Overheads @ 10.0% on (a+b+c) 0.00

e) Contractor’s profit @ 10% on (a+b+c+d) 0.00

Cost of 1750 sqm = a+b+c+d+e 0.00

Rate per sqm = (a+b+c+d+e)/1750 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

5.2 503 Tack Coat

Providing and applying tack coat with


Bitumen emulsion ( RS-1) using
emulsion distributor at rate of 0.20 to
0.25 kg per sqm on prepared bituminous
surface cleaned with Hydraulic broom
as per Technical Specification Clause
503.

Unit = sqm

Taking output = 1750 sqm

a)  Labour

Mate day 0.04 0.00 0.00

Mazdoor(Unskilled) day 1.00 0.00 0.00

b)  Machinery

Hydraulic broom @ 1250 sqm per hour 1.40 0.00 0.00


hour
Air compressor 250 cfm hour 1.40 0.00 0.00
Bitumen emulsion distributor @ hour 1.00 0.00 0.00
1750 sqm per hour
c)  Material

Bitumen emulsion ( RS-1) @ 0.0.225 t 0.39 0.00 0.00


kg per sqm

d) Overheads @ 10.0% on (a+b+c) 0.00

e) Contractor’s profit @ 10% on (a+b+c+d) 0.00

Cost of 1750 sqm = a+b+c+d+e 0.00

Rate per sqm = (a+b+c+d+e)/1750 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

5.11 509 Mixed Seal Surfacing

Providing, laying and rolling of close-graded


premix surfacing material of 20 mm thickness
composed of 11.2 mm to 0.9 mm (Type-A) or
13.2 mm to 0.9 mm (Type-B) aggregates using
penetration grade bitumen to required line,
grade and level to serve as wearing course on
a previously prepared base, including mixing
in a suitable plant, laying and rolling with a
smooth wheeled roller 8-10 t capacity, and
finishing to required level and grades.

By Manual Means

Type A

Unit = sqm

Taking output = 500 sqm

a) Labour

Mate day 1.40 0.00 0.00

Mazdoor ( Unskilled ) day 21.00 0.00 0.00

Mazdoor ( Semi-skilled ) day 7.00 0.00 0.00

b) Machinery

Mixall 6-10 t capacity hour 6.00 0.00 0.00

Oil fired bitumen boiler 1000 l capacity hour 6.00 0.00 0.00
fitted with spray set

Smooth wheeled roller 80-100 kN hour 6.00 0.00 0.00

c) Material

Type-A

* Bitumen @ 22 kg per 10 sqm t 1.10 0.00 0.00

Stone crushed aggregates 11.2 mm to cum 13.50 0.00 0.00


0.09 mm @ 0.27 cum per 10 sqm

d) Overheads @ 10.0% on (a+b+c) 0.00

e) Contractor’s profit @ 10% on (a+b+c+d) 0.00

Cost of 10250 sqm = a+b+c+d+e 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

Rate per sqm = (a+b+c+d+e)/500 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

5.11 509 Mixed Seal Surfacing

Providing, laying and rolling of close-graded


premix surfacing material of 20 mm thickness
composed of 11.2 mm to 0.9 mm (Type-A) or
13.2 mm to 0.9 mm (Type-B) aggregates using
penetration grade bitumen to required line,
grade and level to serve as wearing course on
a previously prepared base, including mixing
in a suitable plant, laying and rolling with a
smooth wheeled roller 8-10 t capacity, and
finishing to required level and grades.

By Manual Means

Type B

Unit = sqm

Taking output = 500 sqm

a) Labour

Mate day 1.40 0.00 0.00

Mazdoor ( Unskilled ) day 21.00 0.00 0.00

Mazdoor ( Semi-skilled ) day 7.00 0.00 0.00

b) Machinery

Mixall 6-10 t capacity hour 6.00 0.00 0.00

Oil fired bitumen boiler 1000 l capacity hour 6.00 0.00 0.00
fitted with spray set
Smooth wheeled roller 80-100 kN hour 6.00 0.00 0.00

c) Material

Type-B

Bitumen @ 19 kg per 10 sqm t 0.95 0.00 0.00

Stone crushed aggregates 13.2 mm to cum 13.50 0.00 0.00


0.09 mm @ 0.27cum per 10 sqm
d) Overheads @ 10.0% on (a+b+c) 0.00

e) Contractor’s profit @ 10% on 0.00

Cost of 500 sqm = a+b+c+d+e 0.00

Rate per sqm = (a+b+c+d+e)/500 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

5.11 509 Mixed Seal Surfacing

Providing, laying and rolling of close-graded


premix surfacing material of 20 mm thickness
composed of 11.2 mm to 0.9 mm (Type-A) or
13.2 mm to 0.9 mm (Type-B) aggregates using
penetration grade bitumen to required line,
grade and level to serve as wearing course on
a previously prepared base, including mixing
in a suitable plant, laying and rolling with a
smooth wheeled roller 8-10 t capacity, and
finishing to required level and grades.

509 By Mechanical Means

Type A

Unit = sqm

Taking output = 4000 sqm (80 cum)

a) Labour

Mate day 0.52 0.00 0.00

Mazdoor ( Un skilled ) day 10.00 0.00 0.00

Mazdoor ( Skilled ) day 3.00 0.00 0.00

b)  Machinery

HMP of appropriate capacity hour 6.00 0.00 0.00

Electric generator set 125 KVA hour 6.00 0.00 0.00

Front end loader 1 cum bucket capacity hour 6.00 0.00 0.00

Tipper 10 t capacity hour 176.00 0.00 0.00


Paver finisher hour 6.00 0.00 0.00
Smooth wheeled 8-10 t roller hour 18.00 0.00 0.00
c)   Material

Type-A
* Bitumen @ 22 kg per 10 sqm t 8.80 0.00 0.00
Stone crushed aggregates 11.2 mm to cum 108.00 0.00 0.00
0.09 mm @ 0.27 cum per 10 sqm

d) Overheads @ 10.0% on (a+b+c) 0.00

e) Contractor’s profit @ 10% on (a+b+c+d) 0.00

Cost of 4000 sqm = a+b+c+d+e 0.00

Rate per sqm = (a+b+c+d+e)/4000 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

5.11 509 Mixed Seal Surfacing


Providing, laying and rolling of close-graded
premix surfacing material of 20 mm thickness
composed of 11.2 mm to 0.9 mm (Type-A) or
13.2 mm to 0.9 mm (Type-B) aggregates using
penetration grade bitumen to required line,
grade and level to serve as wearing course on
a previously prepared base, including mixing
in a suitable plant, laying and rolling with a
smooth wheeled roller 8-10 t capacity, and
finishing to required level and grades.

509 By Mechanical Means


Type B
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate day 0.52 0.00 0.00
Mazdoor ( Un skilled ) day 10.00 0.00 0.00
Mazdoor ( Skilled ) day 3.00 0.00 0.00
b)  Machinery
HMP of appropriate capacity hour 6.00 0.00 0.00 ****
Electric generator set 125 KVA hour 6.00 0.00 0.00
Front end loader 1 cum bucket capacity hour 6.00 0.00 0.00
Tipper 10 t capacity hour 176.00 0.00 0.00
Add 10 per cent of cost of carriage to
cover
Paver cost of loading and unloading
finisher hour 6.00 0.00 0.00
Smooth wheeled 8-10 t roller hour 18.00 0.00 0.00
Type-B
Bitumen @ 19 kg per 10 sqm t 7.60 0.00 0.00
Stone crushed aggregates 13.2 mm to cum 108.00 0.00 0.00
d) 0.09 mm @ 0.27
Overheads cum on
@ 10.0% per(a+b+c)
10 sqm 0.00
e) Contractor’s profit @ 10% on (a+b+c+d) 0.00
Cost of 4000 sqm = a+b+c+d+e 0.00
Rate per sqm = (a+b+c+d+e)/4000 0.00
*****
Chapter – 4

GRANULAR SUB-BASES, BASES (NON-BITUMINOUS) AND SHOULDERS

Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

4.1 401 Granular Sub-base with Close Graded Material (Table 400.1)

(A) By Mix in Place Method

Construction of granular sub-base by


providing close graded material,
spreading in uniform layers with
motor grader on prepared surface,
mixing by mix in place method with
rotavator at OMC, and compacting
with smooth wheeled roller to achieve
the desired density, complete as per
Clause 401.4.2

Unit = cum

Taking output = 300 cum

a) Labour

Mate day 0.48 0.00 0.00

Mazdoor skilled day 2.00 0.00 0.00

Mazdoor unskilled day 10.00 0.00 0.00

b) Machinery

Motor Grader 110 HP @ 50 cum hour 6.00 0.00 0.00


per hour
Smooth wheeled roller 80-100 kN hour 30.00 0.00 0.00
10 cum per hour
Tractor - Rotavator 25 cum per hour 12.00 0.00 0.00
hour
Truck chasis mounted water hour 5.00 0.00 0.00
tanker 6 kl capacity

c) Material

Close graded granular sub-base


material as per Table 400.1
Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

For Grading I Material

53 mm to 9.5 mm @ 50 per cent cum 192.00 0.00 0.00

9.5 mm to 2.36 mm @ 20 per cent cum 77.00 0.00 0.00

2.36 mm below @ 30 per cent cum 115.00 0.00 0.00

Water kl 30.00 0.00 0.00

d) Overheads @ 10.0% on (a+b+c) 0.00

e) Contractor’s profit @ 10% on (a+b+c) 0.00

Cost for 300 cum = a+b+c+d+e 0.00

Rate per m = (a+b+c+d+e)/300 0.00


Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

4.7 405 Water Bound Macadam Sub-base / Base


Providing, laying, spreading and compacting
stone aggregates of specific sizes to water
bound macadam specification including
spreading in uniform thickness, hand
packing, rolling with three wheel 80-100 kN
static roller in stages to proper grade and
camber, applying and brooming, stone
screening/binding materials to fill-up the
interstices of coarse aggregate, watering and
compacting to the required density as per
Technical Specification Clause 405.

WBM Grade-2
(A) By Manual Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate day 10.08 0.00 0.00
Mazdoor skilled day 2.00 0.00 0.00
Mazdoor day 250.00 0.00 0.00
b) Machinery
Smooth wheeled roller 80-100 kN hour 45.00 0.00 0.00
@ 8 cumchasis
Truck per hourmounted water hour 24.00 0.00 0.00
c) tanker 6 kl capacity
Material ( Refer Tables 400.7, 8 & 9)
Aggregate
Grading II 63 mm to 45 mm @ cum 435.60 0.00 0.00
0.91 cum per 10 sqm for
compacted thickness of 75 mm
Stone Screening
Type B 11.2 mm for grading-II @ cum 96.01 0.00 0.00
0.20 cum per 10 sqm
Binding Material
Binding Material @ 0.06 cum per cum 28.80 0.00 0.00
10 sqm for grading II material

(Any one of the aggregate


grading,
Water screening and binding kl 144.00 0.00 0.00
d) Overheads @ 10.0% on (a+b+c) 0.00
e) Contractor’s profit @ 10% on (a+b+c+d) 0.00
Cost for 360 cum = a+b+c+d+e 0.00
Rate per cum = (a+b+c+d+e)/360 0.00
Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

4.7 405 Water Bound Macadam Sub-base / Base


Providing, laying, spreading and compacting
stone aggregates of specific sizes to water
bound macadam specification including
spreading in uniform thickness, hand
packing, rolling with three wheel 80-100 kN
static roller in stages to proper grade and
camber, applying and brooming, stone
screening/binding materials to fill-up the
interstices of coarse aggregate, watering and
compacting to the required density as per
Technical Specification Clause 405.

WBM Grade-3
(A) By Manual Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate day 10.08 0.00 0.00
Mazdoor skilled day 2.00 0.00 0.00
Mazdoor day 250.00 0.00 0.00
b) Machinery
Smooth wheeled roller 80-100 kN hour 45.00 0.00 0.00
@ 8 cumchasis
Truck per hourmounted water hour 24.00 0.00 0.00
c) tanker 6 kl
Material capacity
( Refer Tables 400.7, 8 & 9)
Aggregate
Grading 3 53 mm to 22.4 mm @ cum 435.60 0.00 0.00
0.91 cum per 10 sqm for
compacted thickness of 75 mm
Stone Screening
Type B 11.2 mm for grading-3 @ cum 86.40 0.00 0.00
0.18 cum per 10 sqm
Water kl 144.00 0.00 0.00
d) Overheads @ 10.0% on (a+b+c) 0.00
e) Contractor’s profit @ 10% on (a+b+c+d) 0.00
Cost for 360 cum = a+b+c+d+e 0.00
Rate per cum = (a+b+c+d+e)/360 0.00
Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

4.18 412 Brick Soling


Laying brick soling layer on prepared sub-
grade with brick on end edging according to
line , grade and cross- section shown on the
drawing filling joints with sand and earth ,
spreading 25 mm thick layer of earth over
brick soling , watering and rolling the same
with three wheeled road roller 80-100 KN.

Unit = sqm
Taking output = 150 sqm
a) Labour
Mate day 0.52 0.00 0.00
Mazdoor ( Unskilled ) day 10.00 0.00 0.00
Mason Ist Class day 3.00 0.00 0.00
b) Machinery
Three wheeled 80-100 kN static hour 1.00 0.00 0.00
roller.
Water Tanker hour 1.00 0.00 0.00
c) Materials
Brick Ist Class Each 8,160.00 0.00 0.00
Brick Ist Class on edging Each 1,100.00 0.00 0.00
Fine Sand cum 5.66 0.00 0.00
Earth cum 4.50 0.00 0.00
Water kl 6.00 0.00 0.00

d) Overheads @ 10.0% on (a+b+c) 0.00


e) Contractor’s profit @ 10% on (a+b+c+d) 0.00
Cost for 150 sqm = a+b+c+d+e 0.00
Rate per sqm = (a+b+c+d+e)/150 0.00
Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications

4.7 Less for using stone aggregates as obtained


from dismantling of existing WBM
pavement.
a) Material ( Refer Tables 400.7, 8 & 9)
Aggregate
Grading II 63 mm to 45 mm @ cum 435.60 0.00 0.00
b) 0.91 cum @per
Overheads 10 onsqm
10.0% (a) for 0.00
c) compacted
Contractor’s profit @ 10%mm
thickness of 75 on (a+b+c+d) 0.00
Cost for 360 cum = a+b+c+d+e 0.00
Rate per cum = (a+b+c+d+e)/360 0.00
Chapter – 3

EARTHWORK, EROSION CONTROL AND DRAINAGE

Sr. Reference to Description Unit Quantity Rate Total


No. MORD (Rs.) Amount (Rs.)
Specifications

3.1 301.4.1 Scarifying exiting granul surface to a depth of 50


mm and disposal of scarified material with a lift
upto 3 m and leads upto 1000 m as per Technical
Specification .
Unit = sqm
Taking output = 100 cum
a) Labour
Mate day 0.16 0.00 0.00
Mazdoor (Un skilled ) day 4.00 0.00 0.00
b) Machinery
Tractor with trolley hour 1.50 0.00 0.00
c) Overheads @ 10.0% on (a+b) 0.00
d) Contractor’s profit @ 10% on (a+b+c) 0.00
Rate for 100 cum = a+b+c+d 0.00
Rate per cum = (a+b+c+d)/100 0.00
Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

3.2 301.4 Scarifying the exiting bituminous road surface to


a depth of 150 mm and disposal of scarified
material with a lift upto 3 m and leads upto 1000
m as per Technical Specification .

Unit = sqm

Taking output = 100 cum

a) Labour
Mate day 0.16 0.00 0.00
Mazdoor (Un skilled ) day 4.00 0.00 0.00
b) Machinery
Tractor with trolley hour 1.50 550.00 825.00
Tractor with trolley hour 1.50 550.00 825.00
Tractor with trolley hour 1.50 550.00 825.00
c) Overheads @ 10.0% on (a+b) 247.50

d) Contractor’s profit @ 10% on (a+b+c) 272.25

Rate for 100 cum = a+b+c+d 2,994.75

Rate per cum = (a+b+c+d)/100 29.95


c) Material
Water kl 12.00 0.00 0.00
d) Overheads @ 10.0% on (a+b+c) 601.94
e) Contractor’s profit @ 10% on (a+b+c+d) 662.14
Rate for 100 cum = a+b+c+d+e 7,283.53
Rate per cum = (a+b+c+d+e)/100 72.84
Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

3.3 301.3.41 Construction of Embankment with Material


Obtained from Roadway Cutting

Construction of embankment with approved


materials deposited at site from roadway cutting and
excavation from drain and foundation of other
structures graded and compacted to meet
requirement of Table 300-1 and 300-2.

Unit = cum

Taking output = 100 cum

a) Labour

Mate day 0.02 0.00 0.00

Mazdoor day 0.50 0.00 0.00

b) Machinery

Dozer D-50 (90 HP) for spreading @ 200 hour 0.50 0.00 0.00
cum per hour

Motor grader for grading @ 200 cum per hour hour 0.50 0.00 0.00

Truck mounted water tanker 6 kl capacity hour 2.00 0.00 0.00

Smooth wheeled roller 80-100 kN @ 80 cum hour 1.25 0.00 0.00


per hour

c) Material

Water kl 12.00 0.00 0.00

d) Overheads @ 10.0% on (a+b+c) 0.00

e) Contractor’s profit @ 10% on (a+b+c+d) 0.00

Rate for 100 cum = a+b+c+d+e 0.00

Rate per cum = (a+b+c+d+e)/100 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

3.4 301.3.4.2 Embankment Construction with Material


Obtained from Borrow Pits

Construction of embankment with approved material


obtained from borrow pits with all lifts and leads,
transporting to site, spreading, grading to required
slope and compacting to meet requirement of Table
300-1 and 300-2.

Unit = cum

Taking output = 100 cum

a) Labour

Mate day 0.04 0.00 0.00

Mazdoor day 1.00 0.00 0.00

b) Machinery

Hydraulic excavator 1 cum bucket capacity @ hour 1.67 0.00 0.00


60 cum per hour

Tipper 5.5 cum with 10 t capacity t.km 4.50 0.00 0.00

Dozer D-50 (90 HP) for spreading @ 200 hour 0.50 0.00 0.00
cum per hour

Motor grader for grading @ 200 cum per hour hour 0.50 0.00 0.00

Truck mounted water tanker 6 kl capacity hour 2.00 0.00 0.00

Smooth wheeled roller 80-100 kN @ 80 cum hour 1.25 0.00 0.00


per hour

c) Material

Water kl 12.00 0.00 0.00

Compensation for earth taken from private cum 100.00 0.00 0.00
land
d) Overheads @ 10.0% on (a+b+c) 0.00

e) Contractor’s profit @ 10% on (a+b+c+d) 0.00

Cost for 100 cum = a+b+c+d+e 0.00

Rate per cum = (a+b+c+d+e)/100 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

3.5 302.3.3 (i) Excavation in Soil by Manual Means

Excavation for roadway in soil using manual


means for carrying of cut earth to
embankment site with all lifts and lead upto
50 m.

Unit = cum

Taking output = 120 cum

a) Labour

Mate day 1.80 0.00 0.00

Mazdoor day 45.00 0.00 0.00

b) Overheads @ 10.0% on (a) 0.00

c) Contractor’s profit @ 10% on (a+b) 0.00

Cost of 120 cum = a+b+c 0.00

Rate per cum = (a+b+c)/120 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

3.5 302.3.3 (ii) Excavation in Soil with Dozer with lead upto 100 m

Excavation for roadway in soil by mechanical


means including cutting and pushing the earth
to site of embankment upto a distance of 100
m, including trimming bottom and side slopes
in accordance with requirements of lines,
grades and cross-sections.

Unit = cum

Taking output = 180 cum

a) Labour

Mate day 0.08 0.00 0.00

Mazdoor day 2.00 0.00 0.00

b) Machinery

Dozer D-50 (90 HP) @ 50 cum per hour hour 3.60 0.00 0.00
(cutting with pushing)

c) Overheads @ 10.0% on (a+b) 0.00

d) Contractor’s profit @ 10% on (a+b+c) 0.00

Cost for 180 cum = a+b+c+d 0.00

Rate per cum = (a+b+c+d)/180 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

3.5+3.3 302 Embankment Construction with Material


Obtained from Borrow Pits with a lead upto
100m

Construction of embankment with approved material


obtained from borrow pits with all lifts and leads,
transporting to site, spreading, grading to required
slope and compacting to meet requirement of Table
300-1 and 300-2.

Unit = cum

Taking output = 180 cum

a) Labour

Mate day 0.08 0.00 0.00

Mazdoor day 2.00 0.00 0.00

b) Machinery

Dozer D-50 (90 HP) @ 50 cum per hour hour 3.60 0.00 0.00
(cutting with pushing)
Water tanker 6kl capacity hour 3.60 0.00 0.00

Three wheel 80-100 kn Static roller hour 2.25 0.00 0.00

c) Materials

Water KL 21.60 0.00 0.00

Compensation for earth taken from cum 180.00 0.00 0.00


private land
d) Overheads @ 10.0% on (a+b) 0.00

e) Contractor’s profit @ 10% on (a+b+c) 0.00

Cost for 180 cum = a+b+c+d 0.00

Rate per cum = (a+b+c+d)/180 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

3.12 309 Turfing with Sods

Furnishing and laying of the live sods of


perennial turf forming grass on embankment
slopes, verges or other locations shown on
embankment slope, verges or other locations
shown on the drawing or as directed by the
Unit = sqm
Engineer including preparation of ground,
fetching of sods and watering as per Technical
Taking outputClause
Specification = 100 sqm
309.

a) Labour

Mate day 0.12 0.00 0.00

Mazdoor ( Unskilled ) day 3.00 0.00 0.00

b) Machinery

Water tanker including watering hour 2.00 0.00 0.00


for 1 month
Tractor with Trolley hour 1.00 0.00 0.00

c) Materials

Farmyard manure @ 0.18 cum per cum 0.18 0.00 0.00


100 sqm at site of work
Water Kl 12.00 0.00 0.00

c) Overheads @ 10.0% on (a+b) 0.00

d) Contractor’s profit @ 10% on (a+b+c) 0.00

Cost for 100 sqm = a+b+c+d 0.00

Rate per m = (a+b+c+d)/100 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

3.14 303.1 Construction of Subgrade and Earthen Shoulders

Construction of subgrade and earthen shoulders with


approved material obtained from borrow pits with
all lifts and leads, transporting to site, spreading,
grading to required slope and compacted to meet
requirement of Table 300.2

Unit = cum

Taking output = 100 cum

a) Labour

Mate day 0.04 0.00 0.00

Mazdoor day 1.00 0.00 0.00

b) Machinery

Hydraulic excavator 1 cum bucket capacity hour 1.00 0.00 0.00


@ 60 cum per hour

Tipper 5.5 cum capacity with say 4 trip/hr t.km 4.50 0.00 0.00

Add 10 per cent of cost of carriage to cover


cost of loading and unloading

Dozer D-50 (90 HP) for spreading @ 200 hour 0.50 0.00 0.00
cum per hour

Motor grader for grading @ 200 cum per hour hour 0.50 0.00 0.00

Truck mounted water tanker with 6 km lead hour 2.00 0.00 0.00

Smooth wheeled roller 80-100 kN @ 70 cum hour 1.43 0.00 0.00


per hour

c) Material

Water kl 12.00 0.00 0.00

Compensation for earth taken from private cum 100.00 0.00 0.00
land

d) Overheads @ 10.0% on (a+b+c) 0.00

e) Contractors profit @ 10% on (a+b+c+d) 0.00

Cost for 100 cum = a+b+c+d+e 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

Rate per cum = (a+b+c+d+e)/100 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

3.19 307.2 (i) Surface Drains in Soil

Construction of unlined surface drains of


average cross-sectional area 0.40 sqm in soil
to specified lines, grades, levels and
dimensions to the requirement of Clause 307.
Excavated material to be used in embankment
within a lead of 50 m (average lead 25 m)

Unit = m

Taking output = 10 m

(B) Mechanical Means

a) Labour

Mate day 0.01 0.00 0.00

Mazdoor for dressing of bed and day 0.25 0.00 0.00


side of drain
b) Machinery

Hydraulic excavator 0.3 cum hour 0.11 0.00 0.00


bucket capacity @ 30 m per hour

c) Overheads @ 10.0% on (a+b) 0.00

d) Contractor’s profit @ 10% on (a+b+c) 0.00

Cost for 10 m = a+b+c+d 0.00

Rate per m = (a+b+c+d)/10 0.00


Chapter – 2

SITE CLEARANCE AND SETTING OUT

Sr. Reference to Description Unit Quantity Rate


No. MORD (Rs.)
Specifications

2.1 201.1 Clearing Grass and Removal of Rubbish

Clearing grass and removal of rubbish up to a


distance of 30 metres outside the periphery of
the area as per Technical Specification Clause
201.1.
By Manual Means

Unit = Hectare

Taking output = 1 Hectare

a) Labour

Mate day 1.60 0.00

Mazdoor ( Unskilled ) day 40.00 0.00

b) Overheads @ 10.0 % on (a)

c) Contractor’s profit @ 10 % on (a+b)

Rate per Hectare = a+b+c


Sr. Reference to Description Unit Quantity Rate
No. MORD (Rs.)
Specifications

2.2 201.1 Clearing and Grubbing Road Land

Clearing and grubbing road land including


uprooting wild vegetation, grass, bushes,
shrubs, saplings and trees of girth up to 300
mm, removal of stumps of such trees cut earlier
and disposal of unserviceable materials and
stacking of serviceable material to be used or
auctioned, upto a lead of 1000 metres including
removal and disposal of top organic soil not
exceeding 150 mm in thickness as per Technical
Specification Clause 201.1.

Unit = Hectare

Taking output = 1 Hectare

(I) By Manual Means

(A) In area of non-thorny jungle

a) Labour

Mate day 6.00 0.00

Mazdoor day 150.00 0.00

b) Machinery

50 H.P Tractor with trolley hour 1.00 0.00

c) Overheads @ 10 % on (a+b)

d) Contractor’s profit @ 10 % on (a+b+c)

Rate per Hectare = a+b+c+d


Sr. Reference to Description Unit Quantity Rate
No. MORD (Rs.)
Specifications

2.5 202.1 Dismantling of Structure

Dismantling of existing structures like culverts, bridges ,


retaining walls and other structure comprising of masonry ,
cement concrete , wood work , steel work , including T & P and
scaffolding wherever necessary , sorting the dismantled material ,
disposal of unserviceable material and stacking the unserviceable
material and stacking the serviceable material with all lifts and
lead of 1000 m as per Technical Specification.

By Manual Means.

Unit = cum

Taking output = 1.25

(B) Cement Concrete

a) Labour

Mate day 0.05 0.00

Mazdoor ( Unskilled ). day 1.25 0.00

b) Machinery

Tractor with trolley hour 0.27 0.00

c) Overheads @ 10% on (a+b)

d) Contractor’s profit @ 10 % on (a+b+c)

Cost for 1.25 cum = a+b+c+d

Rate per cum = (a+b+c+d) / 1.25


Sr. Reference to Description Unit Quantity Rate
No. MORD (Rs.)
Specifications

2.5 202.1 Dismantling of Structure

Dismantling of existing structures like culverts, bridges ,


retaining walls and other structure comprising of masonry ,
cement concrete , wood work , steel work , including T & P and
scaffolding wherever necessary , sorting the dismantled material ,
disposal of unserviceable material and stacking the unserviceable
material and stacking the serviceable material with all lifts and
lead of 1000 m as per Technical Specification.

By Manual Means.

Unit = cum

Taking output = 1.25

(C) Reinforced Cement Concrete

a) Labour

Mate day 0.05 0.00

Blacksmith. day 0.25 0.00

Mazdoor ( Unskilled ). day 3.50 0.00

b) Machinery

Tractor with trolley hour 0.27 0.00

c) Overheads @ 10% on (a+b)

d) Contractor’s profit @ 10 % on (a+b+c)

Cost for 1.25 cum = a+b+c+d

Rate per cum = (a+b+c+d) / 1.25


Sr. Reference to Description Unit Quantity Rate
No. MORD (Rs.)
Specifications

2.6 202.1 Dismantling Brick / Tile Work

Unit = cum

Taking output = 1.25

(B) Cement mortar

a) Labour

Mate day 0.03 0.00

Mazdoor for dismantling, loading day 0.75 0.00


and unloading
b) Machinery

50 H.P Tractor with trolley hour 0.27 0.00

c) Overheads @ 10% on (a+b)

d) Contractor’s profit @ 10 % on (a+b+c)

Cost for 1.25 cum = a+b+c+d

Rate per cum = (a+b+c+d) / 1.25


Sr. Reference to Description Unit Quantity Rate
No. MORD (Rs.)
Specifications

2.6 202.1 Dismantling Brick / Tile Work

Unit = cum

Taking output = 1.25

(D) Dry brick pitching or brick soiling

a) Labour

Mate day 0.014 0.00

Mazdoor for dismantling, loading day 0.350 0.00


and unloading

b) Machinery

50 H.P Tractor with trolley hour 0.27 0.00

c) Overheads @ 10% on (a+b)

d) Contractor’s profit @ 10 % on (a+b+c)

Cost for 1.25 cum = a+b+c+d

Rate per cum = (a+b+c+d) / 1.25


Sr. Reference to Description Unit Quantity Rate
No. MORD (Rs.)
Specifications

2.13 202.1 Removing all Type of Hume Pipes and


Stacking within a Lead of 1000 m including
Earthwork and Dismantling of Masonry
Works

Unit = m

Taking Output = 1m

(A) Upto 600 mm dia

a) Labour

Mate day 0.02 0.00

Mazdoor day 0.52 0.00

b) Overheads @ 10% on (a)

c) Contractor’s profit @ 10 % on (a+b)

Rate per m = a+b+c


Sr. Reference to Description Unit Quantity Rate
No. MORD (Rs.)
Specifications

2.13 202.1 Removing all Type of Hume Pipes and


Stacking within a Lead of 1000 m including
Earthwork and Dismantling of Masonry
Works

Unit = m

Taking Output = 1m

(B) Above 600 mm to 900 mm dia

a) Labour

Mate day 0.03 0.00

Mazdoor day 0.70 0.00

b) Overheads @ 10% on (a)

c) Contractor’s profit @ 10 % on (a+b)

Rate per m = a+b+c


Sr. Reference to Description Unit Quantity Rate
No. MORD (Rs.)
Specifications

2.13 202.1 Removing all Type of Hume Pipes and


Stacking within a Lead of 1000 m including
Earthwork and Dismantling of Masonry
Works

Unit = m

Taking Output = 1m

(C) Above 900 mm

a) Labour

Mate day 0.05 0.00

Mazdoor day 1.20 0.00

b) Overheads @ 10% on (a)

c) Contractor’s profit @ 10 % on (a+b)

Rate per m = a+b+c


Sr. Reference to Description Unit Quantity Rate
No. MORD (Rs.)
Specifications

2.14 202.3 Dismantling of Flexible Pavements

Dismantling of flexible pavements and disposal


of dismantled materials upto a lead of 100 m,
stacking serviceable and unserviceable
materials separately

Unit = cum

Taking Output = 1 cum

By Manual Means

(A) Bituminous Courses

a) Labour

Mate day 0.06 0.00

Mazdoor for dismantling, loading day 1.50 0.00


and unloading

b) Machinery

50 H.P Tractor with trolley hour 0.38 0.00

c) Overheads @ 10% on (a+b)

d) Contractor's profit @ 10% on (a+b+c)

Rate per cum = a+b+c+d


Sr. Reference to Description Unit Quantity Rate
No. MORD (Rs.)
Specifications

2.14 202.3 Dismantling of Flexible Pavements

Dismantling of flexible pavements and disposal


of dismantled materials upto a lead of 100 m,
stacking serviceable and unserviceable
materials separately

Unit = cum

Taking Output = 1 cum

By Manual Means

(B) Granular Courses

a) Labour

Mate day 0.04 0.00

Mazdoor for dismantling, loading day 1.00 0.00


and unloading

b) Machinery

50 H.P Tractor with trolley hour 0.33 0.00

c) Overheads @ 10% on (a+b)

d) Contractor's profit @ 10% on (a+b+c)

Rate per cum = a+b+c+d


Total
Amount (Rs.)

0.00

0.00

0.00

0.00

0.00
Total
Amount (Rs.)

0.00

0.00

0.00

0.00

0.00

0.00
Total
Amount (Rs.)

0.00

0.00

0.00

0.00

0.00

0.00

0.00
Total
Amount (Rs.)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
Total
Amount (Rs.)

0.00

0.00

0.00

0.00

0.00

0.00

0.00
Total
Amount (Rs.)

0.00

0.00

0.00

0.00

0.00

0.00

0.00
Total
Amount (Rs.)

0.00

0.00

0.00

0.00

0.00
Total
Amount (Rs.)

0.00

0.00

0.00

0.00

0.00
Total
Amount (Rs.)

0.00

0.00

0.00

0.00

0.00
Total
Amount (Rs.)

0.00

0.00

0.00

0.00

0.00

0.00
Total
Amount (Rs.)

0.00

0.00

0.00

0.00

0.00

0.00
Chapter – 1

LOADING, UNLOADING AND CARRIAGE OF MATERIALS

Sr. Reference to Description Unit Quantity Rate Total


No. MORD (Rs.) Amount (Rs.)
Specifications

1.1 (i) Loading of Lime, aggregate , Stone


Boulder, Brick aggaregate, Kankar,
Building Rubbish, Crushed Slag,
Stone for Masonry Work by manual
means including a lead upto 30 m.

Unit = cum

Taking output = 5.5 cum

a) Labour

Mate day 0.02 0.00 0.00

Mazdoor ( Unskilled) day 0.50 0.00 0.00

b) Machinery

Tipper hour 0.50 0.00 0.00

Cost for 5.5 cum = a+b+c+d 0.00

Rate per cum = (a+b+c+d)/5.5 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

1.10 Cost of Haulage excluding Loading & Unloading

Haulage of materials by tipper excluding cost


of loading , unloading and stacking.
Unit = t.km

Taking output 10 t load and lead 10 km = 100 t.km.

( i ) Surfaced Road

Speed with load: 25 km/hour

Speed while returning empty: 35 km/hour

a) Machinery

i) Tipper 10 t capacity

Time taken for onward haulage hour 0.40 0.00 0.00


with load
Time taken for empty return trip hour 0.29 0.00 0.00

Cost for 100 t km 0.00

Rate per t.km = a/100 0.00

Rate per cum per km = 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

1.10 Cost of Haulage excluding Loading & Unloading

Haulage of materials by tipper excluding cost


of loading , unloading and stacking.
Unit = t.km

Taking output 10 t load and lead 10 km = 100 t.km.

( ii ) Unsurfaced graveled Road

Speed with load: 20 km/hour

Speed while returning empty: 30 km/hour

a) Machinery

i) Tipper 10 t capacity

Time taken for onward haulage hour 0.50 0.00 0.00


with load
Time taken for empty return trip hour 0.33 0.00 0.00

Cost for 100 t km 0.00

Rate per t.km = a/100 0.00

Rate per cum per km = 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

1.10 Cost of Haulage excluding Loading & Unloading

Haulage of materials by tipper excluding cost


of loading , unloading and stacking.
Unit = t.km

Taking output 10 t load and lead 10 km = 100 t.km.

( iii ) Katcha Track & Track in river bed/ nallah bed and Choe Bed.

Speed with load: 10 km/hour

Speed while returning empty: 15 km/hour

a) Machinery

i) Tipper 10 t capacity

Time taken for onward haulage hour 1.00 0.00 0.00


with load
Time taken for empty return trip hour 0.670 0.00 0.00

Cost for 100 t km 0.00

Rate per t.km = a/100 0.00

Rate per cum per km = 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

1.16 Setting Out

(i) Reference benchmark

The rate analysis for a typical bench mark as


per Drawing 200.1.
1 . Excavation for structure earthwork in
excavation for foundations as per
drawing and technical specification
includin dressing of sides and bottom
and backfilling in ordinary soil

As per item No.11.1 of chapter 11 cum 0.325 0.00 0.00

2 . Plain cement concrete M10 ( 1:3:6)


nominal mix in levelling course below
open foundation as per drawing and
technical specification.

As per item No.11.4 of chapter 11 cum 0.10 0.00 0.00


3 . Brick masonaery work in cement mortar
in foundation complete excluding
pointing andNo.11.5
As per item plaster of
aschapter
per drawing
11 and cum 0.475 0.00 0.00
technical specification.
4 . Plastering with cement mortar 1:4 , 15
mm thick cement plaster on brick work
as per technical specification.
As per item No.12.3 of chapter 12 sqm 2.63 0.00 0.00

Add 5 per cent cost of items No.1 to 4 for white 0.00


washing , lettering and painting, etc.
Total 0.00

Rate for Each 0.00


Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

1.16 Setting Out

(i) Reference Pillar

The rate analysis for a typical bench mark as


per Drawing 200.1.
1 . Excavation for structure earthwork in
excavation for foundations as per
drawing andNo.11.1
As per item technical
of specification
chapter 11 cum 0.192 0.00 0.00
includin dressing of sides and bottom
2 . and
Plainbackfilling in ordinary
cement concrete M10 (soil
1:3:6)
nominal mix in levelling course below
open
As perfoundation as per
item No.11.4 drawing
of chapter 11and cum 0.06 0.00 0.00
technical specification.
3 . Brick masonaery work in cement mortar
in foundation complete excluding
pointing andNo.11.5
As per item plaster of
aschapter
per drawing
11 and cum 0.193 0.00 0.00
technical specification.
4 . Plastering with cement mortar 1:4 , 15
mm thick cement plaster on brick work
as
Asper
pertechnical specification.
item No.12.3 of chapter 12 sqm 1.50 0.00 0.00

Add 5 per cent cost of items No.1 to 4 for white 0.00


washing , lettering and painting, etc.

Total 0.00

Rate for Each 0.00


(B) Labour

Sl. No. Description of Labour Unit Rate (Rs.)

L-01 Blacksmith (2nd class) day


Blacksmith (1st class)/ Welder/ Plumber/
L-02 day
Electrician
L-03 Blaster (Stone Cutter) day

L-04 Carpenter (1st Class) day

L-05 Diver day

L-06 Fitter day

L-07 Mason (2nd Class) day

L-08 Mason (1st Class) day

L-09 Mate/Supervisor day

L-10 Mazdoor day

L-11 Mazdoor/Dresser( semi skilled ) day

L-12 Mazdoor/Dresser/Sinker( Skilled ) day

L-13 Operator (Grouting) day

L-14 Surveyor day *******

L-15 Bhisti day *******

L-16 Painter day *******


Chapter – 11
FOUNDATION
Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications

10.1 1701 Printing New Letters and Figures of any Shade.

Printing new letter and figures of any shade


with synthetic enamel paint black or any
other approved colour to give an even shade
as per drawing and Technical specification
Clause 1701.
Details for 100 letters of 160 mm height, i.e.,
1.6
i) m.Hindi
Unit = per cm height per letter
Taking output = 40 sqm
a) Labour
Mate day 0.12 0.00 0.00
Painter Ist class day 2.00 0.00 0.00
Mazdoor ( Unskilled ) day 1.00 0.00 0.00
b) Material
Paint litre 0.70 0.00 0.00
Cost for 1600 cm = a+b+c+d 0.00
Rate per cm height per letter = (a+b+c+d)/1600 0.00
10.5 1700 Painting Two Coats on New Concrete Surfaces
Painting two coats including primer coat after
filling the surface with synthetic enamel paint
in all shades on new plastered/ concrete
surfaces as per drawing and Technical
specification

Unit = sqm
Taking output = 40 sqm
a) Labour
Mate day 0.20 0.00 0.00
Painter ( Ist class ) day 3.00 0.00 0.00
Mazdoor ( Un skilled ) day 2.00 0.00 0.00
b) Material
Cement Primer as per specifications l 3.00 0.00 0.00
Paint conforming to requirement of l 6.00 0.00 0.00
Clause
Cost for 1701.3.8
40 sqm = a+b+c+d 0.00
Rate per sqm = (a+b+c+d)/40 0.00
11.1 305 Excavation for Structures
Earthwork in excavation for structures as per
drawing and technical specification including
setting out, construction of shoring and
bracing, removal of stumps and other
deleterious material, dressing of sides and
bottom and backfilling in trenches with
approved material.
I. Ordinary soil
(i) Upto 3 m depth
Unit = cum
Taking output = 10 cum
a) Labour
Mate day 0.32 0.00 0.00
Mazdoor day 8.00 0.00 0.00
Cost for 10 cum = a 0.00
Rate per cum = a/10 0.00
11.1 305 Excavation for Structures
Earthwork in excavation for structures as per
drawing and technical specification including
setting out, construction of shoring and
bracing, removal of stumps and other
deleterious material, dressing of sides and
bottom and backfilling in trenches with
approved material.

I. Ordinary soil
(ii) 3 m to 6 m depth
a) Labour
Mate day 0.38 0.00 0.00
Mazdoor day 9.50 0.00 0.00
Cost for 10 cum = a 0.00
Rate per cum = (a)/10 0.00
11.1 305 Excavation for Structures
Earthwork in excavation for structures as per
drawing and technical specification including
setting out, construction of shoring and
bracing, removal of stumps and other
deleterious material, dressing of sides and
bottom and backfilling in trenches with
approved material.

II. Ordinary rock (not requiring blasting)


0 to 3 m depth
Unit = cum
Taking output = 10 cum
a) Labour
Mate day 0.20 #NAME? #NAME?
Mazdoor day 5.00 #NAME? #NAME?
Cost for 10 cum = a+b+c #NAME?
Rate per cum = (a+b+c)/10 #NAME?
11.2 305 & 1203 Fillling in foundation trenches as per
drawing
I. and
Sand technical specification
filling
Unit = cum
a) Labour
Mate day 0.01 0.00 0.00
Mazdoor day 0.30 0.00 0.00
b) Material
Sand (assuming 20 per cent voids) cum 1.20 0.00 0.00
Rate per cum = (a+b) 0.00
11.4 802, 803, 1202 & Providing concrete for plain/reinforced
1203 concrete in open foundations complete as
per drawings and technical specification

I. P.C.C grade M-10


(i) Nominal mix 1:3:6
Unit = cum
a) Material
Cement t 0.250 0.00 0.00
Coarse sand cum 0.48 0.00 0.00
40 mm aggregate cum 0.576 0.00 0.00
20 mm aggregate cum 0.288 0.00 0.00
10 mm aggregate cum 0.10 0.00 0.00
b) Labour
Mate day 0.08 0.00 0.00
Mason day 0.10 0.00 0.00
Mazdoor day 1.63 0.00 0.00
Bhisti day 0.27 0.00 0.00
c) Machinery
Concrete mixer 0.4/0.28 cum hour 0.40 0.00 0.00
capacity
d) Formwork @ 4.0% on cost of 0.00
material, labour and
machinery (a+b+c)

Rate per cum = (a+b+c+d) 0.00


11.6 802, 803, 1202 & Providing concrete for plain/reinforced
1203 concrete in open foundations complete as
per drawings and technical specification

I. P.C.C grade M-10


(ii) Nominal mix 1:3.6 (Hand mixing)
Unit = cum
a) Material
Cement t 0.228 #NAME? #NAME?
Coarse sand cum 0.48 #NAME? #NAME?
40 mm aggregate cum 0.576 #NAME? #NAME?
20 mm aggregate cum 0.288 #NAME? #NAME?
10 mm aggregate cum 0.10 #NAME? #NAME?
b) Labour
Mate day 0.09 #NAME? #NAME?
Mason day 0.10 #NAME? #NAME?
Mazdoor day 2.00 #NAME? #NAME?
Bhisti day 0.27 #NAME? #NAME?
c) Formwork @ 4% on cost of #NAME?
material (a) and labour (b)
Rate per cum = (a+b+c+d+e) #NAME?
11.6 802, 803, 1202 & Providing concrete for plain/reinforced
1203 concrete in open foundations complete as
per drawings and technical specification

II. P.C.C grade M-15


(i) Nominal mix (1:2.5:5)
Unit = cum
a) Material
Cement t 0.275 0.00 0.00
Coarse sand cum 0.48 0.00 0.00
40 mm aggregate cum 0.48 0.00 0.00
20 mm aggregate cum 0.24 0.00 0.00
10 mm aggregate cum 0.08 0.00 0.00
b) Labour
Mate day 0.08 0.00 0.00
Mason day 0.10 0.00 0.00
Mazdoor day 1.63 0.00 0.00
Bhisti day 0.27 0.00 0.00
c) Machinery
Concrete mixer 0.4/0.28 cum hour 0.40 0.00 0.00
capacity
d) Formwork @ 4% on cost of 0.00
material, labour and
machinery (a+b+c)

Rate per cum = (a+b+c+d) 0.00


11.5 600 , 1202 , 1203 Cement Mortar

(i) 1:3 ( 1 Cement : 3 Coarse Sand )


Unit = cum
a) Material
Cement t 0.510 0.00 0.00
Coarse sand cum 1.05 0.00 0.00
b) Labour
Mate day 0.04 0.00 0.00
Mazdoor ( Unskilled ) day 0.90 0.00 0.00
Bhisti day 0.08 0.00 0.00
Rate per cum = (a+b) 0.00
11.5 600 , 1202 , 1203 Cement Mortar

(ii) 1:4 ( 1 Cement : 4 Coarse Sand )


Unit = cum
a) Material
Cement t 0.380 0.00 0.00
Coarse sand cum 1.05 0.00 0.00
b) Labour
Mate day 0.04 0.00 0.00
Mazdoor ( Unskilled ) day 0.90 0.00 0.00
Bhisti day 0.08 0.00 0.00
Rate per cum = (a+b) 0.00
12.5 802, 804, 805, Plain/reinforced cement concrete in
806, 807, 1202 & substructure complete as per drawings and
1204 technical specification

I. P.C.C grade M-15


Unit = cum
a) Material
Cement t 0.275 0.00 0.00
Coarse sand cum 0.480 0.00 0.00
40 mm aggregate cum 0.480 0.00 0.00
20 mm aggregate cum 0.240 0.00 0.00
10 mm aggregate cum 0.080 0.00 0.00
b) Labour
Mate day 0.08 0.00 0.00
Mason day 0.10 0.00 0.00
Mazdoor day 1.63 0.00 0.00
Bhisti day 0.27 0.00 0.00
c) Machinery
Concrete mixer 0.4/0.28 cum hour 0.40 0.00 0.00
capacity
d) Formwork @ 10.0% on cost of 0.00
material, labour and
machinery (a+b+c)

Rate per cum = (a+b+c+d) 0.00


12.6 1002, 1005, 1010, Supply, fitting and Placing HYSD bar
& 1202 reinforcement ( Fe 415 ) in substucture
complete as per drawings and technical
specification.

Unit = t
a) Material
HYSD bars including 5 per t 1.050 0.00 0.00
cent overlaps wastage
Binding wire kg 6.000 0.00 0.00
b) Labour
Mate day 0.34 0.00 0.00
Blacksmith day 0.10 0.00 0.00
Mazdoor ( Unskilled ) day 1.63 0.00 0.00
Rate per t = (a+b) 0.00

Rate per Kg = Rate per t / 1000 0.00


Rate at Rate (Rs.) at
Sl. No. Description Unit
Quarry/Source Site

M-01 Stone boulder of size 150 mm and below at Cruser Plant cum

M-02 Coarse sand at Site cum

M-03 Fine sand at Site cum

M-04 Moorum at Site Cum

M-05 Gravel/Quarry spall at Site Cum


Fly ash conforming to IS: 3812 ( Part II & I) atHMP Plant /
M-06 cum
Batching Plant / Crushing Plant
Filter media/Filter Material as per Table 300-3 (MoRT&H
M-07 cum
Specification)
M-08 Grade-I ( Aggregates 90 mm to 45 mm ) cum

M-09 Grade-II ( Aggregates 63 mm to 45 mm ) cum

M-10 Grade-III ( Aggregates 53 mm to 22.4 mm ) cum

M-11 8 mm to 10 mm ( Graded ) cum

M-12 10 mm to 20 mm cum

M-13 6 mm ( Ungraded ) cum

M-14 26.5mm ( Passing through 45mm & retained on 22.4mm) cum

M-15 22.4mm ( Passing through 26.5mm & retained on 13.2mm) cum

M-16 13.2mm ( Passing through 26.4mm & retained on 13.2mm) cum

M-17 11.2mm ( Passing through 13.2mm & retained on 6.7mm) cum

M-18 6.7mm ( Passing through 11.2mm & retained on 2.8mm) cum

M-19 Fine aggregate stone dust cum

M-20 Screening Type A ( 13.2mm) to confirm M.O.S.T. table 400.8 cum

M-21 Screening Type B ( 11.2mm) to confirm M.O.S.T. table 400.8 cum

M-22 Local Sand screened at source FM upto 1.5 cum

M-23 Binding Material ( Cost same as Local sand ) cum

M-24 Bitumen primer tonne

M-25 Bitumen sealant litre

M-26 Jute rope m


Rate at Rate (Rs.) at
Sl. No. Description Unit
Quarry/Source Site

M-27 Debonding strips m

M-28 Polythene sheet m

M-29 Plasticizer m

M-30 Joint filler board 20mm thick as per IS : 1838 sqm

Sl. No. Description Unit Rate (Rs.)

M-58 Alluminium Paint


litre
M-72 Binding Wire
Kg
M-74 Bitumen ( 60-70 grade )
Tonne
M-77 Bitumen ( Emulsion )
Tonne
M-81 Cement
Tonne
M-82 Cold twisted bars( HYSD Bars )
Tonne
M-90 Curing Compound
litre
M-92 Earth Cost or compensation for earth taken from private land
cum
Galvanised steel wire crates of mesh size 100 mm x 100 mm woven with
M-102
4mm dia. GI wire in rolls of required size. Kg
M-126 Mild steel bars
Tonne
M-131 Paint
litre
M-141 Pre moulded Joint filler,25 mm thick for expansion joint. sqm

M-149 RCC Pipe NP-3 heavy duty non presure pipe 1000 mm dia
Metre
M-150 RCC Pipe NP-3 heavy duty non presure pipe 1200 mm dia
Metre
M-151 RCC Pipe NP-3 heavy duty non presure pipe 300 mm dia
Metre
RCC Pipe NP-3 heavy duty non presure pipe 600 mm dia
Metre
M-164 Separation Membrane of impermeable plastic sheeting 125 micron thick
sqm
M-179 Sructural steel
Tonne
M-188 Unstaked Lime
Tonne
M-189 Water
KL
M-190 Cement Primer
litre
Rate at Rate (Rs.) at
Sl. No. Description Unit
Quarry/Source Site

M-191 Brick
1000Nos
M-192 Farmyard Manure
cum
d3

d4

d6

*****

*****

*****

*****
*****

*****

*****

*****

******
******

******
Chapter - 15

USAGE RATES OF PLANT & MACHINERY

Description of Output of Machine Usage Rates in Rs.


Sr. No.
Machine Activity Unit Output Unit

Supplying compressed
T&P-001 Air Compressor 210 cfm cfm 170 / 250 Per hr.
air

Batching and Mixing Plant (a) 30


T&P-002 Concrete Mixing cum/hour 20.00 Per hr.
cum capacity

Batching and Mixing Plant (a)


T&P-003 Concrete Mixing cum/hour 13.00 Per hr.
15-20 cum capacity

Applying bitumen tack


T&P-004 Bitumen pressure distributor sqm/hr 1750.00 Per hr.
coat

T&P-005 Bitumen Boiler oil fired Bitumen Spraying Litre 1500.00 Per hr.

Concrete Paver Finisher with Paving of concrete


T&P-006 cum/hr 20.00 Per hr.
40HP Motor. surface
Concrete Pump of 45 & 30 cum
T&P-007 Pumping of concrete cum/hr 33 / 22 Per hr.
capacity.

T&P-008 Cocrete Bucket For Pouring concrete cum 1 Per hr.

Cocrete Mixer (a) 0.40 / 0.28


T&P-009 Concrete Mixing cum/hr 2.5 Per hr.
cum

T&P-010 Cocrete Mixer (b) 1.00 cum Concrete Mixing cum/hr 7.5 Per hr.

T&P-011 Crane (b) 80 tonnes Lifting Purpose Per hr.

T&P-012 Crane (b) 35 tonnes Lifting Purpose Per hr.

T&P-013 Crane (c) 3 tonnes Lifting Purpose Per hr.

Spreading/ Cutting/ 200 /120/


T&P-015 Dozer D-50-A 15 cum/hr Per hr.
Clearing 150

Applying Emulsion
T&P-016 Emulsion Pressure Distributor sqm/hr 1750.00 Per hr.
Primer/ Tack Coat
Front End Loader 1 cum bucket Soil / Aggregate
T&P-017 cum/hr 60 / 25 Per hr.
capacity Loading

Generation of Electric
T&P-018 Generator 125 KVA KVA 100.00 Per hr.
Energy

Generation of Electric
T&P-019 Generator 63 KVA KVA 100.00 Per hr.
Energy

Hydraulic Excavator of 1 cum Soil ordinary /Soil


T&P-026 cum/hr 60 /60/ 60 Per hr.
bucket Marshy / Soil

Hydraulic Excavator of 0.90 cum


T&P-026A Marshy / Soil unsuitable cum/hr 60 /60/ 60 Per hr.
bucket

T&P-029 Kerb Casting Machine Kerb Making Rm/hr 80.00 Per hr.

T&P-030 Mastic Cooker Mastic Wearing Coat Tonne 1 Per hr.

T&P-031 Mechanical Broom Hydraulic Surface cleaning sqm/hr 1250.00 Per hr.

cleaning/ Spreading/ 200 /200 /


T&P-032 Motor Grader with 3.35 m blade cum/hr Per hr.
GSB/WBM 50 /50

Mixing and Laying Slurry


T&P-033 Mobile slurry seal equipment sqm/hr 2700.00 Per hr.
seal

Paver Finisher Mechanical 100 Paving of WBM / Paving


T&P-035 cum/hr 40 / 30 Per hr.
TPH of DLC

0.75 m dia to 1.2 m


T&P-036 Piling rig with Bentonite pump Rm/hr 2 to 3 Per hr.
Boring

Prestressing Jack with Pump & Stressing of steel wires /


T&P-040 Per hr.
Access stands

T&P-041 Ripper Scarifying cum/hr 60.00 Per hr.

T&P-042 Rotavator Scarifying cum/hr 25.00 Per hr.

T&P-043 Road Marking machine Road Marking sqm/hr 100.00 Per hr.

Smooth Wheeled 8 Tonne Rolling of Aspalt


T&P-045 cum/hour 30.00 Per hr.
Roller Surface
Transportation of Soil,
T&P-048 Tipper 5 cum GSB,WBM. Hotmix cum 5.50 Per hr.
etcmaterials

Transportation of
T&P-049 Transit Mixer 4.0 / 4.5 cum cum/hr 4.50 Per hr.
Concrete Mix to site

Transportation of
T&P-051 Transit Mixer 3.0 cum cum/hr 3.00 Per hr.
Concrete Mix to site

T&P-053 Tractor Pulling HP 50.00 Per hr.

Rate of Tractor +
T&P-054 Tractor with Rotevator Per hr.
Rotevatot

T&P-055 Tractor with Ripper Rate of Tractor + Ripper Per hr.

T&P-060 Water tanker water Transport KL 6.00 Per hr.

Mixing and Laying Slurry


T&P-061 Mixall 6-10t capacity KL 6.00 Per hr.
seal
SL. NO. Description of Machine Unit

T&P-063 Air Compressor with pneumatic chisel attachment for cutting hard clay Per hr.
Batch type cold mixing plant 100-120 TPH capacity producing an average output of 75 tonne
T&P-064 Per hr.
per hour
T&P-067 Cement concrete batch mix plant @ 175 cum per hour ( effective output) Per hr.

T&P-068 Cement concrete batch mix plant @ 75 cum per hour Per hr.

T&P-069 Cold milling machine @ 20cum per hour Per hr.

T&P-070 Crane 5 tonne capacity Per hr.

T&P-071 Crane 10 tonne capacity Per hr.

T&P-072 Crane 15 tonne capacity Per hr.

T&P-073 Crane 20 tonne capacity Per hr.

T&P-074 Crane 40 tonne capacity Per hr.

T&P-075 Crane with grab 0.75 cum capacity Per hr.

T&P-077 Drum mix plant for cold mixes of appropriate capacity but not less than 75 tonnes per hour Per hr.

T&P-079 Generator 33 KVA Per hr.

T&P-080 Generator 100 KVA Per hr.

T&P-081 Generator 250 KVA Per hr.

T&P-083 Joint cutting machine with 2-3 blades ( for rigid pavement ) Per hr.

T&P-086 Plate Compactor Per hr.

T&P-093 Wet Mix Plant 100 TPH Per hr.

T&P-094 Wet Mix Plant 75 TPH Per hr.


T&P-095 Needle/Screed/Plate Vibrator/concrete joint cutting machine Per hr.
T&P-096 Jack hammer 25 kg with tractor Per hr.
Usage Rates in Rs.

Rate
Rate

400.00

1600.00

3359.00

1440.00

600.00

550.00

550.00

550.00

550.00

825.00

825.00

777.00

240.00

450.00

1125.00

150.00

200.00

777.00

777.00
150.00
400.00
h5

h5

h7

h8

h14
h26
*****
*****
*****