Rate Analysis
Rate Analysis
MAINTENANCE OF ROADS
A. Manual Means
Unit = cum
a) Labour
b) Machinery
c) Materials
Making up loss of
material/irregularities on shoulders
to the design level by adding fresh
approved soil and compacting it
with appropriate equipment
Unit = sqm
a. Labour
b. Machinery
c. Material
Unit = sqm
b. Machinery
Unit = cum
a) Labour
b) Machinery
Bottom = 187.5
Total = 215.77
Wt of Bitumen = 1.082
Unit = sqm
a) Labour
b) Machinery
Unit = sqm
Taking output = 200 sqm
a) Labour
Mate day 0.80 0.00 0.00
Mazdoor ( Unskilled ) day 20.00 0.00 0.00
b) Machinery
c) Material
Bitumen for tack coat @ 3kg per tonne 0.06 0.00 0.00
10 sqm 200 x 3 / 10 = 60 kg
say 0.00
Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications
Unit = sqm
a) Labour
Mate day 0.64 #NAME? #NAME?
Mazdoor day 16.00 #NAME? #NAME?
b) Machinery
Concrete mixer 0.4 / 0.28 cum hour 2.50 0.00 0.00
capacity
Air compressor 210 CFM with hour 2.00 0.00 0.00
tractor
Emulsion pressur distributor hour 2.00 Err:509 Err:509
Unit = sqm
Taking output = 14.06 cum
a) Labour
Mate day 0.80 0.00 0.00
Mazdoor ( Unskilled ) day 20.00 0.00 0.00
b) Machinery
Air compressor 210 cfm with hour 2.00 550.00 1,100.00
tractor
Bitumen pressure distributor hour 2.00 550.00 1,100.00
Mixall 6/10t capacity hour 2.00 0.00 0.00
Smooth wheel roller 80-100 kn hour 4.00 0.00 0.00
c) Material
Bitumen for tack coat @ 3kg per tonne 0.06 0.00 0.00
10 sqm 200
Bitumen forx 3pre-mix
/ 10 = 60 kg @ tonne
carpet 0.292 0.00 0.00
14.60 kg for
Bitumen perseal
10 coat
sqm @ = 6.8
200kg x tonne 0.136 0.00 0.00
per 10 sqm
Crushed stone chipping @ 0.27 cum 5.40 0.00 0.00
cum per 10 sqm
Crushed sand passing 2.36 mm cum 1.20 0.00 0.00
d) sieve and charges
Overhead retained on 180
@ 10.0% on a+b+c 220.00
e) Contractor profit @10% on a+b+c+d 242.00
Cost for 200 sqm = a+b+c+d+e 2,662.00
Rate per sqm = a+b+c+d+e/200 13.31
say 13.00
Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications
a) Labour
a) Labour
b) Material
a) Labour
b) Material
a) Labour
Unit = 1 km
a) Labour
b) Material
a) Labour
Unit=Each
a) Labour
Unit = sqm
a) Labour
PROTECTION WORKS
Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications
Unit = cum
a) Material
b) Labour
Unit = cum
a) Material
b) Labour
I. Stone/Boulder
Unit = cum
a) Material
b) Labour
(Rate as per item No. 11.7 II (i)/ II (ii) cum 1.00 Err:509 Err:509
except that the size of aggregate shall
be 20 mm & down
Unit = cum
a) Material
b) Labour
Unit = cum
c) Material
Stone cum 1.00 0.00 0.00
d) Labour
Unit = cum
a) Material
b) Labour
Add 1 per cent of (b) for trimming and preparation of base 0.00
SUPERSTRUCTURE
13.3 1000 Supply, fitting and Placing HYSD bar
reinforcement ( Fe 415 ) in substucture
complete as per drawings and technical
specification.
Unit = t
a) Material
Unit = t
a) Material
SUBSTRUCTURE
12.2 613.3 & 1204 Pointing with cement mortar (1:3) on brickwork
as per technical specification
Unit = 10 sqm
a) Material
Cement mortar 1.3 (Rate as in item 11.5. I) cum 0.03 0.00 0.00
b) Labour
Unit = 10 sqm
a) Material
Cement mortar 1:4 (Rate as in item 11.5 II ) cum 0.240 0.00 0.00 M-081
b) Labour
Unit = cum
a) Material
b) Labour
Unit = cum
a) Material
b) Labour
Unit = cum
a) Material
Unit = cum
a) Material
Unit = cum
a) Material
Unit = cum
a) Material
b) Labour
Unit = cum
a) Material
Unit = cum
a) Material
b) Labour
Unit = cum
a) Material
Unit = cum
a) Material
b) Labour
Unit = cum
a) Material
b) Labour
Unit = cum
a) Material
b) Labour
Unit = cum
Unit = cum
Unit = cum
Unit = cum
Unit = cum
Unit = cum
Unit = T
a) Material
Unit = Nos
a) Material
AC pipe 100 mm dia i/c wastage @ 5 per m 31.50 #NAME? #NAME? M-049
cent. Average length of weep hole is taken
as one metre for the purpose of estimating
Cement mortar 1:3 (For rate refer to item cum 0.05 #NAME? #NAME? M-081
11.5 I)
b) Labour
Unit = cum
I) Granular material
a) Material
b) Labour
Unit = cum
Unit = cum
a) Material
b) Labour
Unit = cum
a) Material
b) Labour
Mazdoor for filling, watering, ramming etc. day 9.00 #NAME? #NAME? L-18
a) Labour
b) Material
Unit = Nos
a) Material
AC pipe 100 mm dia i/c wastage of 5 per m 0.63 #NAME? #NAME? M-049
cent 600 mm long upto the bottom of
levelling course
Filter media base with stone aggregate 0.5 cum 0.25 0.00 0.00 M-004
m x 0.5 m area 1 m deep
b) Labour
FOUNDATION
I. Ordinary soil
Unit = cum
a) Labour
I. Ordinary soil
(ii) 3 m to 6 m depth
a) Labour
I. Sand filling
Unit = cum
a) Labour
b) Material
Unit = cum
a) Material
b) Labour
c) Machinery
Unit = cum
a) Material
b) Labour
c) Machinery
Unit = cum
a) Material
b) Labour
c) Machinery
Unit = cum
a) Material
b) Labour
c) Machinery
Unit = cum
a) Material
b) Labour
c) Machinery
Unit = cum
a) Material
b) Labour
Unit = sqm
Taking output = 40 sqm
a) Labour
Mate day 0.20 0.00 0.00
Painter day 3.00 0.00 0.00
Mazdoor day 2.00 0.00 0.00
b) Material
Unit = each
f) Labour
Say RS 0.00
Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications
Unit = each
f) Labour
g) Machinery
Say RS 0.00
Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications
Unit = each
f) Labour
g) Machinery
Say RS 0.00
Sr. Reference to Description Unit Quantity Rate Total
No. MORD (Rs.) Amount (Rs.)
Specifications
Unit = each
e) Labour
f) Machinery
g) Material
Say RS 0.00
Chapter – 9
PIPE CULVERTS
Unit = m
a) Labour
b) Material
Unit = m
a) Labour
b) Material
Unit = m
a) Labour
b) Material
HILL ROADS
Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications
As per Chapter 2
Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications
Unit = 1km
Unit = cum
a) Labour
Unit = cum
a) Labour
Mazdoor for trimming slopes and day 6.00 #NAME? #NAME? L-18
helping in excavation, etc.
b) Machinery
Dozer D-50 (90 HP) @ 43.28 cum per hour 6.00 0.00 0.00 PM-007
hour
Tipper 5.5 cum capacity, 4 trips per hour 12.00 Err:509 Err:509 PM-035
hour
Unit = cum
a) Labour
Unit = cum
a) Labour
b) Machinery
Dozer D-50 (90 HP) @ 28.32 cum per hour 6.00 0.00 0.00 PM-007
hour
Tipper 5.5 cum capacity, 4 trips per hour 7.00 Err:509 Err:509 PM-035
hour
8.5 1600 / 300 Excavation in Hilly Areas in Hard Rock requiring blasting
Unit = cum
a) Labour
b) Machinery
Dozer D-50 (90 HP) @ 28.32 cum per hour hour 6.00 0.00 0.00 PM-007
Air compressor 250 cfm with two jack hour 5.00 0.00 0.00 PM-001
hammer @ 20 cum per hour
Tipper 5.5 cum capacity, 4 trips per hour hour 7.00 Err:509 Err:509 PM-035
c) Materials
Unit = cum
Unit = cum
Unit = cum
Unit = cum
Unit = cum
Unit = cum
Unit = cum
Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications
Drainage
Unit = 1 m
Unit = 1 m
Unit = 1 m
Unit = 1 m
Unit = 1 m
Unit = 1 m
Unit = 1 m
Unit = 1 m
Unit = 1 m
Unit = 1 m
Unit = 1 m
Unit = 1 m
Unit = 1 m
Taking output = 6 m
(a) As per plate No. 7.27 of Rural Road cum 115.00 0.00
Manual
Rate as per item No.11.1(i to iv) of Chapter 11
Unit = 1 m
Taking output = 6 m
a) Labour
b) Materials
Unit = 1 m
Taking output = 6 m
a) Labour
b) Materials
Unit = 1 m
Taking output = 6 m
a) Labour
b) Materials
Unit = cum
Unit = t
Unit = sqm
Unit = 1 m
a) Labour
b) Materials
45 x 0.500 = 22.50
Unit = sqm
a) Labour
Mazdoor for preparation of ground and day 3.00 #NAME? #NAME? L-18
fetching of sods
b) Machinery
Water tanker including watering for 3 hour 2.00 Err:509 Err:509 PM-044
months
c) Materials
Unit = sqm
a) Labour
b) Machinery
c) Materials
Sludge/Farm yard manure @ 0.18 cum cum 0.43 #NAME? #NAME? M-174
per 100 sqm
Jute netting, open weave, 2.5 cm square sqm 264.00 #NAME? #NAME? M-126
opening
Reference to Total
Sr. Rate
MORD Description Unit Quantity Amount
No. (Rs.)
Specifications (Rs.)
Unit = cum
7.2 800 Plain cement concrete 1:3:6 nominal mix in foundation with
crushed stone aggregate 40 mm nominal size mechanically
mixed, placed in foundation and compacted by vibration
including curing for 14-days.
Unit = cum
7.3 600 (i) Brick Masonry Work in Cement Mortar 1:4 in Foundation
complete excluding Pointing and Plastering, as per
Drawing and Technical Specifications
Unit = cum
Unit = cum
OR
Reference to Total
Sr. Rate
MORD Description Unit Quantity Amount
No. (Rs.)
Specifications (Rs.)
7.3 702, 704, (ii) Stone masonry work in cement mortar in foundation
1202 & 1203 complete as per drawing and technical specification
Unit = cum
Unit = cum
Unit = cum
Unit = cum
7.6 800 / 1700 Construction of RCC guide post of 25 cm dia M-15 grade cast-
in-situ with 20 mm nominal size aggregate, true to line and
grade, tolerance of vertical RCC post not to exceed 1 in 500,
centre spacing between vertical post not to exceed 2000 mm,
including two coats of painting.
Unit = cum
7.6 800 / 1700 Construction of RCC guide post of 25 cm dia M-15 grade cast-
in-situ with 20 mm nominal size aggregate, true to line and
grade, tolerance of vertical RCC post not to exceed 1 in 500,
centre spacing between vertical post not to exceed 2000 mm,
including two coats of painting.
Unit = t
7.6 800 / 1700 Construction of RCC guide post of 25 cm dia M-15 grade cast-
in-situ with 20 mm nominal size aggregate, true to line and
grade, tolerance of vertical RCC post not to exceed 1 in 500,
centre spacing between vertical post not to exceed 2000 mm,
including two coats of painting.
Unit = sqm
Unit = m
7.8 300 Back Filling with Sand in Foundation Trenches as per Drawing
& Technical Specifications
Unit = cum
Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications
Unit = cum
a) Labour
b) Machinery
(i) Concrete mixer 0.2 cum capacity (6 hour 36.00 0.00 0.00
mixers) with weigh batcher and
suitable capacity calibrated water
tank
c) Material
(ii) Sand as per IS:383 and conforming cum 33.75 0.00 0.00
to Clause 1500.2.4.2 @ 0.45
cum/cum of concrete.
(v) 25 mm dia mild steel bars of grade tonne 0.1176 0.00 0.00
S 240. 500 mm long 20 Nos. at
culvert/bridge slab and at
construction joint including 5 per
cent wastage.
Joint filler board 20mm thick as per sqm 3.00 0.00 0.00
IS:1838
( 4x3.75x0.20 = 3 sqm )
Say Rs 77.30
Chapter – 5
Unit = sqm
a) Labour
b) Machinery
c) Material
Unit = sqm
a) Labour
b) Machinery
By Manual Means
Type A
Unit = sqm
a) Labour
b) Machinery
Oil fired bitumen boiler 1000 l capacity hour 6.00 0.00 0.00
fitted with spray set
c) Material
Type-A
By Manual Means
Type B
Unit = sqm
a) Labour
b) Machinery
Oil fired bitumen boiler 1000 l capacity hour 6.00 0.00 0.00
fitted with spray set
Smooth wheeled roller 80-100 kN hour 6.00 0.00 0.00
c) Material
Type-B
Type A
Unit = sqm
a) Labour
b) Machinery
Front end loader 1 cum bucket capacity hour 6.00 0.00 0.00
Type-A
* Bitumen @ 22 kg per 10 sqm t 8.80 0.00 0.00
Stone crushed aggregates 11.2 mm to cum 108.00 0.00 0.00
0.09 mm @ 0.27 cum per 10 sqm
Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications
4.1 401 Granular Sub-base with Close Graded Material (Table 400.1)
Unit = cum
a) Labour
b) Machinery
c) Material
WBM Grade-2
(A) By Manual Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate day 10.08 0.00 0.00
Mazdoor skilled day 2.00 0.00 0.00
Mazdoor day 250.00 0.00 0.00
b) Machinery
Smooth wheeled roller 80-100 kN hour 45.00 0.00 0.00
@ 8 cumchasis
Truck per hourmounted water hour 24.00 0.00 0.00
c) tanker 6 kl capacity
Material ( Refer Tables 400.7, 8 & 9)
Aggregate
Grading II 63 mm to 45 mm @ cum 435.60 0.00 0.00
0.91 cum per 10 sqm for
compacted thickness of 75 mm
Stone Screening
Type B 11.2 mm for grading-II @ cum 96.01 0.00 0.00
0.20 cum per 10 sqm
Binding Material
Binding Material @ 0.06 cum per cum 28.80 0.00 0.00
10 sqm for grading II material
WBM Grade-3
(A) By Manual Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate day 10.08 0.00 0.00
Mazdoor skilled day 2.00 0.00 0.00
Mazdoor day 250.00 0.00 0.00
b) Machinery
Smooth wheeled roller 80-100 kN hour 45.00 0.00 0.00
@ 8 cumchasis
Truck per hourmounted water hour 24.00 0.00 0.00
c) tanker 6 kl
Material capacity
( Refer Tables 400.7, 8 & 9)
Aggregate
Grading 3 53 mm to 22.4 mm @ cum 435.60 0.00 0.00
0.91 cum per 10 sqm for
compacted thickness of 75 mm
Stone Screening
Type B 11.2 mm for grading-3 @ cum 86.40 0.00 0.00
0.18 cum per 10 sqm
Water kl 144.00 0.00 0.00
d) Overheads @ 10.0% on (a+b+c) 0.00
e) Contractor’s profit @ 10% on (a+b+c+d) 0.00
Cost for 360 cum = a+b+c+d+e 0.00
Rate per cum = (a+b+c+d+e)/360 0.00
Reference to
Sr. Rate Total
MORD Description Unit Quantity
No. (Rs.) Amount (Rs.)
Specifications
Unit = sqm
Taking output = 150 sqm
a) Labour
Mate day 0.52 0.00 0.00
Mazdoor ( Unskilled ) day 10.00 0.00 0.00
Mason Ist Class day 3.00 0.00 0.00
b) Machinery
Three wheeled 80-100 kN static hour 1.00 0.00 0.00
roller.
Water Tanker hour 1.00 0.00 0.00
c) Materials
Brick Ist Class Each 8,160.00 0.00 0.00
Brick Ist Class on edging Each 1,100.00 0.00 0.00
Fine Sand cum 5.66 0.00 0.00
Earth cum 4.50 0.00 0.00
Water kl 6.00 0.00 0.00
Unit = sqm
a) Labour
Mate day 0.16 0.00 0.00
Mazdoor (Un skilled ) day 4.00 0.00 0.00
b) Machinery
Tractor with trolley hour 1.50 550.00 825.00
Tractor with trolley hour 1.50 550.00 825.00
Tractor with trolley hour 1.50 550.00 825.00
c) Overheads @ 10.0% on (a+b) 247.50
Unit = cum
a) Labour
b) Machinery
Dozer D-50 (90 HP) for spreading @ 200 hour 0.50 0.00 0.00
cum per hour
Motor grader for grading @ 200 cum per hour hour 0.50 0.00 0.00
c) Material
Unit = cum
a) Labour
b) Machinery
Dozer D-50 (90 HP) for spreading @ 200 hour 0.50 0.00 0.00
cum per hour
Motor grader for grading @ 200 cum per hour hour 0.50 0.00 0.00
c) Material
Compensation for earth taken from private cum 100.00 0.00 0.00
land
d) Overheads @ 10.0% on (a+b+c) 0.00
Unit = cum
a) Labour
3.5 302.3.3 (ii) Excavation in Soil with Dozer with lead upto 100 m
Unit = cum
a) Labour
b) Machinery
Dozer D-50 (90 HP) @ 50 cum per hour hour 3.60 0.00 0.00
(cutting with pushing)
Unit = cum
a) Labour
b) Machinery
Dozer D-50 (90 HP) @ 50 cum per hour hour 3.60 0.00 0.00
(cutting with pushing)
Water tanker 6kl capacity hour 3.60 0.00 0.00
c) Materials
a) Labour
b) Machinery
c) Materials
Unit = cum
a) Labour
b) Machinery
Tipper 5.5 cum capacity with say 4 trip/hr t.km 4.50 0.00 0.00
Dozer D-50 (90 HP) for spreading @ 200 hour 0.50 0.00 0.00
cum per hour
Motor grader for grading @ 200 cum per hour hour 0.50 0.00 0.00
Truck mounted water tanker with 6 km lead hour 2.00 0.00 0.00
c) Material
Compensation for earth taken from private cum 100.00 0.00 0.00
land
Unit = m
Taking output = 10 m
a) Labour
Unit = Hectare
a) Labour
Unit = Hectare
a) Labour
b) Machinery
c) Overheads @ 10 % on (a+b)
By Manual Means.
Unit = cum
a) Labour
b) Machinery
By Manual Means.
Unit = cum
a) Labour
b) Machinery
Unit = cum
a) Labour
Unit = cum
a) Labour
b) Machinery
Unit = m
Taking Output = 1m
a) Labour
Unit = m
Taking Output = 1m
a) Labour
Unit = m
Taking Output = 1m
a) Labour
Unit = cum
By Manual Means
a) Labour
b) Machinery
Unit = cum
By Manual Means
a) Labour
b) Machinery
0.00
0.00
0.00
0.00
0.00
Total
Amount (Rs.)
0.00
0.00
0.00
0.00
0.00
0.00
Total
Amount (Rs.)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
Amount (Rs.)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
Amount (Rs.)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
Amount (Rs.)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
Amount (Rs.)
0.00
0.00
0.00
0.00
0.00
Total
Amount (Rs.)
0.00
0.00
0.00
0.00
0.00
Total
Amount (Rs.)
0.00
0.00
0.00
0.00
0.00
Total
Amount (Rs.)
0.00
0.00
0.00
0.00
0.00
0.00
Total
Amount (Rs.)
0.00
0.00
0.00
0.00
0.00
0.00
Chapter – 1
Unit = cum
a) Labour
b) Machinery
( i ) Surfaced Road
a) Machinery
i) Tipper 10 t capacity
a) Machinery
i) Tipper 10 t capacity
( iii ) Katcha Track & Track in river bed/ nallah bed and Choe Bed.
a) Machinery
i) Tipper 10 t capacity
Total 0.00
Unit = sqm
Taking output = 40 sqm
a) Labour
Mate day 0.20 0.00 0.00
Painter ( Ist class ) day 3.00 0.00 0.00
Mazdoor ( Un skilled ) day 2.00 0.00 0.00
b) Material
Cement Primer as per specifications l 3.00 0.00 0.00
Paint conforming to requirement of l 6.00 0.00 0.00
Clause
Cost for 1701.3.8
40 sqm = a+b+c+d 0.00
Rate per sqm = (a+b+c+d)/40 0.00
11.1 305 Excavation for Structures
Earthwork in excavation for structures as per
drawing and technical specification including
setting out, construction of shoring and
bracing, removal of stumps and other
deleterious material, dressing of sides and
bottom and backfilling in trenches with
approved material.
I. Ordinary soil
(i) Upto 3 m depth
Unit = cum
Taking output = 10 cum
a) Labour
Mate day 0.32 0.00 0.00
Mazdoor day 8.00 0.00 0.00
Cost for 10 cum = a 0.00
Rate per cum = a/10 0.00
11.1 305 Excavation for Structures
Earthwork in excavation for structures as per
drawing and technical specification including
setting out, construction of shoring and
bracing, removal of stumps and other
deleterious material, dressing of sides and
bottom and backfilling in trenches with
approved material.
I. Ordinary soil
(ii) 3 m to 6 m depth
a) Labour
Mate day 0.38 0.00 0.00
Mazdoor day 9.50 0.00 0.00
Cost for 10 cum = a 0.00
Rate per cum = (a)/10 0.00
11.1 305 Excavation for Structures
Earthwork in excavation for structures as per
drawing and technical specification including
setting out, construction of shoring and
bracing, removal of stumps and other
deleterious material, dressing of sides and
bottom and backfilling in trenches with
approved material.
Unit = t
a) Material
HYSD bars including 5 per t 1.050 0.00 0.00
cent overlaps wastage
Binding wire kg 6.000 0.00 0.00
b) Labour
Mate day 0.34 0.00 0.00
Blacksmith day 0.10 0.00 0.00
Mazdoor ( Unskilled ) day 1.63 0.00 0.00
Rate per t = (a+b) 0.00
M-01 Stone boulder of size 150 mm and below at Cruser Plant cum
M-12 10 mm to 20 mm cum
M-29 Plasticizer m
M-149 RCC Pipe NP-3 heavy duty non presure pipe 1000 mm dia
Metre
M-150 RCC Pipe NP-3 heavy duty non presure pipe 1200 mm dia
Metre
M-151 RCC Pipe NP-3 heavy duty non presure pipe 300 mm dia
Metre
RCC Pipe NP-3 heavy duty non presure pipe 600 mm dia
Metre
M-164 Separation Membrane of impermeable plastic sheeting 125 micron thick
sqm
M-179 Sructural steel
Tonne
M-188 Unstaked Lime
Tonne
M-189 Water
KL
M-190 Cement Primer
litre
Rate at Rate (Rs.) at
Sl. No. Description Unit
Quarry/Source Site
M-191 Brick
1000Nos
M-192 Farmyard Manure
cum
d3
d4
d6
*****
*****
*****
*****
*****
*****
*****
*****
******
******
******
Chapter - 15
Supplying compressed
T&P-001 Air Compressor 210 cfm cfm 170 / 250 Per hr.
air
T&P-005 Bitumen Boiler oil fired Bitumen Spraying Litre 1500.00 Per hr.
T&P-010 Cocrete Mixer (b) 1.00 cum Concrete Mixing cum/hr 7.5 Per hr.
Applying Emulsion
T&P-016 Emulsion Pressure Distributor sqm/hr 1750.00 Per hr.
Primer/ Tack Coat
Front End Loader 1 cum bucket Soil / Aggregate
T&P-017 cum/hr 60 / 25 Per hr.
capacity Loading
Generation of Electric
T&P-018 Generator 125 KVA KVA 100.00 Per hr.
Energy
Generation of Electric
T&P-019 Generator 63 KVA KVA 100.00 Per hr.
Energy
T&P-029 Kerb Casting Machine Kerb Making Rm/hr 80.00 Per hr.
T&P-031 Mechanical Broom Hydraulic Surface cleaning sqm/hr 1250.00 Per hr.
T&P-043 Road Marking machine Road Marking sqm/hr 100.00 Per hr.
Transportation of
T&P-049 Transit Mixer 4.0 / 4.5 cum cum/hr 4.50 Per hr.
Concrete Mix to site
Transportation of
T&P-051 Transit Mixer 3.0 cum cum/hr 3.00 Per hr.
Concrete Mix to site
Rate of Tractor +
T&P-054 Tractor with Rotevator Per hr.
Rotevatot
T&P-063 Air Compressor with pneumatic chisel attachment for cutting hard clay Per hr.
Batch type cold mixing plant 100-120 TPH capacity producing an average output of 75 tonne
T&P-064 Per hr.
per hour
T&P-067 Cement concrete batch mix plant @ 175 cum per hour ( effective output) Per hr.
T&P-068 Cement concrete batch mix plant @ 75 cum per hour Per hr.
T&P-077 Drum mix plant for cold mixes of appropriate capacity but not less than 75 tonnes per hour Per hr.
T&P-083 Joint cutting machine with 2-3 blades ( for rigid pavement ) Per hr.
Rate
Rate
400.00
1600.00
3359.00
1440.00
600.00
550.00
550.00
550.00
550.00
825.00
825.00
777.00
240.00
450.00
1125.00
150.00
200.00
777.00
777.00
150.00
400.00
h5
h5
h7
h8
h14
h26
*****
*****
*****