6012 - Creating UPSC Forms
6012 - Creating UPSC Forms
PROJECT REPORT ON
ROLL NO : 12113
CLASS : XII
PGT (CS)
1
Central Academy School
Udaipur DIST
Rajasthan
CERTIFICATE
This is to certify that Cadet Pratyush Jain Roll No: 12113 has
INFORMATION SYSTEM in the subject Computer Science (083) laid down in the
(Krishnakant Sharma)
PGT Comp Sci
2
Master IC
Examiner:
Name: _______________
Signature:
TABLE OF CONTENTS [ T O C ]
01 ACKNOWLEDGEMENT 04
02 INTRODUCTION 05
04 PROPOSED SYSTEM 06
07 FLOW CHART 15
08 SOURCE CODE 16
3
09 OUTPUT 19
10 TESTING 20
12 BIBLIOGRAPHY 24
ACKNOWLEDGEMENT
Apart from the efforts of me, the success of any project depends largely on
the encouragement and guidelines of many others. I take this opportunity to express
my gratitude to the people who have been instrumental in the successful completion
of this project.
I express deep sense of gratitude to almighty God for giving me strength for
the successful completion of the project.
4
I am overwhelmed to express my thanks to The Administrative Officer for
providing me an infrastructure and moral support while carrying out this project in the
school.
The guidance and support received from all the members who contributed
and who are contributing to this project, was vital for the success of the project. I am
grateful for their constant support and help.
INTRODUCTION
This programme helps the users to add a UPSC registration details of particular
student, After feeding information this programme automatically generates a
registration Number and displays it. The user can use the registration number to
view their registered details. This programme can be used only if the Login ID and
the Password is correct by doing so we enforce security and restriction of
unauthorised access.
The objective of this project is to let the students apply the programming
knowledge into a real- world situation/problem and exposed the students how
5
4. Students will demonstrate a breadth of knowledge in computer science, as
PROPOSED SYSTEM
Today one cannot afford to rely on the fallible human beings of be really
wants to stand against today’s merciless competition where not to wise saying “to
err is human” no longer valid, it’s out-dated to rationalize your mistake. So, to keep
pace with time, to bring about the best result without malfunctioning and greater
One has to use the data management software. Software has been an ascent
markets, which have helped in making the organizations work easier and efficiently.
Data management initially hadto maintain a lot of ledgers and a lot of paperwork has
to be done but now software producton this organization has made their work
fasterand easier. Now only this software has to beloaded on the computer and work
can be done.
6
This prevents a lot of time and money. Thework becomes fully automated and
any information regarding the organization can beobtained by clicking the button.
7
Software developmentprojects typically include initiation, planning,design,
development, testing, implementation,and maintenance phases. However, the
phasesmay be divided differently depending on theorganization involved.
For example, initialproject activities might be designated asrequest,
requirements-definition, and planningphases, or initiation, concept-development,and
planning phases. End users of the systemunder development should be involved
inreviewing the output of each phase to ensurethe system is being built to deliver the
neededfunctionality.
INITIATION PHASE
8
Careful oversight is required to ensure projects support strategic business
objectives and resources are effectively implemented into an organization's
enterprise architecture. The initiation phase begins when an opportunity to add,
improve, or correct a system is identified and formally requested through the
presentation of a business case. The business case should, at a minimum, describe
a proposal’s purpose, identify expected benefits, and explain how the proposed
system supports one of the organization’s business strategies. The business case
should also identify alternative solutions and detail as many informational, functional,
and network requirements as possible.
9
software components, or the decision to use an incremental delivery versus a
complete, onetime deployment.
Construction of executable prototypes is encouraged to evaluate technology
to support the business process. The System Boundary Document serves as
an important reference document to support the Information Technology
Project Request (ITPR) process.
The ITPR must be approved by the State CIO before the project can move
forward.
PLANNING PHASE
10
gathered during the initiation phase by further identifying the specificactivities and
resources required to complete a project.
REQUIREMENTSANALYSIS PHASE
This phase formally defines the detailed functional user requirements using
high-level requirements identified in the Initiation, System Concept, and Planning
phases. It also delineates the requirements in terms of data, system performance,
security, and maintainability requirements for the system. The requirements are
defined in this phase to a level of detail sufficient for systems design to proceed.
They need to be measurable, testable, and relate to the business need or
opportunity identified in the Initiation Phase. The requirements that will be used to
determine acceptance of the system are captured in the Test and Evaluation Master
Plan.
Further define and refine the functional and data requirements and document
them in the Requirements Document,
Complete business process reengineering of the functions to be supported
(i.e., verify what information drives the business process, what information is
11
generated, who generates it, where does the information go, and who
processes it),
Develop detailed data and process models (system inputs, outputs, and the
process.
Develop the test and evaluation requirements that will be used to determine
acceptable system performance.
DESIGN PHASE
12
Allocating processes to resources.
Preparing detailed logic specifications for each software module. The result is
a draft System Design Document which captures the preliminary design for
the system.
Everything requiring user input or approval is documented and reviewed by
the user. Once these documents have been approved by the Agency CIO and
Business Sponsor, the final System Design Document is created to serve as
the Critical/Detailed Design for the system.
This document receives a rigorous review by Agency technical and functional
representatives to ensure that it satisfies the business requirements.
Concurrent with the development of the system design, the Agency Project
Manager begins development of the Implementation Plan, Operations and
Maintenance Manual, and the Training Plan.
DEVELOPMENT PHASE
13
Subsystem integration, system, security, and user acceptance testing is
conducted during the integration and test phase. The user, with those
responsible for quality assurance, validates that the functional requirements,
as defined in the functional requirements document, are satisfied by the
developed or modified system. OIT Security staff assesses the system
security and issue a security certification and accreditation prior to
installation/implementation.
Testing as a deployed system with end users working together with contract
personnel
IMPLEMENTATION PHASE
This phase is initiated after the system has been tested and accepted by the
user. In this phase, the system is installed to support the intended business
functions. System performance is compared to performance objectives established
during the planning phase. Implementation includes user notification, user training,
installation of hardware, installation of software onto production computers, and
integration of the system into daily work processes. This phase continues until the
system is operating in production in accordance with the defined user requirements.
14
OPERATIONS AND MAINTENANCE PHASE
START
conn=sql.connect(host='local
host',user='root',passwd='co
mputer',database='UPSC')
c1=conn.cursor()
us=input("user")
pa=input("pass") 15
c1.execute("insert into login_info
values('"+us+"','"+pa+"')")
conn.commit()
STOP
START
conn=sql.connect(host='localhost',user='root'
,passwd='computer',database='UPSC')
c1=conn.cursor()
16
STOP
START
conn=sql.connect(host='localhost',user
='root',passwd='computer',database='
UPSC')
c1=conn.cursor()
dat=c1.fetchall()
if (user,passwd) in dat:
FALSE
TRUE
17
print("$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$ UPSC REGISTARATION$$$$$$$$$$$$$$$$$$
$$$$$$$$$$$$")
c1.execute("select
print("1:ADD DETAILS")* from registration_information")
v_data=c1.fetchall()
print("2:VIEW DETAILS")
v_count=len(v_data)
v_reg_no=(v_count+1)
print("3:QUIT")
v_ea=input("Enter the examination applied--")
v_yr=input("Enter the year--")
v_name=input("Enter your name--")
v_gen=input("Enter your gender--")
v_dob=input("Enter your date of birth--")
v_f_na=input("Enter you father name--")
ch=int(input("Enter the choice--"))
v_m_na=input("Enter your mother name--")
v_nat=input("Enter your nationality--")
v_mar_st=input("Enter your marital staus--")
v_comm=input("Enter your if ch==1:
community--")
FALSE
v_min=input("Do you belong to minority--")
v_add1=input("Enter address line1--")
v_add2=input("Enter address line2--")
v_add3=input("Enter address line3--")
v_dist=input("Enter your district--") TRUE
v_state=input("Enter your state--")
v_pin=input("Enter your pin code--")
v_pho=input("Enter your phone number--")
v_mob=input("Enter your mobile number--")
v_ema=input("Enter your mail ID--")
v_edu=input("Enter your education qualification--")
c1.execute(v_sql)
conn.commit() 18
v_pre=input("Enter your preferance--")
print(v_sql)
c1.execute(v_sql)
conn.commit()
elif ch==2:
FALSE
TRUE
19
reg=int(input("Enter the registartion number"))
c1.execute(v_ch)
data=c1.fetchone()
print('\n')
print("Registration no--",data[26])
print("District --",data[14])
print("State --",data[15])
print("Phone no --",data[17])
print("Mobile no--",data[18])
print("Education_qualification--",data[20])
print("Aadhar no --",data[0])
print("Preferance --",data[21])
20
elif ch==3
FALSE
TRUE
print("QUITTING!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!")
else :
FALSE
TRUE
STOP
21
SOURCE CODE
conn=sql.connect(host='localhost',user='root',passwd='computer
',database='UPSC')
#if conn.is_connected():
#print('connected sucessfully')
c1=conn.cursor()
varchar(11),date_of_birth varchar(10),nationality
varchar(15),marital_status varchar(10),community
22
(10),e_mail varchar(45),education_qualification varchar
(3),aadhar_no bigint)")
conn=sql.connect(host='localhost',user='root',passwd='computer
',database='UPSC')
#if conn.is_connected():
#print('connected sucessfully')
c1=conn.cursor()
#print(v_sql)
#c1.execute(v_sql)
us=input("user")
pa=input("pass")
print(v_sq)
c1.execute(v_sq)
conn.commit()
23
# for getting info, showing info
conn=sql.connect(host='localhost',user='root',passwd='computer
',database='UPSC')
#if conn.is_connected():
#print('connected sucessfully')
c1=conn.cursor()
dat=c1.fetchall()
if (user,passwd) in dat:
print("$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$ UPSC
REGISTARATION$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$")
print("1:ADD DETAILS")
print("2:VIEW DETAILS")
24
print("3:QUIT")
if ch==1:
c1.execute("select * from
registration_information")
v_data=c1.fetchall()
v_count=len(v_data)
v_reg_no=(v_count+1)
25
v_pho=input("Enter your phone number--")
qualification--")
School--")
values
("+v_aadh+","+"'"+v_f_na+"'"+","+"'"+v_m_na+"','"+v_ea+"',"+v_
yr+",'"+v_gen+"','"+v_dob+"','"+v_nat+"','"+v_mar_st+"','"+v_c
omm+"','"+v_min+"','"+v_add1+"','"+v_add2+"','"+v_add3+"','"+v
_dist+"','"+v_state+"',"+v_pin+","+v_pho+","+v_mob+",'"+v_ema+
"','"+v_edu+"','"+v_pre+"','"+v_p_f+"','"+v_stu_sa+"','"+v_son
_mil+"','"+v_name+"',"+str(v_reg_no)+")")
print(v_sql)
number is--",v_reg_no)
c1.execute(v_sql)
26
conn.commit()
elif ch==2:
print('\n')
where reg_no="+str(reg))
c1.execute(v_ch)
data=c1.fetchone()
print('\n',"registration no--",data[26],'\n')
print("Name --",data[25],'\n')
print("Nationality --",data[7],'\n')
print("Marital status--",data[8],'\n')
print("Community--",data[9],'\n')
print("Minority --",data[10],'\n')
print("District --",data[14],'\n')
print("State --",data[15],'\n')
27
print("Phone no --",data[17],'\n')
print("Mobile no--",data[18],'\n')
print("Education_qualification--",data[20],'\n')
print("Aadhar no --",data[0],'\n')
print("Preferance --",data[21],'\n')
print("Belong to sainik\miltary
school--",data[23],'\n')
miltary school--",data[24],'\n')
elif ch==3:
print("QUITTING!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!"
else :
28
OUTPUT
# adding details
29
#Viewing detail
30
TESTING
31
, with respect to the context in which it is intended to operate. Software Testing also
provides an objective, independent view of the software to allow the business to
appreciate and understand the risks at implementation of the software. Test
techniques include, but are not limited to, the process of executing a program or
application with the intent of finding software bugs.
It can also be stated as the process of validating and verifying that a software
program/application/product meets the business and technical requirements that
guided its design and development, so that it works as expected and can be
implemented with the same characteristics. Software Testing, depending on the
testing method employed, can be implemented at any time in the development
process, however the most test effort is employed after the requirements have been
defined and coding process has been completed.
TESTING METHODS
Software testing methods are traditionally divided into black box testing and
white box testing. These two approaches are used to describe the point of view that
a test engineer takes when designing test cases.
SPECIFICATION-BASED TESTING
32
ADVANTAGES AND DISADVANTAGES
The black box tester has no "bonds" with the code, and a tester's perception
is very simple: a code must have bugs. Using the principle, "Ask and you shall
receive," black box testers find bugs where programmers don't. But, on the other
hand, black box testing has been said to be "like a walk in a dark labyrinth without a
flashlight," because the tester doesn't know how the software being tested was
actually constructed.
That's why there are situations when (1) a black box tester writes many test
cases to check something that can be tested by only one test case, and/or (2) some
parts of the back end are not tested at all. Therefore, black box testing has the
advantage of "an unaffiliated opinion," on the one hand, and the disadvantage of
"blind exploring," on the other.
White box testing, by contrast to black box testing, is when the tester has
access to the internal data structures and algorithms (and the code that implement
these)
33
White box testing methods can also be used to evaluate the completeness of
a test suite that was created with black box testing methods. This allows the software
team to examine parts of a system that are rarely tested and ensures that the most
important function points have been tested.
34
I.OPERATING SYSTEM : WINDOWS 7 AND ABOVE
SOFTWARE REQUIREMENTS:
I. Windows OS
II. Python
III. MySQL
35
BIBLIOGRAPHY
***
36