Common-Prequalification Checklist
Common-Prequalification Checklist
1. Project Details
Project Name Project Number
Client
Client Name
Representative
Lead Design
Consultancy Consultancy
Project
Main contractor
management
2. Contract Details
Letter of acceptance Letter of tender Specification Contract Dwg BOQ
3. Subcontractor
Item of work
Subcontractor Name
GENERAL INFORMATION
a) Prequalification Submittal should be submitted in minimum 3 Set
b) Prequalification should be in a File with dividers and the first page
1 I
should be the Index Page.
c) Prequalification is not a technical submittal, which has to be done
separately, if required along with samples.
Scanned soft copy of the complete submittal in a CD or equivalent
2 C
means
ISO certification (If the company is ISO certified). Certifying consultant name & Expiry date
a) ISO 9001:2007(Quality management system)
5 b) ISO 14000: Environment management system O
c) BS OHSAS 18001 :Occupational health & safety
management system)
15 QA/QC System L
16 HSE system L
17 Method Statement L
5. Additional comments.
Additions comments by reviewing officer/ engineer:
6. Summary result.
Compliance Technical
officer engineer Received by TE
Signature Received by CO
Decision
Reviewed by
name
Transmittal to
site on
Return this PQF to
Subcontractor/Purchase ☐
Date
Days taken for
review
Forward this PQF to
Consultant ☐